# CHEVRON PIPE LINE CO — Corrective Action Order

- **operation:** document
- **citation:** CPF 520135006H
- **title:** CHEVRON PIPE LINE CO — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-03-22
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520135006h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520135006h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520135006h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520135006H
**body:**

Corrective Action Order involving CHEVRON PIPE LINE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2013-03-22 and is reported as closed as of 2015-03-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520135006H_Amendment to Corrective Action Order_06242013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520135006H/520135006H_Amendment%20to%20Corrective%20Action%20Order_06242013.pdf

520135006H_Amendment to Corrective Action Order_06242013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520135006H/520135006H_Amendment%20to%20Corrective%20Action%20Order_06242013_text.pdf

520135006H_closure letter_03062015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520135006H/520135006H_closure%20letter_03062015.pdf

520135006H_closure letter_03062015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520135006H/520135006H_closure%20letter_03062015_text.pdf

520135006H_Corrective Action Order_03222013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520135006H/520135006H_Corrective%20Action%20Order_03222013.pdf

520135006H_Corrective Action Order_03222013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520135006H/520135006H_Corrective%20Action%20Order_03222013_text.pdf

520135006H_Corrective Action Order_03222013_text.pdf

March 22 2013
VIA CERTIFIED MAIL 71791000164304521236
FAX TO: 713-432-3737
Mr. Randall Curry
President
Chevron Pipe Line Company
4800 Fournace Place
Bellaire, Texas 77401
Re: CPF No. 5-2013-5006H
Dear Mr. Curry:
Enclosed is a Corrective Action Order issued in the above-referenced case. It requires Chevron
Pipe Line Company to take certain corrective actions with respect to the 8-inch pipeline that
failed on March 18, 2013 near Willard, Utah. Service is being made by certified mail and
facsimile. Your receipt of this Corrective Action Order constitutes service of that document
under 49 C.F.R. § 190.5. The terms and conditions of this Order are effective upon receipt.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Gary Saenz, Team Leader, Chevron Pipe Line Company
Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, OPS
Mr. Chris Hoidal, Director, Western Region, OPS



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Chevron Pipe Line Company,
1 ) CPF No. 5-2013-5006H
)
Respondent. )
____________________________________)
CORRECTIVE ACTION ORDER
Purpose and Background
This Corrective Action Order (Order) is being issued, under the authority of 49 U.S.C. § 60112,
to require Chevron Pipe Line Company (Chevron or Respondent), to take the necessary
corrective action to protect the public, property, and the environment from potential hazards
associated with the recent failure on Chevron’s #1 Oil line in Willard, Utah.
On March 18, 2013, a reportable accident occurred on Chevron’s #1 Oil line resulting in the
release of an estimated 600 barrels of petroleum product (Failure). As of March 21st
,
approximately 251 barrels of product had been recovered. Chevron’s #1 Oil line is a 8-inch
diesel fuel line, approximately 760 miles in length, which transports diesel fuel from Salt Lake
City, Utah, to Spokane, Washington (Pipeline). It includes delivery points to Boise and
Pocatello, Idaho. The cause of the Failure has not yet been determined. The preliminary
investigation points to a longitudinal seam failure; however, the mechanism of the Failure is still
under investigation. Pursuant to 49 U.S.C. § 60117, the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety (OPS), initiated an investigation of the
Failure. The preliminary findings of the ongoing investigation are as follows.
Preliminary Findings
• The Pipeline is an 8-inch diameter pipeline, approximately 760 miles in length, which
transports diesel fuel from Chevron’s Salt Lake City refinery to Spokane, Washington,
with delivery points at Boise and Pocatello, Idaho. The Pipeline is part of Chevron’s
1 On or around December 11, 2012, Chevron Pipe Line Company entered into an agreement with Tesoro Logistics
LP to sell its Northwest Products system which includes the pipeline subject to this Order. The sale was scheduled
to be consummated during the first quarter of 2013. On the date of the Failure, Chevron was operating the Pipeline
and therefore is the Respondent in this matter.



