# HILCORP ALASKA, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 520150016M
- **title:** HILCORP ALASKA, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-11-03
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.615(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520150016m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520150016m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520150016m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520150016M
**body:**

Notice of Amendment involving HILCORP ALASKA, LLC. PHMSA's enforcement data identifies the cited regulation as 192.615(b). The case was opened on 2015-11-03 and is reported as closed as of 2015-12-23. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520150016M_Closure Letter_12232015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150016M/520150016M_Closure%20Letter_12232015.pdf

520150016M_Closure Letter_12232015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150016M/520150016M_Closure%20Letter_12232015_text.pdf

520150016M_Notice of Amendment_11032015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150016M/520150016M_Notice%20of%20Amendment_11032015.pdf

520150016M_Notice of Amendment_11032015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150016M/520150016M_Notice%20of%20Amendment_11032015_text.pdf

520150016M_Operator Response to Notice_12042015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520150016M/520150016M_Operator%20Response%20to%20Notice_12042015.pdf

520150016M_Closure Letter_12232015_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
December 23, 2015
Mr. David S. Wilkins
Senior Vice President of Alaska
Hilcorp Alaska, LLC
3800 Centerpoint Dr., Suite 1400
Anchorage, Alaska 99503
CPF 5-2015-0016M
Dear Mr. Wilkins:
On March 23, 2015, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an
on-site pipeline safety inspection of Hilcorp Alaska procedures in Anchorage, Alaska. As a
result of the inspection, Hilcorp Alaska was issued a Notice of Amendment on November 3,
2015, which proposed amendment of procedures.
Hilcorp Alaska submitted its amended procedures on December 4, 2015. My staff has
reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice
of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
For Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 D. Hassell (#149002)

520150016M_Notice of Amendment_11032015_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
November 3, 2015
Mr. David S. Wilkins
Senior Vice President of Alaska
Hilcorp Alaska, LLC
3800 Centerpoint Dr., Suite 1400
Anchorage, Alaska 99503
CPF 5-2015-0016M
Dear Mr. Wilkins:
On March 23, 2015, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected Hilcorp’s
Operations and Maintenance manual, Department Of Transportation (DOT) Operator
Qualifications program, records, Control Room Management program and Beluga pipeline
specific Operations Manual for the pipeline from Kaloa Junction facility near Granite Point to
Beluga.
On the basis of the inspection, PHMSA identified an apparent inadequacy within Hilcorp’s plans
or procedures, as described below:
1. §192. 615 Emergency plans.
(b) Each operator shall: (1) Furnish its supervisors who are responsible for
emergency action a copy of that portion of the latest edition of the emergency
procedures established under paragraph (a) of this section as necessary for
compliance with those procedures.
(2) Train the appropriate operating personnel to assure that they are knowledgeable
of the emergency procedures and verify that the training is effective.
(3) Review employee activities to determine whether the procedures were effectively
followed in each emergency.
Hilcorp did not establish adequate written procedures for verifying the effectiveness of its
emergency plan training for operating personnel. Hilcorp procedures did not ensure that their
operating personnel are knowledgeable of their emergency procedures.



Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this
Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49
C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within 30 days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that Hilcorp maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to Chris Hoidal, Director, Western Region, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please
refer to CPF 5-2015-0016M and, for each document you submit, please provide a copy in
electronic format to PHP-WRADMIN@dot.gov whenever possible.
Sincerely,
For Chris Hoidal,
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 D. Hassell (#149002)