# Enterprise Products Operating, LLC-1/26/15

- **operation:** document
- **citation:** PHMSA FIR, Enterprise Products Operating, LLC, 2015-01-26
- **title:** Enterprise Products Operating, LLC-1/26/15
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-04-14
- **effective on:** 2015-01-26
- **summary:** Enterprise Products Operating, LLC; Hazardous Liquid; WV; failure 2015-01-26; apparent cause: Material Failure Pipe or Weld.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-enterprise-products-operating-llc-12615.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-enterprise-products-operating-llc-12615.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-enterprise-products-operating-llc-12615
- **source url:** https://www.phmsa.dot.gov/inspections-and-investigations/enterprise-products-operating-llc-12615
**body:**

<<<PAGE 1>>>

DOT U.S. Department of Transportation
PHMSA Pipeline and Hazardous Materials Safety Administration
OPS Office of Pipeline Safety
Eastern Region
Principal Investigator Michael Yazemboski
Senior Accident Investigator Michael Yazemboski
Region Director Byron E. Coy
Date of Report 2/24/2016
Subject Failure Investigation Report—Enterprise Products Operating, LLC:
ATEX Ethane Pipeline Failure, Follansbee, West Virginia
Operator, Location, & Consequences
Date of Failure 1/26/2015
Commodity Released Ethane
City/County & State Follansbee, Brook County, West Virginia
OpID & Operator Name 31618 Enterprise Products Operating, LLC
Unit # & Unit Name 3051 Greensburg
SMART Activity # 149469
Milepost/Location Latitude: 40.366817, Longitude: -80.584594
Type of Failure Girth Weld Failure Caused by Ductile Tensile Overload
Fatalities 0
Injuries 0
Description of area impacted Non-HCA
Total Costs $6,910,591

<<<PAGE 2>>>

Failure Investigation Report—Enterprise Products Operating, LLC
ATEX Ethane Pipeline Failure
Follansbee, Brook County, West Virginia
[Failure Date 1/26/2015]
Executive Summary
On January 26, 2015, an accident occurred on the
Enterprise Products ATEX-1 20-inch nominal pipe size
(NPS) pipeline resulting in the release of approximately
30,565 barrels of liquid ethane in a rural, wooded, non-
high consequence area (HCA) area near Follansbee, West
Virginia. The ATEX-1 pipeline is approximately 1,265 miles
long and transports product from Washington County,
Pennsylvania, to Mont Belvieu, Texas (ATEX-1). The
accident occurred on a 255-mile section of ATEX-1 that
runs from Washington County, Pennsylvania, to Seymour,
Indiana. The Pipeline and Hazardous Materials Safety
Administration’s (PHMSA) Office of Pipeline Safety (OPS) initiated an investigation on January 26, 2015,
determining that the accident was caused by a girth weld failure due to a ductile tensile overload from
stresses resulting from the weight of the surrounding soil. As a result, on January 29, 2015, OPS issued a
Corrective Action Order (CAO) (CPF 1-2015-5002H) requiring Enterprise to take certain corrective actions
pertaining to the safety and remediation of the ATEX-1 pipeline system. An Amended Corrective Action
Order (ACAO) was issued on March 12, 2015. There were no injuries, deaths, or extensive property
damage associated with this accident; however, fire from the rupture burned approximately 5 acres of
woodlands and damaged the siding on one home located approximately 2,000 feet from the failure
location. Enterprise reported the failure to the National Response Center on January 26, 2015, at 11:38
a.m. CST.
System Details
The ATEX-1 pipeline originates in Washington County,
Pennsylvania, and is connected to four fractionators in the
Marcellus/Utica shale plays: the MarkWest Houston plant
in Pennsylvania, the Cadiz plant in Ohio, the Blue Racer
Natrium plant in West Virginia, and the Utica East Ohio
Scio plant in Ohio. The ATEX-1 pipeline has a capacity of
125,000 barrels per day (bpd), expandable to
approximately 265,000 bpd. The ATEX-1 line terminates
at Enterprise’s complex in Mont Belvieu, Texas, which
includes over 100 million barrels of natural gas liquid
(NGL) and petroleum liquid storage capacity, more than
750,000 bpd of fractionation capacity, and an extensive NGL distribution system.
The failure occurred near milepost (MP) 23.1 on Enterprise’s
ATEX-1 20-inch NPS pipeline segment in West Virginia. This
section of the ATEX-1 pipeline is part of the Greensburg-
PA/WV unit, originating at the MarkWest Processing facility
in Houston, Pennsylvania, and running west through West
Virginia. The total length of the ATEX-1 line in the
Greensburg-PA/WV unit is approximately 26 miles. The
ATEX-1 Greensburg Unit passes through Washington County
(b) (7)(F)
Page 2 of 6

