# WYOMING PIPELINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 520136001M
- **title:** WYOMING PIPELINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-06-26
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520136001m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520136001m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520136001m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520136001M
**body:**

Notice of Amendment involving WYOMING PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(3). The case was opened on 2013-06-26 and is reported as closed as of 2015-09-24. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520136001M_closure letter_09242015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520136001M/520136001M_closure%20letter_09242015.pdf

520136001M_closure letter_09242015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520136001M/520136001M_closure%20letter_09242015_text.pdf

520136001M_notice of amendment_06262013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520136001M/520136001M_notice%20of%20amendment_06262013.pdf

520136001M_notice of amendment_06262013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520136001M/520136001M_notice%20of%20amendment_06262013_text.pdf

520136001M_Operator_Response_to_Notice_11212013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520136001M/520136001M_Operator_Response_to_Notice_11212013.pdf

520136001M_notice of amendment_06262013_text.pdf

NOTICE OF AMENDMENT
VIA UPS 2ND DAY DELIVERY- 1Z WR2 578 02 9840 7727
June 26, 2013
Mr. Robert Neufeld
Vice President
Environmental and Governmental Affairs
Wyoming Pipeline Co.
1600 Broadway, Suite 2300
Denver, CO 80202
CPF 5-2013-6001M
Dear Mr. Neufeld:
On October 22-26, 2012, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected
Wyoming Pipeline Company’s (WPC) operations and maintenance (O&M) procedures in
Newcastle, Wyoming.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
WPC’s plans or procedures, as described below:
1. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall be
reviewed at intervals not exceeding 15 months, but at least once each calendar year,
and appropriate changes made as necessary to insure that the manual is effective.
This manual shall be prepared before initial operations of a pipeline system



commence, and appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.
WPC’s Operations and Maintenance (O&M) Procedure Manual did not include a provision in
their manual to address the design and construction of a pipeline to allow passage of in-line
inspection (ILI) devices as required by §195.120(a). Each new pipeline and/or each line section
of a pipeline where the line pipe or components have been replaced must be designed and
constructed to accommodate passage of instrumented internal inspection devices. WPC’s O&M
procedure is inadequate because they did not clearly describe how their personnel will
implement the requirements of section §195.120(a) for new construction.
2. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall be
reviewed at intervals not exceeding 15 months, but at least once each calendar year,
and appropriate changes made as necessary to insure that the manual is effective.
This manual shall be prepared before initial operations of a pipeline system
commence, and appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.
WPC did not establish adequate written procedures for analyzing pipeline accidents to determine
the cause as required by §195.402(c)(5). WPC’s O&M procedure is inadequate because they did
not clearly describe what actions must be taken to meet the requirement of section
§195.402(c)(5).
3. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall be
reviewed at intervals not exceeding 15 months, but at least once each calendar year,
and appropriate changes made as necessary to insure that the manual is effective.
This manual shall be prepared before initial operations of a pipeline system
commence, and appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.
WPC did not establish adequate written procedures for minimizing the potential for hazards and
the possibility of recurrence of accidents as required by §195.402(c)(6). WPC’s O&M procedure
is inadequate because they did not clearly describe what actions must be taken to meet the
requirement of section §195.402(c)(6).
4. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
2



this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
WPC’s O&M Procedure Manual did not include a section to address signage at pump stations
and breakout tank areas. Signage at pumping stations and breakout tank areas are necessary to
ensure the operator can be reached at all times, including emergencies, as required by §195.434.
WPC’s O&M procedure is inadequate because they did not clearly describe where signage must
be maintained to meet the requirements of section §195.434.
5. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
WPC did not establish adequate written procedures for testing, inspecting, and maintaining an
overfill protection system at the required intervals per §195.428(c) and according to API
Recommended Practice 2350. Overfill devices are required for aboveground breakout tanks that
are constructed or significantly altered after October 2, 2000 as required by §195.428(c), unless
an operator notes in the manual required by §195.402 why compliance with that part is not
necessary for safety of the tank. Therefore, WPC’s O&M procedure is inadequate because they
did not clearly describe what actions must be taken to meet the requirements of section
§195.428(c).
6. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
WPC did not establish adequate written procedures for inspecting the physical integrity of in-
service atmospheric aboveground breakout tanks according to API Standard 653 as required by
§195.432(b), e.g. routine in-service inspections (monthly), external inspection. WPC’s O&M
procedure is inadequate because they did not clearly describe how their personnel will
implement the requirements of section §195.432(b).
3



7. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
WPC did not establish adequate written procedures for maintaining the daily operating records as
required by §195.404(b). The daily operating records that indicate the discharge pressure at each
pump station, and any emergency or abnormal operation shall be maintained for at least 3 years.
Therefore, WPC’s O&M procedure is inadequate because they did not clearly define what is an
interval for maintaining the daily operating records as required by §195.404(b).
8. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
WPC did not establish adequate written procedures for maintaining current records or maps to
show the location of cathodically protected pipelines, cathodic protection facilities, and
neighboring structures bonded to cathodic protection systems as required by subpart H,
§195.589(a). WPC’s O&M procedure is inadequate because they did not clearly describe what
actions must be taken to meet the requirements of section §195.589(a).
9. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
WPC did not establish adequate written procedures to address when and how cathodic protection
system used to control corrosion on the bottom of an aboveground breakout tank must be
inspected per subpart H, §195.573(d). Each cathodic protection system used to control corrosion
on the bottom of an aboveground breakout tank must be inspected in accordance with API
Recommended Practice 651 as required by §195.573(d), unless operator notes in the corrosion
control procedures established under §195.402(c)(3) why compliance with all or certain
operation and maintenance provisions of API RP 651 is not necessary for the safety of the tank.
4