2
Northwest Products System, which includes four product pipelines: two 8-inch
mainlines, one lateral, and one jet fuel line to airport. The two 8-inch lines are parallel
and known as the #1 Oil line and #2 Products line.
• At approximately 2:26 p.m. M.D.T., on March 18, 2013, a failure occurred on
Respondent’s #1 Oil Line near Willard, Utah, resulting in the release of an estimated 600
barrels of diesel fuel, which approximately 251 barrels had been recovered by noon,
March 21st. The Failure occurred in a marshland area within a 100 feet of Willard Bay, a
freshwater lake. The Failure occurred at milepost 44.9, west of I-15 (Failure Site). The
Failure was reported to the National Response Center (NRC Report No. 1041456) on
March 18, 2013, at approximately 8:22 p.m. M.D.T.
• In response to the spill, Chevron shut in Line #1, mobilized vacuum trucks, and deployed
booms.
• The Pipeline runs through many environmentally sensitive and drinking water High
Consequence Areas (HCA). The Failure occurred in a marshland area in North Willard
Bay State Park. Willard Bay is a freshwater reservoir on the eastern edge of the Great
Salt Lake. The park is a well-used recreation area and is approximately 50 miles north of
Salt Lake City. The property is owned by the U.S. Department of Interior, Bureau of
Reclamation and is maintained by the State of Utah. The Failure did not cause any
known injuries or evacuations but did result in the closure of a portion of the park and
campground.
• Various state and federal agencies responded to the scene, including the U.S.
Environmental Protection Agency, the U.S. Bureau of Reclamation, the Utah Department
of Natural Resources, the Utah Division of Water Quality, and the Utah Department of
Environmental Quality.
• The Pipeline was constructed between 1949 to 1952, mainly with seamless pipe and low
frequency electric resistance welded pipe (LFERW). Several sections of the Pipeline,
including the Failure site, consisted of seamed LFERW pipe.
• The maximum operating pressure (MOP) of the pipeline is 1870 psig, as established by
hydrostatic test in 1987. At the time of the Failure, the actual operating pressure of the
pipeline was approximately 1550 psig.
• The exact cause of the Failure is unknown and the investigation is ongoing. The
preliminary investigation points to a longitudinal seam failure.
• Chevron last performed an in-line inspection (ILI) of this line in March 2007 and
indicated no metal loss.
• The Northwest Products Pipeline System has experienced several failures dating back to
2002. However, these failures were not associated with longitudinal seams, which is the
preliminary cause of the Failure. One of these, a 22-barrel petroleum release that
occurred on April 26, 2010 on this line, was due to external corrosion at a coating holiday
at Milepost 198.1 in Idaho.



3
• PHMSA previously inspected this line during multiple inspection days occurring between
April 2011 and September 2012. As a result of this ongoing inspection, PHMSA issued a
letter of concern on February 14, 2013, identifying potential safety concerns with the fact
that Chevron’s root cause analysis of that April 26, 2010 spill had not been finalized
• Chevron Pipe Line Company is an indirect wholly-owned subsidiary of Chevron
Corporation. The company operates approximately 10,000 miles of pipelines that
transport crude oil, refined petroleum products, liquefied petroleum gas, and natural gas
across the United States.
2
Determination of Necessity for Corrective Action Order and Right to Hearing
Section 60112 of Title 49, United States Code, provides for the issuance of a Corrective Action
Order, after reasonable notice and the opportunity for a hearing, requiring corrective action,
which may include the suspended or restricted use of a pipeline facility, physical inspection,
testing, repair, replacement, or other action, as appropriate. The basis for making the
determination that a pipeline facility is hazardous, requiring corrective action, is set forth both in
the above-referenced statute and 49 C.F.R. § 190.233, a copy of which is enclosed.
Section 60112 and the regulations promulgated thereunder provide for the issuance of a
Corrective Action Order without prior opportunity for notice and hearing upon a finding that
failure to issue the Order expeditiously will likely result in serious harm to life, property, or the
environment. In such cases, an opportunity for a hearing will be provided as soon as practicable
after the issuance of the Order.
After evaluating the foregoing preliminary findings of fact, I find that continued operation of the
pipeline without corrective measures would be hazardous to life, property, and the environment.
Additionally, having considered the location of the Failure, including the proximity of the
pipeline to fresh water resources, the existence of LFERW seam pipe at the Failure Site, and
uncertainty as to the cause of the Failure, I find that a failure to issue this Order expeditiously to
require immediate corrective action would result in the likelihood of serious harm to life,
property, or the environment.
Accordingly, this Corrective Action Order mandating immediate corrective action is issued
without prior notice and opportunity for a hearing. The terms and conditions of this Order are
effective upon receipt.
Within 10 days of receipt of this Order, Respondent may request a hearing, to be held as soon as
practicable, by notifying the Associate Administrator for Pipeline Safety in writing, with a copy
to the Director, Western Region, PHMSA (Director). If a hearing is requested, it will be held
telephonically or in-person in Denver, CO, or Washington, D.C.
After receiving and analyzing additional data in the course of this investigation, PHMSA may
identify other corrective measures that need to be taken. In that event, Respondent will be
notified of any additional measures required and amendment of this Order will be considered.
2 http://www.chevronpipeline.com/about (last accessed on March 21, 2013).



