# FAIRBANKS NATURAL GAS — Warning Letter

- **operation:** document
- **citation:** CPF 520200003W
- **title:** FAIRBANKS NATURAL GAS — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-02-28
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.1007(c), 192.287, 192.479(a), 192.481(a), 192.743(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520200003w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520200003w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520200003w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520200003W
**body:**

Warning Letter involving FAIRBANKS NATURAL GAS. PHMSA's enforcement data identifies the cited regulations as 192.1007(c),  192.287,  192.479(a),  192.481(a),  192.743(a). The case was opened on 2020-02-28 and is reported as closed as of 2020-02-28. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520200003W_Warning Letter_02282020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520200003W/520200003W_Warning%20Letter_02282020.pdf

520200003W_Warning Letter_02282020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520200003W/520200003W_Warning%20Letter_02282020_text.pdf

520200003W_Warning Letter_02282020_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 28, 2020
Mr. Daniel Britton
President
Fairbanks Natural Gas, LLC
3408 International Way
Fairbanks, Alaska 99701
CPF 5-2020-0003W
Dear Mr. Britton:
On May 6 through 10 and June 24 through 27, 2019, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United
States Code (U.S.C.), inspected your natural gas distribution system in Fairbanks, Alaska.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items
inspected and the probable violations are:
1. § 192.287 Plastic pipe: Inspection of joints.
No person may carry out the inspection of joints in plastic pipes required by §§
192.273(c) and 192.285(b) unless that person has been qualified by appropriate
training or experience in evaluating the acceptability of plastic pipe joints made
under the applicable joining procedure.



Fairbanks Natural Gas (FNG) failed to provide records documenting any operator was
qualified as a joint inspector. FNG personnel stated that they did not have a person qualified
as a joint inspector.
2. § 192.479 Atmospheric corrosion control: General.
(a) Each operator must clean and coat each pipeline or portion of pipeline that is
exposed to the atmosphere, except pipelines under paragraph (c) of this section.
Some piping and valves at meter sets and service regulators lacked coating as required by the
cited regulation.
FNG Standard Operating Procedure 7205 Corrosion Control stated under section titled
Monitoring, subsection titled Distribution Facilities, “…FNG distribution facilities and the
above ground meter set network is protected from atmospheric corrosion, such as by paint...”.
Field observations determined that much of the piping to and within meter and regulator sets
was unpainted, and demonstrated visible surface corrosion. Photographic evidence of surface
corrosion on FNG aboveground piping was taken at the meter set and regulator serving Pizza
Hut at 89 College Road, as well as several meter sets and regulators serving businesses in the
malls located at 357-421 Merhar Avenue.
3. § 192.481 Atmospheric corrosion control: Monitoring.
(a) Each operator must inspect each pipeline or portion of pipeline that is
exposed to the atmosphere for evidence of atmospheric corrosion, as follows:
If the pipeline is
located:
Then the frequency of inspection is:
Onshore At least once every 3 calendar years, but with
intervals not exceeding 39 months
Offshore At least once each calendar year, but with intervals
not exceeding 15 months
FNG failed to conduct atmospheric corrosion inspections of aboveground piping at their meter
sets and service regulators, and as a result, did not provide any documentation of atmospheric
corrosion inspections.
4. § 192.743 Pressure limiting and regulating stations: Capacity of relief devices.
(a) Pressure relief devices at pressure limiting stations and pressure regulating
stations must have sufficient capacity to protect the facilities to which they are
connected. Except as provided in §192.739(b), the capacity must be consistent
2



with the pressure limits of §192.201(a). This capacity must be determined at
intervals not exceeding 15 months, but at least once each calendar year, by testing
the devices in place or by review and calculations.
FNG failed to demonstrate their pressure relief devices had sufficient capacity to protect their
distribution facilities to which they were connected. FNG failed to provide any documentation
of testing the devices or review by calculations annually as required by § 192.743.
5. § 192.1007 What are the required elements of an integrity management plan?
A written integrity management plan must contain procedures for developing and
implementing the following elements:
(a) …
(c) Evaluate and rank risk. An operator must evaluate the risks associated with its
distribution pipeline. In this evaluation, the operator must determine the relative
importance of each threat and estimate and rank the risks posed to its pipeline.
This evaluation must consider each applicable current and potential threat, the
likelihood of failure associated with each threat, and the potential consequences of
such a failure. An operator may subdivide its pipeline into regions with similar
characteristics (e.g., contiguous areas within a distribution pipeline consisting of
mains, services and other appurtenances; areas with common materials or
environmental factors), and for which similar actions likely would be effective in
reducing risk.
FNG did not complete any meaningful evaluation of the Simple, Handy, Risk-based Integrity
Management Plan (SHRIMP) assessment results and, consequently, the risk rank results did
not accurately reflect the threats to their system. The SHRIMP selected the threat "Other
Outside Forces" as the highest ranked risk to FNG's distribution system. SHRIMP described
this threat as: "Above ground facilities are being hit by vehicles. Below ground facilities have
been damaged due to heavy vehicles driving along or over the facility location." FNG
accepted this result as the top-rated threat. During the inspection, FNG stated that their system
hasn't had any leaks caused by the threat "Other Outside Forces". FNG stated that incorrect
data may have caused ranking of "Other Outside Forces" to be ranked as the number one threat
of their system.
Most damage is caused by Excavation Damage - Third Party Damages, which was ranked
third. The threat "Material, Weld or Joint Failure due to workmanship defects" was ranked as
the second highest risk. FNG stated the "Material, Weld or Joint Failure due to workmanship
defects" may have been ranked high, from many welds failing during a pressure test. FNG
should evaluate if this data should have been included in the SHRIMP, since these pressure
test weld failures were not leaks in their distribution system.
3



FNG accepted these ranking results that did not accurately reflect the risks faced by the
system.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for a
related series of violations. For violation occurring on or after November 27, 2018 and before
July 31, 2019, the maximum penalty may not exceed $213,268 per violation per day, with a
maximum penalty not to exceed $2,132,679. For violation occurring on or after November 2,
2015 and before November 27, 2018, the maximum penalty may not exceed $209,002 per
violation per day, with a maximum penalty not to exceed $2,090,022. For violations occurring
prior to November 2, 2015, the maximum penalty may not exceed $200,000 per violation per
day, with a maximum penalty not to exceed $2,000,000 for a related series of violations. We
have reviewed the circumstances and supporting documents involved in this case, and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
time. We advise you to correct the items identified in this letter. Failure to do so will result in
Fairbanks Natural Gas, LLC being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 5-2020-0003W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any portion
of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along
with the complete original document you must provide a second copy of the document with
the portions you believe qualify for confidential treatment redacted and an explanation of why
you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 G. St. Pierre (#162682)
Mark Rockwell, Director of Operations, Fairbanks Natural Gas (via email)
Chris Gillespie, Chief of Engineering, Fairbanks Natural Gas (via email)
4
- **truncated:** false
- **body characters:** 8977