# HILCORP ALASKA, LLC — Corrective Action Order

- **operation:** document
- **citation:** CPF 520177002H
- **title:** HILCORP ALASKA, LLC — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-04-07
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520177002h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520177002h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520177002h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520177002H
**body:**

Corrective Action Order involving HILCORP ALASKA, LLC. The dataset does not identify a cited regulation for this case. The case was opened on 2017-04-07 and is reported as closed as of 2017-05-01. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520177002H_Corrective Action Order_04072017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520177002H/520177002H_Corrective%20Action%20Order_04072017.pdf

520177002H_Corrective Action Order_04072017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520177002H/520177002H_Corrective%20Action%20Order_04072017_text.pdf

520177002H_Region Withdrawal of Notice_05012017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520177002H/520177002H_Region%20Withdrawal%20of%20Notice_05012017.pdf

520177002H_Region Withdrawal of Notice_05012017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520177002H/520177002H_Region%20Withdrawal%20of%20Notice_05012017_text.pdf

520177002H_Corrective Action Order_04072017_text.pdf

VIA CERTIFIED MAIL AND FAX TO (907) 777-8301
April 7, 2017
Mr. Greg Lalicker
President
Hilcorp Alaska, LLC
1201 Louisiana St., Suite 1400
Houston, Texas 77002
RE: CPF No. 5-2017-7002H
Corrections to Order
Dear Mr. Lalicker:
The Pipeline and Hazardous Materials Safety Administration (PHMSA) issued a Corrective Action Order
(CAO), CPF No. 5-2017-7002H, to your company on April 6, 2017. After further review, we have found
we need to make corrections and have attached a CAO showing those corrections:
On Page 3, third paragraph from the bottom – Preliminary finding reference to “in-line
inspection” was deleted in its entirety and replaced with “pigging” of the Affected Segment.
On Page 6, Paragraph 5 – The Required Corrective Actions mandate the daily monitoring to be
completed during “neap” tide, when in fact it should have said during “slack tide during daylight
hours”.
Additionally, an enhanced map of the Anna to Bruce platforms is attached.
If you have any questions concerning this letter, please contact Mr. David Hassell, Alaska Office
Operations Supervisor, at (907) 271-6519.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 T. Johnson
Mr. David S. Wilkins, Senior Vice President, Hilcorp Alaska, LLC
Ms. Erin McKay, Regulatory Compliance Manager, Hilcorp Alaska, LLC



April 7, 2017
VIA CERTIFIED MAIL AND EMAIL TO: glalicker@hilcorp.com
Mr. Greg Lalicker
President
Hilcorp Alaska, LLC
1111 Travis Street
Houston, Texas 77002
CPF No. 5-2017-7002H
Dear Mr. Lalicker:
Enclosed please find a Corrective Action Order (CAO) issued by the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), in the above-
referenced case. It requires Hilcorp Alaska, LLC, a subsidiary of Hilcorp Energy Company, to
take certain corrective actions with respect to its 8-inch sub-sea hazardous liquids pipeline running
from the Anna Platform to the Bruce Platform that experienced a crude oil release on April 1,
2017, into the Cook Inlet of Alaska.
Service of this CAO is being made by certified mail and facsimile. Service of the CAO by
electronic transmission is deemed complete upon transmission and acknowledgement of receipt,
or as otherwise provided under 49 C.F.R. § 190.5. The terms and conditions of this Order are
effective upon completion of service.
Sincerely,
for Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure: CAO, w/ copy of 49 C.F.R. § 190.233
cc: Ms. Linda Daugherty, Deputy Associate Administrator for Field Operations, OPS
Mr. Chris Hoidal, Region Director, Western Region, OPS
Ms. Erin McKay, Regulatory Compliance Manager, Alaska Integrity Group, Hilcorp
Alaska, LLC, at emckay@hilcorp.com



