# DCOR, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 52024011NOPV
- **title:** DCOR, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2024-02-23
- **effective on:** Not available
- **summary:** OPEN notice of probable violation citing 195.403(b), 195.404(b), 195.404(c)(3), 195.410(c), 195.440(i), 195.452(l)(1)(ii), 195.575(a), 195.589(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52024011nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52024011nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52024011nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52024011NOPV
**body:**

Notice of Probable Violation involving DCOR, LLC. PHMSA's enforcement data identifies the cited regulations as 195.403(b),  195.404(b),  195.404(c)(3),  195.410(c),  195.440(i),  195.452(l)(1)(ii),  195.575(a),  195.589(c). The case was opened on 2024-02-23 and is reported as open. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52024011NOPV_Final Order_10152025_(23-264348).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52024011NOPV/52024011NOPV_Final%20Order_10152025_(23-264348).pdf

52024011NOPV_Final Order_10152025_(23-264348)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52024011NOPV/52024011NOPV_Final%20Order_10152025_(23-264348)_text.pdf

52024011NOPV_Operator Response to Notice_03212024_(23-264348).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52024011NOPV/52024011NOPV_Operator%20Response%20to%20Notice_03212024_(23-264348).pdf

52024011NOPV_PCO_02232024_(23-264348).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52024011NOPV/52024011NOPV_PCO_02232024_(23-264348).pdf

52024011NOPV_PCO_02232024_(23-264348)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52024011NOPV/52024011NOPV_PCO_02232024_(23-264348)_text.pdf

52024011NOPV_Final Order_10152025_(23-264348)_text.pdf

October 15, 2025
VIA ELECTRONIC MAIL TO: sknight@dcorllc.com
Mr. Scott Knight
Vice President, Operations
DCOR, LLC
1000 Town Center, Suite 600
Oxnard, CA 93036
Re: CPF No. 5-2024-011-NOPV
Dear Mr. Knight:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws one of the
allegations of violation, makes other findings of violation, and specifies actions that need to be
taken by DCOR, LLC to comply with the pipeline safety regulations. When the terms of the
compliance order have been completed, as determined by the Director, Western Region, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the date
of transmission and acknowledgement of receipt as provided under 49 CFR § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Linda Daugherty
Acting Associate Administrator
for Pipeline Safety
Enclosure
cc: Dustin Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA
Dave Willis, Pipeline Integrity Manager, DCOR, LLC, dwillis@dcorllc.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
DCOR, LLC, ) CPF No. 5-2024-011-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
From August 1 through August 3, 2023, pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an on-site pipeline safety inspection of the facilities and records of DCOR,
LLC’s (DCOR or Respondent) Platform A-to-Rincon crude oil pipeline in Ventura, California.
DCOR operates crude oil and natural gas pipelines in Southern California, the Ventura Basin,
and the Los Angeles Basin.
As a result of the inspection, the Director, Western Region, OPS (Director), issued to
Respondent, by letter dated February 23, 2024, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 CFR § 190.207, the Notice proposed finding
that DCOR committed eight violations of 49 CFR Part 195 and proposed ordering Respondent to
take certain measures to correct the alleged violations.
DCOR responded to the Notice by letter dated March 21, 2024 (Response). DCOR contested
several of the allegations and offered additional information in response to the Notice.
Respondent did not request a hearing and therefore has waived its right to one.
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 CFR Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 CFR § 195.403(b)(1), which states:
§ 195.403 Emergency response training.
(a)…
(b) At the intervals not exceeding 15 months, but at least once each
calendar year, each operator shall:



