# Enterprise Crude Pipeline-12/1/15

- **operation:** document
- **citation:** PHMSA FIR, Enterprise Crude Pipeline, 2015-12-01
- **title:** Enterprise Crude Pipeline-12/1/15
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-04-19
- **effective on:** 2015-12-01
- **summary:** Enterprise Crude Pipeline; Hazardous Liquid Apparent; OK; failure 2015-12-01; apparent cause: Tank Line Failure Due to Internal Corrosion.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-enterprise-crude-pipeline-12115-0.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-enterprise-crude-pipeline-12115-0.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-enterprise-crude-pipeline-12115-0
- **source url:** https://www.phmsa.dot.gov/inspections-and-investigations/enterprise-crude-pipeline-12115-0
**body:**

<<<PAGE 1>>>

USDOT U.S. Department of Transportation
PHMSA Pipeline and Hazardous Materials Safety Administration
OPS Office of Pipeline Safety
Southwest Region
Investigators Charles Onwuachi
David York
Region Director R.M. Seeley
Date of Report 12/27/2016
Subject Failure Investigation Report – Enterprise Crude Pipeline, LLC,
Cushing West Tank Farm Release
Operator, Location, & Consequences
Date of Failure 12/1/2015
Commodity Released Crude Oil
City/County & State Cushing, Payne County, OK
OpID & Operator Name 30829 Enterprise Crude Pipeline
Unit # & Unit Name 14464 Oklahoma 30-Inch
SMART Activity # 151766
Milepost/Location Cushing
Type of Failure Tank line failure due to internal corrosion
Fatalities 0
Injuries 0
Description of area impacted On-site impact to soil and containment pond
Total Costs $291,898

<<<PAGE 2>>>

Failure Investigation Report: Cushing West Tank Farm Release
12/1/2015
Executive Summary
On December 1, 2015, at approximately 10:10 p.m. Central Standard Time (CST), personnel from
Enterprise Crude Pipeline, LLC (Enterprise), discovered a spill at their West Cushing Tank Farm in Cushing,
Oklahoma. Approximately 1,000 barrels of crude oil were released within the terminal, briefly
interrupting operations as Enterprise investigated the source of the leak. Enterprise reported the release
to the National Response Center at 11:30 p.m. CST.
The spill was contained within the tank farm after travelling along the surface of the ground to a retention
pond on the west side of the terminal. The source of the release was determined to be a buried steel tank
transfer pipeline within the station that had an outer diameter of 16 inches. Stress Engineering Services
of Houston, Texas, performed a failure analysis on the damaged portion of pipe, stating in their final report
that the cause of the spill was internal corrosion. The remaining portion of the line was evacuated of
product and abandoned in place.
No fire or injuries occurred as a result of the failure; however, the spill resulted in approximately $291,898
in total damages.
Page 2 of 7

<<<PAGE 3>>>

Failure Investigation Report: Cushing West Tank Farm Release
12/1/2015
System Details
Enterprise operates two storage tank terminals in Cushing, Oklahoma, designated as their East & West
Tank Farms. The combined storage capacity of the terminals is approximately 3.3 million barrels
(MMbbls),
1 inclusive of five larger external floating roof tanks that are leased to Paragon but operated by
Enterprise. Currently there are fifteen storage tanks within the terminal that serve as breakout tanks to
several crude oil pipelines operated by Enterprise and other entities. Product is transported into the West
Terminal through pipeline systems operated by Enterprise, including the Red River Gathering System and
the Basin Pipeline. Product can also be delivered to the Seaway Crude Pipeline system that connects the
West Cushing Terminal to refineries on the Gulf Coast.
Source: http://www.enterpriseproducts.com/about-us/system-map
The leak was identified on an 1,160-foot section of steel pipeline with a 16-inch outer diameter that served
as a fill line within the facility for Tank 41123. The pipe wall measured 0.25 inches, and was manufactured
with a fusion bond external coating; however, the pipeline did not have an internal coating. The maximum
operating pressure of the line was designated as 275 pounds per square inch gauge (psig), limited by the
American National Standards Institute (ANSI) 150 components installed on the system. The manufacturer
and specified minimum yield strength of the line segment was reportedly unknown.
The West Terminal is in the Pipeline and Hazardous Materials Safety Administration’s (PHMSA) Inspection
System 1970 under the name Enterprise_Crude.
1 Crude Oil Pipelines & Services. Enterprise Products Partners, L.P. Retrieved August 2016.
http://www.enterpriseproducts.com/operations/onshore-crude-oil-pipelines-services
Page 3 of 7

