# K O TRANSMISSION COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 52021025NOA
- **title:** K O TRANSMISSION COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-06-11
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.631(a)(1), 192.631(e)(2), 192.631(e)(4), 192.631(h)(1), 192.631(h)(6).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52021025noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52021025noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52021025noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52021025NOA
**body:**

Notice of Amendment involving K O TRANSMISSION COMPANY. PHMSA's enforcement data identifies the cited regulations as 192.631(a)(1),  192.631(e)(2),  192.631(e)(4),  192.631(h)(1),  192.631(h)(6). The case was opened on 2021-06-11 and is reported as closed as of 2021-08-20. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52021025NOA_Closure Letter_08202021_(20-177378).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021025NOA/52021025NOA_Closure%20Letter_08202021_(20-177378).pdf

52021025NOA_Closure Letter_08202021_(20-177378)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021025NOA/52021025NOA_Closure%20Letter_08202021_(20-177378)_text.pdf

52021025NOA_Notice of Amendment_06112021_(20-177378).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021025NOA/52021025NOA_Notice%20of%20Amendment_06112021_(20-177378).pdf

52021025NOA_Notice of Amendment_06112021_(20-177378)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021025NOA/52021025NOA_Notice%20of%20Amendment_06112021_(20-177378)_text.pdf

52021025NOA_Operator Response to Notice _07072021_(20-177378).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52021025NOA/52021025NOA_Operator%20Response%20to%20Notice%20_07072021_(20-177378).pdf

52021025NOA_Closure Letter_08202021_(20-177378)_text.pdf

VIA E-MAIL TO MR. BRIAN WEISKER
August 20, 2021
Mr. Brian Weisker
Senior Vice President & COO Natural Gas
Duke Energy KO Transmission Company
4720 Piedmont Row
Charlotte, NC 28210
CPF 5-2021-025-NOA
Closure Letter
Dear Mr. Weisker:
During the week of October 19 through 23, 2020, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), performed
a virtual inspection of Duke Energy's (Duke) KO Transmission Control Room located in Charlotte, North
Carolina. This inspection included review of the company’s procedures and records, and virtual
observations of control room operations associated with the Control Room Management Program.
As a result of the inspection, Duke was issued a Notice of Amendment on June 11, 2021, which proposed
amendment of your procedures.
Duke submitted its amended procedures on July 7, 2021, via email. My staff has reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for your
cooperation.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (#20-177378)

52021025NOA_Notice of Amendment_06112021_(20-177378)_text.pdf

NOTICE OF AMENDMENT
VIA E-MAIL TO MR. BRIAN WEISKER
June 11, 2021
Mr. Brian Weisker
Senior Vice President & COO Natural Gas
Duke Energy
4720 Piedmont Row
Charlotte, NC 28210
CPF 5-2021-025-NOA
Dear Mr. Weisker:
During the week of October 19 through 23, 2020, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), performed
a virtual inspection of Duke Energy's (Duke) KO Transmission Control Room located in Charlotte, North
Carolina. This inspection included review of the company’s procedures and records, and virtual
observations of control room operations associated with the Control Room Management Program.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within Duke’s
plans or procedures, as described below:
1. § 192.631 - Control room management.
(a) General. (1) This section applies to each operator of a pipeline facility with a controller
working in a control room who monitors and controls all or part of a pipeline facility
through a SCADA system. Each operator must have and follow written control room
management procedures that implement the requirements of this section…
Duke’s control room management procedures are inadequate to assure safe operation of a pipeline
facility. Specifically, Duke failed to have and follow written control room management procedures that
established a maximum limit on controller hours of service (HOS), which may provide for an emergency



