# FLORIDA POWER & LIGHT CO — Warning Letter

- **operation:** document
- **citation:** CPF 52022013WL
- **title:** FLORIDA POWER & LIGHT CO — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-06-03
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.631(e)(5), 192.631(f)(2), 192.631(h)(6).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022013wl.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022013wl.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022013wl
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52022013WL
**body:**

Warning Letter involving FLORIDA POWER & LIGHT CO. PHMSA's enforcement data identifies the cited regulations as 192.631(e)(5),  192.631(f)(2),  192.631(h)(6). The case was opened on 2022-06-03 and is reported as closed as of 2022-06-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52022013WL_Warning Letter_06032022_(21-210179).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022013WL/52022013WL_Warning%20Letter_06032022_(21-210179).pdf

52022013WL_Warning Letter_06032022_(21-210179)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022013WL/52022013WL_Warning%20Letter_06032022_(21-210179)_text.pdf

52022013WL_Warning Letter_06032022_(21-210179)_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
June 3, 2022
Mr. Danny Schedule
Senior Director
Midstream Operations
Florida Power & Light Company
601 Travis Street, Suite 1900
Houston, Texas 77002
CPF 5-2022-013-WL
Dear Mr. Schedule:
From June 7 through June 11, 2021, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
inspected your control room operations in Houston, Texas.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. § 192.631 Control room management.
(a) …
(e) Alarm management. Each operator using a SCADA system must have a written
alarm management plan to provide for effective controller response to alarms. An
operator's plan must include provisions to:
(1) …
(5) Monitor the content and volume of general activity being directed to and required
of each controller at least once each calendar year, but at intervals not to



exceed 15 months, that will assure controllers have sufficient time to analyze and
react to incoming alarms;
Florida Power & Light failed to monitor the content and volume of general activity being
directed to and required of each controller at least once each calendar year, but at intervals not to
exceed 15 months, that will assure controllers have sufficient time to analyze and react to
incoming alarms.
During the inspection, Florida Power & Light failed to provide records to demonstrate that it
performed the requisite monitoring during 2017.1
2. § 192.631 Control room management.
(a) …
(f) Change management. Each operator must assure that changes that could affect
control room operations are coordinated with the control room personnel by
performing each of the following:
(1) …
(2) Require its field personnel to contact the control room when emergency
conditions exist and when making field changes that affect control room operations;
Florida Power & Light failed to assure that changes that could affect control room operations are
coordinated with the control room by failing to require its field personnel contact the control
room when making field changes that affect control room operations.
During the inspection, PHMSA reviewed valve inspection records for 2019 that failed to confirm
control room personnel were contacted prior to the inspections.2
Specifically, valves inspection records for the following inspections failed to demonstrate the
control room was contacted:
• Beechnut CG Pipeline System inspected on June 24, 2019 - eight (8) valves.
• Eldridge CG Pipeline System inspected on June 24, 2019 – six (6) valves.
• Highway 3 City Gate inspected on June 25, 2019 – four (4) valves.
• Sugarland Junction City Gate inspected on June 24, 2019 – seven (7) valves.
3. § 192.631 Control room management.
(a) …
1 See 192.631(j)(1) (requiring operators to maintain for review during inspections records that demonstrate
compliance with the requirements in § 192.631).
2 Valve inspections involve field changes that affect control room operations.



(h) Training. Each operator must establish a controller training program and review
the training program content to identify potential improvements at least once each
calendar year, but at intervals not to exceed 15 months. An operator's program
must provide for training each controller to carry out the roles and responsibilities
defined by the operator. In addition, the training program must include the
following elements:
(1) …
(6) Control room team training and exercises that include both controllers and other
individuals, defined by the operator, who would reasonably be expected to
operationally collaborate with controllers (control room personnel) during normal,
abnormal or emergency situations. Operators must comply with the team training
requirements under this paragraph by no later than January 23, 2018.
Florida Power & Light failed to properly conduct team training and exercises that include both
controllers and other individuals, defined by the operator, who would reasonably be expected to
operationally collaborate with controllers (control room personnel) during normal, abnormal, or
emergency situations.
During the inspection, PHMSA reviewed the following records and identified the following
deficiencies:
• 2018 team training failed to include other individuals outside of control room personnel.
Furthermore, the records failed to indicate what topic(s) were covered or what the
training objective included; and
• 2019 - No records of team training could be provided.3
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$239,142 per violation per day the violation persists, up to a maximum of $2,391,142 for a
related series of violations. For violation occurring on or after May 3, 2021 and before March
21, 2022, the maximum penalty may not exceed $225,134 per violation per day the violation
persists, up to a maximum of $2,251,334 for a related series of violations. For violation
occurring on or after January 11, 2021 and before May 3, 2021, the maximum penalty may not
exceed $222,504 per violation per day the violation persists, up to a maximum of $2,225,034 for
a related series of violations. For violation occurring on or after July 31, 2019 and before
January 11, 2021, the maximum penalty may not exceed $218,647 per violation per day the
violation persists, up to a maximum of $2,186,465 for a related series of violations. For violation
occurring on or after November 27, 2018 and before July 31, 2019, the maximum penalty may
not exceed $213,268 per violation per day, with a maximum penalty not to exceed $2,132,679.
For violation occurring on or after November 2, 2015 and before November 27, 2018, the
maximum penalty may not exceed $209,002 per violation per day, with a maximum penalty not
to exceed $2,090,022.
We have reviewed the circumstances and supporting documents involved in this case and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
3 Id.



time. We advise you to correct the items identified in this letter. Failure to do so will result in
Florida Power & Light being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 5-2022-013-WL. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Dustin Hubbard
Director, Western Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (#21-210179)