# NORTH SLOPE BOROUGH ENERGY MANAGEMENT — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 52023039NOPV
- **title:** NORTH SLOPE BOROUGH ENERGY MANAGEMENT — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-11-02
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.1007(f), 192.605(a), 192.605(b)(8), 192.615(a)(4), 192.625(f), 192.739(a), 192.805.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023039nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023039nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023039nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52023039NOPV
**body:**

Notice of Probable Violation involving NORTH SLOPE BOROUGH ENERGY MANAGEMENT. PHMSA's enforcement data identifies the cited regulations as 192.1007(f),  192.605(a),  192.605(b)(8),  192.615(a)(4),  192.625(f),  192.739(a),  192.805. The case was opened on 2023-11-02 and is reported as closed as of 2024-11-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52023039NOPV_Closure Letter_11182024_(22-254201).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023039NOPV/52023039NOPV_Closure%20Letter_11182024_(22-254201).pdf

52023039NOPV_Closure Letter_11182024_(22-254201)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023039NOPV/52023039NOPV_Closure%20Letter_11182024_(22-254201)_text.pdf

52023039NOPV_Final Order_01112024_(22-254201).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023039NOPV/52023039NOPV_Final%20Order_01112024_(22-254201).pdf

52023039NOPV_Final Order_01112024_(22-254201)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023039NOPV/52023039NOPV_Final%20Order_01112024_(22-254201)_text.pdf

52023039NOPV_Operator Response to Notice_11302023_(22-254201).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023039NOPV/52023039NOPV_Operator%20Response%20to%20Notice_11302023_(22-254201).pdf

52023039NOPV_PCO_11022023_(22-254201).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023039NOPV/52023039NOPV_PCO_11022023_(22-254201).pdf

52023039NOPV_PCO_11022023_(22-254201)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023039NOPV/52023039NOPV_PCO_11022023_(22-254201)_text.pdf

52023039NOPV_Final Order_01112024_(22-254201)_text.pdf

January 11, 2024
VIA ELECTRONIC MAIL TO: josiah.patkotak@north-slope.org
The Honorable Josiah Patkotak
Mayor of the North Slope Borough
P.O. Box 69
Utqiagvik, Alaska 99723
Re: CPF No. 5-2023-039-NOPV
Dear Mr. Patkotak:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Western Region, this enforcement action will be closed. Service of the Final Order by
e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Dustin Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA
Mr. Scott K. Danner, Director, Department of Public Works, North Slope Borough,
scott.danner@north-slope.org
Mr. James Aiken, Deputy Director, Department of Public Works, North Slope Borough,
james.aiken@north-slope.org







Ms. Joanne Simmonds, Assistant to the Mayor, North Slope Borough,
joanne.simmonds@north-slope.org
Mr. Roy Martinez, Gas Distribution Manager, Nuiqsut Utility Cooperative,
NSBmanager@nucmail.com
CONFIRMATION OF RECEIPT REQUESTED







U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
North Slope Borough, ) CPF No. 5-2023-039-NOPV
a municipal corporation, )
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On November 2, 2023, pursuant to 49 C.F.R. § 190.207, the Director, Western Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation and Proposed Compliance Order
(Notice) to North Slope Borough Energy Management (Respondent (North Slope Borough, a
municipal corporation)). The Notice proposed finding that Respondent had violated the pipeline
safety regulations in 49 C.F.R. Part 192. The Notice also proposed certain measures to correct
the violations. Respondent did not contest the allegations of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.605(a) (Item 1) ─ Respondent failed to follow its procedures
when it significantly altered the pipeline monitoring system without prior
notification to field personnel (contractors), Nuiqsut Utility Cooperative;
49 C.F.R. § 192.605(a) (Item 2) ─ Respondent failed to review and update its
operations and maintenance manuals at intervals not exceeding 15 months, but at
least once each calendar year;
49 C.F.R. § 192.605(b)(8) (Item 3) ─ Respondent failed to complete periodic
effectiveness reviews by failing to modify its procedures when deficiencies were
found;
49 C.F.R. § 192.615(a)(4) (Item 4) ─ Respondent failed to ensure the availability
of personnel, equipment, tools, and materials, as needed, at the scene of an
emergency;



