# INTERIOR GAS UTILITY — Notice of Amendment

- **operation:** document
- **citation:** CPF 52025007NOA
- **title:** INTERIOR GAS UTILITY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-12-03
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.605(a), 192.631(a)(1), 192.631(d)(1), 192.631(d)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52025007noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52025007noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52025007noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52025007NOA
**body:**

Notice of Amendment involving INTERIOR GAS UTILITY. PHMSA's enforcement data identifies the cited regulations as 192.605(a),  192.631(a)(1),  192.631(d)(1),  192.631(d)(4). The case was opened on 2025-12-03 and is reported as closed as of 2026-01-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52025007NOA_Closure Letter_01222026_(24-298947).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52025007NOA/52025007NOA_Closure%20Letter_01222026_(24-298947).pdf

52025007NOA_Closure Letter_01222026_(24-298947)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52025007NOA/52025007NOA_Closure%20Letter_01222026_(24-298947)_text.pdf

52025007NOA_Notice of Amendment_12032025_(24-298947).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52025007NOA/52025007NOA_Notice%20of%20Amendment_12032025_(24-298947).pdf

52025007NOA_Notice of Amendment_12032025_(24-298947)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52025007NOA/52025007NOA_Notice%20of%20Amendment_12032025_(24-298947)_text.pdf

52025007NOA_Operator Response to Notice_12292025_(24-298947).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52025007NOA/52025007NOA_Operator%20Response%20to%20Notice_12292025_(24-298947).pdf

52025007NOA_Notice of Amendment_12032025_(24-298947)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
12300 W. Dakota Ave., Suite 340
Lakewood, CO 80228
NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: esudduth@interiorgas.com
December 3, 2025
Ms. Elena Sudduth
General Manager
Interior Gas Utility
2525 Phillips Field
Fairbanks, AK 99709
CPF 5-2025-007-NOA
Dear Ms. Sudduth:
From July 29 through August 3, 2024, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected Interior Gas Utility’s (IGU) Gas Control Plan and procedures in Fairbanks and North
Pole, Alaska.
As a result of the inspection, PHMSA has identified the apparent inadequacies found within
IGU’s plans or procedures. The items inspected and the inadequacies are described below:
1. §192.631 Control room management.
(a) General.
(1) This section applies to each operator of a pipeline facility with a controller
working in a control room who monitors and controls all or part of a pipeline
facility through a SCADA system. Each operator must have and follow written
control room management procedures that implement the requirements of this
section, except that for each control room where an operator’s activities are limited
to either or both of:
(i) Distribution with less than 250,000 services, or



(ii) Transmission without a compressor station, the operator must have and follow
written procedures that implement only paragraphs (d) (regarding fatigue), (i)
(regarding compliance validation), and (j) (regarding compliance and deviations) of
this section.
IGU’s procedures were inadequate to ensure the safe operation of a pipeline facility.
Specifically, a review of IGU’s Gas Control Plan (GCP), Revision 03, effective date July 22,
2024, revealed that the GCP did not include what criteria IGU used to establish what it
considered to be a control room. IGU has three physical sites and several portable laptop
computers capable of accessing its Supervisory Control and Data Acquisition (SCADA) system
in order to monitor and control parts of its pipeline facility. A review of IGU’s GCP found that
while it identified the three physical locations as primary and backup control rooms, it was silent
regarding the laptop computers. Further, the plan did not define a control room. As its control
room personnel were required to be qualified controllers, without defining what was a control
room or identifying through specified criteria whether the laptops capable of accessing its
SCADA system were considered control rooms pers IGU’s GCP, it is unclear whether IGU
required its personnel to be qualified controllers in order to access and operate the SCADA
system via the laptops.
Accordingly, PHMSA proposes that IGU must amend its written procedures to establish criteria
defining a control room.
2. § 192.605 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a manual of
written procedures for conducting operations and maintenance activities and for
emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed and
updated by the operator at intervals not exceeding 15 months, but at least once each
calendar year. This manual must be prepared before operations of a pipeline
system commence. Appropriate parts of the manual must be kept at locations
where operations and maintenance activities are conducted.
IGU’s procedures were inadequate to ensure the safe operation of a pipeline facility.
Specifically, IGU’s GPC failed to provide a clear process for reviewing the fatigue education
training program, required by its plan.
During the inspection, PHMSA reviewed IGU’s GCP. While reviewing the GPC’s section on
Fatigue Management and Training, PHMSA observed that the section stated, in part that “[t]he
Fatigue Management plan shall be reviewed once per calendar year, not to exceed 15 months.”
However, upon further review, the GCP did not include any details or specifics on how IGU’s
personnel would conduct the review. In addition, the GPC was silent regarding who was
responsible for conducting the annual review, what metrics IGU’s personnel should use to
determine effectiveness, how IGU’s personnel should address identified deficiencies, and how
the review would be documented.
2



