# CPN PIPELINE COMPANY — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 520140006
- **title:** CPN PIPELINE COMPANY — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2014-11-12
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.453.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520140006.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520140006.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520140006
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520140006
**body:**

Notice of Probable Violation involving CPN PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 192.453. The case was opened on 2014-11-12 and is reported as closed as of 2015-11-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520140006_Final Order_11032015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520140006/520140006_Final%20Order_11032015.pdf

520140006_Final Order_11032015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520140006/520140006_Final%20Order_11032015_text.pdf

520140006_NOPV PCO_11122014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520140006/520140006_NOPV%20PCO_11122014.pdf

520140006_NOPV PCO_11122014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520140006/520140006_NOPV%20PCO_11122014_text.pdf

520140006_Operator Response to Notice_12092014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520140006/520140006_Operator%20Response%20to%20Notice_12092014.pdf

520140006_Final Order_11032015_text.pdf

November 3, 2015
Mr. Thad Hill
President
Calpine Corporation
717 Texas Avenue
Suite 1000
Houston, TX 77002
Re: CPF No. 5-2014-0006
Dear Mr. Hill:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws the
allegation of violation and notes that CPN Pipeline Company has taken certain actions.
Therefore, this case is now closed. Service of the Final Order by certified mail is deemed
effective upon the date of mailing, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Director, Western Region, OPS
Mr. Lyle Fedge, Director, Pipeline Operations, CPN Pipeline Company, 60 River Road,
Rio Vista, CA 94571
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
CPN Pipeline Company, ) CPF No. 5-2014-0006
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On May 5-9, June 9-12, and July 21-25 2014, pursuant to 49 U.S.C. § 60117, a representative of
the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an on-site pipeline safety inspection of the facilities and records of CPN
Pipeline Company (CPN or Respondent) in Rio Vista, California. CPN Pipeline Company is a
subsidiary of Calpine Corporation. CPN Pipeline Company transports the natural gas that fuels
Calpine power plants, including the Baytown, Freestone, Deer Park, Channel, Pasadena and
Magic Valley Energy Centers.1
As a result of the inspection, the Director, Western Region, OPS (Director), issued to
Respondent, by letter dated November 12, 2014, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that CPN Pipeline Company had violated 49 C.F.R. § 192.453 and proposed ordering
Respondent to take certain measures to correct the alleged violation.
CPN responded to the Notice by letter dated December 9, 2014 (Response). The company
contested the allegation of violation but also provided information concerning certain actions it
had taken and submitted copies of its revised procedures. Respondent did not request a hearing
and therefore has waived its right to one.
FINDING OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 192, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.453, which states:
§ 192.453 General.
1 http://sitemanager.pdigm.com/user/file/Texas/CPN_Pipeline_Company.pdf (last accessed June 30, 2015).



CPF No. 5-2014-0006
Page 2
The corrosion control procedures required by § 192.605(b)(2),
including those for the design, installation, operation, and maintenance of
cathodic protection systems, must be carried out by, or under the direction
of, a person qualified in pipeline corrosion control methods.
The Notice alleged that Respondent violated 49 C.F.R. § 192.453 by failing to carry out the
corrosion control procedures by, or under the direction of, a person qualified in corrosion control
methods required by § 192.605(b)(2), including those for the design, installation, operation, and
maintenance of cathodic protection systems. Specifically, the Notice alleged that CPN failed to
document the person qualified in pipeline corrosion control methods on its corrosion control
records when specific covered tasks were performed. When reviewing several annual cathodic
protection (CP) survey reports and periodic rectifier reading records, the OPS inspector found
that the name of a qualified individual was missing.
In its Response, CPN disputed the allegation that it violated § 192.453 and attached an affidavit
by their corrosion control specialist stating that he, a qualified corrosion specialist, performed the
corrosion control activities referenced in the Notice. The Respondent stated that, as a small
operator, a single employee, with limited assistance from an outside contractor, performed all
required inspections on its Sacramento Valley pipeline system.
While each cathodic protection survey and rectifier reading should clearly indicate the name of
the qualified individual who performed the task, I find Respondent’s explanation that a single
qualified individual carried out or supervised the corrosion control procedures persuasive. The
regulation in question requires that the procedures be carried out, or performed under the
direction, of a qualified person. The Respondent has provided the name and qualifications of the
individual that performed these tasks, along with his affidavit that the required procedures were
followed for the records referenced in the Notice. The Respondent’s production of this evidence
has shifted the burden of proof to the Western Region to demonstrate that a violation has
occurred. The Region produced no rebuttal evidence.
Respondent did not contest this allegation of violation. Accordingly, after considering all of the
evidence, I find that Respondent complied with 49 C.F.R. § 192.453 by using a person qualified
in pipeline corrosion control to carry out its procedures. Based upon the foregoing, I hereby
order that Item 1 be withdrawn.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 in the Notice for violation of 49
C.F.R. § 192.453. Under 49 U.S.C. § 60118(a), each person who engages in the transportation
of gas or who owns or operates a pipeline facility is required to comply with the applicable
safety standards established under chapter 601. The Director indicates that Respondent has taken
the following actions specified in the proposed compliance order:
1. With respect to the violation of § 192.453 (Item 1), Respondent has provided



CPF No. 5-2014-0006
Page 3
documentation of the qualified individual who performed the task on each cathodic
protection survey and rectifier reading record.
Given that the Notice has been withdrawn, there is no basis for a Compliance Order.
Nevertheless, this Order acknowledges that the Respondent has taken the aforementioned
actions.
Under 49 C.F.R. § 190.243, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of this Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.243. Unless the Associate Administrator, upon request, grants a
stay, the terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false