4
To the extent consistent with safety, Respondent will be afforded notice and an opportunity for a
hearing prior to the imposition of any additional corrective measures.
Required Corrective Actions
Pursuant to 49 U.S.C. § 60112, I hereby order Chevron to immediately take the following
corrective actions on that portion of the #1 Oil line running from the Salt Lake Pump Station
(Milepost 0) to the Juniper pump station (Milepost 117.6) (Affected Segment):
1. Chevron must not operate the Affected Segment until authorized to do so by the Director.
2. Restart Plan. Develop and submit a written re-start plan for prior approval of the
Director. Submit the written plan to the Director at the Pipeline and Hazardous Materials
Safety Administration, 12300 W. Dakota Avenue, Suite 110, Lakewood, CO 80228.
a. The restart plan must provide for adequate patrolling of the Affected Segment
during the restart process and must include an incremental start-up, with each increment
to be held for at least two hours. The plan must include sufficient surveillance of each
increment to ensure that no leaks are present when operation of the line resumes. The
restart plan must specify a daylight restart and advance communications with local
emergency response officials.
b. The restart plan must provide for a review of the Affected Segment for LFERW
pipe conditions similar to those at the Failure site including original construction
documents, integrity management records such as in-line tool inspection results, past
hydrostatic tests, root-cause analysis of previous leaks and failures involving LFERW
pipe, corrosion and cathodic protection records affecting LFERW pipe, and any findings
that require remediation measures to be implemented prior to restart.
c. The restart plan must provide a hydrostatic testing plan and schedule for the
LFERW pipe in the vicinity of the North Willard Bay State Park (approximately milepost
43 to milepost 46). The proposed plan for hydrostatic testing must be at a pressure
sufficient to strength test the pipeline considering the size of flaws that would survive the
pressure test, and conform to the requirements of 49 CFR Part 195, Subpart E. The
hydrostatic test must also include 30-minute spike test.
d. Upon approval of the Director of the hydrostatic test plan, complete this testing
within 30 days of restart. Any failures on the pipe during the testing must be removed
and sent to an approved laboratory for metallurgical testing. Respondent must provide
continuous patrolling of the pipeline segment between mileposts 43 and 46 at all times
until hydrostatic testing is completed and the restart plan must provide for adequate
patrolling of the pipeline segment between mileposts 43 and 46 during the restart process.
e. The restart plan must also include documentation of the completion of all
mandated actions, and a management of change plan that will ensure that all
modifications are safely incorporated into Chevron’s ongoing operations and
maintenance procedures.



