# CAELUS NATURAL RESOURCES ALASKA, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 520197001M
- **title:** CAELUS NATURAL RESOURCES ALASKA, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-01-14
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(c)(3), 195.452(f)(4), 195.452(f)(5), 195.505(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520197001m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520197001m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520197001m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520197001M
**body:**

Notice of Amendment involving CAELUS NATURAL RESOURCES ALASKA, LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(c)(3),  195.452(f)(4),  195.452(f)(5),  195.505(a). The case was opened on 2019-01-14 and is reported as closed as of 2019-07-02. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520197001M_Closure Letter_07022019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520197001M/520197001M_Closure%20Letter_07022019.pdf

520197001M_Closure Letter_07022019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520197001M/520197001M_Closure%20Letter_07022019_text.pdf

520197001M_Notice of Amendment_01142019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520197001M/520197001M_Notice%20of%20Amendment_01142019.pdf

520197001M_Notice of Amendment_01142019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520197001M/520197001M_Notice%20of%20Amendment_01142019_text.pdf

520197001M_Operator Response to Notice Letter_02202019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520197001M/520197001M_Operator%20Response%20to%20Notice%20Letter_02202019.pdf

520197001M_Closure Letter_07022019_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 2, 2019
Mr. Jim Musselman
President and CEO
Caelus Natural Resources Alaska, LLC
3700 Centerpoint Drive, Suite 500
Anchorage, Alaska 99503
CPF 5-2019-7001M
Closure Letter
Dear Mr. Musselman:
From April 9 through 13, 2018, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected Caelus Natural
Resources Alaska, LLC’s (Caelus) procedures for pipeline operations, maintenance, corrosion control,
and integrity management in Anchorage, Alaska. Currently, the Caelus procedures that we reviewed
apply to your Oooguruk 2-inch diesel pipelines.
As a result of the inspection, Caelus was issued a Notice of Amendment (NOA) on January 14, 2019,
which proposed amendment of your procedures.
Caelus submitted its amended procedures on June 3, 2019. My staff reviewed the amended procedures,
and it appears that the inadequacies outlined in the NOA were corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for
your cooperation.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 G. St. Pierre (#158101)
Erin Renfro, Caelus Engineering Supervisor, Operations and Production

520197001M_Notice of Amendment_01142019_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 14, 2019
Jim Musselman
President and CEO
Caelus Natural Resources Alaska, LLC
3700 Centerpoint Drive
Suite 500
Anchorage, Alaska 99503
CPF 5-2019-7001M
Dear Mr. Musselman:
From April 9 through 13, 2018, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Caelus
Natural Resources Alaska, LLC’s (Caelus) procedures for pipeline operations, maintenance,
corrosion control, and integrity management in Anchorage, Alaska. Currently, the Caelus
procedures that we reviewed apply to your Oooguruk 2-inch diesel pipelines.
During the inspection, PHMSA identified apparent inadequacies within Caelus’s plans or
procedures, as described below:
1. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) . . . .
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.



Caelus's Operations and Maintenance Manual (Rev. 2 March 2018) (the “O&M Manual”) lacks
written processes for operating and maintaining the diesel pipeline consistent with subparts F and
H of 49 C.F.R. Part 195. Specifically, the O&M Manual lacks:
 A procedure for repairing each type of defect, consistent with § 195.401(b), § 195.422,
and § 195.585. The O&M Manual incorporates Caelus’s Construction and Repair
Manual by reference. However, the repairs discussed in the Construction and Repair
manual are specific to repairs during construction (for example, welding repairs) and do
not discuss operations and maintenance repairs to the pipeline (for example, repair of
corroded pipe).
 A procedure to maintain each valve needed to safely operate the pipeline, consistent with
§ 195.420(a). The O&M Manual incorrectly states that there are no valves on the
pipeline, which is inconsistent with documents provided by Caelus to PHMSA during the
inspection. For example, Caelus’s diesel transfer procedures (“OTP-0300-OP-
0810REV.06” and “ODS-0300-OP-0810Rev.01”), base oil transfer procedures (“OTP-
0300-OP-0910Rev.07” and “ODS-0300-OP-0910Rev.01”) and piping and
instrumentation diagrams (P&IDs) all identify valves which are needed to safely operate
the pipeline. Caelus must identify valves needed to safely operate the pipeline, and must
prepare a written maintenance program for those valves that is adequate to ensure that the
valves are kept in good working order at all times.
 A procedure to inspect each mainline valve at intervals not exceeding 71∕2 months, but at
least twice each calendar year, consistent with § 195.420(b). The O&M Manual
incorrectly states that there are no valves on the pipeline. However, during the inspection
PHMSA observed valves at the upstream and downstream ends of the pipeline. Caelus
must identify each mainline valve (for example, isolation block valves on either end of
the pipeline) and must establish for those valves a written inspection program consistent
§ 195.420(b).
 A procedure to inspect and test each pressure limiting device, relief device, pressure
regulator, or other item of pressure control, consistent with § 195.428(a). The diesel
pipeline uses various types of overpressure protection and pressure control equipment
(for example, pressure safety valves and equipment associated with the high-pressure
shutdown process for the transfer pumps). The O&M Manual does not include
procedures to test and inspect the various overpressure protection and pressure control
equipment.
 A procedure for inspecting the internal surface of the pipe for evidence or corrosion
whenever pipe is removed from a pipeline, as required by 195.579(c). The O&M Manual
incorporates the Caelus Corrosion Control Manual by reference. Neither the O&M
Manual nor the Corrosion Control Manual have a process to inspect the internal surface
of the removed pipe for evidence of corrosion.
2



