# MARATHON PIPE LINE (WEST) — Warning Letter

- **operation:** document
- **citation:** CPF 520195014W
- **title:** MARATHON PIPE LINE (WEST) — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-12-09
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.307(d).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520195014w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520195014w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520195014w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520195014W
**body:**

Warning Letter involving MARATHON PIPE LINE (WEST). PHMSA's enforcement data identifies the cited regulation as 195.307(d). The case was opened on 2019-12-09 and is reported as closed as of 2019-12-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520195014W_Warning Letter_12092019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195014W/520195014W_Warning%20Letter_12092019.pdf

520195014W_Warning Letter_12092019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520195014W/520195014W_Warning%20Letter_12092019_text.pdf

520195014W_Warning Letter_12092019_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
December 9, 2019
Mr. Don Sorensen
Senior Vice President, Logistics
Tesoro Logistics, Northwest Pipeline LLC
19100 Ridgewood Parkway
San Antonio, TX 78259
CPF 5-2019-5014W
Dear Mr. Sorensen:
On March 11 through 13, 2019, a representative of the Washington Utilities and
Transportation Commission for the Pipeline and Hazardous Materials Safety Administration
(PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected the Tesoro
Logistics, Northwest Pipeline LLC, Pasco Terminal breakout tanks in Pasco, Washington.
As a result of the inspection, it is alleged that Tesoro has committed a probable violation of
the Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The item
inspected and the probable violation is:
1. § 195.307 Pressure testing aboveground breakout tanks
(a) . . .
(d) For aboveground atmospheric pressure breakout tanks constructed of carbon
and low alloy steel, welded or riveted, and non-refrigerated tanks built to API
STD 650 or its predecessor Standard 12 C that are returned to service after
October 2, 2000, the necessity for the hydrostatic testing of repair, alteration, and



reconstruction is covered in section 12.3 of API Standard 653 (incorporated by
reference, see §195.3).
Previous owner (Chevron), based on lack of and incomplete records, did not follow API Std
653 (except section 6.4.3) when repairing their breakout tanks in violation of 49 CFR §
195.307(d). API Standard 653 Section 12.3 sets forth requirements for reconstruction and
hydrotesting a tank prior to being placed back in service. Specifically, 12.3.1.b requires
hydrotesting for any tank which has undergone major repairs or alterations. A new bottom in
a tank is considered a major repair/alteration pursuant to API 653 Section 3.20. This requires
that tanks which have had a new bottom installed since October 2, 2000, to be hydrotested
prior to returning to service per API 650 Section 7.3.5 and 7.3.6 (11th edition).
At the Pasco delivery station, eight tanks have had their bottoms replaced since October 2,
2000: 1 (2006), 2 (2006), 6 (2002), 7 (2006), 8 (2005), 9 (2003), 12 (2001), and 15 (2001).
Tesoro was unable to provide any records to indicate a hydrostatic test was performed in
accordance to API Std 653 on Tanks 6, 8, 9, 12 and 15.1 The test records provided on Tanks
1, 2 and 7 were incomplete; the Hydrostatic Test Certification Form received from Matrix
Service Inc. (Matrix) on these tanks was missing fill height and testing time.
Since Tesoro did not receive or maintain a complete set of records from the previous operator
(Chevron), whom completed the repairs and return to service, Tesoro should conduct an
engineering assessment on Tanks 1, 2, 6, 7, 8, 9, 12 and 15 to confirm the current fill height is
safe for the integrity of the tank and to provide an explanation why a hydrotest is not required
(API Std 653 section 12.3).
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $218,647 per violation per day the violation persists, up to a maximum of $2,186,465
for a related series of violations. For violation occurring on or after November 27, 2018 and
before July 31, 2019, the maximum penalty may not exceed $213,268 per violation per day,
with a maximum penalty not to exceed $2,132,679. For violation occurring on or after
November 2, 2015 and before November 27, 2018, the maximum penalty may not exceed
$209,002 per violation per day, with a maximum penalty not to exceed $2,090,022. For
violations occurring prior to November 2, 2015, the maximum penalty may not exceed
$200,000 per violation per day, with a maximum penalty not to exceed $2,000,000 for a
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or
penalty assessment proceedings at this time. We advise you to correct the item identified in
this letter. Failure to do so will result in Tesoro Logistics, Northwest Pipeline LLC being
subject to additional enforcement action.
1 49 C.F.R. § 195.310 requires records for each pressure test required by Subpart E of Part 195.
2



No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 5-2019-5014W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 A. Ceartin (#166461)
Sean Mayo, Pipeline Safety Director, Washington Utilities and Transportation
Commission
3