5
3. 4. 5. 6. 7. 8. Return to Service. Obtain written approval from the Director prior to resuming operation.
Pressure Restriction. After receiving approval from the Director to restart the pipeline,
the pressure of the Affected Segment is not to exceed 1190 psig (80% of the pressure at
the time of the Failure) at the Failure site. This pressure restriction will remain in effect
until written approval to increase the pressure or return the pipeline to its pre-failure
operating pressure is obtained from the Director.
Removal of Pressure Restriction. The Director may allow the removal or modification of
the pressure restriction upon a written request from Respondent demonstrating that
restoring the Affected Segment to its pre-failure operating pressure is justified based on a
reliable engineering analysis showing that the pressure increase is safe considering all
known defects, anomalies and operating parameters of the Affected Segment.
Metallurgical Testing. Within 45 days of receipt of this Order, complete mechanical and
metallurgical testing and failure analysis of the failed pipe, including analysis of soil
samples and any foreign materials. Complete the testing and analysis as follows:
a. Document the chain-of-custody when handling and transporting the failed pipe
section and other evidence from the failure site;
b. Within 10 days of receipt of this Order, develop and submit to the Director the
testing protocol, including selection of the testing laboratory, for prior approval.
c. Prior to commencing the mechanical and metallurgical testing, provide the
Director with the scheduled date, time, and location of the testing to allow a
PHMSA representative to witness the testing; and
d. Ensure that the testing laboratory distributes all resulting reports in their entirety
(including all media), whether draft or final, to the Director at the same time as
they are made available to Respondent.
Root Cause Failure Analysis. Within 60 days following receipt of this Order, complete a
root cause failure analysis that is supplemented and facilitated by an independent third-
party acceptable to the Director. The root cause analysis must document all contributory
factors and the decision making process. Submit a final report of the root cause process
results to the Director including any lessons learned and whether the findings are
applicable to other locations within the Northwest Products System.
Emergency Response. Review and assess the effectiveness of the emergency response
plans as related to the Failure, including public awareness and training activities prior to
the Failure, as well on-scene response, coordination, communication and support during
the Failure.
Pursuant to 49 U.S.C. § 60112, I hereby order Chevron to immediately take the following
corrective actions on the Pipeline, as defined in the Purpose and Background Section.



6
9. Records Verification. As recommended in PHMSA Advisory Bulletin 2012-06, verify the
records for the Pipeline which confirm the operating specifications for maximum
operating pressure (MOP). Within 30 days of receipt of this Order, submit a report on
this record verification for the Affected Segment to the Director and make the supporting
records available. Within 90 days of receipt of this Order, submit a report to the Director
on the remaining portion of the Pipeline and make the supporting records available.
10. Inline Inspection. Within 6 months of resuming operation, perform an in-line inspection
(ILI) of the Pipeline. Chevron must use a tool capable of identifying and assessing
LFERW longitudinal seam issues. The Director must provide prior approval of the final
criteria and technology considerations taken into account in selecting the specific
inspection tool. Technology considerations and final criteria should account for the size
(length and depth) of seam anomalies and the possibility of selective seam corrosion in
the Pipeline. The ILI must also include consideration of best available technology to
reliably detect and size seam anomalies in casings. The data analysis must be completed
expeditiously, but no later than 30 days of successful completion of the ILI. The ILI
vendor must evaluate the results per a performance specification, including consideration
of the location and size of the defects. The ILI vendor must distribute all reports in their
entirety (including all media), whether preliminary or final, to the Director and the
Respondent at the same time. Results of the ILI must be compared with the results of the
previous ILIs in a report submitted to the Director that includes such comparison, as well
as criteria and a plan for remediation of anomalies requiring immediate action.
Other Requirements
Reporting. Submit quarterly reports to the Director that: (1) include all available data and results
of the testing and evaluations required by this Order; and (2) describe the progress of the repairs
or other remedial actions being undertaken. The first quarterly report is due on June 22, 2013.
The Director may change the interval for the submission of these reports.
Documentation of the Costs. It is requested but not required that Respondent maintain
documentation of the costs associated with implementation of this Corrective Action Order.
Include in each monthly report submitted, the to-date total costs associated with: (1) preparation
and revision of procedures, studies and analyses; (2) physical changes to pipeline infrastructure,
including repairs, replacements and other modifications; and (3) environmental remediation, if
applicable.
Approvals. With respect to each submission that under this Order requires the approval of the
Director, the Director may: (a) approve, in whole or part, the submission; (b) approve the
submission on specified conditions; (c) modify the submission to cure any deficiencies; (d)
disapprove in whole or in part, the submission, directing that Respondent modify the submission,
or (e) any combination of the above. In the event of approval, approval upon conditions, or
modification by the Director, Respondent shall proceed to take all action required by the
submission as approved or modified by the Director. If the Director disapproves all or any