Meanwhile, WPC’s O&M procedure is inadequate because they did not clearly describe how
their personnel will implement the requirements of section §195.573(d).
10. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
WPC did not establish adequate written procedures to describe the circumstances in which a CIS
or comparable technology is practicable and necessary, as required by subpart H, §195.573(a)(2),
and in accordance with paragraph 10.1.1.3 of NACE SP 0169. Each operator must identify not
more than 2 years after cathodic protection is installed, the circumstances in which a close-
interval survey or comparable technology is practicable and necessary as required by
§195.573(a)(2). WPC’s O&M procedure is inadequate because they did not clearly describe how
their personnel will implement the requirements of section §195.573(a)(2).
11. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
WPC did not establish adequate written procedures for defining the interference bonds (critical
and non-critical) and how to electrically check for proper performance of each bond as required
by subpart H, §195.573(c). The O&M manual needs to address the difference between critical
and non-critical bonds and how to inspect the two (2) types. Interference Bond whose failure
would jeopardize structural protection must be inspected as required by §195.573(c). WPC’s
O&M procedure is inadequate because they did not clearly describe how their personnel will
implement the requirements of section §195.573(c).
12. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
5



WPC did not establish adequate written procedures for electrically isolating each buried or
submerged pipeline from other metallic structures unless they electrically interconnect and
cathodically protect the pipeline and other structures as a single unit per subpart H, §195.575(a).
The O&M manual needs to describe the criteria for isolation as required by §195.575(a), e.g.
casings, custody transfer points/flanges. WPC’s O&M procedure is inadequate because they did
not clearly describe how their personnel will implement the requirements of section §195.575(a).
13. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall
be reviewed at intervals not exceeding 15 months, but at least once each calendar
year, and appropriate changes made as necessary to insure that the manual is
effective. This manual shall be prepared before initial operations of a pipeline
system commence, and appropriate parts shall be kept at locations where operations
and maintenance activities are conducted.
WPC did not establish adequate written procedures to address training program to instruct
emergency response personnel to the following types of emergencies: carry out the emergency
procedures that relate to their assignments, know the characteristics and hazards of the hazardous
liquids transported, recognize conditions that are likely to cause emergencies, predict the
consequences of facility malfunctions or failures and hazardous liquids spills, and take
appropriate corrective action, take steps necessary to control any accidental release of hazardous
liquid and to minimize the potential for fire, explosion, toxicity, or environmental damage, and
learn the potential causes, types, sizes, and consequences of fire and the appropriate use of
portable fire extinguishers and other on-site fire control equipment, involving, where feasible, a
simulated pipeline emergency condition. WPC’s emergency procedures must clearly describe
what actions must be taken to meet the minimum emergency scenario requirements of section
§195.403(a).
14. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall
be reviewed at intervals not exceeding 15 months, but at least once each calendar
year, and appropriate changes made as necessary to insure that the manual is
effective. This manual shall be prepared before initial operations of a pipeline
system commence, and appropriate parts shall be kept at locations where operations
and maintenance activities are conducted.
WPC did not establish adequate written emergency procedures for reviewing with personnel
their performance in meeting the objectives of the emergency response training program. It also
did not include a requirement for making appropriate changes to the emergency response training
program as necessary to ensure that it is effective. Each operator shall, at intervals not exceeding
6



15 months, but at least once each calendar year, review with personnel their performance and
make appropriate changes to the emergency response training program as required by
§195.403(b). WPC’s emergency procedure is inadequate because they did not clearly describe
what actions must be taken to meet the requirements of section §195.403(b).
15. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall
be reviewed at intervals not exceeding 15 months, but at least once each calendar
year, and appropriate changes made as necessary to insure that the manual is
effective. This manual shall be prepared before initial operations of a pipeline
system commence, and appropriate parts shall be kept at locations where operations
and maintenance activities are conducted.
WPC did not establish adequate written emergency procedures to verify that the supervisors be
maintained a thorough knowledge of that portion of the emergency response procedures for
which they are responsible. Each operator shall require and verify that supervisors maintain a
thorough knowledge of the emergency response procedures for which they are responsible as
required by §195.403(c). WPC’s emergency procedure is inadequate because they did not
clearly describe what actions must be taken to meet the requirements of section §195.403(c).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within thirty days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
7



It is requested (not mandated) that Wyoming Pipeline Company maintain documentation of the
safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Chris Hoidal, Director,
Western Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 5-2013-6001M and, for each document you submit,
please provide a copy in electronic format whenever possible.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 C. Allen/D. Hubbard (#139527)
8

520136001M_closure letter_09242015_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
September 24, 2015
Mr. Robert Neufeld
Vice President
Environmental and Governmental Affairs
Wyoming Pipeline Co.
1600 Broadway, Suite 2300
Denver, CO 80202
CPF 5-2013-6001M
Case Closure
Dear Mr. Neufeld:
On October 22 through 26, 2012, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
inspected Wyoming Pipeline Company’s (WPC) Operations and Maintenance (O&M)
procedures in Newcastle, Wyoming. As a result of the inspection, WPC was issued a Notice
of Amendment on June 26, 2013, which proposed amendment of your procedures.
We received your amended procedures dated April 13, 2015 and August 17, 2015. My staff
reviewed the amended procedures, and it appears that the inadequacies outlined in the Notice
of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
For Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 C. Allen/D. Hubbard (#139527)
- **truncated:** false
- **body characters:** 21908