<<<PAGE 3>>>

Failure Investigation Report—Enterprise Products Operating, LLC
ATEX Ethane Pipeline Failure
Follansbee, Brook County, West Virginia
[Failure Date 1/26/2015]
in Pennsylvania and Brooke and Hancock Counties in West Virginia, terminating at the Ohio/West
Virginia state line (Appendix A, map 4).
Events Leading up to the Failure
The operating pressure at the time of failure was 1,183 psig, which was below the maximum operating
pressure (MOP) of 1,440 psig for the affected segment.
1 On January 26, 2015, at approximately 9:38
a.m. CST, Enterprise’s control room observed a sudden pressure drop on its supervisory control and data
acquisition (SCADA) screens, indicating a possible failure on the ATEX-1 pipeline near MP 23.1.
Emergency Response
Upon identifying a sudden pressure drop on the ATEX-1 Line,
Enterprise’s control room began closing the automated block
valves (Motor Operated Valve (MOV)- ) and
(b) (7)(F)
MOV- to isolate the segment. The control
(b) (7)(F)
room then notified Enterprise field personnel, who
responded by manually closing mainline block valves (MLV)-
(b) (7)(F) (b) (7)(F)
) and MLV- to further restrict
product flow. A detailed map showing the ATEX-1 line and
the location of valves can be found in Appendix A, map 4.
Immediately after the accident, Line A-1, an 8-inch NPS
propane line located in the vicinity of the rupture site, was
also isolated as a precaution. It was later determined that Line A-1 was not impacted by the fire or
explosion due to its location several hundred feet from the failure site (Appendix A, map 3). Line A-1
was later returned to normal service.
The fire departments in Wellsburg, West Virginia, and Follansbee, West Virginia, responded to incident,
evacuating a nearby residence approximately 2,000 feet from the site and closing Lee Road and Scott
Hollow Road to vehicle traffic. The residence suffered external damage to its siding due to radiant heat
caused by the fire (Appendix A). The resulting explosion and fire from the rupture burned
approximately 5 acres of woodland and damaged overhead powerlines located in the vicinity of the
rupture (Appendix A). There were no reported injuries, fatalities, or permanent evacuations. A detailed
timeline of events can be found in Appendix E.
Summary of Return-to-Service
On January 29, 2015, PHMSA issued a CAO requiring Enterprise to take certain corrective actions to
verify the safety and integrity of the ATEX-1 Pipeline. An ACAO was later issued on March 12, 2015. The
requirements of the order included the following elements (details of which are outlined in the order):
1. Repair Plan
2. Restart Plan
3. Contingency Plan (Operating and Monitoring of the Pipeline During Startup)
4. Records Verification (Confirmation of Maximum Operating Pressure)
5. Review of Prior In-line inspection (ILI) Results
1 The term “Affected Segment” means the segment that runs from the MarkWest Processing Facility in Houston,
Pennsylvania, to Seymour, Indiana.
Page 3 of 6