<<<PAGE 4>>>

Failure Investigation Report: Cushing West Tank Farm Release
12/1/2015
Events Leading up to the Failure
On December 1, 2015, at approximately 1:00 p.m. CST, Enterprise started to move product out of Tank
41123. The three pipelines connected to Tank 41123 have outer diameters of 16, 18, and 24 inches. The
transfer was scheduled for the 18-inch delivery line, progressing throughout the day and ending by
midnight. During the course of this delivery process, Enterprise began a flush into Tank 41123 through
the 16-inch fill line at approximately 8:28 p.m. (b)((F)
CST. The flush lasted for roughly 30 minutes.
At 9:56 p.m. CST, a terminal operator-who was
scheduled to take samples from the Manifold A
area-detected the scent of crude oil and
discovered oil on the ground just north of
Manifold A.
Emergency Response
Upon notification from the terminal operator,
operations personnel immediately initiated
shutdown of all equipment within the terminal.
Notification of the incident was made by
telephone, first to operations and maintenance
supervisors and then to response contractors and additional operations personnel. Two local spill
response teams were mobilized and began arriving at the terminal at 11:30 p.m. with heavy machinery,
frac tanks, and vacuum trucks. Crews continued work to identify and sequester the source of the release,
isolating Tank 41123 at 11:45 p.m. through the use of manual valves.
The oil travelled approximately 1,200 feet from the leak source to an onsite containment area and
retention pond. The contaminated soil was removed to an area on the northwest side of the terminal
while personnel installed a hard boom across the retention area, removing the oil with surface skimmers.
The Cushing West Terminal is not located in an area determined to possibly affect a High Consequence
Area as a result of an unintended release. The Terminal is included in the Facility Response Plan written
to comply with Title 49 CFR 194; however, the plan was not activated in response to this spill.
PHMSA's Southwest Region responded to the site on Thursday, December 3, 2015, to initiate an
investigation.
Summary of Return-to-Service
The 16-inch pipeline was not immediately returned to service following the release. Following visual
examination, Enterprise installed a mechanical clamp over the damaged portion of the pipeline on
December 3, 2015. The line was drained down and remained inactive, and the damaged portion of the
pipe was later removed and sent to Houston, Texas, for failure analysis.
With the damaged 16-inch fill line isolated, the West Terminal restarted operations on Wednesday,
December 2, 2015.
Page 4 of 7

<<<PAGE 5>>>

Failure Investigation Report: Cushing West Tank Farm Release
12/1/2015
Investigation Details
PHMSA’s investigation included a review of the events, the response of Enterprise personnel, Supervisory
Control and Data Acquisition (SCADA) operations, and internal corrosion management within the
terminal.
(b) (7)(F)
The release was discovered following the flush performed on Tank 41123 through a third-party line. The
flush operation required an attendant be onsite at the Manifold A area. As the flush was completed the
manual valve to the 16-inch line at Manifold A area was closed, at which time Enterprise personnel had
not detected an abnormal condition at the terminal.
At approximately 10:00 a.m. on December 2, hydro-excavation revealed the source of the spill to be the
16-inch fill line. A visual examination revealed a small hole at the 6 o’clock position on the piping, buried
under approximately 3.5 feet of soil and gravel. No mechanical damage was visible, and the external
coating around the defect appeared to be in good condition. Enterprise ordered a 16 x 18 PLDICO Clamp
+ Sleeve to facilitate the repair, which was completed on December 3, before PHMSA inspectors arrived
onsite.
At the time of the accident, the pressure within the 16-inch line was estimated to be less than 10 psig.
Enterprise provided records indicating the 16-inch line was hydrostatically tested in 1997 to a minimum
pressure of 346 psig for 8 hours.
Product is transported to the West Terminal through pipelines owned and operated by Enterprise and
Enbridge, as well as through a truck terminal located within the facility. Internal corrosion monitoring at
the West Terminal is conducted primarily through weight loss coupons installed on incoming pipelines at
the East Terminal: there are no monitoring points located within the West Terminal. Records show that
the average corrosion rate in miles per year (MPY) over the course of three years leading up to the
accident was well below what would be considered significant. Additionally, biocide treatment was
started in 2012.
Metallurgical Analysis
Enterprise sent approximately 6 feet of the failed 16-inch pipe to Stress Engineering Services in Houston,
Texas, for analysis. The findings are summarized here; a copy of the final report can be found in Appendix
D.
In a final report dated July 12, 2016, Stress Engineering concluded that the hole, measuring 1 1/16 inches
in diameter and found in the bottom of the 16-inch pipe, was the result of a carbon dioxide-driven attack.
Several pits of varying size were found along the bottom of the pipe sample, around which tests registered
the presence of hydrogen sulfide, although the report concluded that this did not influence the creation
of the pitting. Chemical analysis on deposits within the pit adjacent to the through-wall defect revealed
the presence of sand and chlorine, products likely to be entrained in the product stream.
Page 5 of 7