Accordingly, PHMSA proposes that IGU must amend its written procedures to provide a process
on how to conduct the annual review of its fatigue management and training plan.
3. § 192.631 Control room management.
(a) …
(d) Fatigue mitigation. Each operator must implement the following methods to
reduce the risk associated with controller fatigue that could inhibit a controller's
ability to carry out the roles and responsibilities the operator has defined:
(1) Establish shift lengths and schedule rotations that provide controllers off-duty
time sufficient to achieve eight hours of continuous sleep;
IGU’s procedures were inadequate to ensure the safe operation of a pipeline facility.
Specifically, a review of IGU’s GCP revealed the plan failed to establish schedule rotations that
provided controllers off-duty time sufficient to achieve eight hours of continuous sleep, as
required.
During the inspection, PHMSA reviewed IGU’s GCP and found the Fatigue Mitigation and
Scheduling section did not provide schedule rotations (e.g., DuPont Schedule or modified
versions) demonstrating that controllers are given sufficient off-duty time to achieve eight hours
of continuous sleep. While the plan outlined day and night shift times, it lacked detail on how
shifts rotate or how the scheduling system ensures adequate rest between shifts.
Further, PHMSA identified that the Fatigue Mitigation and Scheduling section failed to address
on-call personnel who are qualified controllers. The GCP did not define or identify on-call
controllers who may be called in to operate the control room. These individuals appear to
maintain traditional work schedules with other responsibilities outside the control room but who
are available to fill in when needed. The GCP did not outline shift lengths or shift rotations for
these on-call personnel nor did it describe how their hours would be tracked to ensure the ability
to achieve eight hours of continuous off-duty sleep. On-call controllers are subject to the same
fatigue mitigation standards as regular controllers including defined shift lengths and schedule
rotations to ensure fatigue risk is managed.
Accordingly, PHMSA proposes that IGU must amend its written procedures to establish shift
length and schedule rotations that provide controllers off-duty time sufficient to achieve eight
hours of continuous sleep.
4. § 192.631 Control room management.
(a) …
(d) Fatigue mitigation. Each operator must implement the following methods to
reduce the risk associated with controller fatigue that could inhibit a controller's
ability to carry out the roles and responsibilities the operator has defined:
(1) …
3



(4) Establish a maximum limit on controller hours-of-service, which may provide
for an emergency deviation from the maximum limit if necessary for the safe
operation of a pipeline facility.
IGU’s procedures were inadequate to ensure the safe operation of a pipeline facility.
Specifically, a review of IGU’s GCP revealed it was unclear regarding the establishment of a
maximum limit on controller hours-of-service.
During the inspection, PHMSA reviewed IGU’s GCP. Within the Fatigue Mitigation and
Scheduling section, the plan stated that controller hours of service would be limited to 65 hours
in a sliding seven day period and that all work performed for the operator, regardless of what
functions the controller performed would be counted as part of the 65 hours. PHMSA observed
that the plan also required that a controller was not to work for more than 14 consecutive hours
during normal operating conditions in a 24 hour sliding period. However, the plan also stated
that “[i]n the event a controller is required to exceed the consecutive hourly limitation or exceed
16 hours in a single shift, a Deviation Form shall be filled out and approved by the Director of
Operations or their designee.”
This language was unclear if all deviations, including the exceeding of 65 hours in any 7 day
sliding day period needed to be recorded on a Deviation Form, or if it was only referencing the
requirement to not exceed 14 consecutive hours in a 24 hour sliding period. In addition, the
language of the Gas Control Plan was unclear if 14 or 16 hours was the correct maximum
consecutive hours of service in a 24 hour sliding period.
Accordingly, PHMSA proposes that IGU must amend its written procedures to provide clarity on
maximum hours of service and how deviations of these hours would be documented.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Enforcement Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
4



plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
30 days of receipt of this Notice. This period may be extended by written request for good
cause. Once the inadequacies identified herein have been addressed in your amended
procedures, this enforcement action will be closed.
It is requested (not mandated) that Interior Gas Utility maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Dustin Hubbard, Director, Western Region, Pipeline
and Hazardous Materials Safety Administration. In correspondence concerning this matter,
please refer to CPF 5-2025-007-NOA and, for each document you submit, please provide a copy
in electronic format whenever possible.
Sincerely,
Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (24-303396 & 24-298947)
Jeremiah Flint, Operations Supervisor, Interior Gas Utility, jflint@interiorgas.com
George Deal, Director of Operations, Interior Gas Utility, sdeal@interiorgas.com
5

52025007NOA_Closure Letter_01222026_(24-298947)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
VIA ELECTRONIC MAIL – esudduth@interiorgas.com
12300 W. Dakota Ave., Suite 340
Lakewood, CO 80228
January 22, 2026
Ms. Elena Sudduth
General Manager
Interior Gas Utility
2525 Phillips Field
Fairbanks, AK 99709
CPF 5-2025-007-NOA
Closure Letter
Dear Ms. Sudduth:
From July 29 through August 3, 2024 a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Interior Gas Utility’s (IGU) Gas Control Plan
and procedures in Fairbanks and North Pole, Alaska. As a result of the inspection, IGU was
issued a Notice of Amendment on December 3, 2025, which proposed amendment of your
procedures.
IGU submitted its amended procedures on December 29, 2025. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
For Dustin Hubbard
Director, Western Region
Pipeline and Hazardous Materials Safety Administration



cc: PHP-60 Compliance Registry
PHP-500 D. Fehling (24-298947)
Jeremiah Flint, IGU Operations Supervisor, jflint@interiorgas.com
George Deal, IGU Director of Operations, sdeal@interiorgas.com
- **truncated:** false