<<<PAGE 4>>>

Failure Investigation Report—Enterprise Products Operating, LLC
ATEX Ethane Pipeline Failure
Follansbee, Brook County, West Virginia
[Failure Date 1/26/2015]
6. Mechanical and Metallurgical Testing
7. Root Cause Failure Analysis
8. Emergency Response Plan and Training Review
9. Public Awareness Program Review
10. Remedial Work Plan (RWP)
Repair and remediation work at the site was performed in accordance with Enterprise’s Repair Plan
(Appendix I). Replacement pipe was installed and the damaged segments of pipe were removed and
sent to Kiefner and Associates for metallurgical analysis (Appendix D).
On February 14, 2015, the ATEX pipeline section stretching from Houston, Pennsylvania, to the Ohio
River resumed operations at a reduced MOP of 947 psig (20% pressure reduction from 1,183 psig at the
time of the incident) in accordance with the PHMSA-approved Restart Plan submitted by Enterprise
(Appendix H). Following the restart of the line, a series of ILI tools were run in accordance with the
PHSMA-approved RWP submitted by Enterprise (Appendix G).
Enterprise completed analysis of the data, including bending strain across all segments, on August 14,
2015. All necessary excavations were completed on August 28, 2015. PHMSA conducted numerous on-
site inspections throughout the course of the work to ensure that all requirements of the RWP were
completed.
On September 8, 2015, PHMSA approved removal of the ACAO-initiated pressure restriction, and the
ATEX-1 pipeline was permitted to return to 100% MOP.
Investigation Details
1. The ATEX-1 pipeline was placed into service on November 25, 2013.
2. The pipeline transports liquid ethane.
3. The line is 20-inch NPS, 0.312-inch wall thickness, API 5L X-70, high-frequency electric resistance
welded pipe manufactured by American Pipe.
4. The pipe was externally coated with fusion bonded epoxy and protected since construction by
an impressed current cathodic protection system.
5. Historical operation and maintenance records were reviewed during the investigation. There
were no reported maintenance issues, incidents, or repairs made to the pipeline since it was
placed in service.
6. Prior integrity assessments consisted of the original post-construction hydrostatic test and post-
construction caliper ILI.
7. The MOP of the pipeline in the affected segment is 1,440 psig, as established by hydrostatic
testing in 2013.
8. The explosion and fire that resulted from the pipeline rupture burned approximately 5 acres of
woodlands. However, there was no impact to waterways due to the rapid vaporization of the
liquid ethane, and the area is not considered an HCA.
9. Immediately after the accident, Line A-1, an 8-inch NPS propane line located in the vicinity of
the rupture site, was also isolated as a precaution. It was later determined that Line A-1 was not
impacted by the fire or explosion due to its location several hundred feet from the failure site
(Appendix A, map 3). Line A-1 was later returned to normal service.
10. A nearby 6-inch NPS pipeline, Line A3, has been idle since 1972 and is not currently in operation.
Page 4 of 6

<<<PAGE 5>>>

Failure Investigation Report—Enterprise Products Operating, LLC
ATEX Ethane Pipeline Failure
Follansbee, Brook County, West Virginia
[Failure Date 1/26/2015]
11. Prior to the failure, SCADA pressure records showed the MOP of the line was not exceeded.
Operating pressure at the time of failure was 1,183 psig, below the MOP of 1,440 psig.
12. PHMSA reviewed the adequacy of emergency response related to the release, as well as
applicable procedures pertaining to construction, operations, and maintenance of the ATEX-1
pipeline. No issues were identified.
13. Samples of the affected pipe were removed and sent to Kiefner for metallurgical analysis and
testing. These samples included the upstream and downstream girth welds, upstream and
downstream pipe joints, and 2 feet of the pipe immediately upstream and downstream of the
failure location. Results of the testing and examination are outlined in Appendix D of this
report.
14. A survey of the failure site comparing the elevation of the pipeline at the failure location to the
as-built map elevations was conducted during the excavation and remediation process. The
survey indicated that the pipe had dropped more than 3 feet since the line was originally
constructed. A geotechnical survey conducted by Pennsylvania Soil and Rock determined that
the failed pipe was installed across a transition area or “head wall” of an old underground mine
and surface strip mine. In addition, the soil on which the pipeline was laid had undergone little
consolidation since the mining was completed. Details of the geotechnical survey analysis can
be found in the Enterprise Remedial Work Plan (Appendix G).
15. Depth of cover at the failure site was approximately 12 feet.
16. There were multiple complex bends near the failure location.
17. Buoyancy control weights were installed in the vicinity of the failure site during the original
construction of the pipeline (Appendix A, photo 7).
18. The explosion and fire that resulted from the pipeline rupture burned approximately 5 acres of
woodlands and damaged high tension power lines near the failure site (Appendix A, photo 2).
19. Due to the rapid vaporization of the liquid ethane there was no impact to waterways.
20. Approximately 30,565 barrels of liquid ethane were released.
Findings and Contributing Factors
Findings:
Metallurgical testing of the failed pipe section was conducted by Kiefner and Associates, and showed
that the accident was caused by a girth weld failure due to a ductile tensile overload from stresses
resulting from loads imposed by the surrounding soil. The data also indicated that the intact upstream
and downstream girth welds met the quality requirements and mechanical properties of API 1104. The
mechanical properties of the pipe joints immediately adjacent to the rupture location, as well as the
next pipe joints upstream and downstream, also met the chemical and mechanical properties for Grade
X70 pipe (Appendix D).
Contributing Factors:
Previous mining activities were a contributing factor to the failure. The pipeline settlement in the failure
location was likely caused by the consolidation of existing surface mine spoils during construction,
added cover, and the placement of buoyancy control measures on the pipe.
Page 5 of 6