7
portion of the submission, Respondent must correct all deficiencies within the time specified by
the Director, and resubmit it for approval.
Extensions of Time. The Director may grant an extension of time for compliance with any of the
terms of this Order upon a written request timely submitted demonstrating good cause for an
extension.
The actions required by this Corrective Action Order are in addition to and do not waive any
requirements that apply to Respondent’s pipeline system under 49 C.F.R. Part 195, under any
other order issued to Respondent under authority of 49 U.S.C. § 60101 et seq., or under any other
provision of Federal or State law.
Respondent may appeal any decision of the Director to the Associate Administrator for Pipeline
Safety. Decisions of the Associate Administrator shall be final.
Be advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b).
Failure to comply with this Order may result in the assessment of civil penalties and in referral to
the Attorney General for appropriate relief in United States District Court pursuant to 49 U.S.C.
§ 60120.
In your correspondence on this matter, please refer to CPF No. 5-2013-5006H and for each
document you submit, please provide a copy in electronic format whenever possible.
The terms and conditions of this Corrective Action Order are effective upon receipt.
__________________________________ __________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

520135006H_Amendment to Corrective Action Order_06242013_text.pdf

VIA UPS 2nd DAY DELIVERY [1Z WR2 578 02 9286 6886]
June 24, 2013
Mr. Rick D. Weyen
VP, Logistics
Tesoro Logistics
19100 Ridgewood Parkway
San Antonio, TX 78259
Re: CPF 5-2013-5006H
Dear Mr. Weyen:
As you are aware, the Pipeline and Hazardous Materials Safety Administration issued the
enclosed Corrective Action Order (Order) to Chevron Pipe Line Company on March 22, 2013 in
the above-referenced case. It required Chevron Pipe Line Company to take certain corrective
actions with respect to the 8-inch pipeline that failed on March 18, 2013 near Willard, Utah.
It has come to my attention that Tesoro Logistics is now the owner and operator of this pipeline.
As the owner and operator of this pipeline, Tesoro Logistics is ultimately responsible to ensure
that the pipeline is operated in compliance with the pipeline safety regulations and that all of the
corrective measures listed in the Order are completed. Tesoro must either conduct the work
itself or make arrangements with Chevron to ensure that the terms of the Order are satisfied.
Thank you for your cooperation in this matter.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure
cc: Mr. Randall Curry, President, Chevron Pipe Line Company
Mr. Gary Saenz, Team Leader, Chevron Pipe Line Company



2
VIA CERTIFIED MAIL 71791000164304521236
FAX TO: 713-432-3737
Mr. Randall Curry
President
Chevron Pipe Line Company
4800 Fournace Place
Bellaire, Texas 77401
Re: CPF No. 5-2013-5006H
Dear Mr. Curry:
Enclosed is a Corrective Action Order issued in the above-referenced case. It requires Chevron
Pipe Line Company to take certain corrective actions with respect to the 8-inch pipeline that
failed on March 18, 2013 near Willard, Utah. Service is being made by certified mail and
facsimile. Your receipt of this Corrective Action Order constitutes service of that document
under 49 C.F.R. § 190.5. The terms and conditions of this Order are effective upon receipt.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Gary Saenz, Team Leader, Chevron Pipe Line Company
Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, OPS
Mr. Chris Hoidal, Director, Western Region, OPS