(1) Review with personnel their performance in meeting the objectives
of the emergency response training program set forth in paragraph (a) of
this section; and
(2) Make appropriate changes to the emergency response training
program as necessary to ensure that it is effective.
The Notice alleged that Respondent violated 49 CFR § 195.403(b)(1) by failing to review with
personnel their performance in meeting the objectives of the emergency response training
program at intervals not exceeding 15 months, but at least once each calendar year. Specifically,
the Notice alleged that at the time of PHMSA’s inspection, DCOR was unable to produce any
records that demonstrated that the reviews had taken place.
In its Response, DCOR contested Item 1, explaining that it conducts routine operator
qualification (OQ) training and provides other emergency response training covering topics such
as fire extinguisher training, H2S, HAZWOPR, explosive and hazardous chemicals, abnormal
operating conditions (AOCs), and Hazard Communication. DCOR also stated that it is in the
process of building additional pipeline-specific emergency response training to include in the
PetroSkills OQ program. DCOR stated the relevant records were attached to the Response as
Attachment 1(a).
Having considered the Response, I find the evidence supports finding a violation. DCOR failed
to provide any records demonstrating that it had reviewed with personnel their performance in
meeting the objectives of the emergency response training program, as required by section
195.403(b)(1). While DCOR presented information about emergency response training in
Attachment 1(a), the Notice alleged DCOR failed to review with personnel their performance.
DCOR did not present any information regarding annual review of personnel performance in
meeting the objectives of the training program.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR
§ 195.403(b)(1) by failing to review with personnel their performance in meeting the objectives
of the emergency response training program at intervals not exceeding 15 months, but at least
once each calendar year.
Item 2: The Notice alleged that Respondent violated 49 CFR § 195.404(b), which states:
§ 195.404 Maps and records.
(a)…
(b) Each operator shall maintain for at least 3 years daily operating
records that indicate –
(1) The discharge pressure at each pump station; and
(2) Any emergency or abnormal operation to which the procedures
under § 195.402 apply.
The Notice alleged that Respondent violated 49 CFR § 195.404(b) by failing to maintain for at
least 3 years daily operating records that indicate the discharge pressure at each pump station and
any abnormal operation to which the procedures under section 195.402(d) apply.



Specifically, the Notice alleged that at the time of the PHMSA inspection, DCOR was unable to
provide any of these daily operating records.
In its Response, DCOR contested Item 2. DCOR explained in its Response that it monitors
pipeline pressures through SCADA and the LDS and noted that inspectors observed pipeline
pressures at the onshore receiving facility in Rincon during the inspection. DCOR also stated that
it maintained records of any AOCs in the operator’s daily logbook, which was discussed with
inspectors at the time of inspection. DCOR acknowledged, however, that this process did not
provide an effective means to review past AOCs. Since the inspection, DCOR reported that it is
in the process of implementing a dedicated AOC reporting form for use by all operators. DCOR
stated records for pipeline pressures were included in the Response as Attachment 2(a).
After reviewing DCOR’s Response, I find the evidence supports finding DCOR failed to comply
with sections 195.404(b)(1) and (2). DCOR asserted that it provided a dedicated AOC reporting
form as Attachment 2(a), but upon review, PHMSA finds such a document was not included.1
Without documentation of daily records of operating pressure and abnormal operations, which
DCOR is required to maintain, PHMSA finds DCOR in violation of section 195.404(b) as
alleged.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR
§ 195.404(b) by failing to maintain daily operating records that indicate the discharge pressure at
each pump station and any abnormal operation to which the procedures under section 195.402(d)
apply for at least 3 years.
Item 3: The Notice alleged that Respondent violated 49 CFR § 195.404(c)(3), which states:
§ 195.404 Maps and records.
(a)…
(c) Each operator shall maintain the following records for the periods
specified:
(1)…
(3) A record of each inspection and test required by this subpart shall be
maintained for at least 2 years or until the next inspection or test is
performed, whichever is longer.
The Notice alleged that Respondent violated 49 CFR § 195.404(c)(3) by failing to maintain a
record of each inspection and test required by Subpart F of Part 195 for at least 2 years or until
the next inspection or test is performed, whichever is longer. Specifically, the Notice alleged that
at the time of the PHMSA inspection, DCOR was unable to provide any records demonstrating
that it had inspected valve PSV ROSF-117 at least twice each calendar year, but at intervals not
exceeding 7½ months in accordance with section 195.420(b).2
1 In a recommendation for final action dated September 5, 2024, submitted pursuant to section 190.209(b)(7), the
Director identified that several records DCOR claimed were included in the Response (e.g., for Items 2, 6, and 8),
were in fact not included. The Director provided a copy of his recommendation to DCOR on September 5, 2024.
2 Section 195.420(b) requires operators to inspect each mainline valve at least twice each calendar year, but at
intervals not exceeding 7½ months.