<<<PAGE 6>>>

Failure Investigation Report—Enterprise Products Operating, LLC
ATEX Ethane Pipeline Failure
Follansbee, Brook County, West Virginia
[Failure Date 1/26/2015]
Appendices
A 149469 Appendix A—Maps and Photographs
B 149469 Appendix B—NRC Report 1106602
C 149469 Appendix C—Incident Report Form 7000.1
D 149469 Appendix D—Metallurgical Analysis Report
E 149469 Appendix E—Timeline of Events
F 149469 Appendix F—Amended CAO—CPF120155002H
G 149469 Appendix G—ATEX Remedial Work Plan
H 149469 Appendix H—ATEX Restart Plan
I 149469 Appendix I—ATEX Repair Plan
Page 6 of 6

<<<PAGE 7>>>

149469 Appendix A_Maps and Photographs
Map-1
Map-2
Page 1 of 14

<<<PAGE 8>>>

149469 Appendix A_Maps and Photographs
Map-3
Page 2 of 14

<<<PAGE 9>>>

149469 Appendix A_Maps and Photographs
(b) (7)(F)
Map-4 : Atex-1 Pipeline
Page 3 of 14

<<<PAGE 10>>>

149469 Appendix A_Maps and Photographs
Page 4 of 14

<<<PAGE 11>>>

149469 Appendix A_Maps and Photographs
Photo 1 : (Jan 26, 2015)
The explosion and fire that resulted from the pipeline rupture burned approximately 5 acres of
woodlands. There was no impact to waterways due to the rapid vaporization of the liquid ethane.
Page 5 of 14

<<<PAGE 12>>>

149469 Appendix A_Maps and Photographs
Photo 2 – (Jan 26, 2015)
Power lines were damaged in the right-of-way that crosses the Atex-1 pipeline.
Page 6 of 14

<<<PAGE 13>>>

149469 Appendix A_Maps and Photographs
Photo 3 – (Jan 26, 2015)
Siding damaged from residual heat. This home is located approximately 2000 feet from the ruputure
site.
Page 7 of 14

<<<PAGE 14>>>

149469 Appendix A_Maps and Photographs
Photo 4 – (Jan 27, 2015)
Rupture site.
Page 8 of 14

<<<PAGE 15>>>

149469 Appendix A_Maps and Photographs
Photo 5 – (Jan 27, 2015)
Page 9 of 14

<<<PAGE 16>>>

149469 Appendix A_Maps and Photographs
Photo 6 – (Feb 1, 2015)
Excavating the pipe.
Page 10 of 14

<<<PAGE 17>>>

149469 Appendix A_Maps and Photographs
Photo 7 – (Feb 2, 2015)
Photo shows failure location wrapped with rock shield to protect the pipe ends durng excavation.
Weighted buoyancy control bags are shown on the pipe.
Page 11 of 14

<<<PAGE 18>>>

149469 Appendix A_Maps and Photographs
Photo 8 –(Feb 3, 2015)
Removal of ruptured pipe.
Page 12 of 14

<<<PAGE 19>>>

149469 Appendix A_Maps and Photographs
Photo 9 – (Feb 3, 2015)
Ruptured pipe section removed including upstream and downstream welds. Pipe and welds sent for
metallurgical testing.
Page 13 of 14

