# LONG BEACH GAS DEPT, CITY OF — Notice of Amendment

- **operation:** document
- **citation:** CPF 520150009M
- **title:** LONG BEACH GAS DEPT, CITY OF — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-07-01
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.1007(a), 192.1007(c), 192.1007(d), 192.1007(e), 192.1007(f).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520150009m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520150009m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520150009m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520150009M
**body:**

Notice of Amendment involving LONG BEACH GAS DEPT, CITY OF. PHMSA's enforcement data identifies the cited regulations as 192.1007(a),  192.1007(c),  192.1007(d),  192.1007(e),  192.1007(f). The case was opened on 2015-07-01 and is reported as closed as of 2016-02-25. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520150009M_Closure Letter_02252016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150009M/520150009M_Closure%20Letter_02252016.pdf

520150009M_Closure Letter_02252016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150009M/520150009M_Closure%20Letter_02252016_text.pdf

520150009M_notice of amendment_07012015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150009M/520150009M_notice%20of%20amendment_07012015.pdf

520150009M_notice of amendment_07012015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150009M/520150009M_notice%20of%20amendment_07012015_text.pdf

520150009M_Operator Response to Notice_07302015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150009M/520150009M_Operator%20Response%20to%20Notice_07302015.pdf

520150009M_notice of amendment_07012015_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 1, 2015
Mr. Stephen Bateman
DOT Compliance Primary Manager
City of Long Beach Gas & Oil
2400 East Spring Street
Long Beach, CA 90806-2285
CPF 5-2015-0009M
Dear Mr. Bateman:
PHMSA conducted an internal audit of its past regulatory inspections and noted that this
previously prepared enforcement letter from a 2012 audit of your pipeline facilities was not
issued. While we apologize for the tardiness of this letter, PHMSA must still ensure any past
regulatory violations have been addressed.
From April 9-12 of 2012, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected your
Long Beach Gas and Oil (LBGO) procedures and records for Distribution Integrity
Management Program (DIMP), as of 2012, in your Long Beach, CA offices.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
LBGO’s plans or procedures, as described below:
1. §192.1007 What are the required elements of an integrity management plan?
A written integrity management plan must contain procedures for developing
and implementing the following elements:
(a) Knowledge. An operator must demonstrate an understanding of its gas



distribution system developed from reasonably available information.
(1) Identify the characteristics of the pipeline's design and operations and the
environmental factors that are necessary to assess the applicable threats and
risks to its gas distribution pipeline.
(2) Consider the information gained from past design, operations, and
maintenance.
(3) Identify additional information needed and provide a plan for gaining that
information over time through normal activities conducted on the pipeline (for
example, design, construction, operations or maintenance activities).
(4) Develop and implement a process by which the IM program will be reviewed
periodically and refined and improved as needed.
(5) Provide for the capture and retention of data on any new pipeline installed.
The data must include, at a minimum, the location where the new pipeline is
installed and the material of which it is constructed.
LBGO’s DIMP did not provide sufficient procedural specificity to describe how the identified
data sources were used to develop and are to be used for implementation for the gathering of
information and knowledge of its gas distribution system.
LBGO’s DIMP did not provide sufficient procedural specificity for identifying, listing, and
collecting (as appropriate) additional data and information that is needed to fill gaps in
knowledge and information due to missing, inaccurate, or incomplete records. If LBGO has
determined there are no information gaps, the DIMP is required to clearly state this
determination.
2. §192.1007 What are the required elements of an integrity management plan?
A written integrity management plan must contain procedures for developing
and implementing the following elements:
(c) Evaluate and rank risk. An operator must evaluate the risks associated with
its distribution pipeline. In this evaluation, the operator must determine the
relative importance of each threat and estimate and rank the risks posed to its
pipeline. This evaluation must consider each applicable current and potential
threat, the likelihood of failure associated with each threat, and the potential
consequences of such a failure. An operator may subdivide its pipeline into
regions with similar characteristics (e.g., contiguous areas within a distribution
pipeline consisting of mains, services and other appurtenances; areas with
common materials or environmental factors), and for which similar actions likely
would be effective in reducing risk.
LBGO’s DIMP did not adequately account for the evaluation and ranking of risks that are
typically associated with pipeline installations installed prior to the 1950’s. While LBGO’s
DIMP identifies, discusses, and analyzes the threats and the higher leak rates associated with
pre-1950’s pipeline (e.g., Table 8, Section 4.2.13, Section 4.2.5.3, Section 5.2), the relative
importance of this combination of threats (or system vulnerability) is not determined and
estimated, and the risks posed to the pipeline system is not ranked against other threats.
2



