# THUNDER BASIN PIPELINE, LLC — Warning Letter

- **operation:** document
- **citation:** CPF 520176008W
- **title:** THUNDER BASIN PIPELINE, LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-03-27
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 194.117(a)(1)(i), 194.117(b)(1), 195.403(a)(1), 195.404(c)(2), 195.404(c)(3), 195.569, 195.579(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520176008w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520176008w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520176008w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520176008W
**body:**

Warning Letter involving THUNDER BASIN PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 194.117(a)(1)(i),  194.117(b)(1),  195.403(a)(1),  195.404(c)(2),  195.404(c)(3),  195.569,  195.579(c). The case was opened on 2017-03-27 and is reported as closed as of 2017-03-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520176008W_Operator Response to Notice_04042017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520176008W/520176008W_Operator%20Response%20to%20Notice_04042017.pdf

520176008W_Warning Letter_03272017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520176008W/520176008W_Warning%20Letter_03272017.pdf

520176008W_Warning Letter_03272017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520176008W/520176008W_Warning%20Letter_03272017_text.pdf

520176008W_Warning Letter_03272017_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 27, 2017
Mr. Grant Simms
CEO
Genesis Energy, L.P.
919 Milam Street, Suite 2100
Houston, TX 77002
CPF 5-2017-6008W
Dear Mr. Simms:
On September 19 through 23, 2016, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
inspected your Thunder Basin Pipeline in Douglas, Wyoming.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violations are:
1. §194.117 Training.
(b) Each operator shall maintain a training record for each individual that has
been trained as required by this section. These records must be maintained in the
following manner as long as the individual is assigned duties under the response
plan:
(1) Records for operator personnel must be maintained at the operator’s
headquarters.



Hazwoper refresher (every two years) training records are not being kept current for response
personnel. Hazwoper refresher training for a first emergency responder, 2014 certification,
was not signed by the instructor or the employee. In addition, hazwoper refresher training for
a second emergency responder was not provided for 2014 or 2016. Furthermore, Hazwoper
refresher training records for a third emergency responder indicated it was beyond the two-
year interval for refresher training but was assigned the duties without having recertification.
2. §194.117 Training.
(a) Each operator shall conduct training to ensure that:
(i) Their responsibilities under the response plan.
Per Appendix D of the operator’s Facility Response Plan (FRP), the operator states they are
performing quarterly QI notification exercises, annual equipment deployment exercises, and
annual spill management team tabletop exercises. The operator failed to perform an annual
tabletop exercise in 2014.
3. §195.403 Emergency Response Training.
(a) Each operator shall establish and conduct a continuing training program to
instruct emergency response personnel to:
(1) Carry out the emergency procedures established under 195.402 that relate to
their assignments.
The operator adopted Enterprise’s O&M Manual in August 2016. Prior to that, the operator
used Genesis’s LOME Manual. The operator has not demonstrated that they are performing
training to its emergency response personnel. Documentation could not be provided to
demonstrate that emergency response training occurred in 2015.
4. §195.404 Maps and Records.
(c) Each operator shall maintain the following records for the period specified:
(2) The date, location, and description of each repair made to parts of the
pipeline system other than pipe shall be maintained for at least 1 year.
The operator’s records indicated that during an inspection of valve #1810 (on October 12,
2015), the valve was not seating completely. Records to demonstrate that corrective actions
were implemented could not be provided.
5. §195.404 Maps and Records.
(c) Each operator shall maintain the following records for the period specified:
(3) A record of each inspection and test required by this subpart shall be
maintained for at least two years or until the next inspection or test is performed,
whichever is longer.
The 2012 API 653 tank inspection for Tank #1154 indicated several repairs were necessary.
The operator was able to provide a proposal for tank repairs and an invoice for repairs but
2



could not demonstrate explicitly which repairs were performed. Detailed repair
documentation could not be provided.
6. §195.569 Do I have to examine exposed portions of buried pipeline?
Whenever you have knowledge when any portion of a buried pipeline is exposed,
you must examine the exposed portion for evidence of external corrosion if the
pipe is bare, or if the coating is deteriorated. If you find external corrosion
requiring corrective action under 195.585, you must investigate circumferentially
and longitudinally beyond the exposed portion (by visual examination, indirect
method, or both) to determine whether additional corrosion requiring remedial
action exists in the vicinity of the exposed portion.
Exposed piping reports from Calendar Year 2014 to September 2016 were reviewed. One
exposure, that occurred in 2014, did not include documentation of a coating inspection.
7. §195.579 What must I do to mitigate internal corrosion?
(c) Removing pipe: Whenever you remove pipe from a pipeline, you must inspect
the internal surface of the pipe for evidence of corrosion. If you find internal
corrosion requiring corrective action under 195.585, you must investigate
circumferentially and longitudinally beyond the removed pipe (by visual
examination, indirect method, or both) to determine whether additional
corrosion requiring remedial action exists in the vicinity of the removed pipe.
A mainline valve was replaced at Lisco Junction in May 2016. Records for the replacement of
the valve were reviewed. No records were provided to demonstrate that an internal inspection
for corrosion was performed on the removed pipe/valve at Lisco Junction.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed
$205,638 per violation per day the violation persists up to a maximum of $2,056,380 for a
related series of violations. For violation occurring between January 4, 2012 to August 1,
2016, the maximum penalty may not exceed $200,000 per violation per day, with a maximum
penalty not to exceed $2,000,000 for a related series of violations. For violations occurring
prior to January 4, 2012, the maximum penalty may not exceed $100,000 per violation per
day, with a maximum penalty not to exceed $1,000,000 for a related series of violations.
We have reviewed the circumstances and supporting documents involved in this case, and
have decided not to conduct additional enforcement action or penalty assessment proceedings
at this time. We advise you to correct the item(s) identified in this letter. Failure to do so will
result in Genesis Energy, L.P. being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 5-2017-6008W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
3



along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (#153764)
4
- **truncated:** false
- **body characters:** 7925