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________ )
In the Matter of )
Chevron Pipe Line Company,1 ) CPF No. 5-2013-5006H
)
)
Respondent. )
____________________________________)
CORRECTIVE ACTION ORDER
Purpose and Background
This Corrective Action Order (Order) is being issued, under the authority of 49 U.S.C. §
60112, to require Chevron Pipe Line Company (Chevron or Respondent), to take the
necessary corrective action to protect the public, property, and the environment from potential
hazards associated with the recent failure on Chevron’s #1 Oil line in Willard, Utah.
On March 18, 2013, a reportable accident occurred on Chevron’s #1 Oil line resulting in the
release of an estimated 600 barrels of petroleum product (Failure). As of March 21st
,
approximately 251 barrels of product had been recovered. Chevron’s #1 Oil line is a 8-inch
diesel fuel line, approximately 760 miles in length, which transports diesel fuel from Salt
Lake City, Utah, to Spokane, Washington (Pipeline). It includes delivery points to Boise and
Pocatello, Idaho. The cause of the Failure has not yet been determined. The preliminary
investigation points to a longitudinal seam failure; however, the mechanism of the Failure is
still under investigation. Pursuant to 49 U.S.C. § 60117, the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), initiated an
investigation of the Failure. The preliminary findings of the ongoing investigation are as
follows.
Preliminary Findings
• The Pipeline is an 8-inch diameter pipeline, approximately 760 miles in length, which
transports diesel fuel from Chevron’s Salt Lake City refinery to Spokane, Washington,
with delivery points at Boise and Pocatello, Idaho. The Pipeline is part of Chevron’s
Northwest Products System, which includes four product pipelines: two 8-inch
1 On or around December 11, 2012, Chevron Pipe Line Company entered into an agreement with Tesoro
Logistics LP to sell its Northwest Products system which includes the pipeline subject to this Order. The sale
was scheduled to be consummated during the first quarter of 2013. On the date of the Failure, Chevron was
operating the Pipeline and therefore is the Respondent in this matter.



mainlines, one lateral, and one jet fuel line to airport. The two 8-inch lines are parallel
and known as the #1 Oil line and #2 Products line.
• At approximately 2:26 p.m. M.D.T., on March 18, 2013, a failure occurred on
Respondent’s #1 Oil Line near Willard, Utah, resulting in the release of an estimated
600 barrels of diesel fuel, which approximately 251 barrels had been recovered by
noon, March 21st. The Failure occurred in a marshland area within a 100 feet of
Willard Bay, a freshwater lake. The Failure occurred at milepost 44.9, west of I-15
(Failure Site). The Failure was reported to the National Response Center (NRC
Report No. 1041456) on March 18, 2013, at approximately 8:22 p.m. M.D.T.
• In response to the spill, Chevron shut in Line #1, mobilized vacuum trucks, and
deployed booms.
• The Pipeline runs through many environmentally sensitive and drinking water High
Consequence Areas (HCA). The Failure occurred in a marshland area in North
Willard Bay State Park. Willard Bay is a freshwater reservoir on the eastern edge of
the Great Salt Lake. The park is a well-used recreation area and is approximately 50
miles north of Salt Lake City. The property is owned by the U.S. Department of
Interior, Bureau of Reclamation and is maintained by the State of Utah. The Failure
did not cause any known injuries or evacuations but did result in the closure of a
portion of the park and campground.
• Various state and federal agencies responded to the scene, including the U.S.
Environmental Protection Agency, the U.S. Bureau of Reclamation, the Utah
Department of Natural Resources, the Utah Division of Water Quality, and the Utah
Department of Environmental Quality.
• The Pipeline was constructed between 1949 to 1952, mainly with seamless pipe and
low frequency electric resistance welded pipe (LFERW). Several sections of the
Pipeline, including the Failure site, consisted of seamed LFERW pipe.
• The maximum operating pressure (MOP) of the pipeline is 1870 psig, as established
by hydrostatic test in 1987. At the time of the Failure, the actual operating pressure of
the pipeline was approximately 1550 psig.
• The exact cause of the Failure is unknown and the investigation is ongoing. The
preliminary investigation points to a longitudinal seam failure.
• Chevron last performed an in-line inspection (ILI) of this line in March 2007 and
indicated no metal loss.
• The Northwest Products Pipeline System has experienced several failures dating back
to 2002. However, these failures were not associated with longitudinal seams, which
is the preliminary cause of the Failure. One of these, a 22-barrel petroleum release
that occurred on April 26, 2010 on this line, was due to external corrosion at a coating
holiday at Milepost 198.1 in Idaho.