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
________________________________________________
In the Matter of )
)
)
Hilcorp Alaska, LLC, )
a subsidiary of Hilcorp Energy Company, Respondent. )
)
)
_______________________________________________ )
) CPF No. 5-2017-7002H
CORRECTIVE ACTION ORDER
Purpose and Background:
This Corrective Action Order (CAO or Order) is being issued under the authority of 49 U.S.C.
§ 60112 to require Hilcorp Alaska, LLC (Hilcorp or Respondent), to take the necessary
corrective actions to protect the public, property, and the environment from potential hazards
associated with the release from its 8-inch hazardous liquids subsea pipeline running from
Hilcorp’s Anna Platform to its Bruce Platform in the Cook Inlet, Alaska.1
On April 1, 2017, a reportable accident occurred on the portion of Hilcorp’s 8-inch, subsea
pipeline that runs from the Anna Platform to the Bruce Platform (Affected Segment), resulting in
the release of an unknown quantity of crude oil (Failure). Hilcorp reported that no injuries or
fatalities occurred as a result of the Failure and there was no fire or explosion. The Failure
occurred in a High Consequence Area (HCA) with endangered and threatened species of marine
life near the location of the spill.2 The cause of the Failure has not yet been determined.
Pursuant to 49 U.S.C. § 60117, the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), initiated an investigation of the Failure. The
preliminary findings of the agency's ongoing investigation are as follows:
Preliminary Findings:
 The Granite Point crude oil pipeline facilities include pipelines associated with the Anna
Platform, Bruce Platform, Granite Point Platform, and Granit Pointe Tank Farm. The
1 The Anna to Bruce pipeline is a crude-oil gathering line that is part of Hilcorp’s Granite Point pipeline facilities
located in the Cook Inlet, Alaska.
2 According to 49 C.F.R. § 195.450, a “High Consequence Area” is (1) a commercially navigable waterway, (2) a
high population area, (3) an “other populated area,” or (4) “an unusually sensitive area,” as more specifically defined
in § 195.6.



CPF No. 5-2017-7002H
Page 3
Failure is associated with the crude oil pipeline that transports crude oil from the Anna
Platform to the Bruce Platform. Once on the Bruce Platform, the Anna crude oil is
commingled with the crude oil produced on the Bruce Platform and the commingled
crude oil is transported by pipeline from the Bruce Platform to the Granite Point Tank
Farm.3
 The Affected Segment is a crude-oil pipeline associated with Hilcorp’s Granite Point Tank
Farm (GPTF) facility. The GPTF includes crude-oil and gas pipelines that serve the
company’s Anna, Bruce, Granite Point, Spark, and Spurr Platforms in Cook Inlet. The
GPTF is not part of Hilcorp’s Middle Ground Shoal (MGS) Fuel Gas System, which is
currently experiencing an ongoing natural gas leak in another part of the Cook Inlet,
Alaska and is subject to a separate PHMSA enforcement proceeding.4
 The Affected Segment is approximately 8570 feet in length, and is constructed with
8.625-inch diameter, Grade B, seamless pipe with a coal tar/enamel coating. The pipe
wall thickness is 0.593 inch for the offshore pipe and 0.500 inch for the riser pipe. The
steel coating is in turn overlaid with a 1.25-inch-thick concrete coating. This segment
was installed in 1966. The Maximum Operating Pressure (MOP) of the pipeline is 340
psig.
 The Affected Segment has a maximum capacity of 461 barrels of crude oil and was
operating at full capacity at the time of the Failure. The crude oil in the Affected Segment
is produced and processed on the Anna Platform for crude-oil pipeline transportation.
The Anna to Bruce pipeline was operating at 70 psi at the time of the Failure.
 At approximately 11:20 a.m. AKDT (all times are AKDT unless otherwise noted) on
April 1, 2017, Hilcorp discovered a discharge of crude oil due to a potential leak on the
Anna to Bruce pipeline. Hilcorp reported an impact on the Anna Platform and
immediately confirmed by visual observation a crude-oil release. Hilcorp reported that
the Affected Segment and the Anna Platform were shut in (closed) immediately upon the
visual observation of the release. The Bruce Platform is still operating and continues to
produce and send processed crude oil to the GPTF facility.
 The accident was initially reported by Hilcorp to the National Response Center at 3:55
p.m. EDT on April 1, 2017 (NRC Report No. 1174601), indicating a release of an
unknown quantity of crude oil. Hilcorp subsequently reported that the release amount
was less than 10 gallons.
 No injuries or fatalities occurred as a result of the Failure and there was no fire or
explosion. The Affected Segment is located in an Unusually Sensitive Area with
endangered and threatened species marine life in and around the location of the Failure.
3 See Figure 1, Map of the Granite Point crude oil pipeline facilities
4 See, In the Matter of Hilcorp Alaska, LLC [5-2017-0004S] (available on PHMSA’s website).