<<<PAGE 20>>>

149469 Appendix A_Maps and Photographs
Photo 10 - (Feb 5, 2015)
Installing replacement pipe section.
Page 14 of 14

<<<PAGE 21>>>

149469 Appendix B_NRC Report 1106602
Page 1 of 4

<<<PAGE 22>>>

149469 Appendix B_NRC Report 1106602
Page 2 of 4

<<<PAGE 23>>>

149469 Appendix B_NRC Report 1106602
Page 3 of 4

<<<PAGE 24>>>

149469 Appendix B_NRC Report 1106602
Page 4 of 4

<<<PAGE 25>>>

149469 Appendix C_Incident Report Form 7000.1
NOTICE: This report is required by 49 CFR Part 195. Failure to report can result in a civil penalty not to
exceed $100,000 for each violation for each day that such violation persists except that the maximum civil
penalty shall not exceed $1,000,000 as provided in 49 USC 60122.
OMB NO: 2137-0047
EXPIRATION DATE: 07/31/2015
Original Report
Date: 02/24/2015
U.S Department of Transportation
Pipeline and Hazardous Materials Safety Administration
No. 20150071 - 20723
--------------------------
(DOT Use Only)
ACCIDENT REPORT - HAZARDOUS LIQUID
PIPELINE SYSTEMS
A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply
with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid
OMB Control Number. The OMB Control Number for this information collection is 2137-0047. All responses to the collection of information are mandatory.
Send comments regarding this burden or any other aspect of this collection of information, including suggestions for reducing the burden to: Information
Collection Clearance Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590.
INSTRUCTIONS
Important: Please read the separate instructions for completing this form before you begin. They clarify the information requested and provide specific
examples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page at
http://www.phmsa.dot.gov/pipeline/library/forms.
PART A - KEY REPORT INFORMATION
Report Type: (select all that apply) Original: Supplemental: Final:
Yes
Last Revision Date: 09/08/2015
1. Operator's OPS-issued Operator Identification Number (OPID): 31618
2. Name of Operator ENTERPRISE PRODUCTS OPERATING LLC
3. Address of Operator:
3a. Street Address 1100 Louisiana Street
3b. City HOUSTON
3c. State Texas
3d. Zip Code 77002
4. Local time (24-hr clock) and date of the Accident: 01/26/2015 09:38
5. Location of Accident:
Latitude: 40.366817
Longitude: -80.584594
6. National Response Center Report Number (if applicable): 1106602
7. Local time (24-hr clock) and date of initial telephonic report to the
National Response Center (if applicable): 01/26/2015 11:38
8. Commodity released: (select only one, based on predominant
volume released)
HVL or Other Flammable or Toxic Fluid which is a Gas at
Ambient Conditions
- Specify Commodity Subtype: Other HVL
- If "Other" Subtype, Descr be: Ethane
- If Biofuel/Alternative Fuel and Commodity Subtype is
Ethanol Blend, then % Ethanol Blend:
- If Biofuel/Alternative Fuel and Commodity Subtype is
Biodiesel, then Biodiesel Blend e.g. B2, B20, B100
9. Estimated volume of commodity released unintentionally (Barrels): 30,565.00
10. Estimated volume of intentional and/or controlled release/blowdown
(Barrels):
11. Estimated volume of commodity recovered (Barrels):
12. Were there fatalities? No
- If Yes, specify the number in each category:
12a. Operator employees
12b. Contractor employees working for the Operator
12c. Non-Operator emergency responders
12d. Workers working on the right-of-way, but NOT
associated with this Operator
12e. General public
12f. Total fatalities (sum of above)
13. Were there injuries requiring inpatient hospitalization? No
- If Yes, specify the number in each category:
13a. Operator employees
13b. Contractor employees working for the Operator
13c. Non-Operator emergency responders
13d. Workers working on the right-of-way, but NOT
associated with this Operator
13e. General public
Form PHMSA F 7000.1
Page 1 of 13

<<<PAGE 26>>>

149469 Appendix C_Incident Report Form 7000.1
13f. Total injuries (sum of above)
14. Was the pipeline/facility shut down due to the Accident? Yes
- If No, Explain:
- If Yes, complete Questions 14a and 14b: (use local time, 24-hr clock)
14a. Local time and date of shutdown: 01/26/2015 09:39
14b. Local time pipeline/facility restarted: 02/14/2015 13:30
- Still shut down? (* Supplemental Report Required)
15. Did the commodity ignite? Yes
16. Did the commodity explode? Yes
17. Number of general public evacuated: 1
18. Time sequence (use local time, 24-hour clock):
18a. Local time Operator identified Accident - effective 7- 2014
changed to "Local time Operator identified failure": 01/26/2015 09:39
18b. Local time Operator resources arrived on site: 01/26/2015 11:00
PART B - ADDITIONAL LOCATION INFORMATION
1. Was the origin of the Accident onshore? Yes
If Yes, Complete Questions (2-12)
If No, Complete Questions (13-15)
- If Onshore:
2. State: West Virginia
3. Zip Code: 26035
4. City Colliers
5. County or Parish Brooke
6. Operator-designated location: Milepost/Valve Station
Specify: 23.1
7. Pipeline/Facility name: ATEX-1
8. Segment name/ID: Greensburg - Pennsylvania/West Virginia
9. Was Accident on Federal land, other than the Outer Continental Shelf
(OCS)? No
10. Location of Accident: Pipeline Right-of-way
11. Area of Accident (as found): Underground
Specify: Under soil
- If Other, Descr be:
Depth-of-Cover (in): 168
12. Did Accident occur in a crossing? No
- If Yes, specify type below:
- If Bridge crossing –
Cased/ Uncased:
- If Railroad crossing –
Cased/ Uncased/ Bored/drilled
- If Road crossing –
Cased/ Uncased/ Bored/drilled
- If Water crossing –
Cased/ Uncased
- Name of body of water, if commonly known:
- Approx. water depth (ft) at the point of the Accident:
- Select:
- If Offshore:
13. Approximate water depth (ft) at the point of the Accident:
14. Origin of Accident:
- In State waters - Specify:
- State:
- Area:
- Block/Tract #:
- Nearest County/Parish:
- On the Outer Continental Shelf (OCS) - Specify:
- Area:
- Block #:
15. Area of Accident:
PART C - ADDITIONAL FACILITY INFORMATION
1. Is the pipeline or facility: Interstate
2. Part of system involved in Accident: Onshore Pipeline, Including Valve Sites
- If Onshore Breakout Tank or Storage Vessel, Including Attached
Appurtenances, specify:
3. Item involved in Accident: Pipe
- If Pipe, specify: Pipe Body
3a. Nominal diameter of pipe (in): 20
Form PHMSA F 7000.1
Page 2 of 13

