# BETA OFFSHORE — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 52023042NOPV
- **title:** BETA OFFSHORE — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-12-26
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.446(c)(3), 195.446(c)(4), 195.446(e)(3), 195.446(e)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023042nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023042nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52023042nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52023042NOPV
**body:**

Notice of Probable Violation involving BETA OFFSHORE. PHMSA's enforcement data identifies the cited regulations as 195.446(c)(3),  195.446(c)(4),  195.446(e)(3),  195.446(e)(4). The case was opened on 2023-12-26 and is reported as closed as of 2026-04-08. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52023042NOPV_Closure Letter_04082026_(22-232644).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_Closure%20Letter_04082026_(22-232644).pdf

52023042NOPV_Closure Letter_04082026_(22-232644)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_Closure%20Letter_04082026_(22-232644)_text.pdf

52023042NOPV_Consent Agreement and Order_04162025_(22-232644).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_Consent%20Agreement%20and%20Order_04162025_(22-232644).pdf

52023042NOPV_Consent Agreement and Order_04162025_(22-232644)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_Consent%20Agreement%20and%20Order_04162025_(22-232644)_text.pdf

52023042NOPV_Operator Request for Hearing and Statement of Issues and Request for Informal Conference_01192024_(22-232644).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_Operator%20Request%20for%20Hearing%20and%20Statement%20of%20Issues%20and%20Request%20for%20Informal%20Conference_01192024_(22-232644).pdf

52023042NOPV_Operator Withdrawal of Hearing Request_04212025_(22-232644).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_Operator%20Withdrawal%20of%20Hearing%20Request_04212025_(22-232644).pdf

52023042NOPV_PCO_12262023_(22-232644).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_PCO_12262023_(22-232644).pdf

52023042NOPV_PCO_12262023_(22-232644)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_PCO_12262023_(22-232644)_text.pdf

52023042NOPV_PHC Hearing Rescheduled_02042025_(22-232644).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_PHC%20Hearing%20Rescheduled_02042025_(22-232644).pdf

52023042NOPV_PHC Hearing Rescheduled_02042025_(22-232644)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_PHC%20Hearing%20Rescheduled_02042025_(22-232644)_text.pdf

52023042NOPV_PHC Hearing Rescheduled_10182024_(22-232644).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_PHC%20Hearing%20Rescheduled_10182024_(22-232644).pdf

52023042NOPV_PHC Hearing Rescheduled_10182024_(22-232644)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_PHC%20Hearing%20Rescheduled_10182024_(22-232644)_text.pdf

52023042NOPV_PHC Hearing Scheduled_05302024_(22-232644).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_PHC%20Hearing%20Scheduled_05302024_(22-232644).pdf

52023042NOPV_PHC Hearing Scheduled_05302024_(22-232644)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52023042NOPV/52023042NOPV_PHC%20Hearing%20Scheduled_05302024_(22-232644)_text.pdf

52023042NOPV_PHC Hearing Scheduled_05302024_(22-232644)_text.pdf

May 30, 2024
VIA ELECTRONIC MAIL TO: jcurry@babstcalland.com and dustin.hubbard@dot.gov
Mr. James Curry
Counsel for Amplify Energy Corp.
Babst Calland
505 9th Street, NW, Suite 602
Washington, DC 20004
Mr. Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
12300 W. Dakota Avenue, Suite 110
Lakewood, CO 80228
Re: Notice of Hearing, Amplify Energy Corporation
CPF No. 5-2023-042-NOPV
Dear Mr. Curry and Mr. Hubbard:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation and Proposed Compliance Order issued by the Pipeline and Hazardous Materials
Safety Administration in the above-referenced case. The hearing will take place on October 30,
2024, beginning at 8:30 a.m. Mountain Time.
The hearing will be held at the PHMSA Western Region office, 12300 W. Dakota Ave, Suite 110,
Lakewood, CO 80228. Upon arrival at the building, attendees will be required to present photo
identification to security personnel. A contact phone number for the day of the hearing is (720)
963-3160.
At least 10 calendar days prior to the hearing (or by October 21, 2024), both parties must submit
and exchange any additional written materials they intend to present at the hearing and the name
and email address of each attendee. This information should be provided electronically. Materials
not submitted by this date may be excluded. If you have any questions, please do not hesitate to
contact me.
Sincerely,
Larry White
Presiding Official