<<<PAGE 6>>>

Failure Investigation Report: Cushing West Tank Farm Release
12/1/2015
While the year and manufacturer of the pipe were unknown, tensile and hardness tests show the pipe
met the current requirements for the American Petroleum Institute (API) Grades X42, X46, and B. The
analysis did not discover any manufacturing or metallurgical defects that could have contributed to the
failure, and apart from the external coating missing at the defect, the fusion-bonded epoxy (FBE) coating
was determined to be in good condition.
Conclusion
PHSMA concurs with the findings of the metallurgical analysis. The pit immediately adjacent to the
through-wall defect exhibited signs of deposit corrosion, common in station piping where flow rates are
generally lower than transmission piping and pigging is largely impracticable.
PHMSA determined the accident likely went undetected for approximately one hour, and Enterprise’s
response was appropriate following discovery of the spill.
Appendices
A Map and Photographs
B NRC Report #1134731
C Operator Accident Report to PHMSA (#20150464)
D Laboratory Analysis
Page 6 of 7

<<<PAGE 7>>>

Failure Investigation Report: Cushing West Tank Farm Release
12/1/2015
Appendix A – Map
Page 7 of 7

<<<PAGE 8>>>

HMIS-> INCIDENTS-TELEPHONICS
Materials Safety
Pipeline & Hazardous
Administration
(Version 4.0.0 PROD)
Rules of Behavior
Home
Logout
Menu
[Retum to Search!
NRC Number:
Call Date:
12/02/2015
Call Time:
00:30:00
Caller Information
[DAVIO
ENTERPRISE CRUDE PIPELINE
Last Name:
GIBBBIS
City:
HOUSTON
(9420 WEST SAM HOUSTON FKWY NCRTH
USA
State:
[PRIVATE
(2818872640
Zp:
Phone 2:
77064
• Yes E No F$No Response
Is caller the spiter?
DAVID
Discharger Information
ENTERFRISE CRUDE PIPELINE
Last Name:
Hail
City:
19420 WEST SAM HOUSTON FKWY NORTH
¡USA
HOUSTON
State:
(2018972840
Zip:
[TX
[PRIVATE
Phone 2:
77064
Nearest Cty:
State:
(CUSHING
OK
Spill Information
County:
Location
Zp Code:
740120 SOUTH 3510 ROAD
Spil Date:
(12/01/2015 (mm/dd/yay)
Spill Time:
2215:00 (24hh:mm:ss)
Incient Type
DTG Type:
k- Select DTG Type ->
Description
Storage Tanks
Reported Incident Type
STORAGE TANKS
CALLER IS REPORTING A DISCHARGE OF LIGHT SOUR CRUDE FROM A CRUDE TANK DUE TO A
CRACKED MANIFOLD.
Material / Chris Name
Materials Inolved
[OL: CRUDE
(Chris Code.
800 BARREL(S)
[Total Qty.
Water Qty.
Additional Medium Information:
Medium Type:
- Select Medium Type.
/ ONSITE FIRE RESERVOIR (SECONDARY CONTAINMENT)
Evacuations:
Injuries:
Damages:
C Yes ® No C Unknown
• Yes @ No Unknown
Other Agency Notified:
Federel Agency Notified:
© yes O No Unknown
• Yes C No FUnknown
State Agency Notified:
• yes @ No Unknown
Romedial Actions

<<<PAGE 9>>>

IN THE PROCESS GETTING A PLANNED TOGETHER FOR CLAN UP.
CALLER STATED THAT THE MATERIAL DISCHARGED INTO AN ONSITE PIT WITH WATER IN IT THAT
tonal inte
IS USED TO PUT OUT FIRES.
•ll Rescinded Comments (max 250 charactors) |
22 Preybus
1..1 of 25