<<<PAGE 27>>>

149469 Appendix C_Incident Report Form 7000.1
3b. Wall thickness (in): .312
3c. SMYS (Specified Minimum Yield Strength) of pipe (psi): 70,000
3d. Pipe specification: API-5L X70
3e. Pipe Seam , specify: Longitudinal ERW - High Frequency
- If Other, Descr be:
3f. Pipe manufacturer: American Pipe
3g. Year of manufacture: 2013
3h. Pipeline coating type at point of Accident, specify: Fusion Bonded Epoxy
- If Other, Descr be:
- If Weld, including heat-affected zone, specify. If Pipe Girth Weld,
3a through 3h above are required:
- If Other, Descr be:
- If Valve, specify:
- If Mainline, specify:
- If Other, Descr be:
3i. Manufactured by:
3j. Year of manufacture:
- If Tank/Vessel, specify:
- If Other - Descr be:
- If Other, descr be:
4. Year item involved in Accident was installed: 2013
5. Material involved in Accident: Carbon Steel
- If Material other than Carbon Steel, specify:
6. Type of Accident Involved: Rupture
- If Mechanical Puncture – Specify Approx. size:
in. (axial) by
in. (circumferential)
- If Leak - Select Type:
- If Other, Descr be:
- If Rupture - Select Orientation: Circumferential
- If Other, Describe:
Approx. size: in. (widest opening) by 1
in. (length circumferentially or axially) 20
- If Other – Describe:
PART D - ADDITIONAL CONSEQUENCE INFORMATION
1. Wildlife impact: No
1a. If Yes, specify all that apply:
- Fish/aquatic
- Birds
- Terrestrial
2. Soil contamination: No
3. Long term impact assessment performed or planned: No
4. Anticipated remediation: Yes
4a. If Yes, specify all that apply:
- Surface water
- Groundwater
- Soil
- Vegetation Yes
- Wildlife
5. Water contamination: No
5a. If Yes, specify all that apply:
- Ocean/Seawater
- Surface
- Groundwater
- Drinking water: (Select one or both)
- Private Well
- Public Water Intake
5b. Estimated amount released in or reaching water (Barrels):
5c. Name of body of water, if commonly known:
6. At the location of this Accident, had the pipeline segment or facility
been identified as one that "could affect" a High Consequence Area
(HCA) as determined in the Operator's Integrity Management Program?
No
7. Did the released commodity reach or occur in one or more High
Consequence Area (HCA)? No
7a. If Yes, specify HCA type(s): (Select all that apply)
- Commercially Navigable Waterway:
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Form PHMSA F 7000.1
Page 3 of 13