cc: Mr. Dan Furbee, Senior Vice President and Chief Operating Officer,
Amplify Energy Corp., dan.furbee@amplifyenergy.com
Ms. Alexandra Iorio, Counsel, Western Region, Office of Pipeline Safety, PHMSA,
alexandra.iorio@dot.gov
Ms. Kathleen Maitland, Counsel, Western Region, Office of Pipeline Safety, PHMSA,
kathleen.maitland@dot.gov

52023042NOPV_Closure Letter_04082026_(22-232644)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety Administration
12300 West Dakota Avenue, Suite 340
Lakewood, Colorado 80228
VIA ELECTRONIC MAIL TO: martyn.willsher@amplifyenergy.com
April 8, 2026
Mr. Martyn Willsher
President and Chief Executive Officer
Amplify Energy Corporation.
111 Ocean Boulevard, Suite 1240
Long Beach, CA 90802
CPF No’s. 5-2023-041-NOA & 5-2023-042-NOPV
Closure Letter
Dear Mr. Willsher:
On April 16, 2025, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Amplify Energy Corporation (Amplify) a Consent Order incorporating the terms of the
Consent Agreement between PHMSA and Amplify in the above-referenced case. This Order
included a Compliance Terms requirement for Amplify to take certain corrective actions.
Per the terms of the Consent Agreement, the Consent Agreement would terminate once the
Compliance Terms of Section V were deemed satisfied. After a review of the documents
Amplify provided on July 15, 2025 and August 14, 2025, it has been determined that the
Compliance Terms have been satisfied.
Accordingly, the Consent Agreement is terminated, and this case is now closed.
Thank you for your cooperation in this matter.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration



cc: PHP-60 Compliance Registry
PHP-500 J. Dunphy (#22-232644)

52023042NOPV_PHC Hearing Rescheduled_10182024_(22-232644)_text.pdf

Date: October 18, 2024
From: Larry White
To: File
Re: Continuance of Hearing, Amplify Energy
CPF No. 5-2023-042-NOPV
By electronic mail dated October 15, 2024, Kathleen Maitland, Counsel for OPS Western Region,
and Claire Haines, Counsel for Amplify Energy, submitted a joint request for a continuance of the
hearing previously scheduled for October 30, 2024. The request explained that the parties are in
active settlement discussions in this case. It further stated that a consent agreement may not be
completed by the scheduled hearing date, and requested a continuance to ensure sufficient time to
complete the agreement.
I granted the request for a continuance until February 20, 2025 which will be the new hearing date if
a consent agreement is not completed by that time.

52023042NOPV_Consent Agreement and Order_04162025_(22-232644)_text.pdf

April 16, 2025
VIA ELECTRONIC MAIL TO: martyn.willsher@amplifyenergy.com
Mr. Martyn Willsher
President and Chief Executive Officer
Amplify Energy Corp.
111 Ocean Boulevard, Suite 1240
Long Beach, CA 90802
CPF Nos. 5-2023-041-NOA & 5-2023-042-NOPV
Dear Mr. Willsher:
Enclosed please find a Consent Order incorporating the terms of the Consent Agreement between the
Pipeline and Hazardous Materials Safety Administration (PHMSA) and Beta Operating Company,
LLC d/b/a Beta Offshore, which was executed on March 26, 2025. Service of the Consent Order and
Consent Agreement by electronic mail is deemed effective upon the date of transmission and
acknowledgement of receipt, or as otherwise provided under 49 CFR § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure: Consent Order and Consent Agreement



cc: Dustin Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA
Brianne Kurdock, Esq., Counsel for Respondent, Babst Calland, bkurdock@babstcalland.com.