<<<PAGE 10>>>

exceed 5100,00 for are violation or each day that such relation persist excep actine rain cavil
OMB NO: 2137-0047
penalty shall not exceed $1,000,000 as provided in 49 USC 60122.
EXPIRATION DATE: 12/31/2016
Original Report
Date:
12/16/2015
U.S Department of Transportation
No.
20150464 - 21420
Pipeline and Hazardous Materials Safety Administration
(DOT Use Only)
ACCIDENT REPORT - HAZARDOUS LIQUID
PIPELINE SYSTEMS
vith a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid
federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply
Send comments regarding this burden or any other aspect of this collection of information, including suggestions for reducing the burden to: information
OMB Control Number.
The OMB Control Number for this information collection is 2137-0047. All responses to the collection of information are mandatory.
Collection Clearance Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590.
INSTRUCTIONS
amples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page i
portant: Please read the separate instructions for completing this form before you begin. They clarify the information requested and provide speci
http://www.phmsa.dot.gov/pipeline/library/forms.
PART A - KEY REPORT INFORMATION
Report Type: (select all that apply)
Original:
Supplemental:
Yes
Final:
Yes
Last Revision Date:
2. Name of Operator
1. Operator's OPS-issued Operator Identification Number (OPID):
06/06/2016
30829
3. Address of Operator:
ENTERPRISE CRUDE PIPELINE LLC
3b. City
3а. Street Address
1100 Louisiana Street
3c. State
Texas
Houston
4. Local time (24-hr clock) and date of the Accident:
3d. Zip Code
77002
5. Location of Accident:
12/01/2015 22:10
35.95201
6. National Response Center Report Number (if applicable):
-96.759592
National Response Center (if applicable):
7. Local time (24-hr clock) and date of initial telephonic report to the
1134731
12/01/2015 22:35
8. Commodity released: (select only one, based on predominant
volume released)
Crude Oil
- Specify Commodity Subtype:
- If Biofuel/Alternative Fuel and Commodity Subtype is
- If "Other" Subtype, Describe:
- If Biofuel/Alternative Fuel and Commodity Subtype is
Ethanol Blend, then % Ethanol Blend:
Biodiesel, then Biodiesel Blend e.g. B2, B20, B100
9. Estimated volume of commodity released unintentionally (Barrels):
10. Estimated volume of intentional and/or controlled release/blowdown
1,000.00
11. Estimated volume of commodity recovered (Barrels):
(Barrels):
- If Yes, specify the number in each category:
12. Were there fatalities?
No
1,000.00
12c. Non-Operator emergency responders
12b. Contractor employees working for the Operator
12d. Workers working on the right-of-way, but NOT
12e. General public
associated with this Operator
13. Were there injuries requiring inpatient hospitalization?
12f. Total fatalities (sum of above)
- If Yes, specify the number in each category:
No
13a. Operator employees
13c. Non-Operator emergency responders
13b. Contractor employees working for the Operator
13a. Worse with this Operaight-of- way, bur NoT
Form PHMSA F 7000.1

<<<PAGE 11>>>

14. Was the pipeline/facility shut down due to the Accident?
13f. Total injuries (sum of above)
- If Yes, complete Questions 14a and 14b: (use local time, 24-hr clock)
- If No, Explain:
Yes
14a. Local time and date of shutdown:
14b. Local time pipeline/facility restarted:
12/01/2015 22:10
15. Did the commodity ignite?
- Still shut down? (* Supplemental Report Required)
12/02/2015 13:00
16. Did the commodity explode?
No
18. Time sequence (use local time, 24-hour clock):
17. Number of general public evacuated:
No
18a. Local time Operator identified Accident - effective 7- 2014
changed to "Local time Operator identified failure":
12/01/2015 22:10
18b. Local time Operator resources arrived on site:
12/01/2015 22:10
PART B - ADDITIONAL LOCATION INFORMATION
1. Was the origin of the Accident onshore?
If Yes, Complete Questions (2-12)
Yes
- If Onshore:
If No, Complete Questions (13-15)
2. State:
4. City
3. Zip Code:
Oklahoma
74023
6. Operator-designated location:
5. County or Parish
Cushing
Payne
7. Pipeline/Facility name:
Specify:
Milepost/Valve Station
West Terminal
9. Was Accident on Federal land, other than the Outer Continental Shelf
8. Segment name/ID:
Cushing West Terminal
Tank 23 flush line
(OCS)?
No
10. Location of Accident:
11. Area of Accident (as found):
Underground
Totally contained on Operator-controlled property
- If Other, Describe:
Specify:
Under soil
12. Did Accident occur in a crossing?
Depth-of-Cover (in):
No
36
- If Yes, specify type below:
- If Bridge crossing -
- If Railroad crossing -
Cased/ Uncased:
- If Road crossing -
Cased/ Uncased/ Bored/drilled
- If Water crossing -
Cased/ Uncased/ Bored/drilled
Cased/ Uncased
- Approx. water depth (ft) at the point of the Accident:
- Name of body of water, if commonly known:
- If Offshore:
- Select:
14. Origin of Accident:
13. Approximate water depth (ft) at the point of the Accident:
- In State waters - Specify:
- Area:
- Nearest County/Parish:
- Block/Tract #:
- On the Outer Continental Shelf (OCS) - Specify:
- Area:
15. Area of Accident:
- Block #•
PART C - ADDITIONAL FACILITY INFORMATION
1. Is the pipeline or facility:
2. Part of system involved in Accident:
Interstate
Appurtenances, specify:
- If Onshore Breakout Tank or Storage Vessel, Including Attached
Onshore Terminal/Tank Farm Equipment and Piping
3. Item involved in Accident:
- If Pipe, specify:
Pipe
3a. Nominal diameter of pipe (in):
Pipe Body
16
Form PHMSA F 7000.1