<<<PAGE 28>>>

149469 Appendix C_Incident Report Form 7000.1
Integrity Management Program?
- High Population Area:
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Integrity Management Program?
- Other Populated Area
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
- Unusually Sensitive Area (USA) - Drinking Water
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
- Unusually Sensitive Area (USA) - Ecological
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
8. Estimated cost to Operator – effective 12-2012, changed to "Estimated Property Damage":
8a. Estimated cost of public and non-Operator private property
damage paid/reimbursed by the Operator – effective 12-2012,
"paid/reimbursed by the Operator" removed
$ 95,000
8b. Estimated cost of commodity lost $ 194,000
8c. Estimated cost of Operator's property damage & repairs $ 1,821,591
8d. Estimated cost of Operator's emergency response $ 0
8e. Estimated cost of Operator's environmental remediation $ 0
8f. Estimated other costs $ 4,800,000
Descr be: Costs to implement Remedial Work Plan
8g. Estimated total costs (sum of above) – effective 12-2012,
changed to "Total estimated property damage (sum of above)" $ 6,910,591
PART E - ADDITIONAL OPERATING INFORMATION
1. Estimated pressure at the point and time of the Accident (psig): 1,183.00
2. Maximum Operating Pressure (MOP) at the point and time of the
Accident (psig): 1,440.00
3. Describe the pressure on the system or facility relating to the
Accident (psig): Pressure did not exceed MOP
4. Not including pressure reductions required by PHMSA regulations
(such as for repairs and pipe movement), was the system or facility
relating to the Accident operating under an established pressure
restriction with pressure limits below those normally allowed by the
MOP?
No
- If Yes, Complete 4.a and 4.b below:
4a. Did the pressure exceed this established pressure
restriction?
4b. Was this pressure restriction mandated by PHMSA or the
State?
5. Was "Onshore Pipeline, Including Valve Sites" OR "Offshore
Pipeline, Including Riser and Riser Bend" selected in PART C, Question
2?
Yes
- If Yes - (Complete 5a. – 5f below) effective 12-2012, changed to "(Complete 5.a – 5.e below)"
5a. Type of upstream valve used to initially isolate release
source: Remotely Controlled
5b. Type of downstream valve used to initially isolate release
source: Remotely Controlled
5c. Length of segment isolated between valves (ft): 112,094
5d. Is the pipeline configured to accommodate internal
inspection tools? Yes
- If No, Which physical features limit tool accommodation? (select all that apply)
- Changes in line pipe diameter
- Presence of unsuitable mainline valves
- Tight or mitered pipe bends
- Other passage restrictions (i.e. unbarred tee's,
projecting instrumentation, etc.)
- Extra thick pipe wall (applicable only for magnetic
flux leakage internal inspection tools)
- Other -
- If Other, Descr be:
5e. For this pipeline, are there operational factors which
significantly complicate the execution of an internal inspection tool
run?
No
- If Yes, Which operational factors complicate execution? (select all that apply)
Form PHMSA F 7000.1
Page 4 of 13

<<<PAGE 29>>>

149469 Appendix C_Incident Report Form 7000.1
- Excessive debris or scale, wax, or other wall buildup
- Low operating pressure(s)
- Low flow or absence of flow
- Incompatible commodity
- Other -
- If Other, Descr be:
5f. Function of pipeline system: > 20% SMYS Regulated Trunkline/Transmission
6. Was a Supervisory Control and Data Acquisition (SCADA)-based
system in place on the pipeline or facility involved in the Accident? Yes
If Yes -
6a. Was it operating at the time of the Accident? Yes
6b. Was it fully functional at the time of the Accident? Yes
6c. Did SCADA-based information (such as alarm(s),
alert(s), event(s), and/or volume calculations) assist with
the detection of the Accident?
Yes
6d. Did SCADA-based information (such as alarm(s),
alert(s), event(s), and/or volume calculations) assist with
the confirmation of the Accident?
Yes
7. Was a CPM leak detection system in place on the pipeline or facility
involved in the Accident? Yes
- If Yes:
7a. Was it operating at the time of the Accident? Yes
7b. Was it fully functional at the time of the Accident? Yes
7c. Did CPM leak detection system information (such as
alarm(s), alert(s), event(s), and/or volume calculations) assist
with the detection of the Accident?
Yes
7d. Did CPM leak detection system information (such as
alarm(s), alert(s), event(s), and/or volume calculations) assist
with the confirmation of the Accident?
Yes
8. How was the Accident initially identified for the Operator?
CPM leak detection system or SCADA-based information
(such as alarm(s), alert(s), event(s), and/or volume
calculations)
- If Other, Specify:
8a. If "Controller", "Local Operating Personnel", including
contractors", "Air Patrol", or "Ground Patrol by Operator or its
contractor" is selected in Question 8, specify:
9. Was an investigation initiated into whether or not the controller(s) or
control room issues were the cause of or a contributing factor to the
Accident?
- If No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary due to:
(provide an explanation for why the operator did not investigate)
No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary
due to: (provide an explanation for why the Operator did not
investigate)
Line ruptured while in steady-state operation below MOP.
No investigation into controller actions necessary.
- If Yes, specify investigation result(s): (select all that apply)
- Investigation reviewed work schedule rotations,
continuous hours of service (while working for the
Operator), and other factors associated with fatigue
- Investigation did NOT review work schedule rotations,
continuous hours of service (while working for the
Operator), and other factors associated with fatigue
Provide an explanation for why not:
- Investigation identified no control room issues
- Investigation identified no controller issues
- Investigation identified incorrect controller action or
controller error
- Investigation identified that fatigue may have affected the
controller(s) involved or impacted the involved controller(s)
response
- Investigation identified incorrect procedures
- Investigation identified incorrect control room equipment
operation
- Investigation identified maintenance activities that affected
control room operations, procedures, and/or controller
response
- Investigation identified areas other than those above:
Descr be:
PART F - DRUG & ALCOHOL TESTING INFORMATION
Form PHMSA F 7000.1
Page 5 of 13