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of )
Beta Offshore, ) CPF Nos. 5-2023-041-NOA &
a subsidiary of Amplify Energy, Inc., ) 5-2023-042-NOPV
Respondent. )
)
)
)
)
CONSENT ORDER
By letters dated December 26, 2023, the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), issued a Notice of Probable Violation and Proposed
Compliance Order and a Notice of Amendment (Notices) to Beta Operating Company, LLC d/b/a
Beta Offshore (Beta or Respondent).
In response to the Notices, Respondent requested hearings on all Items, contesting the underlying
violations, the proposed compliance order, and the alleged inadequacies within the Notices. Beta
also asked for the opportunity to meet informally with PHMSA to discuss the allegations in the
Notices. Respondent and PHMSA (The Parties) subsequently met to discuss the issues raised in the
Responses. As a result of those discussions, as explained in more detail below, the Parties have
agreed to a Consent Agreement by which makes findings of violation and inadequacy, includes
modified compliance terms, and acknowledges the corrective actions the Respondent has taken to
resolve several of the allegations.
Accordingly, the Consent Agreement is hereby approved and incorporated by reference into this
Consent Order. Beta is hereby ordered to comply with the terms of the Consent Agreement
pursuant to its terms. Pursuant to 49 U.S.C. § 60101, et seq., failure to comply with this Consent
Order may result in the assessment of civil penalties as set forth in 49 U.S.C. § 60122 and 49
C.F.R. § 190.223, or in referral to the Attorney General for appropriate relief in a district court of
the United States.
The terms and conditions of this Consent Order are effective upon service in accordance with
49 C.F.R. § 190.5.
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of )
Beta Offshore ) CPF No. 5-2023-041-NOA &
a subsidiary of Amplify Energy Corp. ) CPF No. 5-2023-042-NOPV
Respondent. )
)
)
)
)
CONSENT AGREEMENT
From November 28 through December 2, 2022, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.), conducted an on-site pipeline safety inspection of the
facilities and records of Beta Operating Company, LLC d/b/a Beta Offshore (Beta or Respondent)
control room in Long Beach, California.
As a result of the inspection, the Director, Western Region, OPS (Director), issued to Respondent,
by letters dated December 26, 2023, a Notice of Amendment (NOA) and Notice of Probable
Violation and Proposed Compliance Order (NOPV), which also included a warning pursuant to 49
CFR § 190.205. In accordance with 49 CFR § 190.206, PHMSA alleged inadequacies in Beta’s
procedures. In accordance with 49 CFR § 190.207, PHMSA alleged that Beta had committed three
violations of 49 CFR Part 195 (Items 1, 2, and 4), and proposed ordering Respondent to take certain
measures to correct the alleged violations. The NOPV also included a warning item (Item 3) and
advised the operator to correct the probable violation or face potential future enforcement action.
On January 19, 2024, Beta responded to the NOA and NOPV (the Notices). Beta requested an
informal conference, or alternatively, an administrative hearing. Thereafter, Respondent and
PHMSA (collectively, the Parties) met on several occasions to discuss the allegations. Between
September and December 2024, the Parties discussed amendments of the relevant procedures. As
a result, the Parties have agreed to resolve this matter via consent order and agreement. This
Agreement will serve the public interest by promoting safety and protection of the environment.
Pursuant to 49 U.S.C. § 60101, et seq. and 49 CFR Part 190, and upon consent and agreement, the
Parties hereby agree as follows:



