# SCM PR, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 52022021NOPV
- **title:** SCM PR, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-06-15
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.446(e)(4), 195.446(e)(5), 195.446(e)(6), 195.446(f)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022021nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022021nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022021nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52022021NOPV
**body:**

Notice of Probable Violation involving SCM PR, LLC. PHMSA's enforcement data identifies the cited regulations as 195.446(e)(4),  195.446(e)(5),  195.446(e)(6),  195.446(f)(1). The case was opened on 2022-06-15 and is reported as closed as of 2022-08-05. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52022021NOPV_Final Order_08052022_(21-201441).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022021NOPV/52022021NOPV_Final%20Order_08052022_(21-201441).pdf

52022021NOPV_Final Order_08052022_(21-201441)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022021NOPV/52022021NOPV_Final%20Order_08052022_(21-201441)_text.pdf

52022021NOPV_PCO_06152022_(21-201441).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022021NOPV/52022021NOPV_PCO_06152022_(21-201441).pdf

52022021NOPV_PCO_06152022_(21-201441)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022021NOPV/52022021NOPV_PCO_06152022_(21-201441)_text.pdf

52022021NOPV_Final Order_08052022_(21-201441)_text.pdf

August 5, 2022
VIA ELECTRONIC MAIL TO: jpbarley@scmidstream.com
Mr. J. Patrick Barley
Chief Executive Officer
SCM PR, LLC
909 Lake Carolyn Parkway, Suite 650
Irving, Texas 75039
Re: CPF No. 5-2022-021-NOPV
Dear Mr. Barley:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and finds that the proposed actions to comply with the pipeline safety regulations have
been completed. This case is now closed. Service of the Final Order by e-mail is effective upon
the date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Dustin Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA
Ms. Mary Patton, Regulatory Manager, Silver Creek Midstream Holdings, LLC,
mpatton@scmidstream.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
SCM PR, LLC, )
a subsidiary of Silver Creek ) CPF No. 5-2022-021-NOPV
Midstream Holdings, LLC, )
)
Respondent. )
____________________________________)
FINAL ORDER
On June 15, 2022, pursuant to 49 C.F.R. § 190.207, the Director, Western Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to SCM PR, LLC, a
wholly-owned subsidiary of Silver Creek Midstream Holdings, LLC (Respondent). The Notice
proposed finding that Respondent had violated the pipeline safety regulations in 49 C.F.R. Part
195. The Notice also proposed certain measures to correct the violations. Respondent did not
contest the allegations of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.446(e)(5) & (6) (Item 2) ─ Respondent failed to implement a
written alarm management plan that included provisions to monitor the content
and volume of the general activity of the controller to assure controllers have
sufficient time to analyze and react to incoming alarms.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
The Director has indicated that Respondent completed the actions proposed in the Notice to
correct the violation. Therefore, it is not necessary to include the proposed compliance terms in
this Final Order.



Warning Items
With respect to Items 1 and 3, the Notice alleged probable violations of 49 C.F.R. §§
195.446(e)(4) and 195.446(f)(1), respectively, but did not propose a civil penalty or compliance
order for these items. Therefore, these are considered to be warning items. If OPS finds a
violation of these provisions in a subsequent inspection, Respondent may be subject to future
enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
August 5, 2022
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false