<<<PAGE 12>>>

3b. Wall thickness (in):
3c. SMYS (Specified Minimum Yield Strength) of pipe (psi):
.250
Зе.
3a. Pipe specification:
5L
Unknown
Pipe Seam, specify:
Pipe manufacturer:
- If Other, Describe:
Longitudinal ERW - High Frequency
3g. Year of manufacture:
Unknown
Unknown
Pipeline coating type at point of Accident, specify:
- If Weld, including heat-affected zone, specify. If Pipe Girth Weld,
- If Other, Describe:
Fusion Bonded Epoxy
Зa through 3h above are required:
- If Valve, specify:
- If Other, Describe:
- If Mainline, specify:
3i. Manufactured by:
- If Other, Describe:
3j. Year of manufacture:
- If Tank/Vessel, specify:
- If Other, describe:
- If Other - Describe:
5. Material involved in Accident:
4. Year item involved in Accident was installed:
1993
6. Type of Accident Involved:
- If Material other than Carbon Steel, specify:
Carbon Steel
Leak
- If Mechanical Puncture - Specify Approx. size:
in. (circumferential)
in. (axial) by
- If Leak - Select Type:
- If Rupture - Select Orientation:
- If Other, Describe:
Pinhole
Approx. size: in. (widest opening) by
- If Other, Describe:
- If Other - Describe:
in. (length circumferentially or axially)
PART D - ADDITIONAL CONSEQUENCE INFORMATION
1. Wildlife impact:
1a. If Yes, specify all that apply:
| No
- Birds
- Fish/aquatic
- Terrestrial
2. Soil contamination:
3. Long term impact assessment performed or planned:
Yes
4. Anticipated remediation:
No
4a. If Yes, specify all that apply:
Yes
- Surface water
- Soil
- Groundwater
- Vegetation
Yes
5. Water contamination:
- Wildlife
5a. If Yes, specify all that apply:
No
- Ocean/Seawater
- Surface
- Drinking water: (Select one or both)
5b. Estimated amount released in or reaching water (Barrels):
6. At the location of this Accident, had the pipeline segment or facility
5c. Name of body of water, if commonly known:
(HCA) as determined in the Operator's Integrity Management Program?
been identified as one that "could affect" a Hiah Consequence Area
No
7. Did the released commodity reach or occur in one or more High
No
7a. If Yes, specify HCA type(s): (Select all that apply)
- Commercially Navigable Waterway:
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Form PHMSA F 7000.1

<<<PAGE 13>>>

Integrity Management Program?
determination for this Accident site in the Operator's
Was this HCA identified in the "could affect"
Integrity Management Program?
for this Accident site in the Operator's Integrity
Was this HCA identified in the "could affect" determination
- Unusually Sensitive Area (USA) - Drinking Water
Management Program?
for this Accident site in the Operator's Integrity
Was this HCA identified in the "could affect" determination
- Unusually Sensitive Area (USA) - Ecological
Management Program?
for this Accident site in the Operator's Integrity
Was this HCA identified in the "could affect" determination
8. Estimated cost to Operator - effective 12-2012, changed to "Estimated Property Damage":
Management Program?
8a. Estimated cost of public and non-Operator private property
"paid/reimbursed by the Operator" removed
damage paid/reimbursed by the Operator - effective 12-2012,
8b. Estimated cost of commodity lost
8d. Estimated cost of Operator's emergency response
8c. Estimated cost of Operator's property damage & repairs
Estimated cost of Operator's environmental remediation
$
$
changed to "Total estimated property damage (sum of above)"
8g. Estimated total costs (sum of above) - effective 12-2012,
$
291,898
PART E - ADDITIONAL OPERATING INFORMATION
2. Maximum Operating Pressure (MOP) at the point and time of the
1. Estimated pressure at the point and time of the Accident (psig):
10.00
Accident (psig):
275.00
3. Describe the pressure on the system or facility relating to the
Pressure did not exceed MOP
(such as for repairs and pipe movement), was the system or facility
4. Not including pressure reductions required by PHMSA regulations
restriction with pressure limits below those normally allowed by the
relating to the Accident operating under an established pressure
No
- If Yes, Complete 4.a and 4.b below:
Did the pressure exceed this established pressure
4b. Was this pressure restriction mandated by PHMSA or the
5. Was "Onshore Pipeline, Including Valve Sites" OR "Offshore
2?
Pipeline, Including Riser and Riser Bend" selected in PART C, Question
No
- If Yes - (Complete 5a. - 5f below) effective 12-2012, changed to "(Complete 5.a - 5.e below)"
source:
5a. Type of upstream valve used to initially isolate release
5b. Type of downstream valve used to initially isolate release
5c. Length of segment isolated between valves (ft):
5d. Is the pipeline configured to accommodate internal
- If No, Which physical features limit tool accommodation? (select all that apply).
- Changes in line pipe diameter
- Presence of unsuitable mainline valves
projecting instrumentation, etc.)
- Other passage restrictions (i.e. unbarred tee's,
flux leakage internal inspection tools)
- Extra thick pipe wall (applicable only for magnetic
5e. For this pipeline, are there operational factors which
- If Other, Describe:
run?
significantly complicate the execution of an internal inspection tool
- If Yes, Which operational factors complicate execution? (select all that apply)
Form PHMSA F 7000.1

