# MARATHON PIPE LINE (WEST) — Warning Letter

- **operation:** document
- **citation:** CPF 520196010W
- **title:** MARATHON PIPE LINE (WEST) — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-12-12
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.446(j)(1), 195.581(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520196010w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520196010w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520196010w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520196010W
**body:**

Warning Letter involving MARATHON PIPE LINE (WEST). PHMSA's enforcement data identifies the cited regulations as 195.446(j)(1),  195.581(b). The case was opened on 2019-12-12 and is reported as closed as of 2019-12-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520196010W_Warning Letter_12122019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520196010W/520196010W_Warning%20Letter_12122019.pdf

520196010W_Warning Letter_12122019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520196010W/520196010W_Warning%20Letter_12122019_text.pdf

520196010W_Warning Letter_12122019_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
December 12, 2019
Mr. Shawn Lyon
President
Marathon Pipe Line LLC
200 East Hardin Street
Findlay, Ohio 45840
CPF 5-2019-6010W
Dear Mr. Lyon:
Between November 27, 2018 and August 15, 2019, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United
States Code (U.S.C.), inspected your1 Middle Ground Shoal crude oil pipeline (MGS) in
Nikiski, Alaska.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items
inspected and the probable violations are:
1 At the beginning of the inspection Tesoro Alaska Pipeline Company LLC was the operator of the MGS
pipeline.



1. § 195.446 Control room management.
(a) …
inspection:
(j) Compliance and deviations. An operator must maintain for review during
(1) Records that demonstrate compliance with the requirements of this section;
Tesoro Logistics Operations, LLC’s (TLO) records were inadequate because they were
incomplete and lacked sufficient information to demonstrate the following tasks were
completed as required:
 Test any backup SCADA systems at least once each calendar year, but at intervals
not to exceed 15 months as required by § 195.446(c)(4), and;
 Review the alarm management plan required by § 195.446(e) to determine the
effectiveness of the plan, as required by § 195.446(e)(4).
The 2018 “BCC (Backup Control Center) Test Critique Form” was not dated, therefore it is
not possible to verify the TLO completed the test within the time frame required by
§ 195.446(c)(4).
The 2017 and 2018 “Control Room Management Review” records were incomplete. The
reviewer did not make an indication in “Were Controllers interviewed?” boxes on page 3.
The records were left blank under the sections titled “Reviewed Findings and Action Items”
and “Documentation and Systems Affected by Changes.” The reviews were cursory and not
sufficient to determine the effectiveness of the plan.
2. § 195.581 Which pipelines must I protect against atmospheric corrosion and what
coating material may I use?
(a) …
corrosion.
(b) Coating material must be suitable for the prevention of atmospheric
The polyethylene wrap was not adhered to the MGS pipeline where it transitions from above-
grade to below-grade at the pig launcher site.
This deficiency was documented in an API-570 Visual Inspection Report completed in
February 2017 by HSI Group Inc. The report recommended review, and potential
remediation, of this atmospheric corrosion issue. This issue was still existing during the
August 2019 field observations and TLO had no documentation to demonstrate the findings
and recommendations from the API-570 report were reviewed or implemented.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $218,647 per violation per day the violation persists, up to a maximum of $2,186,465
for a related series of violations. For violation occurring on or after November 27, 2018 and
2



before July 31, 2019, the maximum penalty may not exceed $213,268 per violation per day,
with a maximum penalty not to exceed $2,132,679. For violation occurring on or after
November 2, 2015 and before November 27, 2018, the maximum penalty may not exceed
$209,002 per violation per day, with a maximum penalty not to exceed $2,090,022. For
violations occurring prior to November 2, 2015, the maximum penalty may not exceed
$200,000 per violation per day, with a maximum penalty not to exceed $2,000,000 for a
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or
penalty assessment proceedings at this time. We advise you to correct the items identified in
this letter. Failure to do so will result in Marathon Pipe Line LLC being subject to additional
enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 5-2019-6010W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b),
along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 G. St. Pierre (# 162677)
Alonso Rodriguez (via electronic mail)
Andy Richardson (via electronic mail)
Juliana Galvis (via electronic mail)
3
- **truncated:** false
- **body characters:** 5615