deviation from the maximum limit if necessary for the safe operation of the pipeline facility pursuant to §
192.631(d)(4).
Duke’s Control Room Management (CRM) Plan for Natural Gas Pipelines, Rev. Sept. 3, 2020, Fatigue
Management CRM 1080, Section 1080.4 - Normal Operations fails to sufficiently address the supervisor
position that works a Monday through Friday, 6am – 6pm shift. For example, it fails to note certain
fatigue mitigation tactics, including if the supervisor is afforded a two-day break after successive shifts.1
It also fails to address the schedules of the Gas Control Manager and Director positions.2
This procedure also fails to adequately address documentation.3 First, it does not explicitly state that all
HOS, scheduled and unscheduled, will be tracked and/or tabulated. Second, it fails to explicitly require
that countermeasures be documented during the 3am-6am and 3pm-6pm time periods in Duke’s eLogger.
Duke must amend its procedure to address the deficiencies noted above.
2. § 192.631 - Control room management.
(a) …
(e) Alarm management. Each operator using a SCADA system must have a written alarm
management plan to provide for effective controller response to alarms. An operator’s
plan must include provisions to:
(1) …
(2) Identify at least once each calendar month points affecting safety that have been taken
off scan in the SCADA host, have had alarms inhibited, generated false alarms, or that have
had forced or manual values for periods of time exceeding that required for associated
maintenance or operating activities;
Duke’s control room management procedures are inadequate to assure safe operation of a pipeline
facility. Specifically, Duke’s CRM Plan for Natural Gas Pipelines, Rev. Sept. 3, 2020, Alarm
Management Plan CRM 1090, Section 1090.2 – Safety Related Alarms and Review Process, Subsection
1090.2.3 fails to sufficiently describe the process for conducting monthly reviews that identify points
affecting safety that have been taken off scan, inhibited alarms, generated false alarms, or that have had
forced or manual values for periods of time exceeding that required for associated maintenance or
operating activities. The procedure has identified Key Performance Indicators (KPIs) in Tables 14, 15,
and 16, that follow API 1167, but the procedure fails to clearly state how the KPIs are incorporated into
the review.
Duke must amend its procedure to address the deficiency noted above.
3. § 192.631 - Control room management.
(a) …
1 See, e.g., Control Room Management Frequently Asked Questions (FAQ) Subsection D (Jan. 16, 2018).
2 These additional positions are held by qualified controllers who could work any console under emergency
situations; therefore, hours of service (HOS) for these positions needs to be included in Duke’s procedures.
3 See 49 C.F.R. § 192.631(j)(1) (requiring operators to maintain for review during an inspection records that
demonstrate compliance with the requirements of this section).
2



(e) Alarm management. Each operator using a SCADA system must have a written alarm
management plan to provide for effective controller response to alarms. An operator’s
plan must include provisions to:
(1) …
(4) Review the alarm management plan required by this paragraph at least once each
calendar year, but at intervals not exceeding 15 months, to determine the effectiveness of
the plan;
Duke’s control room management procedures are inadequate to assure safe operation of a pipeline
facility. Specifically, Duke’s alarm management plan fails to include provisions to review the plan at
least once each calendar year, but at intervals not exceeding 15 months, to determine the effectiveness of
the plan. Further, Section 1090.2 – Safety Related Alarms and Review Process, Subsection 1090.2.4 fails
to clearly identify the process for performing this annual review. For example, Table 3 – Responsibility Z
fails to identify who is accountable for the review and who approves the outcome of the review before it
is deemed effective. It also does not provide any information on how to measure effectiveness.
Additionally, Table 3 indicates a variety of people who participate in the annual review of the program
but fails to state exactly who is responsible for what items during the review process. The procedure also
fails to identify who has final approval authority or how the review will be documented.4
Duke must amend the procedure to address the deficiencies noted above.
4. § 192.631 - Control room management.
(a) …
(h) Training. Each operator must establish a controller training program and review
the training program content to identify potential improvements at least once each
calendar year, but at intervals not to exceed 15 months. An operator’s program must
provide for training each controller to carry out the roles and responsibilities defined by the
operator. In addition, the training program must include the following elements:
(1) Responding to abnormal operating conditions likely to occur simultaneously or in
sequence;
Duke’s control room management procedures are inadequate to assure safe operation of a pipeline
facility. Specifically, Duke failed to establish a controller training program that included responding to
abnormal operating conditions (AOCs) likely to occur simultaneously or in sequence. Duke’s CRM Plan
for Natural Gas Pipelines, Rev. Sept. 3, 2020, Training CRM 1110, Section 1110, Subsection 1110.2.6
mentions “AOC Conditions Occurring Individually and in Sequence (Scenario Training)” but fails to
identify any AOCs that are likely to occur simultaneously or in sequence. It also incorrectly states that
controllers must respond to AOCs occurring “individually or in sequence,” rather than “simultaneously or
in sequence” pursuant to the requirement in § 192.631(h)(1) (emphasis added).
Duke must amend its procedure to address the deficiencies noted above.
5. § 192.631 - Control room management.
(a) …
(h) Training. Each operator must establish a controller training program and review
the training program content to identify potential improvements at least once each
calendar year, but at intervals not to exceed 15 months. An operator’s program must
4 Id.
3