<<<PAGE 14>>>

- Low operating pressure(s)
- Incompatible commodity
- Low flow or absence of flow
- Other -
5f. Function of pipeline system:
- If Other, Describe:
system in place on the pipeline or facility involved in the Accident?
6. Was a Supervisory Control and Data Acquisition (SCADA)-based
> 20% SMYS Regulated Trunkline/Transmission
Yes
If Yes -
6b. Was it fully functional at the time of the Accident?
6a. Was it operating at the time of the Accident?
Yes
alerts), events), and/or volume calculations) assist with
6c. Did SCADA-based information (such as alarms),
Yes
the detection of the Accident?
No
alert(s), events), and/or volume calculations) assist with
6d. Did SCADA-based information (such as alarms),
7. Was a CPM leak detection system in place on the pipeline or facility
the confirmation of the Accident?
No
involved in the Accident?
No
7a. Was it operating at the time of the Accident?
7b. Was it fully functional at the time of the Accident?
alarms), alerts), events), and/or volume calculations) assist
Tc. Did CPM leak detection system information (such as
with the detection of the Accident?
alarm(s), alerts), events), and/or volume calculations) assist
7d. Did CPM leak detection system information (such as
8. How was the Accident initially identified for the Operator?
with the confirmation of the Accident?
8a. If "Controller" "Local Operating Personnel", including
- If Other, Specify:
Local Operating Personnel, including contractors
contractor" is selected in Question 8, specify:
contractors", "Air Patrol", or "Ground Patrol by Operator or its
Operator employee
9. Was an investigation initiated into whether or not the controllers) or
No, the Operator did not find that an investigation of the
control room issues were the cause of or a contributing factor to the
controllers) actions or control room issues was necessan
due to: (provide an explanation for why the Operator did no
- If No, the Operator did not find that an investigation of the
(provide an explanation for why the operator did not investigate)
controllers) actions or control room issues was necessary due to:
Controller nor control room were a contributing factor
- If Yes, specify investigation results): (select all that apply)
- Investigation reviewed work schedule rotations,
Operator), and other factors associated with fatigue
continuous hours of service (while working for the
- Investigation did NOT review work schedule rotations,
Operator), and other factors associated with fatigue
continuous hours of service (while working for the
- Investigation identified no control room issues
Provide an explanation for why not:
- Investigation identified incorrect controller action or
- Investigation identified no controller issues
- Investigation identified that fatigue may have affected the
controller(s) involved or impacted the involved controllers)
- Investigation identified incorrect control room equipment
- Investigation identified incorrect procedures
- Investigation identified maintenance activities that affected
control room operations, procedures, and/or controller
- Investigation identified areas other than those above:
PART F - DRUG & ALCOHOL TESTING INFORMATION
under the post-accident drug and alcohol testing requirements of DOT's
1. As a result of this Accident, were any Operator employees tested
Drug & Alcohol Testing regulations?
No
1a. Specify how many were tested:
Form PHMSA F 7000.1

<<<PAGE 15>>>

2. As a result of this Accident, were any Operator contractor employees
1b. Specify how many tailed:
DOT's Drug & Alcohol Testing regulations?
tested under the post-accident drug and alcohol testing requirements of
No
2a. Specify how many were tested:
2b. Specify how many failed:
PART G - APPARENT CAUSE
Select only one box from PART Gin shaded column on left representing the APPARENT Cause of the Accident, and answer
the questions on the right. Describe secondary, contributing or root causes of the Accident in the narrative (PART H).
Apparent Cause:
G1 - Corrosion Failure
G1 - Corrosion Failure - only one sub-cause can be picked from shaded left-hand column
- If External Corrosion:
Corrosion Failure - Sub-Cause:
Internal Corrosion
1. Results of visual examination:
2. Type of corrosion: (select all that apply)
- If Other, Describe: 1
- Atmospheric
- Galvanic
- Microbiological
- Stray Current
- Other:
- Selective Seam
3. The type(s) of corrosion selected in Question 2 is based on the following: (select all that apply)
- If Other, Describe:
- Field examination
- Determined by metallurgical analysis
4. Was the failed item buried under the ground?
protection at the time of the Accident?
04a. Was failed item considered to be under cathodic
4b. Was shielding, tenting, or disbonding of coating evident at
If Yes - Year protection started:
conducted at the point of the Accident?
4c. Has one or more Cathodic Protection Survey been
If "Yes, Close Interval Survey" - Most recent year conducted:
If "Yes, CP Annual Survey" - Most recent year conducted:
- If No:
If "Yes, Other CP Survey" - Most recent year conducted:
5. Was there observable damage to the coating or paint in the vicinity of
4d. Was the failed item externally coated or painted?
the corrosion?
6. Results of visual examination:
• If Internal Corrosion:
. Type of corrosion (select all that apply):
- Other:
General Corrosion
- Water drop-out/Acid
Corrosive Commodity
- Erosion
- Microbiological
- Other:
- If Other, Describe:
carbon dioxide
Yes
8. The cause(s) of corrosion selected in Question 7 is based on the following (select all that apply): -
- Field examination
- Other:
- Determined by metallurgical analysis
Yes
9. Location of corrosion (select all that apply): -
- If Other, Describe:
- Low point in pipe
- Other:
- Elbow
Yes
Form PHMSA F 7000.1