In its Response, DCOR contested Item 3. DCOR stated in its Response that during the inspection
it did not have access to the pressure safety valve (PSV) records, but those records have since
been located. DCOR explained that ICS performed all PSV testing and was able to provide
copies of the PSV testing reports. DCOR included a copy of the inspection records for PSV
ROSF-117 with its Response as Attachment 3(a).
After evaluating the Response submitted by Respondent, I find that the evidence supports finding
DCOR failed to comply with section 195.404(c)(3). Upon review of Attachment 3(a), these
records demonstrate only that the valve was inspected once per year from 2020 through 2022.
The valve was not inspected twice per calendar year, at intervals not exceeding 7½ months, as
required by section 195.420(b). DCOR’s records for calendar year 2023 are complete.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR
§ 195.404(c)(3) by failing to maintain a record of each inspection and test required by Subpart F
for at least 2 years or until the next inspection or test is performed, whichever is longer.
Item 4: The Notice alleged that Respondent violated 49 CFR § 195.410(c), which states:
§ 195.410 Line markers.
(a)…
(c) Each operator shall provide line marking at locations where the line
is above ground in areas that are accessible to the public.
The Notice alleged that Respondent violated 49 CFR § 195.410(c) by failing to provide line
marking at all locations where the line is above ground in areas that are accessible to the public.
Specifically, the Notice alleged that DCOR had a test station and casing vent in a publicly
accessible area that did not have a line marker.
In its Response, DCOR did not contest Item 4. DCOR stated that it is verifying all pipeline
marker locations for compliance with section 195.410. DCOR did not provide any records
related to Item 4.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR §
195.410(c) by failing to provide line marking at all locations where the line is above ground in
areas that are accessible to the public.
Item 5: The Notice alleged that Respondent violated 49 CFR § 195.440(i), which states:
§ 195.440 Public Awareness.
(a)…
(i) The operator’s program documentation and evaluation results must
be available for periodic review by appropriate regulatory agencies.
The Notice alleged that Respondent violated 49 CFR § 195.440(i) by failing to make its public
awareness program documentation and evaluation results available for review by PHMSA.



Specifically, the Notice alleged that at the time of the PHMSA inspection, DCOR was unable to
provide any records demonstrating it had completed an annual review of its public awareness
program as required by API RP 1162 section 8.3 (incorporated by reference, see section 195.3).
In its Response, DCOR contested Item 5. DCOR stated that the public awareness program has
been evaluated as required. Additionally, DCOR provided records of its public awareness
program and yearly reports on the effectiveness of the program for calendar years 2020, 2021,
2022, and 2023 as Attachment 4(a) to the Response.
In a recommendation for final action submitted pursuant to section 190.209(b)(7), the Director
recommended withdrawing the alleged violation of section 195.440(i). Accordingly, based upon
the foregoing, I hereby order that Item 5 be withdrawn.
Item 6: The Notice alleged that Respondent violated 49 CFR § 195.452(l)(1)(ii), which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) …
(l) What records must an operator keep to demonstrate compliance?
(1) An operator must maintain, for the useful life of the pipeline, records
that demonstrate compliance with the requirements of this subpart. At a
minimum, an operator must maintain the following records for review
during an inspection:
(i) …
(ii) Documents to support the decisions and analyses, including any
modifications, justifications, deviations and determinations made,
variances, and actions taken, to implement and evaluate each element of the
integrity management program listed in paragraph (f) of this section.
The Notice alleged that Respondent violated 49 CFR § 195.452(l)(1)(ii) by failing to maintain
documents to support the decisions and analyses, including any modifications, justifications,
deviations and determinations made, variances, and actions taken, to implement and evaluate
each element of the integrity management program listed in section 195.452(f). Specifically, the
Notice alleged two instances of this violation:
(a) DCOR failed to provide records to demonstrate the implementation of a means to detect
leaks on its pipeline system as required by sections 195.452(f)(6) and 195.452(i)(3); and
(b) DCOR failed to provide records to demonstrate the methods used to measure the integrity
management program’s effectiveness as required by sections 195.452(f)(7) and
195.452(k).
In its Response, DCOR contested Item 6. With respect to Item 6(a), in its Response, DCOR
stated that during the inspection at the Rincon facility, inspectors reviewed and discussed the
CPM leak detection system installed on the line. DCOR explained that the system consists of the
EFA LeakNet CPM leak detection system and contended that it included with its Response a
picture of the EFA LDS located on the console at the Rincon facility, as Attachment 5(a).



