# DOMINION ENERGY QUESTAR PIPELINE, LLC — Warning Letter

- **operation:** document
- **citation:** CPF 520131008W
- **title:** DOMINION ENERGY QUESTAR PIPELINE, LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-07-25
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.616(b), 192.616(c), 192.616(c)(i), 192.616(f), 192.616(g).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131008w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131008w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131008w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520131008W
**body:**

Warning Letter involving DOMINION ENERGY QUESTAR PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 192.616(b),  192.616(c),  192.616(c)(i),  192.616(f),  192.616(g). The case was opened on 2013-07-25 and is reported as closed as of 2013-07-25. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520131008W_Warning Letter_07252013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131008W/520131008W_Warning%20Letter_07252013.pdf

520131008W_Warning Letter_07252013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131008W/520131008W_Warning%20Letter_07252013_text.pdf

520131008W_Warning Letter_07252013_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 25, 2013
Mr. Alan Bradley
President
Questar Pipeline Company
333 South State Street
Salt Lake City, UT 84111-2302
CPF 5-2013-1008W
Dear Mr. Bradley:
On November 28-29, 2012, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), the Arizona Corporation Commission, the Idaho Public Utilities
Commission, the Utah Department of Commerce, and the Wyoming Public Service Commission
pursuant to Chapter 601 of 49 United States Code, inspected Questar Pipeline Company’s and
Questar Gas Company’s (Questar) procedures for its Public Awareness Program required under
49 C.F.R. §192.616. Total combined pipeline mileage for these pipeline systems is 114,552
miles.
As a result of the inspection, it appears that Questar has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the
probable violations are:
1. §192.616 Public Awareness
(b) The operator's program must follow the general program recommendations of
API RP 1162 and assess the unique attributes and characteristics of the operator's
pipeline and facilities. Per API RP 1162 Section 2.7 and Section 4 the
communications should include enough information so that in the event of a pipeline
emergency, the intended audience will know how to identify a potential hazard,
protect themselves, notify emergency response personnel, and notify the pipeline
operator.



Questar has not provided key emergency response information, specifically outreach
communications, to the stakeholders near storage facilities and critical valves. Questar’s Public
Awareness Program (PAP) lists all of the operator’s gas and storage fields but does not
communicate relevant safety information concerning gas and storage fields to the potentially
affected residents. Furthermore, references to the unique attributes and characteristics of these
facilities were not provided in Questar’s Public Awareness Plans.
2. § 192.616 Public Awareness
(f) The program and the media used must be as comprehensive as necessary to
reach all areas in which the operator transports gas. Per API RP 1162 Section 2.2,
Section 3 and Appendix B.1.1 For the sub-groups Residents located along
transmission pipeline ROW and Places of Congregation, it is recommended that
transmission pipeline operators provide communications within a minimum
coverage area distance of 660 feet on each side of the pipeline, or as much as 1000
feet in some cases. The transmission pipeline operator should tailor its
communications coverage area (buffer) to fit its particular pipeline, location, and
potential impact consequences.
The distances for its communication coverage areas were not calculated or verified by Questar.
Questar listed minimum communication distances per API 1162 recommendations without
verifying that 660 feet is adequate. Questar needs to document a method to confirm their
distances are adequate to cover potentially impacted parties.
3. § 192.616 Public Awareness
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety.
(i) The operator's program documentation and evaluation results must be available
for periodic review by appropriate regulatory agencies.
Per API RP 1162 Section 8, 8.1 A secondary purpose for Public Awareness Program
evaluation is to demonstrate to company management and regulators, for pipelines
subject to federal or state pipeline safety jurisdiction, the status and validity of the
operator’s Public Awareness Programs.
Questar did not have procedures or document how they determine a statistical sample size and
margin-of-error for performing Public Awareness Program Effectiveness Evaluations (PAPEEs)
when using stakeholder surveys. Questar PAP, Part 5.4.8, also did not specify that the reviews
would be performed annually. In addition, Questar did not have written documentation that the
required effectiveness evaluations would be conducted on a set periodic cycle.
4. § 192.616 Public Awareness
(g) The program must be conducted in English and in other languages commonly
understood by a significant number and concentration of the non-English speaking
population in the operator's area. Per API 1162 Section 2.3.1 Regulations require
pipeline operators to establish continuing education programs to enable the public,
2



appropriate government organizations, and persons engaged in excavation-related
activities to recognize a pipeline emergency and to report it to the operator and/or
the fire, police, or other appropriate public officials. The programs are to be
provided in both English and in other languages commonly used by a significant
concentration of non-English speaking population along the pipeline.
Questar or their contractor, Paradigm, did not document their process for determining whether
there was a significant Spanish speaking population along the pipeline. In addition, Questar’s
PAPs did not specify how Questar determines whether there are other areas along the ROW
where non-English was the primary spoken language.
5. §192.616 Public Awareness
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety. Per API RP 1162 Section 4.4 Communicating periodically
with local emergency officials is an important aspect of all Public Awareness
Programs. Operators should provide a summary of emergency preparedness
information to local public officials and should indicate that detailed information
has been provided to emergency response agencies in their jurisdictions.
In Section 3, Questar did not have a procedure stating how they follow up with Emergency
Responders that do not attend their Paradigm/PAPA Emergency Responder meetings. Questar
did not have any documentation verifying that the Emergency Responders have adequate and
proper resources to respond to a pipeline emergency. Questar did not document how
information was provided to those emergency responders that did not attend the operator’s
training and information sessions.
6. §192.616 Public Awareness
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety. Per API RP 1162 Section 8.3
(i) The operator's program documentation and evaluation results must be available
for periodic review by appropriate regulatory agencies. Per API RP 1162 Section
8.3 The operator should complete an annual audit or review of whether the program
has been developed and implemented according to the guidelines in this RP. The
purpose of the audit is to answer the following two questions:
Has the Public Awareness Program been developed and written to address the
objectives, elements and baseline schedule as described Section 2 and the remainder
of this Recommended Practice? Has the Public Awareness Program been
implemented and documented according to the written program?
3