<<<PAGE 16>>>

11. Was the interior coated or lined with protective coating?
10. Was the commodity treated with corrosion inhibitors or biocides?
- If Other, Describe:
Yes
12. Were cleaning/dewatering pigs (or other operations) routinely
No
Not applicable - Not mainline pipe
13. Were corrosion coupons routinely utilized?
Complete the following if any Corrosion Failure sub-cause is selected AND the 'Item Involved in Accident" (from PART C,
Not applicable - Not mainline pipe
14. List the year of the most recent inspections:
14a. API Std 653 Out-of-Service Inspection
14b. API Std 653 In-Service Inspection
- No Out-of-Service Inspection completed
Complete the following If any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
- No In-Service Inspection completed
15. Has one or more internal inspection tool collected data at the point of the
Question 3) is Pipe or Weld.
Accident?
15a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage Tool
- Ultrasonic
Most recent year:
- Geometry
Most recent year:
- Caliper
Most recent year:
- Crack
Most recent year:
- Hard Spot
Most recent year:
- Combination Tool
Most recent year:
- Transverse Field/Triaxial
Most recent year:
- Other
Most recent year:
Most recent year:
16. Has one or more hydrotest or other pressure test been conducted since
Describe:
If Yes -
original construction at the point of the Accident?
No
Most recent year tested:
- If Yes, and an investigative dig was conducted at the point of the Accident.:
Has one or more Direct Assessment been conducted on this segment?
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
18. Has one or more non-destructive examination been conducted at the
Most recent year conducted:
point of the Accident since January 1, 2002?
recent year the examination was conducted:
18a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Most recent year conducted:
Describe:
G2 - Natural Force Damage - only one sub-cause can be picked from shaded left-handed column
Natural Force Damage - Sub-Cause:
1. Specify:
- If Earth Movement, NOT due to Heavy Rains/Floods:
Form PHMSA F 7000.1

<<<PAGE 17>>>

- If Heavy Rains/Floods:
- If Other, Describe:
2. Specify:
- If Lightning:
- If Other, Describe:
3. Specify:
4. Specify:
- If Temperature:
- If Other Natural Force Damage:
- If Other, Describe:
Complete the following if any Natural Force Damage sub-cause is selected.
5. Describe:
conjunction with an extreme weather event?
6. Were the natural forces causing the Accident generated in
6a. If Yes, specify: (select all that apply)
- Tropical Storm
- Hurricane
- Tornado
- Other
- If Other, Describe:
G3 - Excavation Damage - only one sub-cause can be picked from shaded left-hand column
Excavation Damage - Sub-Cause:
- If Previous Damage due to Excavation Activity: Complete Questions 1-5 ONLY IF the Item Involved in Accident" (from PART
C, Question 3) is Pipe or Weld
1. Has one or more internal inspection tool collected data at the point of
1a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage
- Ultrasonic
Most recent year conducted:
- Geometry
Most recent year conducted:
- Caliper
Most recent year conducted:
- Crack
Most recent year conducted:
- Hard Spot
Most recent year conducted:
- Combination Tool
Most recent year conducted:
- Transverse Field/Triaxial
Most recent year conducted:
- Other
Most recent year conducted:
Most recent year conducted:
2. Do you have reason to believe that the internal inspection was
Describe:
completed BEFORE the damage was sustained?
original construction at the point of the Accident?
3. Has one or more hydrotest or other pressure test been conducted since
Most recent year tested:
4. Has one or more Dired Assessment been conducted pressure (psig:
- If Yes, and an investigative dig was conducted at the point of the Accident:
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
5. Has one or more non-destructive examination been conducted at the
Most recent year conducted:
point of the Accident since January 1, 2002?
recent year the examination was conducted:
5a. If Yes, for each examination, conducted since January 1, 2002, select type of non-destructive examination and indicate most
- Guided Wave Ultrasonic
Most recent year conducted:
Most recent year conducted:
Form PHMSA F 7000.1

