{"operation":"document","citation":"CPF 52022021NOPV","title":"SCM PR, LLC — Notice of Probable Violation","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2022-06-15","effective_on":null,"summary":"CLOSED notice of probable violation citing 195.446(e)(4), 195.446(e)(5), 195.446(e)(6), 195.446(f)(1).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-52022021nopv.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-52022021nopv.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-52022021nopv","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/52022021NOPV","body":"Notice of Probable Violation involving SCM PR, LLC. PHMSA's enforcement data identifies the cited regulations as 195.446(e)(4),  195.446(e)(5),  195.446(e)(6),  195.446(f)(1). The case was opened on 2022-06-15 and is reported as closed as of 2022-08-05. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n52022021NOPV_Final Order_08052022_(21-201441).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022021NOPV/52022021NOPV_Final%20Order_08052022_(21-201441).pdf\n\n52022021NOPV_Final Order_08052022_(21-201441)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022021NOPV/52022021NOPV_Final%20Order_08052022_(21-201441)_text.pdf\n\n52022021NOPV_PCO_06152022_(21-201441).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022021NOPV/52022021NOPV_PCO_06152022_(21-201441).pdf\n\n52022021NOPV_PCO_06152022_(21-201441)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022021NOPV/52022021NOPV_PCO_06152022_(21-201441)_text.pdf\n\n52022021NOPV_Final Order_08052022_(21-201441)_text.pdf\n\nAugust 5, 2022\nVIA ELECTRONIC MAIL TO: jpbarley@scmidstream.com\nMr. J. Patrick Barley\nChief Executive Officer\nSCM PR, LLC\n909 Lake Carolyn Parkway, Suite 650\nIrving, Texas 75039\nRe: CPF No. 5-2022-021-NOPV\nDear Mr. Barley:\nEnclosed please find the Final Order issued in the above-referenced case. It makes findings of\nviolation and finds that the proposed actions to comply with the pipeline safety regulations have\nbeen completed. This case is now closed. Service of the Final Order by e-mail is effective upon\nthe date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.\nThank you for your cooperation in this matter.\nSincerely,\nAlan K. Mayberry\nAssociate Administrator\nfor Pipeline Safety\nEnclosures (Final Order and NOPV)\ncc: Mr. Dustin Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA\nMs. Mary Patton, Regulatory Manager, Silver Creek Midstream Holdings, LLC,\nmpatton@scmidstream.com\nCONFIRMATION OF RECEIPT REQUESTED\n\n\n\nU.S. DEPARTMENT OF TRANSPORTATION\nPIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION\nOFFICE OF PIPELINE SAFETY\nWASHINGTON, D.C. 20590\n____________________________________\n)\nIn the Matter of )\n)\nSCM PR, LLC, )\na subsidiary of Silver Creek ) CPF No. 5-2022-021-NOPV\nMidstream Holdings, LLC, )\n)\nRespondent. )\n____________________________________)\nFINAL ORDER\nOn June 15, 2022, pursuant to 49 C.F.R. § 190.207, the Director, Western Region, Office of\nPipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to SCM PR, LLC, a\nwholly-owned subsidiary of Silver Creek Midstream Holdings, LLC (Respondent). The Notice\nproposed finding that Respondent had violated the pipeline safety regulations in 49 C.F.R. Part\n195. The Notice also proposed certain measures to correct the violations. Respondent did not\ncontest the allegations of violation or corrective measures.\nBased upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the\npipeline safety regulation listed below, as more fully described in the enclosed Notice, which is\nincorporated by reference:\n49 C.F.R. § 195.446(e)(5) & (6) (Item 2) ─ Respondent failed to implement a\nwritten alarm management plan that included provisions to monitor the content\nand volume of the general activity of the controller to assure controllers have\nsufficient time to analyze and react to incoming alarms.\nThis finding of violation will be considered a prior offense in any subsequent enforcement action\ntaken against Respondent.\nCompliance Actions\nThe Director has indicated that Respondent completed the actions proposed in the Notice to\ncorrect the violation. Therefore, it is not necessary to include the proposed compliance terms in\nthis Final Order.\n\n\n\nWarning Items\nWith respect to Items 1 and 3, the Notice alleged probable violations of 49 C.F.R. §§\n195.446(e)(4) and 195.446(f)(1), respectively, but did not propose a civil penalty or compliance\norder for these items. Therefore, these are considered to be warning items. If OPS finds a\nviolation of these provisions in a subsequent inspection, Respondent may be subject to future\nenforcement action.\nThe terms and conditions of this order are effective upon service in accordance with 49 C.F.R.\n§ 190.5.\nAugust 5, 2022\n___________________________________ _________________________\nAlan K. Mayberry Date Issued\nAssociate Administrator\nfor Pipeline Safety","truncated":false,"body_characters":4456}