# QEP MARKETING COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 520171008M
- **title:** QEP MARKETING COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-05-26
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.605(a), 192.605(b)(8), 192.605(e), 192.615(a)(6).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520171008m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520171008m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520171008m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520171008M
**body:**

Notice of Amendment involving QEP MARKETING COMPANY. PHMSA's enforcement data identifies the cited regulations as 192.605(a),  192.605(b)(8),  192.605(e),  192.615(a)(6). The case was opened on 2017-05-26 and is reported as closed as of 2017-09-15. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520171008M_Closure Letter_09152017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520171008M/520171008M_Closure%20Letter_09152017.pdf

520171008M_Closure Letter_09152017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520171008M/520171008M_Closure%20Letter_09152017_text.pdf

520171008M_Notice of Amendment_05262017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520171008M/520171008M_Notice%20of%20Amendment_05262017.pdf

520171008M_Notice of Amendment_05262017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520171008M/520171008M_Notice%20of%20Amendment_05262017_text.pdf

520171008M_Operator Response to Notice_06222017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520171008M/520171008M_Operator%20Response%20to%20Notice_06222017.pdf

520171008M_Closure Letter_09152017_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
September 15, 2017
Mr. Matt Thompson
Vice President Energy
QEP Energy
1050 17th St., Suite 800
Denver, CO 80265
CPF 5-2017-1008M
Closure Letter
Dear Mr. Thompson:
On August 17 through 21, 2015, a representative from the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of the QEP Marketing Company’s (QEP)
Clear Creek Gas Storage gas transmission unit located near Evanston, Wyoming. As a result
of the inspection, QEP was issued a Notice of Amendment on May 26, 2017, which proposed
amendment of your procedures.
QEP submitted its amended procedures on June 22, 2017. PHMSA reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have
been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Huy Nguyen
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 B. Brown

520171008M_Notice of Amendment_05262017_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
May 26, 2017
Mr. Matt Thompson
Vice President Energy
QEP Energy
1050 17th St, Suite 800
Denver, CO 80265
CPF 5-2017-1008M
Dear Mr. Thompson:
On August 17 through 21, 2015, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
inspected QEP Marketing Company’s (QEP) Clear Creek Gas Storage gas transmission unit
located near Evanston, Wyoming.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
QEP’s plans or procedures, as described below:
1. §192.605 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a manual
of written procedures for conducting operations and maintenance activities and
for emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed
and updated by the operator at intervals not exceeding 15 months, but at least
once each calendar year. This manual must be prepared before operations of a
pipeline system commence. Appropriate parts of the manual must be kept at
locations where operations and maintenance activities are conducted.
(e) Surveillance, emergency response, and accident investigation. The procedures
required by §§ 192.613(a), 192.615, and 192.617 must be included in the manual



required by paragraph (a) of this section.
QEP’s Emergency Plan was in a separate book from the O & M Manual and the O & M
Manual did not reference the Emergency Plan. Also, the operator's Emergency Plan does not
address an annual review of the plan. In accordance with 192.602(e) with the emergency
response (emergency plan) part of the O & M Manual that is required in 192.605(a) and thus
part of the annual O&M Manual review. Standard 192.605(a), has an annual review
requirement, also includes emergency response (emergency plan) in its requirements.
Without referencing the Emergency Plan in the O&M Manual there is no Annual Review
requirement for the Emergency Plan. QEP’s O&M Manual needs to incorporate the
Emergency Plan by reference or add the annual review requirement to the Emergency Plan.
2. §192.605 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a manual
of written procedures for conducting operations and maintenance activities and
for emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed
and updated by the operator at intervals not exceeding 15 months, but at least
once each calendar year. This manual must be prepared before operations of a
pipeline system commence. Appropriate parts of the manual must be kept at
locations where operations and maintenance activities are conducted.
(e) Surveillance, emergency response, and accident investigation. The procedures
required by §§ 192.613(a), 192.615, and 192.617 must be included in the manual
required by paragraph (a) of this section.
§192.615 Emergency Plan.
(a) Each operator shall establish written procedures to minimize the hazard
resulting from a gas pipeline emergency. At a minimum, the procedures must
provide for the following:
(6) Emergency shutdown and pressure reduction in any section of the operator's
pipeline system necessary to minimize hazards to life or property.
QEP’s Emergency Plan did not include procedures for the emergency shutdown or pressure
reduction in any section of pipeline system as would be necessary to minimize hazards to life
or property. The operator's Emergency Plan needs to be amended to include this procedure.
3. §192.605 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a manual
of written procedures for conducting operations and maintenance activities and
for emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed
and updated by the operator at intervals not exceeding 15 months, but at least
once each calendar year. This manual must be prepared before operations of a
pipeline system commence. Appropriate parts of the manual must be kept at
locations where operations and maintenance activities are conducted.
(c) Abnormal operation. For transmission lines, the manual required by
2



paragraph (a) of this section must include procedures for the following to provide
safety when operating design limits have been exceeded:
(4) Periodically reviewing the response of operator personnel to determine the
effectiveness of the procedures controlling abnormal operation and taking
corrective action where deficiencies are found.
QEP’s O&M Manual does not have a procedure requiring a periodic review of operator
personnel to determine the effectiveness of the procedures controlling abnormal operation
and taking corrective action where deficiencies are found. This review.
4. §192.605 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a manual of
written procedures for conducting operations and maintenance activities and for
emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed and
updated by the operator at intervals not exceeding 15 months, but at least once
each calendar year. This manual must be prepared before operations of a pipeline
system commence. Appropriate parts of the manual must be kept at locations
where operations and maintenance activities are conducted.
(b) Maintenance and normal operations. The manual required by paragraph (a)
of this section must include procedures for the following, if applicable, to provide
safety during maintenance and operations.
(8) Periodically reviewing the work done by operator personnel to determine the
effectiveness, and adequacy of the procedures used in normal operation and
maintenance and modifying the procedures when deficiencies are found.
QEP’s O&M Manual does not have a procedure requiring a periodic review of operator
personnel to determine the effectiveness of the procedures controlling normal operation and
taking corrective action where deficiencies are found.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in
this Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as
alleged in this Notice without further notice to you and to issue an Order Directing
3



Amendment. If your plans or procedures are found inadequate as alleged in this Notice, you
may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R.
§190.206). If you are not contesting this Notice, we propose that you submit your amended
procedures to my office within 30 days of receipt of this Notice. This period may be extended
by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that QEP Energy maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision
of plans, procedures) and submit the total to Kim West, Acting Director, Western Region,
Pipeline and Hazardous Materials Safety Administration. In correspondence concerning this
matter, please refer to CPF 5-2017-1008M and, for each document you submit, please
provide a copy in electronic format whenever possible.
Sincerely,
Kim West
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 B. Brown (#149941)
4