After reviewing the additional materials provided with DCOR’s Response, I find the evidence in
the record supports finding that DCOR did not comply with section 195.452(l)(1)(ii). In
particular, while DCOR asserted that it had installed an EFA LeakNet CPM leak detection
system on its pipeline to detect leaks and stated that it included documentation regarding this
system as Attachment 5(a), upon review, these documents were not included in the Response.
Without any records to demonstrate the implementation of a means to detect leaks on its
pipeline, PHMSA finds DCOR in violation of section 195.452(l)(1)(ii) as alleged.
With respect to Item 6(b), in its Response, DCOR did not refute that it had not formally recorded
a review of the integrity management program (IMP) effectiveness. DCOR explained that it had
recently implemented an IMP review process, but that no records existed for prior years. DCOR
stated it submitted with its Response a copy of the completed annual Program Review form.
Since DCOR did not refute the allegation of violation in Item 6(b), PHMSA finds DCOR in
violation of section 195.452(l)(1)(ii) as alleged. PHMSA notes further that while DCOR stated it
included a copy of a newly completed Program Review form, upon review, the referenced form
was not provided in the Response.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR
§ 195.452(l)(1)(ii) by failing to maintain documents to support the decisions and analyses,
including any modifications, justifications, deviations and determinations made, variances, and
actions taken, to implement and evaluate each element of the integrity management program
listed in section 195.452(f).
Item 7: The Notice alleged that Respondent violated 49 CFR § 195.575(a), which states:
§ 195.575 Which facilities must I electrically isolate and what
inspections, tests, and safeguards are required?
(a) You must electrically isolate each buried or submerged pipeline from
other metallic structures, unless you electrically interconnect and
cathodically protect the pipeline and the other structures as a single unit.
The Notice alleged that Respondent violated 49 CFR § 195.575(a) by failing to electrically
isolate each buried or submerged pipeline from other metallic structures as required. Specifically,
the Notice alleged that PHMSA observed that the isolation installed between the pipeline and the
Rincon facility piping was not functioning properly, resulting in a resistive short.
In its Response, DCOR contested Item 7. DCOR explained that during the field inspection, the
PHMSA inspector asked DCOR to verify the isolation of the pipeline-to-facility isolation flange.
DCOR stated that its contractor, Far West Corrosion, used a multimeter to conduct a preliminary
on-site evaluation of the isolation. According to DCOR, the multimeter indicated that there was
potential current flow across the flange, though the direction and current could not be obtained
without the use of Far West’s Radio Frequency Insulation Tester. DCOR included with its
Response copies of the annual cathodic protection (CP) surveys.



After reviewing the additional materials provided with DCOR’s Response, I find the evidence in
the record supports finding a violation as alleged. While records from Farwest Corrosion Control
Company reflect that there was no problem with the cathodic protection current isolation
between the offshore side and the facility side during CP surveys performed in 2020 – 2023 prior
to the PHMSA inspection in August 2023, PHMSA observed a resistive short during the
inspection. Respondent acknowledged there was potential current flow across the flange
observed at that time. DCOR did not provide any records dated after the issue was observed to
show DCOR has remediated the issue.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR
§ 195.575(a) by failing to electrically isolate each buried or submerged pipeline from other
metallic structures as required.
Item 8: The Notice alleged that Respondent violated 49 CFR § 195.589(c), which states:
§ 195.589 What corrosion control information do I have to maintain?
(a)…
(c) You must maintain a record of each analysis, check, demonstration,
examination, inspection, investigation, review, survey, and test required by
this subpart in sufficient detail to demonstrate the adequacy of corrosion
control measures or that corrosion requiring control measures does not
exist. You must retain these records for at least 5 years, except that records
related to §§ 195.569, 195.573(a) and (b), and 195.579(b)(3) and (c) must
be retained for as long as the pipeline remains in service.
The Notice alleged that Respondent violated 49 CFR § 195.589(c) by failing to maintain a record
of each inspection required by Subpart H of Part 195 in sufficient detail to demonstrate the
adequacy of corrosion control measures. Specifically, the Notice alleged that DCOR was unable
to provide a copy of the atmospheric corrosion inspection records for the portion of the pipeline
on Platform A.3
In its Response, DCOR contested Item 8. DCOR stated the required atmospheric corrosion
records were located on the platform and available, but the PHMSA inspector was unable to
travel to the platform. DCOR stated that it included as Attachment 7(a) documentation regarding
this Item.
After reviewing the additional materials provided with DCOR’s Response, I find the evidence
supports finding DCOR failed to comply with section 195.589(c). While DCOR stated it had the
required records and submitted them in the Response, upon review, the records were not
provided by DCOR. Without records of each inspection required, which DCOR is required to
maintain, PHMSA finds DCOR in violation of section 195.589(c) as alleged.
3 Section 195.583 requires the inspection of each pipeline or portion of pipeline exposed to the atmosphere for
evidence of atmospheric corrosion.



Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR
§ 195.589(c) by failing to maintain a record of each inspection required by Subpart H in
sufficient detail to demonstrate the adequacy of corrosion control measures.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1, 2, 3, 4, 5, 6, 7, and 8 in the
Notice for violations of 49 CFR §§ 195.403(b)(1), 195.404(b), 195.404(c)(3), 195.410(c),
195.440(i), 195.452(l)(1)(ii), 195.575(a), and 195.589(c), respectively. Under 49 U.S.C.
§ 60118(a), each person who engages in the transportation of hazardous liquids or who owns or
operates a pipeline facility is required to comply with the applicable safety standards established
under chapter 601. As discussed above, Item 5 has been withdrawn. Therefore, the compliance
terms proposed in the Notice for that Item are not included in this Order.
With regard to the violation of section 195.404(c)(3) (Item 3), the Director has indicated that
DCOR satisfied the proposed compliance terms associated with Item 3. Therefore, Item 3 is not
included in this Compliance Order.
Pursuant to the authority of 49 U.S.C. § 60118(b) and 49 CFR § 190.217, Respondent is ordered
to take the following actions to ensure compliance with the pipeline safety regulations applicable
to its operations:
1. With respect to the violation of section 195.403(b)(1) (Item 1), Respondent must
conduct and document a review of the emergency response training program
within 90 days of receipt of the Final Order and submit this documentation to the
Director, Western Region.
2. With respect to the violation of section 195.404(b) (Item 2), Respondent must
provide the daily operating records for the last three years as required by section
195.404(b) within 90 days of receipt of the Final Order and submit this
documentation to the Director, Western Region.
3. With respect to the violation of section 195.410(c) (Item 4), Respondent must
place a line marker at the test station and casing vent across the street from the
Rincon facility within 90 days of receipt of the Final Order and submit
documentation of this to the Director, Western Region.
4. With respect to the violation of section 195.452(l)(1)(ii) (Item 6), Respondent
must document the methods used to demonstrate the integrity management
program’s effectiveness as required by section 195.452(f)(7) within 90 days of
receipt of the Final Order and submit this documentation to the Director, Western
Region.
5. With respect to the violation of section 195.575(a) (Item 7), Respondent must



ensure that the pipeline receiver and the facility pipe at Rincon are electrically
isolated within 90 days of receipt of the Final Order and submit documentation of
this to the Director, Western Region.
6. With respect to the violation of section 195.589(c) (Item 8), Respondent must
conduct an atmospheric corrosion inspection of the portion of the pipeline located
on Platform A within 90 days of receipt of the Final Order and submit this
documentation to the Director, Western Region.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
PHMSA requests that Respondent maintain documentation of the safety improvement costs
associated with fulfilling this Compliance Order and submit the total to the Director. It is
requested that these costs be reported in two categories: (1) total cost associated with
preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated with
replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
exceeding $200,000, as adjusted for inflation (see 49 CFR § 190.223 for adjusted amounts), for
each violation for each day the violation continues or in referral to the Attorney General for
appropriate relief in a district court of the United States.
Under 49 CFR § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
statement of the issue(s) and meet all other requirements of 49 CFR § 190.243. The terms of the
order, including corrective action, remain in effect unless the Associate Administrator, upon
request, grants a stay. The terms and conditions of this Final Order are effective upon service in
accordance with 49 CFR § 190.5.
___________________________________ __________________________
Linda Daugherty Date Issued
Acting Associate Administrator
for Pipeline Safety