I. General Provisions
1. Respondent acknowledges that as the operator of the pipeline facilities subject to
the Notices, Respondent and its referenced pipeline facilities are subject to the jurisdiction of the
Federal pipeline safety laws, 49 U.S.C. § 60101, et seq., and the regulations and administrative
orders issued thereunder. For purposes of this Consent Agreement (Agreement), Respondent
acknowledges that it received proper notice of PHMSA’s actions in these proceedings and that the
Notices state claims upon which relief may be granted pursuant to 49 U.S.C. § 60101, et seq., and
the regulations and orders issued thereunder.
2. After Respondent returns this signed Agreement to PHMSA, the Agency’s
representative will present it to the Associate Administrator for Pipeline Safety, recommending that
the Associate Administrator adopt the terms of this Agreement by issuing an administrative order
(Consent Order) incorporating the terms of this Agreement. The terms of this Agreement constitute
an offer of settlement until accepted by the Associate Administrator. Once accepted, the Associate
Administrator will issue a Consent Order incorporating the terms of this Agreement.
3. Respondent consents to the issuance of the Consent Order, and hereby waives any
further procedural requirements with respect to its issuance. Respondent waives all rights to contest
the adequacy of notice, or the validity of the Consent Order or this Agreement, including all rights
to administrative or judicial hearings or appeals, except for the Dispute Resolution provisions set
forth herein. Respondent agrees to withdraw its requests for an administrative hearing in these
matters upon receipt of the Consent Order.
4. This Agreement shall apply to and be binding upon PHMSA and Respondent, its
officers, directors, and employees, and its successors, assigns, or other entities or persons otherwise
bound by law. Respondent agrees to provide a copy of this Agreement and any incorporated work
plans and schedules to all of Respondent’s officers, employees, and agents whose duties might
reasonably include compliance with this Agreement.
5. This Agreement constitutes the final, complete and exclusive agreement and
understanding between the Parties with respect to the settlement embodied in this Agreement. The
Parties acknowledge that there are no representations, agreements or understandings relating to
settlement other than those expressly contained in this Agreement, except that the terms of this
Agreement may be construed by reference to the Notices.
6. Nothing in this Agreement affects or relieves Respondent of its responsibility to
comply with all applicable requirements of the Federal pipeline safety laws, 49 U.S.C. § 60101, et
seq., and the regulations and orders issued thereunder. Nothing in this Agreement alters PHMSA's
right of access, entry, inspection, and information gathering or PHMSA's authority to bring
enforcement actions against Respondent pursuant to the Federal pipeline safety laws, the
regulations and orders issued thereunder, or any other provision of Federal or State law.
7. For all transfers of ownership or operating responsibility of Respondent’s pipeline
system referenced herein, Respondent will provide a copy of this Agreement to the prospective



transferee at least 30 days prior to such transfer. Respondent will provide written notice of the
transfer to the Director no later than 60 days after the transfer occurs.
8. This Agreement does not waive or modify any Federal, State, or local laws or
regulations that are applicable to Respondent’s pipeline systems. This Agreement is not a
permit, or a modification of any permit, under any Federal, State, or local laws or regulations.
Respondent remains responsible for achieving and maintaining compliance with all applicable
Federal, State, and local laws, regulations and permits.
9. This Agreement does not create rights in, or grant any cause of action to, any third
party, not party to this Agreement. The U.S. Department of Transportation is not liable for any
injuries or damages to persons or property arising from acts or omissions of Respondent or its
officers, employees, or agents carrying out the work required by this Agreement. Respondent
agrees to hold harmless the U.S. Department of Transportation, its officers, employees, agents,
and representatives from any and all causes of action arising from any acts or omissions of
Respondent or its contractors in carrying out any work required by this Agreement.
10. Respondent neither admits nor denies any allegations or conclusions in the
Notices. Respondent agrees for purposes of this Agreement to accept the allegations in the NOA
and NOPV as findings and to comply with the terms of this Agreement.
11. This Agreement does not constitute a finding of violation of any other federal law
or regulation and may not be used in any civil proceeding of any kind as evidence or proof of
any fact, fault or liability, or as evidence of a violation of any law, rule, regulation, or
requirement, except in a proceeding to enforce the provisions of this Agreement.
Findings of Inadequacy - NOA
12. Item 1 - 49 CFR § 195.402(a): The NOA alleged Beta’s Pipeline Specific
Operations and Maintenance Manual (O&M Manual), Section 19 – Control Management, did not
contain instructions for conducting and documenting the annual review required by the pipeline
safety regulations. Beta contested this Item and the Parties engaged in discussions to clarify the
allegations in the NOA. Without admission, Respondent accepts the procedures as alleged in the
NOA as inadequate and has developed revised procedures which have been submitted to PHMSA
for review. The Director has accepted these revised procedures as adequate, and no further action
is necessary.
13. Item 2 - 49 CFR § 195.446(b)(1): The NOA alleged Beta’s procedures failed to
clearly define the roles and responsibilities of controllers during normal operating conditions
including when making onshore deliveries to the Crimson Pipeline. Beta contested this Item and
the Parties engaged in discussions to clarify the allegations in the NOA. Beta is currently in the
process of amending the procedures. PHMSA commends Beta’s prompt efforts to strengthen its
procedures to ensure pipeline safety. Without admission, Respondent accepts the procedures as
alleged in the NOA as inadequate.
II.