CPF No. 5-2017-7002H
Page 4
 On April 1, 2017, Hilcorp directed its Oil Spill Removal Organization (OSRO), Cook
Inlet Spill Prevention & Response, Inc. (CISPRI), to mobilize the spill response ship
Perseverance. Hilcorp also mobilized a helicopter overflight in the area of the
Failure. The overflight confirmed the presence of a crude-oil sheen. There were
approximately six different sheens found near the area of the Failure. Most of the sheens
had an area of approximately 100 square feet. The leading edge of the sheens was
approximately 3.5 miles south from the Anna Platform.
 At 1:15 p.m. AKDT on April 2, 2017, Hilcorp began activities to purge the Affected
Segment of oil and replace it with sea water by the use of a foam pig. The purging
activities were completed at 9:20 p.m. on April 2, 2017, and the Affected Segment is now
purged. ADEC and the USCG had observers on the Anna Platform during the purging of
the Affected Segment. PHMSA’s Office of Pipeline Safety Western Region also had an
inspector present at the Incident Command Site in Nikiski, Alaska.
 On April 2, 2017, at 8:00 a.m., a Unified Command comprised of the USCG, ADEC, and
Hilcorp was established.
 The Affected Segment had an In Line Inspection (ILI) preformed in June 2016. Less than
20 anomalies were found. The deepest anomaly had metal loss less than 35 percent of the
0.593” thick pipe wall.
 On April 3, 2017, Hilcorp conducted an additional overflight and reported no observable
oil sheen or wildlife in the area of the Failure. Based on the overflight information from
April 2nd and April 3rd, the Unified Command stood down the Incident Command Post
at 9:00 a.m. on April 3rd 2017.
 On April 3-4, 2017, Hilcorp conducted pigging of the Affected Segment. Hilcorp reported
that it sent a cleaning/scraper “pig” followed by a foam pig toward the Bruce Platform,
past the sub-sea flanges near the Anna Platform. Hilcorp used 100 barrels of filtered
Cook Inlet water to push the pigs past the sub-sea flanges near the Anna Platform.
Hilcorp reported that they are unable to send the pigs the full distance to the Bruce
Platform at this time due to the low water-handling capability at the Bruce Platform.
 On April 3-4, 2017, Hilcorp conducted a pressure test on the Affected Segment by
increasing the pressure to 340 psig for a period of 24 hours. Hilcorp reported that the
Affected Segment lost pressure slowly during the test.
 Hilcorp reports that it installed blind flanges on both ends of the Affected Segment. On
April 5, 2017, Hilcorp performed a second pressure test on the Affected Segment starting
at 1:30 a.m. to 337 psig. The pipeline pressure was 335 psig at 6:30 a.m. At
approximately 8:30 a.m., the pressure was reading 336 psig, seven hours after the test
began. Hilcorp reports that it will prepare to perform an eight-hour hydro test in
accordance with Federal pipeline safety standards, 49 CFR Part 195, Subpart E.



CPF No. 5-2017-7002H
Page 5
 Hilcorp reports that it is developing a plan to return the Affected Segment to service but
will wait to see the results of the pressure test before making a determination on returning
the line to service.
 Hilcorp reports that is has not yet identified the exact location of the release, its cause, or
the exact amount of product released into the environment.
Determination of Necessity for Corrective Action Order and Right to Hearing:
Section 60112 of Title 49, United States Code, provides for the issuance of a Corrective Action
Order, after reasonable notice and the opportunity for a hearing, requiring corrective action,
which may include the suspended or restricted use of a pipeline facility, physical inspection,
testing, repair, replacement, or other action, as appropriate. The basis for making the
determination that a pipeline facility is hazardous and requiring corrective action is set forth both
in the above-referenced statute and 49 C.F.R.§ 190.233, a copy of which is enclosed.
Section 60112, and the regulations promulgated thereunder, provide for the issuance of a
Corrective Action Order without prior opportunity for notice and hearing upon a finding that
failure to issue the Order expeditiously will likely result in serious harm to life, property or the
environment. In such cases, an opportunity for a hearing will be provided as soon as practicable
after the issuance of the Order.
After evaluating the foregoing preliminary findings of fact and considering the ongoing
investigation of the Failure, I find that the continued operation of the Affected Segment without
corrective measures is or would be hazardous to life, property and the environment.
Additionally, after considering the age of the pipe, the circumstances surrounding the Failure, the
hazardous nature of the product being transported, the pressure required for transporting the
material, the uncertainties as to the cause of the Failure, the environmental hazards associated
with the Failure, the location of the Failure in an HCA, and the ongoing investigations to
determine the cause of the Failure, I find that a failure to issue this Order expeditiously to require
immediate corrective action would result in likely serious harm to life, property, and the
environment.
Accordingly, this Corrective Action Order mandating immediate corrective action is issued
without prior notice and opportunity for a hearing. The terms and conditions of this Order are
effective upon receipt.
Within 10 days of receipt of this Order, Respondent may request a hearing, to be held as soon as
practicable, by notifying the Associate Administrator for Pipeline Safety in writing, with a copy
to the Director, Western Region, PHMSA (Director). If a hearing is requested, it will be held
telephonically or in-person in Denver, Colorado, unless a different location is expressly agreed to
in writing by the Director.
After receiving and analyzing additional data in the course of this investigation, PHMSA may
identify other corrective measures that need to be taken. Respondent will be notified of any



