# RESOLUTE NATURAL RESOURCES COMPANY — Warning Letter

- **operation:** document
- **citation:** CPF 520185003W
- **title:** RESOLUTE NATURAL RESOURCES COMPANY — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-03-16
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.404(c)(3), 195.420(b), 195.420(c), 195.573(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520185003w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520185003w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520185003w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520185003W
**body:**

Warning Letter involving RESOLUTE NATURAL RESOURCES COMPANY. PHMSA's enforcement data identifies the cited regulations as 195.404(c)(3),  195.420(b),  195.420(c),  195.573(c). The case was opened on 2018-03-16 and is reported as closed as of 2018-03-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520185003W_Warning Letter_03162018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520185003W/520185003W_Warning%20Letter_03162018.pdf

520185003W_Warning Letter_03162018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520185003W/520185003W_Warning%20Letter_03162018_text.pdf

520185003W_Warning Letter_03162018_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 16, 2018
Mr. James M. Piccone
President
Resolute Natural Resources Company
1700 Lincoln Street, Suite 2800
Denver, CO 80203
CPF 5-2018-5003W
Dear Mr. Piccone:
On August 1 through 4, and August 24, 2017, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code
(U.S.C.), inspected your Greater Aneth CO2 Pipeline in Cortez, Colorado, and Aneth, Utah.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items
inspected and the probable violations are:
1. §195.420 Valve maintenance.
(b) Each operator shall, at intervals not exceeding 7 ½ months, but at least twice
each calendar year, inspect each mainline valve to determine that it is functioning
properly.
Resolute Natural Resources Company (RNRC) failed to inspect each mainline valve to
determine that it is functioning properly in accordance with §195.420(b). Records available at



the time of inspection, indicated that the maximum 7 ½ months interval was exceeded
between June 23, 2016 and February 6, 2017.
2. §195.420 Valve maintenance.
(c) Each operator shall provide protection for each valve from unauthorized
operation and from vandalism.
During the field inspection of the facility, it was noted that the relief valve at the Hovenweep
Skid was found to be unsecured. The relief valve is not in an enclosed or secured area, and no
lock or chain was found on the valve.
3. §195.573 What must I do to monitor external corrosion control?
(c) Rectifiers and other devices. You must electrically check for proper
performance each device in the first column at the frequency stated in the second
column.
Rectifier – At least six times each calendar year, but with intervals not exceeding
2 ½ months.
Records available at the time of inspection for rectifier inspections (Hovenweep and Cahone
Mesa locations) for September and November of 2016 only documented the month and year
of the inspection. Since the day of the inspection was not documented, demonstration that the
interval was not exceeded could not be determined, therefore, compliance date for rectifier
inspections could not be determined.
4. §195.404 Maps and records.
(c) Each operator shall maintain the following records for the periods specified:
(3) A record of each inspection and test required by this subpart shall be
maintained for at least 2 years or until the next inspection or test is performed,
whichever is longer.
During the inspection of your records of the Operations and Maintenance (O&M) activities, it
was noted that RNRC only documented month and year on compliance documents. In order to
determine compliance, the month, day, and year must be documented. Therefore, the
compliance date for O&M activities could not be determined.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $209,002 per violation per day the violation persists, up to a maximum of $2,090,022
for a related series of violations. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
not to exceed $2,000,000 for a related series of violations. We have reviewed the
circumstances and supporting documents involved in this case, and have decided not to
conduct additional enforcement action or penalty assessment proceedings at this time. We
advise you to correct the items identified in this letter. Failure to do so will result in Resolute
Natural Resources Company being subject to additional enforcement action.
2



No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 5-2018-5003W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Kim West
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (#155736)
3
- **truncated:** false