14. Item 3 - 49 CFR § 195.446(c)(1): The NOA alleged Beta’s procedures failed to
clearly define the types of changes to the SCADA system that constitute additions, expansion and
replacements that would require implementation of API RP 1165. Beta contested this Item and the
Parties engaged in discussions to clarify the allegations in the NOA. Without admission,
Respondent accepts the procedures as alleged in the NOA as inadequate and has developed revised
procedures which have been submitted to PHMSA for review. The Director has accepted these
revised procedures as adequate, and no further action is necessary.
15. Item 4 - 49 CFR § 195.446(c)(2): The NOA alleged Beta’s procedures did not
define the terms “point” and “safety-related point” and did not define a process for establishing
points on a pipeline including how to select initial setpoint values for points on the pipeline. Beta
contested this Item and the Parties engaged in discussions to clarify the allegations in the NOA.
Without admission, Respondent accepts the procedures as alleged in the NOA as inadequate and
has developed revised procedures which have been submitted to PHMSA for review. The Director
has accepted these revised procedures as adequate, and no further action is necessary.
16. Item 5 - 49 CFR § 195.446(d)(1): The NOA alleged Beta’s procedures did not
address methods to mitigate travel fatigue associated with controllers commuting long distances
for their first controller shift at the duty station. Beta contested this Item and the Parties engaged
in discussions to clarify the allegations in the NOA. Without admission, Respondent accepts the
procedures as alleged in the NOA as inadequate and has developed revised procedures which have
been submitted to PHMSA for review. The Director has accepted these revised procedures as
adequate, and no further action is necessary.
III. Findings of Violation - NOPV
17. Item 1 - 49 CFR § 195.446(c)(3): The NOPV alleged Beta failed to test and verify
its internal communication plan as required. Specifically, the NOPV alleged that during inspection,
Beta failed to provide records demonstrating that Beta had tested and verified its internal
communications plan at least once each calendar year, but at intervals not to exceed 15 months, as
required by its O&M Manual for the calendar years of 2018, 2019, 2020, 2021 and 2022. Beta
contested this Item and the Parties engaged in discussions to clarify the allegations in the NOPV.
Without admission, Beta accepts PHMSA’s finding of violation of 49 CFR § 195.446(c)(3).
18. Item 2 - 49 CFR § 195.446(c)(4): The NOPV alleged that Beta failed to test its
backup SCADA systems as required. Specifically, the NOPV alleged that during the inspection,
Beta could not provide records to demonstrate that Beta had tested its backup SCADA systems at
least once each calendar year, but at intervals not to exceed 15 months, for the calendar years of
2018, 2019, 2020, 2021 and 2022. Beta contested this Item and the Parties engaged in discussions
to clarify the allegations in the NOPV. Beta is currently in the process of amending the procedures.
PHMSA commends Beta’s prompt efforts to strengthen its procedures to ensure pipeline safety
Without admission, Beta accepts PHMSA’s finding of violation of 49 CFR § 195.446(c)(4).
19. Item 4 - 49 CFR § 195.446(e)(4): The NOPV alleged Beta failed to conduct a
review of the alarm management plan at least once each calendar year, but at intervals not
exceeding 15 months, to determine the effectiveness of the plan, as required. Specifically, the



