# WESTERN MIDSTREAM PARTNERS, LP — Notice of Amendment

- **operation:** document
- **citation:** CPF 520185008M
- **title:** WESTERN MIDSTREAM PARTNERS, LP — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-12-31
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.505(c), 195.505(g).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520185008m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520185008m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520185008m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520185008M
**body:**

Notice of Amendment involving WESTERN MIDSTREAM PARTNERS, LP. PHMSA's enforcement data identifies the cited regulations as 195.505(c),  195.505(g). The case was opened on 2018-12-31 and is reported as closed as of 2019-04-19. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520185008M_Closure Letter_04192019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520185008M/520185008M_Closure%20Letter_04192019.pdf

520185008M_Closure Letter_04192019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520185008M/520185008M_Closure%20Letter_04192019_text.pdf

520185008M_Notice of Amendment_12312018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520185008M/520185008M_Notice%20of%20Amendment_12312018.pdf

520185008M_Notice of Amendment_12312018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520185008M/520185008M_Notice%20of%20Amendment_12312018_text.pdf

520185008M_Operator Response to Notice_01212019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520185008M/520185008M_Operator%20Response%20to%20Notice_01212019.pdf

520185008M_Notice of Amendment_12312018_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
December 31, 2018
Mr. Al Walker
President
Anadarko Petroleum Corporation
1201 Lake Robbin Drive
The Woodlands, TX 77380
CPF 5-2018-5008M
Dear Mr. Walker:
From August 20 through August 24, 2018, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
inspected Anadarko’s written Operator Qualifications (OQ) Program in The Woodlands, Texas.
The OQ Program applies to all of Anadarko’s hazardous liquid assets.
Based on the inspection, PHMSA has identified apparent inadequacies found within Anadarko’s
(operator) written OQ procedures, as described below:
1. §195.505 Qualification Program
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) …
(c) Allow individuals that are not qualified pursuant to this subpart to perform a
covered task if directed and observed by an individual that is qualified; …
Anadarko’s OQ procedures did not establish span of control ratios, and did not consider or fully
address factors that influence span of control, such as distance and noise levels. Furthermore,
Anadarko personnel could not explain how the span of control ratios were established, and



instead relied upon a third-party vendor to provide the ratios without an appropriate analysis for
the basis of stated ratios.
2. §195.505 Qualification Program
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) …
(g) Identify those covered tasks and the intervals at which evaluation of the
individual’s qualifications is needed; …
Anadarko’s OQ procedures did not establish and justify re-evaluation intervals. Instead,
Anadarko used an across-the board application of extended re-evaluation intervals with no
documented justification or basis. Additionally, Anadarko’s OQ program provided no basis for
the re-evaluation interval chosen, and the interval is applied to all tasks regardless of complexity
of the task, the critical nature of the task, or the frequency of task performance. Furthermore,
Anadarko’s OQ program did not identify a minimum time-frame for re-evaluation upon failure
of evaluation for a covered task, nor established how many times an individual will be allowed to
attempt the requalification process before the qualification is revoked.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
45 days of receipt of this Notice. This period may be extended by written request for good
cause. Once the inadequacies identified herein have been addressed in your amended
procedures, this enforcement action will be closed.
It is requested (not mandated) that Anadarko Petroleum Corporation maintain documentation of
2



the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Chris Hoidal, Acting Director,
Western Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 5-2018-5008M and, for each document you submit,
please provide a copy in electronic format whenever possible.
Sincerely,
Chris Hoidal
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 (D. Fehling #160703)
3

520185008M_Closure Letter_04192019_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 19, 2019
Mr. Al Walker
President
Anadarko Petroleum Corporation
1201 Lake Robbin Drive
The Woodlands, TX 77380
CPF 5-2018-5008M
Closure Letter
Dear Mr. Walker:
From August 20th to 24th, 2018, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-site
pipeline safety inspection of Anadarko Petroleum’s Operator Qualification procedures in The
Woodlands, Texas. As a result of the inspection, Anadarko Petroleum was issued a Notice of
Amendment on December 31, 2018, which proposed amendment of your procedures.
Anadarko Petroleum submitted its amended procedures on January 21, 2019. My staff reviewed
the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Chris Hoidal
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 (D. Fehling #160703)