The threat of “Failure to follow Procedure” discussed in LBGO’s DIMP Section 4.2.5.4 is not
adequately accounted for in the evaluation and ranking of risks and this threat must be
evaluated and ranked. Our inspectors believe the various threats, e.g., employee’s failure to
follow procedures due to any number issues, that are combined in the threat of “Failure to
follow Procedure” as low probability / high consequence risks that must be accounted for and
analyzed.
3. §192.1007 What are the required elements of an integrity management plan?
A written integrity management plan must contain procedures for developing
and implementing the following elements:
(d) Identify and implement measures to address risks. Determine and implement
measures designed to reduce the risks from failure of its gas distribution pipeline.
These measures must include an effective leak management program (unless all
leaks are repaired when found).
LBGO’s DIMP did not adequately address the risk posed to the integrity of their pipelines
system by the threat of the “Age of Infrastructure”. This threat is not adequately evaluated and
ranked in the LBGO DIMP (see Item 2); LBGO has failed to identify measures to address
risks for implementation. LBGO did not identify measures to reduce risk posed by this threat
that adequately account for the low probability / low consequence risks posed by existing
threats from pre-1950’s pipeline installations.
4. §192.1007 What are the required elements of an integrity management plan?
A written integrity management plan must contain procedures for developing
and implementing the following elements:
(e) Measure performance, monitor results, and evaluate effectiveness.
(1) Develop and monitor performance measures from an established baseline to
evaluate the effectiveness of its IM program. An operator must consider the
results of its performance monitoring in periodically re-evaluating the threats
and risks. These performance measures must include the following:
(i) Number of hazardous leaks either eliminated or repaired as required by
§192.703(c) of this subchapter (or total number of leaks if all leaks are repaired
when found), categorized by cause;
(ii) Number of excavation damages;
(iii) Number of excavation tickets (receipt of information by the underground
facility operator from the notification center);
(iv) Total number of leaks either eliminated or repaired, categorized by cause;
(v) Number of hazardous leaks either eliminated or repaired as required by
§192.703(c) (or total number of leaks if all leaks are repaired when found),
categorized by material; and
(vi) Any additional measures the operator determines are needed to evaluate the
effectiveness of the operator's IM program in controlling each identified threat.
3



5. LBGO’s DIMP lacked procedural specificity for collecting information for performance
measures for leak eliminated or repaired categorized by material (§192.1007(e)(1)(v)) as well
as those performance measures used to track the effectiveness of measures implemented to
reduce risk (§192.1007(e)(1)(vi)).
§192.1007 What are the required elements of an integrity management plan?
A written integrity management plan must contain procedures for developing
and implementing the following elements:
(f) Periodic Evaluation and Improvement. An operator must re-evaluate threats
and risks on its entire pipe-line and consider the relevance of threats in one
location to other areas. Each operator must determine the appropriate period for
conducting complete program evaluations based on the complexity of its system
and changes in factors affecting the risk of failure. An operator must conduct a
complete program re-evaluation at least every five years. The operator must
consider the results of the performance monitoring in these evaluations.
LBGO’s DIMP lacked procedural specificity to detail how LBGO conducts a periodic
evaluation. The delineation between the annual review and periodic evaluation (not to exceed
5 years) is not clear in the DIMP. These tasks appear to either need to be merged together
(until the time a periodic evaluation is conducted on a longer interval) or the steps and actions
to perform a periodic evaluation must be clearly described in the required procedural format.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond
within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to
find facts as alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 60 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
It is requested (not mandated) that Long Beach Gas and Oil maintain documentation of the
4



safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Chris Hoidal, Director,
Western Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 5-2015-0009M and, for each document you
submit, please provide a copy in electronic format whenever possible.
PHMSA does apologize for any inconvenience or confusion that this delayed enforcement let
might cause. If there are any questions concerning this letter, please do not hesitate to contact
me at (720) 963-3160. Thank you for your cooperation in this matter.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 H. Monfared (#139063)
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
5

520150009M_Closure Letter_02252016_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 25, 2016
Mr. Stephen Bateman
DOT Compliance Primary Manager
City of Long Beach Gas & Oil
2400 East Spring Street
Long Beach, CA 90806-2285
CPF 5-2015-0009M
Case Closure
Dear Mr. Bateman:
Between April 9-12, 2012, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected City
of Long Beach Gas & Oil DIMP program in City of Long Beach. As a result of the
inspection, City of Long Beach Gas & Oil was issued a Notice of Amendment on July 1,
2015, which proposed amendment of your procedures.
We received your amended procedures dated July 30, 2015. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in the Notice of Amendment have
been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
For Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 H. Monfared (#139063)