- **summary:** CLOSED warning letter citing 194.101(a), 195.402(a), 195.64(c)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-52026003wl.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-52026003wl.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-52026003wl
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/52026003WL
**body:**

Warning Letter involving CONTANGO RESCOURCES. PHMSA's enforcement data identifies the cited regulations as 194.101(a),  195.402(a),  195.64(c)(2). The case was opened on 2026-03-19 and is reported as closed as of 2026-03-19. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

52026003WL_Warning Letter_03192026_(25-329418).pdf: https://primis.phmsa.dot.gov/enforcement-documents/52026003WL/52026003WL_Warning%20Letter_03192026_(25-329418).pdf

52026003WL_Warning Letter_03192026_(25-329418)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/52026003WL/52026003WL_Warning%20Letter_03192026_(25-329418)_text.pdf

52026003WL_Warning Letter_03192026_(25-329418)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
12300 W. Dakota Ave., Suite 340
Lakewood, CO 80228
WARNING LETTER
VIA ELECTRONIC MAIL TO: greg.westfall@contango.com
March 19, 2026
Mr. Greg Westfall
Director
Contango Resources
1717 South Boulder, Suite 900
Tulsa, OK 74119
CPF 5-2026-003-WL
Dear Mr. Westfall:
From September 22 through September 25, 2025 representatives of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United
States Code, (U.S.C.) inspected Contango Resource’s (Contango) Wamsutter Crude System in
Wamsutter, Wyoming.
As a result of the inspection, it is alleged that Contango has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall be
reviewed at intervals not exceeding 15 months, but at least once each calendar year,
and appropriate changes made as necessary to ensure that the manual is effective.
This manual shall be prepared before initial operations of a pipeline system
commence, and appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.



Contango failed to have a written manual of procedures for conducting normal operations and
maintenance activities and handling abnormal operations and emergencies, as required.
Specifically, during the PHMSA inspection, Contango was unable to provide its step-by-step
operating procedures for any covered task specific to the pipeline system, as defined per
§ 195.501(b), such as how to close a block valve during normal operations or emergencies.
PHMSA reviewed Contango’s operations and maintenance manual (O&M) during the PHMSA
inspection which cross referenced Standard Operating Procedures (SOPs) specific to the
Wamsutter Pipeline System. The O&M also noted that the SOPs manual was located at the
Wamsutter, Wyoming Field Operations Office. However, when asked, Contango was unable to
provide the SOPs for review.
Therefore, Contango failed to prepare and follow a manual of written procedures for normal
operations, maintenance activities, abnormal operating conditions and emergencies in
accordance with § 195.402(a).
2. § 194.101 Operators required to submit plans.
(a) Except as provided in paragraph (b) of this section, unless OPS grants a request
from a Federal On-Scene Coordinator (FOSC) to require an operator of a pipeline
in paragraph (b) to submit a response plan, each operator of an onshore pipeline
facility shall prepare and submit a response plan to PHMSA as provided in
§ 194.119. A pipeline which does not meet the criteria for significant and substantial
harm as defined in § 194.103(c) and is not eligible for an exception under
§ 194.101(b), can be expected to cause substantial harm. Operators of substantial
harm pipeline facilities must prepare and submit plans to PHMSA for review.
Contango failed to submit a response plan to PHMSA as provided in § 194.119. Specifically,
during inspection, Contango was unable to provide the PHMSA inspector a copy of its response
plan or any proof a response plan had been prepared and submitted to PHMSA for approval in
accordance with § 194.119, as required. Further, the exception for not preparing and submitting
a response plan to PHMSA, as described per § 194.101(b), did not apply to the Wamsutter Crude
System because the system consists of approximately 26 miles of 6-inch pipe and 6.1 miles of 8-
inch pipe.
Therefore, Contango failed to prepare a response plan that was reviewed and approved by
PHMSA in accordance with § 194.101(a).
3. § 195.64 National Registry of Operators.
(a) …
(c) Changes. Each operator must notify PHMSA electronically through the
National Registry of Operators at https://portal.phmsa.dot.gov, of certain events.
(1) …
(2) An operator must notify PHMSA of any following event not later than 60 days
after the event occurs:
2



(i) A change in the primary entity responsible (i.e., with an assigned OPID) for
managing or administering a safety program required by this part covering
pipeline facilities operated under multiple OPIDs.
(ii) A change in the name of the operator;
(iii) A change in the entity (e.g., company, municipality) responsible for operating
an existing pipeline, pipeline segment, or pipeline facility;
(iv) The acquisition or divestiture of 50 or more miles of pipeline or pipeline system
subject to this part; or
(v) The acquisition or divestiture of an existing pipeline facility subject to this part.
Contango failed to notify PHMSA of an acquisition of an existing pipeline facility subject to this
part within 60 days, as required. Specifically, Western Midstream Partners, the prior owners of
the Wamsutter Crude System, submitted a divestiture notification to PHMSA on August 13,
2024 with an effective date of July 31, 2024. However, Contango did not notify PHMSA it had
taken responsibility of the system. Rather, PHMSA learned of Contango’s acquisition seven
months later on March 25, 2025 when a PHMSA representative spoke with Contango’s
Department of Transportation compliance point of contact who verified the acquisition.
Therefore, Contango failed to notify PHMSA of its acquisition of an existing pipeline facility
subject to Part 195 no later than 60 days after the event occurred.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$272,926 per violation per day the violation persists, up to a maximum of $2,729,245 for a
related series of violations. For violation occurring on or after December 28, 2023 and before
December 30, 2024, the maximum penalty may not exceed $266,015 per violation per day the
violation persists, up to a maximum of $2,660,135 for a related series of violations. For violation
occurring on or after January 6, 2023 and before December 28, 2023, the maximum penalty may
not exceed $257,664 per violation per day the violation persists, up to a maximum of $2,576,627
for a related series of violations. For violation occurring on or after March 21, 2022 and before
January 6, 2023, the maximum penalty may not exceed $239,142 per violation per day the
violation persists, up to a maximum of $2,391,142 for a related series of violations. For violation
occurring on or after May 3, 2021 and before March 21, 2022, the maximum penalty may not
exceed $225,134 per violation per day the violation persists, up to a maximum of $2,251,334 for
a related series of violations. For violation occurring on or after January 11, 2021 and before
May 3, 2021, the maximum penalty may not exceed $222,504 per violation per day the violation
persists, up to a maximum of $2,225,034 for a related series of violations. For violation
occurring on or after July 31, 2019 and before January 11, 2021, the maximum penalty may not
exceed $218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for
a related series of violations.
We have reviewed the circumstances and supporting documents involved in this case and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
time. We advise you to correct the items identified in this letter. Failure to do so will result in
Contango being subject to additional enforcement action.
3



No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 5-2026-003-WL. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. § 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. § 552(b).
Sincerely,
Dustin Hubbard
Director, Western Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 E. Ballado (25-329418)
Randy Schrinar, Contango Resources, Pipeline Manager, randy.schrinar@contango.com