# E&B NATURAL RESOURCES MANAGEMENT CORP — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 52023040NOPV
- **title:** E&B NATURAL RESOURCES MANAGEMENT CORP — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-07-26
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.479(a), 192.481(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023040nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023040nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023040nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52023040NOPV
**body:**

Notice of Probable Violation involving E&B NATURAL RESOURCES MANAGEMENT CORP. PHMSA's enforcement data identifies the cited regulations as 192.479(a),  192.481(a). The case was opened on 2023-07-26 and is reported as closed as of 2023-10-17. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52023040NOPV_Final Order_10172023_(23-264043).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023040NOPV/52023040NOPV_Final%20Order_10172023_(23-264043).pdf

52023040NOPV_Final Order_10172023_(23-264043)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023040NOPV/52023040NOPV_Final%20Order_10172023_(23-264043)_text.pdf

52023040NOPV_Operator Response to Notice_08252023_(23-264043).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023040NOPV/52023040NOPV_Operator%20Response%20to%20Notice_08252023_(23-264043).pdf

52023040NOPV_PCO_07262023_(23-264043).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023040NOPV/52023040NOPV_PCO_07262023_(23-264043).pdf

52023040NOPV_PCO_07262023_(23-264043)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023040NOPV/52023040NOPV_PCO_07262023_(23-264043)_text.pdf

52023040NOPV_Final Order_10172023_(23-264043)_text.pdf

October 17, 2023
VIA ELECTRONIC MAIL TO: slayton@ebresources.com
Steve Layton
President
E&B Natural Resources Management Corp.
249 E. Ocean Blvd., Suite 900
Long Beach, California 90892
Re: CPF No. 5-2023-040-NOPV
Dear Mr. Layton:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and finds that the proposed actions to comply with the pipeline safety regulations have
been completed. This case is now closed. Service of the Final Order by e-mail is effective upon
the date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Dustin B. Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA
Mr. Louis Zylstra, Senior Vice President, LA Basin, E&B Natural Resources
Management Corp., lzylstra@ebresources.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
______________________________________________
In the Matter of )
E&B Natural Resources Management Corp., ) CPF No. 5-2023-040-NOPV
)
)
)
Respondent. )
__________________________________________)
FINAL ORDER
On July 26, 2023, pursuant to 49 C.F.R. § 190.207, the Director, Western Region, Office of Pipeline
Safety (OPS), issued a Notice of Probable Violation and Proposed Compliance Order (Notice) to
E&B Natural Resources Management Corporation (Respondent). The Notice proposed finding that
Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 192. The Notice also
proposed certain measures to correct the violations. Respondent did not contest the allegations of
violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.481(a) (Item 1) ─ Respondent failed to inspect and evaluate its PXP
Gathering System for evidence of atmospheric corrosion since it assumed operation of
the pipeline on March 30, 2018.
49 C.F.R. § 192.479(a) (Item 2) ─ Respondent failed to clean and coat each portion of
its pipeline within the Inglewood Oil Field that was exposed to the atmosphere.
These findings of violation will be considered prior offenses in any subsequent enforcement action
taken against Respondent.
The Director has indicated that Respondent completed the actions proposed in the Notice to correct
the violations. Therefore, it is not necessary to include the proposed compliance terms in this Final
Order.
§ 190.5.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
October 17, 2023
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false