• PHMSA previously inspected this line during multiple inspection days occurring
between April 2011 and September 2012. As a result of this ongoing inspection,
PHMSA issued a letter of concern on February 14, 2013, identifying potential safety
concerns with the fact that Chevron’s root cause analysis of that April 26, 2010 spill
had not been finalized
• Chevron Pipe Line Company is an indirect wholly-owned subsidiary of Chevron
Corporation. The company operates approximately 10,000 miles of pipelines that
transport crude oil, refined petroleum products, liquefied petroleum gas, and natural
gas across the United States.
2
Determination of Necessity for Corrective Action Order and Right to Hearing
Section 60112 of Title 49, United States Code, provides for the issuance of a Corrective
Action Order, after reasonable notice and the opportunity for a hearing, requiring corrective
action, which may include the suspended or restricted use of a pipeline facility, physical
inspection, testing, repair, replacement, or other action, as appropriate. The basis for making
the determination that a pipeline facility is hazardous, requiring corrective action, is set forth
both in the above-referenced statute and 49 C.F.R. § 190.233, a copy of which is enclosed.
Section 60112 and the regulations promulgated thereunder provide for the issuance of a
Corrective Action Order without prior opportunity for notice and hearing upon a finding that
failure to issue the Order expeditiously will likely result in serious harm to life, property, or
the environment. In such cases, an opportunity for a hearing will be provided as soon as
practicable after the issuance of the Order.
After evaluating the foregoing preliminary findings of fact, I find that continued operation of
the pipeline without corrective measures would be hazardous to life, property, and the
environment. Additionally, having considered the location of the Failure, including the
proximity of the pipeline to fresh water resources, the existence of LFERW seam pipe at the
Failure Site, and uncertainty as to the cause of the Failure, I find that a failure to issue this
Order expeditiously to require immediate corrective action would result in the likelihood of
serious harm to life, property, or the environment.
Accordingly, this Corrective Action Order mandating immediate corrective action is issued
without prior notice and opportunity for a hearing. The terms and conditions of this Order are
effective upon receipt.
Within 10 days of receipt of this Order, Respondent may request a hearing, to be held as soon
as practicable, by notifying the Associate Administrator for Pipeline Safety in writing, with a
copy to the Director, Western Region, PHMSA (Director). If a hearing is requested, it will be
held telephonically or in-person in Denver, CO, or Washington, D.C.
After receiving and analyzing additional data in the course of this investigation, PHMSA may
identify other corrective measures that need to be taken. In that event, Respondent will be
2 http://www.chevronpipeline.com/about (last accessed on March 21, 2013).



notified of any additional measures required and amendment of this Order will be considered.
To the extent consistent with safety, Respondent will be afforded notice and an opportunity
for a hearing prior to the imposition of any additional corrective measures.
Required Corrective Actions
Pursuant to 49 U.S.C. § 60112, I hereby order Chevron to immediately take the following
corrective actions on that portion of the #1 Oil line running from the Salt Lake Pump Station
(Milepost 0) to the Juniper pump station (Milepost 117.6) (Affected Segment):
1. Chevron must not operate the Affected Segment until authorized to do so by the
Director.
2. Restart Plan. Develop and submit a written re-start plan for prior approval of the
Director. Submit the written plan to the Director at the Pipeline and Hazardous
Materials Safety Administration, 12300 W. Dakota Avenue, Suite 110, Lakewood, CO
80228.
a. The restart plan must provide for adequate patrolling of the Affected Segment
during the restart process and must include an incremental start-up, with each
increment to be held for at least two hours. The plan must include sufficient
surveillance of each increment to ensure that no leaks are present when operation of
the line resumes. The restart plan must specify a daylight restart and advance
communications with local emergency response officials.
b. The restart plan must provide for a review of the Affected Segment for
LFERW pipe conditions similar to those at the Failure site including original
construction documents, integrity management records such as in-line tool inspection
results, past hydrostatic tests, root-cause analysis of previous leaks and failures
involving LFERW pipe, corrosion and cathodic protection records affecting LFERW
pipe, and any findings that require remediation measures to be implemented prior to
restart.
c. The restart plan must provide a hydrostatic testing plan and schedule for the
LFERW pipe in the vicinity of the North Willard Bay State Park (approximately
milepost 43 to milepost 46). The proposed plan for hydrostatic testing must be at a
pressure sufficient to strength test the pipeline considering the size of flaws that would
survive the pressure test, and conform to the requirements of 49 CFR Part 195,
Subpart E. The hydrostatic test must also include 30-minute spike test.
d. Upon approval of the Director of the hydrostatic test plan, complete this testing
within 30 days of restart. Any failures on the pipe during the testing must be removed
and sent to an approved laboratory for metallurgical testing. Respondent must provide
continuous patrolling of the pipeline segment between mileposts 43 and 46 at all times
until hydrostatic testing is completed and the restart plan must provide for adequate
patrolling of the pipeline segment between mileposts 43 and 46 during the restart
process.