provide for training each controller to carry out the roles and responsibilities defined by the
operator. In addition, the training program must include the following elements:
(1) …
(6) Control room team training and exercises that include both controllers and other
individuals, defined by the operator, who would reasonably be expected to operationally
collaborate with controllers (control room personnel) during normal, abnormal or
emergency situations. Operators must comply with the team training requirements under
this paragraph by no later than January 23, 2018.
Duke’s control room management procedures are inadequate to assure safe operation of a pipeline
facility. Specifically, Duke failed to establish a controller training program that included control room
team training and exercises that include both controllers and other individuals, defined by the operator,
who would reasonably be expected to operationally collaborate with controllers (control room personnel)
during normal, abnormal or emergency situations.
Duke’s CRM Plan for Natural Gas Pipelines, Rev. Sept. 3, 2020, Training CRM 1110, Section 1110.3
Team Training procedure lists topics that will be covered in team training, but fails to specifically address
how team training will be conducted. For example, the procedure fails to include information regarding
tabletop exercises, lessons learned, historical events, or oil-gas industry events. Team training may
include multiple methods and tools to supplement exercises - i.e. computer-based training (CBT),
classroom, on the job training (OJT), etc.; however, the focus must be on personnel interaction and team
work.5
Furthermore, Subsection 1110.3.1 only states that team training will include both controllers and other
individuals who would reasonably be expected to operationally collaborate with controllers during
normal, abnormal or emergency situations. The procedure fails to identify which identified individuals or
positions (job titles) are required to participate in team training.
Duke must amend its Team Training procedure to correct the deficiencies noted above.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as part of
this Notice is a document entitled Response Options for Pipeline Operators in Compliance Proceedings.
Please refer to this document and note the response options. Be advised that all material you submit in
response to this enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with
the complete original document you must provide a second copy of the document with the portions you
believe qualify for confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised procedures, or
a request for a hearing under §190.211. If you do not respond within 30 days of receipt of this Notice,
this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the Associate
Administrator for Pipeline Safety to find facts as alleged in this Notice without further notice to you and
to issue an Order Directing Amendment. If your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R.
5 See Control Room Management FAQ H.07 (Jan. 16, 2018).
4



§ 190.206). If you are not contesting this Notice, we propose that you submit your amended procedures to
my office within 60 days of receipt of this Notice. This period may be extended by written request for
good cause. Once the inadequacies identified herein have been addressed in your amended procedures,
this enforcement action will be closed.
It is requested (not mandated) that Duke Energy maintain documentation of the safety improvement costs
associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures) and
submit the total to Dustin Hubbard, Director, Western Region, Pipeline and Hazardous Materials Safety
Administration. In correspondence concerning this matter, please refer to CPF 5-2021-025-NOA and, for
each document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Dustin Hubbard
Director, Western Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (#20-177378)
5