49 C.F.R. § 192.625(f) (Item 5) ─ Respondent failed to adequately conduct and
record periodic sampling of combustible gases for odorization;
49 C.F.R. § 192.805 (Item 7) ─ Respondent failed to follow its written
qualification program when the review and revision log within its Operator
Qualification Plan manual had no documented revisions since 2019; and
49 C.F.R. § 192.1007(f) (Item 8) ─ Respondent failed to conduct a complete
program re-evaluation at least every five years as required.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violations. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.
Warning Item
With respect to Item 6, the Notice alleged probable violation of 49 C.F.R. § 192.739(a), but did
not propose a civil penalty or compliance order for this item. Therefore, this is considered to be
a warning item. If OPS finds a violation of this provision in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
January 11, 2024
__________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

52023039NOPV_Closure Letter_11182024_(22-254201)_text.pdf

VIA ELECTRONIC MAIL TO: josiah.patkotak@north-slope.org
November 18, 2024
The Honorable Josiah Patkotak
Mayor of the North Slope Borough
P.O. Box 69
Utqiagvik, Alaska 99723
CPF 5-2023-039-NOPV
Closure Letter
Dear Mr. Patkotak:
On January 11, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to North Slope Borough (NSB) a Final Order in the above-referenced case. This Order
included a Compliance Order and requirements to take corrective actions on your pipeline.
Based on our review of the documentation you provided, it has been determined that you have
complied with the terms of this Order.
Item 1:
PHMSA has reviewed documentation received on February 20, 2024, regarding the Nuiqsut
Natural Gas Pipeline Monitoring System, item 1 of the NOPV and item A of the Compliance
Order. The documentation was satisfactory, therefore, item 1 of the Final Order is now
considered closed.
Item 2:
PHMSA has reviewed documentation received on April 10, 2024, regarding the Nuiqsut Natural
Gas Pipeline Operations & Maintenance manual and Pipeline Specific Operations &
Maintenance manual, item 2 of the NOPV and item B of the Compliance Order. The
documentation was satisfactory, therefore, item 2 of the Final Order is now considered closed.
Item 3
PHMSA has reviewed documentation received on July 24, 2024, regarding the periodic review
of the effectiveness and adequacy of the Nuiqsut Natural Gas Pipeline Operations &
Maintenance manual and Pipeline Specific Operations & Maintenance manual, item 3 of the



NOPV and item C of the Compliance Order. PHMSA also received documentation reviewed on
November 12, 2024, demonstrating the inclusion of the lessons learned and other insights
specifically noted in the violation report of the NOPV. The documentation was satisfactory,
therefore, item 3 of the Final Order is now considered closed.
Item 4:
PHMSA has reviewed documentation received on April 10, 2024, regarding the Nuiqsut Natural
Gas Pipeline Equipment for Emergency Response, item 4 of the NOPV and item D of the
Compliance Order. The documentation was satisfactory, therefore, item 4 of the Final Order is
now considered closed, no further action is required.
Item 5:
PHMSA has reviewed the documentation received on November 12, 2024, regarding the odorant
testing, item 5 of the NOPV and item E of the Compliance Order. The documentation was
satisfactory, therefore, item 5 of the Final Order is now considered closed, no further action is
required.
Item 6:
This was a Warning item and Warning items are not adjudicated.
Item 7:
PHMSA has reviewed documentation received on July 24, 2024, regarding the OQ manual. NSB
appears to have reviewed the OQ manual as stated in the compliance order. Therefore, item 7 of
the Final Order is now considered closed, no further action is required.
Item 8:
PHMSA has reviewed documentation received on July 24, 2024, regarding the DIMP manual.
NSB appears to have reviewed the DIMP manual as stated in the compliance order. Therefore,
item 8 of the Final Order is now considered closed, no further action is required.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 M. Yeager (#22-254201)
Roy Martinez, Nuiqsut Gas Distribution Manager, NSBmanager@nucmail.com
Joanne Simmonds, Assistant to the Mayor, joanne.simmonds@north-slope.org
Charlie Risley, NSB Gas Field Manager, charlie.risley@north-slope.org