e. The restart plan must also include documentation of the completion of all
mandated actions, and a management of change plan that will ensure that all
modifications are safely incorporated into Chevron’s ongoing operations and
maintenance procedures.
3. Return to Service. Obtain written approval from the Director prior to resuming
operation.
4. Pressure Restriction. After receiving approval from the Director to restart the
pipeline, the pressure of the Affected Segment is not to exceed 1190 psig (80% of the
pressure at the time of the Failure) at the Failure site. This pressure restriction will
remain in effect until written approval to increase the pressure or return the pipeline to
its pre-failure operating pressure is obtained from the Director.
5. Removal of Pressure Restriction. The Director may allow the removal or modification
of the pressure restriction upon a written request from Respondent demonstrating that
restoring the Affected Segment to its pre-failure operating pressure is justified based
on a reliable engineering analysis showing that the pressure increase is safe
considering all known defects, anomalies and operating parameters of the Affected
Segment.
6. Metallurgical Testing. Within 45 days of receipt of this Order, complete mechanical
and metallurgical testing and failure analysis of the failed pipe, including analysis of
soil samples and any foreign materials. Complete the testing and analysis as follows:
a. Document the chain-of-custody when handling and transporting the failed pipe
section and other evidence from the failure site;
b. Within 10 days of receipt of this Order, develop and submit to the Director the
testing protocol, including selection of the testing laboratory, for prior
approval.
c. Prior to commencing the mechanical and metallurgical testing, provide the
Director with the scheduled date, time, and location of the testing to allow a
PHMSA representative to witness the testing; and
d. Ensure that the testing laboratory distributes all resulting reports in their
entirety (including all media), whether draft or final, to the Director at the same
time as they are made available to Respondent.
7. Root Cause Failure Analysis. Within 60 days following receipt of this Order,
complete a root cause failure analysis that is supplemented and facilitated by an
independent third-party acceptable to the Director. The root cause analysis must
document all contributory factors and the decision making process. Submit a final
report of the root cause process results to the Director including any lessons learned
and whether the findings are applicable to other locations within the Northwest
Products System.



8. Emergency Response. Review and assess the effectiveness of the emergency response
plans as related to the Failure, including public awareness and training activities prior
to the Failure, as well on-scene response, coordination, communication and support
during the Failure.
Pursuant to 49 U.S.C. § 60112, I hereby order Chevron to immediately take the following
corrective actions on the Pipeline, as defined in the Purpose and Background Section.
9. Records Verification. As recommended in PHMSA Advisory Bulletin 2012-06, verify
the records for the Pipeline which confirm the operating specifications for maximum
operating pressure (MOP). Within 30 days of receipt of this Order, submit a report on
this record verification for the Affected Segment to the Director and make the
supporting records available. Within 90 days of receipt of this Order, submit a report
to the Director on the remaining portion of the Pipeline and make the supporting
records available.
10. Inline Inspection. Within 6 months of resuming operation, perform an in-line
inspection (ILI) of the Pipeline. Chevron must use a tool capable of identifying and
assessing LFERW longitudinal seam issues. The Director must provide prior approval
of the final criteria and technology considerations taken into account in selecting the
specific inspection tool. Technology considerations and final criteria should account
for the size (length and depth) of seam anomalies and the possibility of selective seam
corrosion in the Pipeline. The ILI must also include consideration of best available
technology to reliably detect and size seam anomalies in casings. The data analysis
must be completed expeditiously, but no later than 30 days of successful completion
of the ILI. The ILI vendor must evaluate the results per a performance specification,
including consideration of the location and size of the defects. The ILI vendor must
distribute all reports in their