2. § 195.452 Pipeline integrity management in high consequence areas.
(a) . . . .
(f) What are the elements of an integrity management program? An integrity
management program begins with the initial framework. An operator must
continually change the program to reflect operating experience, conclusions drawn
from results of the integrity assessments, and other maintenance and surveillance
data, and evaluation of consequences of a failure on the high consequence area. An
operator must include, at minimum, each of the following elements in its written
integrity management program:
(4) Criteria for remedial actions to address integrity issues raised by the assessment
methods and information analysis (see paragraph (h) of this section);
Caelus's written Integrity Management Plan (Rev 0, 10/2017) (the “IMP”) lacks written criteria
for remedial actions to address integrity issues consistent with § 195.452(h). The IMP states that
the diesel pipeline “would remain shut down until an integrity issue is addressed.” However,
Caelus failed to define in their IMP what is an “integrity issue” which would cause them to shut
down the pipeline. The IMP must include a written process explaining how Caelus will
“evaluate all anomalous conditions and remediate those that could reduce a pipeline's integrity,”
as required by § 195.452(h)(1). The IMP must include specific criteria for remedial action,
including, at a minimum, the special requirements for scheduling remediation in § 195.452(h)(4).
3. § 195.452 Pipeline integrity management in high consequence areas.
(a) . . . .
(f) What are the elements of an integrity management program? An integrity
management program begins with the initial framework. An operator must
continually change the program to reflect operating experience, conclusions drawn
from results of the integrity assessments, and other maintenance and surveillance
data, and evaluation of consequences of a failure on the high consequence area. An
operator must include, at minimum, each of the following elements in its written
integrity management program:
(5) A continual process of assessment and evaluation to maintain a pipeline's
integrity (see paragraph (j) of this section);
Caelus's IMP lacks a process of continual assessment and evaluation to maintain the pipeline’s
integrity consistent with § 195.452(j). Specifically:
 Caelus failed include a process in their IMP to conduct continuing evaluations of the
pipeline’s integrity consistent with § 195.452(j)(2). The operator stated that their
corrosion control contractor conducts quarterly mechanical integrity evaluations of their
facilities and pipelines and prepares a summary report. However, this process has not
been incorporated into Caelus’s written IMP. The IMP must include a written process for
determining how frequently evaluations will be conducted based on risk factors specific
to the pipeline (including, at a minimum, the factors specified in § 195.452(e)). The IMP
also must describe the contents of the evaluations. At a minimum, the evaluation must
3



consider the results of the baseline and periodic integrity assessments, information
analysis (§ 195.452(g)) and decisions about remediation, and preventive and mitigative
actions (§ 195.452(h) and § 195.452(i)).
 The IMP lacks a process to establish an assessment interval based on all factors,
consistent with § 195.452(j)(3). The IMP has no process to establish reassessment
intervals, based on the risk factors § 195.452(e). The IMP also lacks a process to notify
PHMSA for variance from the 5-year maximum integrity assessment interval (for
example, engineering basis or unavailable technology), consistent with § 195.452(j)(4)
and § 195.452(m).
 The IMP lacks a process to implement the integrity assessments using the allowable
methods in § 195.452(j)(5) and in accordance with industry standards consistent with
§ 195.425(b)(6). The IMP states that “[a] one-hour leak integrity test is performed
monthly in lieu of performing a hydrostatic test every 5 years.” This is not one of the
allowable assessment methods in § 195.452(j)(5).
 The IMP lacks a process to review the integrity assessment results analysis by a person
qualified to evaluate the results consistent with § 195.452(f)(8). The IMP has no process
for reviewing integrity assessment results.
4. § 195.505 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) Identify covered tasks;
Caelus failed to identify all covered tasks consistent with § 195.501(b). In Caelus’s Operator
Qualification Manual (Rev. 0 July 2016) and associated Task Analysis Sheets (November 2016),
Caelus identified covered tasks associated with maintaining the mainline pipe (for example,
“Conduct Close Interval Survey”) but failed to identify tasks associated with operating any
equipment, facility, or building used in the transportation of hazardous liquids. For example,
starting up and shutting down the pipeline and valve operation and maintenance are not
identified as covered tasks.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b).
4



Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
90 days of receipt of this Notice. This period may be extended by written request for good
cause. Once the inadequacies identified herein have been addressed in your amended
procedures, this enforcement action will be closed.
It is requested (not mandated) that Caelus Natural Resources Alaska, LLC maintain
documentation of the safety improvement costs associated with fulfilling this Notice of
Amendment (preparation/revision of plans, procedures) and submit the total to Chris Hoidal,
Acting Director, Western Region, Pipeline and Hazardous Materials Safety Administration. In
correspondence concerning this matter, please refer to CPF 5-2019-7001M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Chris Hoidal
Acting Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 J. Gano (#158101)
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
5
- **truncated:** false