NOPV alleged that during the inspection, Beta could not provide any documentation
demonstrating a review of its alarm management plan. Beta contested this Item and the Parties
engaged in discussions to clarify the allegations in the NOPV. Without admission, Beta accepts
PHMSA’s finding of violation of 49 CFR § 195.446(e)(4).
20. Items 1, 2, and 4 will be considered by PHMSA as prior offenses in any future
PHMSA enforcement action taken against Respondent for the five (5) year period following the
Effective Date of this Agreement.
IV. Warning Item:
21. Item 3 - 49 CFR § 195.446(e)(3): The NOPV alleged that Beta failed to verify the
correct safety-related alarm set-point values and alarm descriptions when associated field
instruments are calibrated or changed and at least once each calendar year, but at intervals not to
exceed 15 months, as required. Specifically, the NOPV alleged that a review of Beta’s records
during the inspection revealed that the 2019 and 2020 reviews of safety-related alarm set-point
values and alarm descriptions exceeded the 15-month maximum review interval as the 2019 review
was dated May 19, 2019, and the 2020 review was dated September 20, 2020. This Item was
brought as a warning item and does not constitute a finding of violation.
22. For Warning Item 3, if OPS finds a violation of this provision in a subsequent
inspection, Respondent may be subject to future enforcement action.
V. Compliance Terms:
23. Item 2 (NOA) – 49 CFR § 195.446(b)(1): As stated above, the NOA alleged
Beta’s procedures failed to clearly define the roles and responsibilities of controllers during
normal operating conditions including when making onshore deliveries to the Crimson Pipeline.
Beta must amend its procedures to clearly define the roles and responsibilities of
the controllers during normal operating conditions including when making onshore deliveries on
the Crimson Pipeline within 90 days of the Effective Date.
24. Item 1 (NOPV) - 49 CFR § 195.446(c)(3): The NOPV proposed certain
compliance actions to address the allegations in the NOPV. Beta contested the proposed actions
and the Parties engaged in discussions to clarify the proposal. Respondent developed a revised
internal communication plan and submitted it to PHMSA for review. PHMSA finds these
revisions acceptable.
Beta must conduct the required testing and verification of the amended internal
communications plan within 120 days of the Effective Date.
25. Item 2 (NOPV) - 49 CFR § 195.446(c)(4): The NOPV proposed certain
compliance actions to address the allegations in the NOPV. Beta contested the proposed actions
and the Parties engaged in discussions to clarify the proposal. Beta is currently in the process of
amending its procedures to allow for the testing of Elly personnel who, in an emergency, can



make deliveries to downstream pipelines. Beta will also amend its procedures to allow for the
testing of the backup SCADA system including the testing of the backup servers that were not in
existence at the time of the inspection.
Beta must complete those amendments and submit the revised procedures along
with records demonstrating that the procedures have been tested within 120 days of the Effective
Date.
26. Item 4 (NOPV) - 49 CFR § 195.446(e)(4): The NOPV proposed certain
compliance actions to address the allegations in the NOPV. Beta contested the proposed actions
and the Parties engaged in discussions to clarify the proposal. Respondent developed a revised
Alarm Management Plan procedures and submitted it to PHMSA for review. PHMSA finds
these revisions acceptable.
Beta must conduct a review of the amended Alarm Management Plan and submit
records of that review within 120 days of the Effective Date.
VI. Enforcement:
27. This Agreement is subject to all enforcement authorities available to PHMSA under
49 U.S.C. § 60101, et seq., and 49 CFR Part 190, including administrative civil penalties under 49
U.S.C. § 60122, of up to $266,015 per violation for each day the violation continues and referral of
the case to the Attorney General for judicial enforcement, if PHMSA determines that Respondent
is not complying with the terms of this Agreement in accordance with the determinations made by
the Director, or in accordance with decisions of the Associate Administrator if resolved pursuant to
the Dispute Resolution process herein. The maximum civil penalty amounts are adjusted annually
for inflation. See 49 CFR § 190.223. All time frames to complete the compliance terms referenced
in Section V (Compliance Terms) are automatically incorporated into this Agreement and are
enforceable in the same manner.
VII. Review and Approval Process:
28. With respect to any submission under Section V (Compliance Terms) of this
Agreement that requires the approval of the Director, the Director may: (a) approve, in whole or
in part, the submission; (b) approve the submission on specified, reasonable conditions; (c)
disapprove, in whole or in part, the submission; or (d) any combination of the foregoing. If the
Director approves, approves in part, or approves with conditions, Respondent will take all actions
as approved by the Director, subject to Respondent’s right to invoke the dispute resolution
procedures with respect to any conditions the Director identifies. If the Director disapproves all or
any portion of the submission, the Director will provide Respondent a written notice of the
deficiencies. Respondent will correct all deficiencies within the time specified by the Director and
resubmit it for approval.
VIII. Dispute Resolution:
29. The Director and Respondent will informally attempt to resolve any disputes arising
under this Agreement, including any decision of the Director under the terms of Section V