<<<PAGE 30>>>

149469 Appendix C_Incident Report Form 7000.1
1. As a result of this Accident, were any Operator employees tested
under the post-accident drug and alcohol testing requirements of DOT's
Drug & Alcohol Testing regulations?
No
- If Yes:
1a. Specify how many were tested:
1b. Specify how many failed:
2. As a result of this Accident, were any Operator contractor employees
tested under the post-accident drug and alcohol testing requirements of
DOT's Drug & Alcohol Testing regulations?
No
- If Yes:
2a. Specify how many were tested:
2b. Specify how many failed:
PART G – APPARENT CAUSE
Select only one box from PART G in shaded column on left representing the APPARENT Cause of the Accident, and answer
the questions on the right. Describe secondary, contributing or root causes of the Accident in the narrative (PART H).
Apparent Cause: G5 - Material Failure of Pipe or Weld
G1 - Corrosion Failure - only one sub-cause can be picked from shaded left-hand column
Corrosion Failure – Sub-Cause:
- If External Corrosion:
1. Results of visual examination:
- If Other, Descr be:
2. Type of corrosion: (select all that apply)
- Galvanic
- Atmospheric
- Stray Current
- Microbiological
- Selective Seam
- Other:
- If Other, Descr be:
3. The type(s) of corrosion selected in Question 2 is based on the following: (select all that apply)
- Field examination
- Determined by metallurgical analysis
- Other:
- If Other, Descr be:
4. Was the failed item buried under the ground?
- If Yes :
4a. Was failed item considered to be under cathodic
protection at the time of the Accident?
If Yes - Year protection started:
4b. Was shielding, tenting, or disbonding of coating evident at
the point of the Accident?
4c. Has one or more Cathodic Protection Survey been
conducted at the point of the Accident?
If "Yes, CP Annual Survey" – Most recent year conducted:
If "Yes, Close Interval Survey" – Most recent year conducted:
If "Yes, Other CP Survey" – Most recent year conducted:
- If No:
4d. Was the failed item externally coated or painted?
5. Was there observable damage to the coating or paint in the vicinity of
the corrosion?
- If Internal Corrosion:
6. Results of visual examination:
- Other:
7. Type of corrosion (select all that apply): -
- Corrosive Commodity
- Water drop-out/Acid
- Microbiological
- Erosion
- Other:
- If Other, Descr be:
8. The cause(s) of corrosion selected in Question 7 is based on the following (select all that apply): -
- Field examination
- Determined by metallurgical analysis
- Other:
Form PHMSA F 7000.1
Page 6 of 13

<<<PAGE 31>>>

149469 Appendix C_Incident Report Form 7000.1
- If Other, Descr be:
9. Location of corrosion (select all that apply): -
- Low point in pipe
- Elbow
- Other:
- If Other, Descr be:
10. Was the commodity treated with corrosion inhibitors or biocides?
11. Was the interior coated or lined with protective coating?
12. Were cleaning/dewatering pigs (or other operations) routinely
utilized?
13. Were corrosion coupons routinely utilized?
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
Question 3) is Tank/Vessel.
14. List the year of the most recent inspections:
14a. API Std 653 Out-of-Service Inspection
- No Out-of-Service Inspection completed
14b. API Std 653 In-Service Inspection
- No In-Service Inspection completed
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
Question 3) is Pipe or Weld.
15. Has one or more internal inspection tool collected data at the point of the
Accident?
15a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage