# SIGNATURE FLIGHT SUPPORT, M&O _ HONOLULU — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 52022024NOPV
- **title:** SIGNATURE FLIGHT SUPPORT, M&O _ HONOLULU — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-04-27
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.262(d), 195.406(b), 195.428(a), 195.581(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022024nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022024nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52022024nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52022024NOPV
**body:**

Notice of Probable Violation involving SIGNATURE FLIGHT SUPPORT, M&O _ HONOLULU. PHMSA's enforcement data identifies the cited regulations as 195.262(d),  195.406(b),  195.428(a),  195.581(b). The case was opened on 2022-04-27 and is reported as closed as of 2026-03-19. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52022024NOPV_Closure Letter_03192026_(21-218959).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022024NOPV/52022024NOPV_Closure%20Letter_03192026_(21-218959).pdf

52022024NOPV_Closure Letter_03192026_(21-218959)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022024NOPV/52022024NOPV_Closure%20Letter_03192026_(21-218959)_text.pdf

52022024NOPV_Final Order_06302022_(21-218959).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022024NOPV/52022024NOPV_Final%20Order_06302022_(21-218959).pdf

52022024NOPV_Final Order_06302022_(21-218959)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022024NOPV/52022024NOPV_Final%20Order_06302022_(21-218959)_text.pdf

52022024NOPV_Operator Response to Notice and Request Time Extension_05262022_(21-218959).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022024NOPV/52022024NOPV_Operator%20Response%20to%20Notice%20and%20Request%20Time%20Extension_05262022_(21-218959).pdf

52022024NOPV_PCO_04272022_(21-218959).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022024NOPV/52022024NOPV_PCO_04272022_(21-218959).pdf

52022024NOPV_PCO_04272022_(21-218959)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52022024NOPV/52022024NOPV_PCO_04272022_(21-218959)_text.pdf

52022024NOPV_Closure Letter_03192026_(21-218959)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
VIA ELECTRONIC MAIL TO: j.wilson@signatureaviation.com
12300 W. Dakota Ave., Suite 340
Lakewood, CO 80228
March 19, 2026
John Wilson
Director
Signature Flight Support Corporation
13485 Veterans Way, Suite 600
Orlando, FL 32827
CPF 5-2022-024-NOPV
Closure Letter
Dear Mr. Wilson:
On June 30, 2022, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Signature Flight Support Corporation a Final Order. Based on our review of the
documentation you provided on March 11, 2026, it has been determined that you have complied
with the terms of this Order.
Accordingly, this case is now closed, and no further action will be taken regarding the matters
involved. Thank you for your cooperation.
Sincerely,
Dustin Hubbard
Director, Western Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 J. Gano (21-218959)
Jason Maga, General Manager, Jason.maga@signatureflight.com
Larisa Demling, Sr. Facilities Manager, Larisa.Demling@signatureflight.com

52022024NOPV_Final Order_06302022_(21-218959)_text.pdf

June 30, 2022
VIA ELECTRONIC MAIL TO: eric.hietala@signatureflight.com
Mr. Eric Hietala
Senior Vice President, Airport Property Development
Signature Flight Support Corporation
13485 Veterans Way, Suite 600
Orlando, Florida 32827
Re: CPF No. 5-2022-024-NOPV
Dear Mr. Hietala:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Western Region, this enforcement action will be closed. Service of the Final Order by
e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Dustin B. Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA
Mr. Jason Maga, General Manager, Signature Flight Support Corporation,
jason.maga@signatureflight.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Signature Flight Support Corporation, ) CPF No. 5-2022-024-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On April 27, 2022, pursuant to 49 C.F.R. § 190.207, the Director, Western Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Signature Flight
Support Corporation (Respondent). The Notice proposed finding that Respondent had violated
the pipeline safety regulations in 49 C.F.R. Part 195. The Notice also proposed certain measures
to correct the violation. Respondent did not contest the allegations of violation or corrective
measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.262(d) (Item 1) ─ Respondent failed to install pumping
equipment on property that is under the control of the operator and at least 15.2 m
(50 ft) from the boundary of the pump station.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



Warning Items
With respect to Items 2, 3, and 4, the Notice alleged probable violations of 49 C.F.R. §§
195.406(b), 195.428(a) and 195.581(b), respectively, but did not propose a civil penalty or
compliance order for these items. Therefore, these are considered to be warning items. If OPS
finds a violation of any of these items in a subsequent inspection, Respondent may be subject to
future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
June 30, 2022
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false
- **body characters:** 6747