(Compliance Terms). If Respondent and the Director are unable to informally resolve the dispute
within 15 calendar days after the dispute is first raised, in writing, to the Director, Respondent may
submit a written request for a determination resolving the dispute from the Associate Administrator
for Pipeline Safety, PHMSA. Such request must be made in writing and provided to the Director,
counsel for the Western Region, and to the Associate Administrator for Pipeline Safety, no later
than 10 calendar days from the 15-day deadline for informal resolution referenced in this
paragraph. Along with its request, Respondent must provide the Associate Administrator with all
information Respondent believes is relevant to the dispute. Decisions of the Associate
Administrator under this paragraph will constitute final agency action. The existence of a dispute
and PHMSA’s consideration of matters placed in dispute will not excuse, toll, or suspend any term
or timeframe for completion of any work to be performed under this Agreement during the
pendency of the dispute resolution process.
IX. Effective Date:
30. The term “Effective Date,” as used herein, is the date on which the Consent Order
is issued by the Associate Administrator, PHMSA, incorporating the terms of this Agreement.
X. Recordkeeping and Information Disclosure:
31. Unless otherwise required in this Agreement, Respondent agrees to maintain
records demonstrating compliance with all requirements of this Agreement for a period of at least
five (5) years following completion of all work to be performed. For any reports, plans, or other
deliverables required to be submitted to PHMSA pursuant to this Agreement, Respondent may
assert a claim of business confidentiality or other protections applicable to the release of
information by PHMSA, covering part or all of the information required to be submitted to
PHMSA pursuant to this Agreement in accordance with 49 CFR Part 7. Respondent must mark
the claim of confidentiality in writing on each page and include a statement specifying the grounds
for each claim of confidentially. PHMSA determines release of any information submitted
pursuant to this Agreement in accordance with 49 CFR Part 7, the Freedom of Information Act, 5
U.S.C. § 552, DOT and PHMSA policies, and other applicable regulations and Executive Orders.
XI. Modification:
32. The terms of this Agreement may be modified by mutual agreement of the Parties.
Such modifications must be in writing and signed by both parties.
XII. Termination:
33. This Agreement will remain in effect until the Compliance Terms in Section V are
deemed satisfied, as determined by the Director. The Agreement shall not terminate until the
Director confirms, in writing, that the Agreement is terminated in accordance with this paragraph.
Nothing in this Agreement prevents Respondent from completing any of the obligations earlier
than the deadlines provided for in this Agreement.



XIII. Ratification:
34. The Parties’ undersigned representatives certify that they are fully authorized to
enter into the terms and conditions of this Agreement and to execute and legally bind such party
to this document.
35. The Parties hereby agree to all findings, conditions, and terms of this Agreement.
[Signature Lines on Following Page]



For Beta Operating Company, LLC:
Date
For PHMSA:
Director, Western Region, Office of Pipeline Safety
Date

52023042NOPV_PHC Hearing Rescheduled_02042025_(22-232644)_text.pdf

Date: February 4, 2025
From: Joseph St. Peter
To: File
Re: Continuance of Informal Hearing in CPF No.’s 5-2023-041-NOA & 5-2023-042-NOPV
(Beta Offshore (Amplify Energy Corp.))
By electronic mail on January 29, 2025, Kathleen Maitland and Alexandra Iorio, Counsel for
Western Region, and Brianne Kurdock, counsel for Amplify Energy Corp., submitted a status
update indicating that the parties are currently engaged in settlement discussions and requested to
postpone the current hearing date of February 20, 2025. The request is granted, and the informal
hearing in this case will be held on Thursday May 8, 2025, at 8:30 a.m. Mountain Daylight Time
at Western Region’s office in Lakewood, Colorado. Pre-hearing submissions under 49 CFR §
190.211(d) are due no later than April 28, 2025.