<<<PAGE 18>>>

- Handheld Ultrasonic Tool
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Most recent year conducted:
Describe:
Complete the following if Excavation Damage by Third Party is selected as the sub-cause.
6. Did the operator get prior notification of the excavation activity?
6a. If Yes, Notification received from: (select all that apply) -
- Excavator
- One-Call System
- Contractor
- Landowner
Complete the following mandatory CGA-DIRT Program questions if any Excavation Damage sub-cause is selected.
DIRT (www.cga-dirt.com)?
7. Do you want PHMSA to upload the following information to CGA-
8. Right-of-Way where event occurred: (select all that apply) -
- Public
- Private
- If "Public", Specify:
- Pipeline Property/Easement
- If "Private", Specify:
- Power/Transmission Line
- Railroad
- Federal Land
- Dedicated Public Utility Easement
- Data not collected
10. Type of excavation equipment:
12. Was the One-Call Center notified?
12a. If Yes, specify ticket number:
exists, list the name of the One-Call Center notified:
12b. If this is a State where more than a single One-Call Center
15. Were facilities marked correctly?
14. Were facility locate marks visible in the area of excavation?
Did the damage cause an interruption in service?
17. Description of the CGA-DIRT Root Cause (select only the one predominant first level CGA-DIRT Root Cause and then, where
16a. If Yes, specify duration of the interruption (hours)
available as a choice, the one predominant second level CGA-DIRT Root Cause as well):
- If One-Call Notification Practices Not Sufficient, specify:
- If Locating Practices Not Sufficient, specify:
- If Other/None of the Above, explain:
- If Excavation Practices Not Sufficient, specify:
G4 - Other Outside Force Damage - only one sub-cause can be selected from the shaded left-hand column
Other Outside Force Damage - Sub-Cause:
- If Damage by Car, Truck, or Other Motorized Vehicle/Equipment NOT Engaged in Excavation:
- If Damage by Boats, Barges, Drilling Rigs, or Other Maritime Equipment or Vessels Set Adrift or Which Have Otherwise Lost
1. Vehicle/Equipment operated by:
2. Select one or more of the following IF an extreme weather event was a factor:
- Tornado
- Tropical Storm
- Other
- Heavy Rains/Flood
- If Previous Mechanical Damage NOT Related to Excavation: Complete Questions 3-7 ONLY IF the "Item Involved in
- If Other, Describe:
3. Has one or more internal inspection tool collected data at the point of
Accident" (from PART C, Question 3) is Pipe or Weld.
Form PHMSA F 7000.1

<<<PAGE 19>>>

the Accident?
3a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run:
- Magnetic Flux Leakage
- Ultrasonic
Most recent year conducted:
- Geometry
Most recent year conducted:
- Caliper
Most recent year conducted:
- Crack
Most recent year conducted:
- Hard Spot
Most recent year conducted:
- Combination Tool
Most recent year conducted:
- Transverse Field/Triaxial
Most recent year conducted:
- Other
Most recent year conducted:
Most recent year conducted
4. Do you have reason to believe that the internal inspection was
Describe:
completed BEFORE the damage was sustained?
since original construction at the point of the Accident?
5. Has one or more hydrotest or other pressure test been conducted
- If Yes:
Most recent year tested:
6. Has one or more Direct Assessment been conducted on the pipeline
Test pressure (psig):
segment?
- If Yes, and an investigative dig was conducted at the point of the Accident:
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
7. Has one or more non-destructive examination been conducted at the
Most recent year conducted:
point of the Accident since January 1, 2002?
recent year the examination was conducted:
7a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Most recent year conducted:
- If Intentional Damage:
Describe:
8. Specify:
- If Other Outside Force Damage:
- If Other, Describe:
9. Describe:
G5 - Material Failure of Pipe or Weld - only one sub-cause can be selected from the shaded left-hand column
"Weld."
Use this section to report material failures ONLY IF the "Item Involved in Accident" (from PART C, Question 3) is "Pipe" or
Material Failure of Pipe or Weld - Sub-Cause:
1. The sub-cause shown above is based on the following: (select all that apply)
- Determined by Metallurgical Analysis
- Field Examination
- Other Analysis
- Sub-cause is Tentative or Suspected; Still Under Investigation
- If "Other Analysis", Describe:
(Supplemental Report required)
Form PHMSA F 7000.1

<<<PAGE 20>>>

- If Construction, Installation, or Fabrication-related Or If Original Manufacturing-related: T
2. List contributing factors: (select all that apply)
- Fatigue or Vibration-related
- If Other, Describe:
Specify:
- Mechanical Stress:
- Other
- If Environmental Cracking-related:
- If Other, Describe:
3. Specify:
- If Other - Describe:
Complete the following if any Material Failure of Pipe or Weld sub-cause is selected.
4. Additional factors: (select all that apply):
- Dent
- Pipe Bend
- Gouge
- Arc Burn
- Lack of Fusion
- Crack
- Buckle
- Lamination
- Misalignment
- Wrinkle
- Burnt Steel
- Other:
5. Has one or more internal inspection tool collected data at the point of
- If Other, 