Questar did not document the occurrence of annual reviews between 2007 thru 2011. Questar
developed a form for recording annual reviews but it appears they performed only one annual
review on 10/31/2012. Even though Questar worked with Paradigm and PAPA to acquire public
awareness review data, Questar did not have specific annual review documentation. Questar now
has a process to ensure annual reviews and Public Awareness Programs (PAPs) changes are
made and documented. Regardless, Questar did not document these changes in their written
PAPs from 2006 to 2011.
7. §192.616 Public Awareness
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety. Per API RP 1162 Section 8.4.1 This is a basic measurement
indicating whether the operator’s public awareness messages are getting to the
intended stakeholders. A baseline evaluation program should establish a
methodology to track the number of individuals or entities reached within an
intended audience (e.g., households, excavating companies, local government, and
local first responder agencies). Additionally, this measure should estimate the
percentage of the stakeholders actually reached within the target geographic region
along the pipeline. This measurement will help to evaluate the effectiveness of the
delivery methods used.
Paradigm determined the statistical size and margin of error per Section 1.06 of Questar’s
PAPs. However, Questar did not document this in their procedures in Section 1.06 of their
PAPs.
8. §192.616 Public Awareness
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety. Per API RP 1162 Section 8.4.2 This measure would assess
the percentage of the intended stakeholder audience that understood and retained
the key information in the message received. This measurement will help to
evaluate the effectiveness of the delivery media and the message style and content.
This measurement will also help to assess the effectiveness of the delivery methods
used.
Questar did not provide a process for verifying they assessed the percentage of intended
stakeholder audience that understood and retained the key information provided. Questar also
did not have a process or document how they are going to pretest the delivery media message and
content.
4



9. §192.616 Public Awareness
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety. Per API RP 1162 Section 8.4.3 This measure is aimed at
determining whether appropriate prevention behaviors have been learned and is
taking place when needed and whether appropriate response or mitigation
behaviors would occur and have taken place. This is a measure of learned and, if
applicable, actual reported behavior.
Questar did not specify how they determined whether appropriate prevention behaviors have
been learned and are taking place when needed.
10. §192.616 Public Awareness
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety. Per API RP 1162 Section 8.4.4 One measure of the bottom-
line results is the damage prevention effectiveness of an operator’s Public
Awareness Program and the change in the number and consequences of third-party
incidents. As a baseline, the operator should track the number of incidents and
consequences caused by third party excavators. This should include reported near
misses; reported pipeline damage occurrences that did not result in a release; and
third-party excavation damage events that resulted in pipeline failures. The
tracking of leaks caused by third-party excavation damage should be compared to
statistics of pipelines in the same sector (e.g. gathering, transmission, local
distribution). While third-party excavation damage is a major cause of pipeline
incidents, data regarding such incidents should be evaluated over a relatively long
period of time to determine any meaningful trends relative to the operator’s Public
Awareness Program. This is due to the low frequency of such incidents on a specific
pipeline system. The operator should also look for other types of bottom-line
measures. One other measure that operators may consider is the affected public’s
perception of the safety of pipelines.
Questar Gas uses a customer satisfaction survey and bounce back cards. Questar did not
specify that they use a customer satisfaction survey and bounce back cards in their written
Public Awareness plans.
11. §192.616 Public Awareness
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety. Per API RP 1162 Section 2.7 Step 12 and 8.5 SUMMARY
5



OF BASELINE EVALUATION PROGRAM Table 8-1—Summary of Baseline
Evaluation Program. The results of the evaluation need to be considered and
revisions/updates made in the public awareness program plan, implementation,
materials, frequency and/or messages.
Questar did not have a written Public Awareness evaluation that was based on a four (4)
year cycle. Also, they could not document that one was performed. Furthermore, Questar
did not have a process for making changes in their Public Awareness plans.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $200,000
for each violation for each day the violation persists up to a maximum of $2,000,000 for any
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the items identified in this letter.
Failure to do so will result in Questar Gas Company and/or Questar Pipeline Company being
subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, please send all documents to our office
at 12300 West Dakota Avenue, Suite 110, Lakewood, CO 80228, and in your correspondence
please refer to CPF 5-2013-1008W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any portion of
your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with
the complete original document you must provide a second copy of the document with the
portions you believe qualify for confidential treatment redacted and an explanation of why you
believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 T. Finch (#141036)
Questar - Mr. Craig Wagstaff
Arizona Corporation Commission - Robert Miller and Ryan Weight
Idaho Public Utilities Commission – Ellis Hire
Utah Department of Commerce – Al Zadeh
Wyoming Public Service Commission – David Piroutek
6
- **truncated:** false