CPF No. 5-2017-7002H
Page 6
additional measures required and amendment of this Order will be considered. To the extent
consistent with safety, Respondent will be afforded notice and an opportunity for a hearing prior
to the imposition of any additional corrective measures.
Required Corrective Actions:
Definitions:
Affected Segment – The Affected Segment means Respondent’s 8-inch crude-oil subsea pipeline
segment of the Granite Point Tank Farm pipeline facility that runs approximately 1.6 miles from
the Anna Platform to the Bruce Platform in the Cook Inlet, Alaska.
Director – The Director means the Director, Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety, Western Region.
Failure Site – The Failure Site means the location on the Affected Segment where the leak
occurred on April 1, 2017 in Cook Inlet, Alaska.
Pursuant to 49 U.S.C. 60112, I hereby order Hilcorp to immediately take the following corrective
actions for the Affected Segment:
1. Shut down of the Affected Segment. Hilcorp must not operate the Affected Segment
until authorized to do so by the Director.
Pressure Test. Within five days of receipt of this Order, Hilcorp must perform a
hydrostatic pressure test of the Affected Segment during daylight hours that meets the
requirements of 49 CFR Part 195 Subpart E. Hilcorp must submit the results of the
Subpart E pressure test to the Director within three days of completing the pressure test
required by this paragraph. Additionally, prior to the hydrostatic pressure test, Hilcorp
must conduct a full volumetric accounting of the displaced oil in the pipeline.
Inspection. Within 25 days of receipt of this Order, Hilcorp must conduct a direct visual
examination of the Affected Segment at the point where it exits the Anna Platform leg,
including the interior of the Anna Platform leg, to ensure there has been no physical
damage to the pipeline or ancillary connections. Examination of the annulus between the
pipeline and the Anna Platform leg, including sampling for hydrocarbons, shall also be
completed during this time. Hilcorp must submit written results of the visual
observations and sampling, including any photographs, videos, or other supporting
documentation, within three days of completion of the inspection required by this
paragraph.
Review of Prior ILI Results. Within 14 days of receipt of this Order, Hilcorp must
conduct a reevaluation of the 2016 ILI survey results on the Affected Segment, including
a review of the ILI vendors' raw data and analysis. Hilcorp must determine if any
features were present on the Affected Segment that may indicate an integrity-threatening
anomaly. Hilcorp must submit documentation of this ILI review and analysis to the
Director within 21 days of receipt of this Order.
2. 3. 4.



CPF No. 5-2017-7002H
Page 7
5. Return to Service. Hilcorp must provide a restart plan to the Director for review and
approval that demonstrates CAO Corrective Items 2-4 above have been completed prior
to restart. The restart plan must also include a plan to conduct daily monitoring of the
Affected Segment right-of-way. The daily monitoring shall be conducted during slack
tide during daylight hours for a period of 30 consecutive days.
6. Root Cause Failure Analysis. Within 90 days following receipt of this Order, Hilcorp
must complete a root cause failure analysis (RCFA) that is supplemented and facilitated
by an independent third-party vendor acceptable to the Director. The RCFA must
document all contributory factors and the decision-making process. Hilcorp must submit
a final report of the RCFA to the Director. The final report must include findings, any
lessons learned, and whether the findings and any lessons learned are applicable to other
locations within Hilcorp’s Granite Point Tank Farm Platform pipeline systems.
In addition to the above Corrective Action Items, PHMSA strongly encourages, but does not
order, that Respondent take immediate steps to develop and implement a Safety Management
System (SMS) for all its pipeline assets in Cook Inlet and that such a system be fully
implemented within one year from the Date of this Order. API 1173 provides pipeline operators
with safety management system requirements that, when properly applied, provide an effective
framework for revealing and managing risk, promoting a learning environment, and continuously
improving pipeline safety and integrity.
The Director may grant an extension of time for compliance with any of the terms of this Order
upon a written request timely submitted demonstrating good cause for an extension.
With respect to each submission that under this Order requires the approval of the Director, the
Director may: (a) approve, in whole or part, the submission; (b) approve the submission on
specified conditions; (c) modify the submission to cure any deficiencies; (d) disapprove, in
whole or in part, the submission, directing that Respondent modify the submission; or (e) any
combination of the above. In the event of approval, approval upon conditions, or modification
by the Director, Respondent will proceed to take all action required by the submission as
approved or modified by the Director. If the Director disapproves all or any portion of the
submission, Respondent will correct all deficiencies within the time specified by the Director,
and resubmit it for approval. If a resubmitted item is disapproved in whole or in part, the
Director may again require Respondent to correct the deficiencies in accordance with the
foregoing procedure, and the Director may otherwise proceed to enforce the terms of this Order.
Be advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. § 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. § 552(b).



CPF No. 5-2017-7002H
Page 8
In your correspondence on this matter, please refer to "CPF No. 5-2017-7002H” and for each
document you submit, please provide a copy in electronic format whenever possible. The
actions required by this Order are in addition to and do not waive any requirements that apply to
Respondent's pipeline system under 49 C.F.R. Parts 190 through 199, under any other order
issued to Respondent under authority of 49 U.S.C. Chapter 601, or under any other provision of
Federal or State law.
Respondent may appeal any decision of the Director to the Associate Administrator for Pipeline
Safety. Decisions of the Associate Administrator shall be final.
Failure to comply with this Order may result in the assessment of civil penalties and in referral to
the Attorney General for appropriate relief in United States District Court pursuant to
49 U.S.C. § 60120.
The terms and conditions of this Order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
April 7, 2017
_________________________________ ________________
for Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

520177002H_Region Withdrawal of Notice_05012017_text.pdf

May 1, 2017
VIA FACSIMILE TO (907) 777-8301 AND CERTIFIED MAIL
Mr. Greg Lalicker
President
Hilcorp Alaska, LLC
1111 Travis Street
Houston, Texas 77002
RE: Corrective Action Order CPF No. 5-2017-7002H
Granite Point Tank Farm Pipeline Facilities (Anna to Bruce Pipeline)
Notice of Withdrawal
Dear Mr. Lalicker:
On April 7, 2017, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
a Corrective Action Order (CAO) to Hilcorp Alaska, LLC (Hilcorp) for the potential hazards
associated with the April 1, 2017 release of crude oil from Hilcorp’s Granite Point Tank Farm
Pipeline Facilities. Hilcorp initially reported to PHMSA that the release was a result of a failure
on the Anna to Bruce crude oil pipeline (Pipeline), which is a component of the Granite Point
Tank Farm Pipeline Facilities, and runs between the Anna Platform and the Bruce Platform in
the Cook Inlet, Alaska.
The CAO required Hilcorp to perform certain corrective measures with respect to the Pipeline, to
include, a 49 CFR Part 195 Subpart E pressure test of the pipeline; a visual inspection of the
pipeline; review of Hilcorp’s 2016 In-line inspection (ILI) data from the pipeline; completion of
a root cause analysis of the failure; and submission of a restart plan for approval. Hilcorp
completed a Subpart E pressure test of the Pipeline, conducted a visual inspection of the
Pipeline, reviewed the prior ILI data, performed an internal root cause analysis that was
subsequently reviewed by an independent third party expert, submitted a restart plan for
approval, and provided PHMSA with all of the required documentation associated with each of
these tasks. On April 27, 2017, PHMSA approved Hilcorp’s restart plan as it relates to pipeline
operations.
PHMSA, in conjunction with relevant state and federal authorities, undertook a thorough review
and analysis of the documentation submitted by Hilcorp in response to the CAO. As a result of
this review, PHMSA has determined that the crude oil release of April 1, 2017, was due to



CPF No. 5-2017-7002H
Page 2
components on the Anna Platform, not from the Pipeline or from a pipeline facility subject to
PHMSA’s regulatory authority. As a result, PHMSA withdraws CAO No. 5-2017-7002H in its
entirety, effective immediately.
If you have any questions concerning this letter, please contact Mr. Alan Mayberry, Associate
Administrator for Pipeline Safety, at (202) 366-5124.
Sincerely,
Alan Mayberry
Associated Administrator
for Pipeline Safety.
cc: PHP-60 Compliance Registry
PHP-500 D. Hassell
PHP-500 D. Hubbard
Mr. Larry White, Presiding Official
Mr. David S. Wilkins, Senior Vice President, Hilcorp Alaska, LLC
Ms. Erin McKay, Regulatory Compliance Manager, Hilcorp Alaska, LLC
Mr. James Curry, counsel for Hilcorp Alaska, LLC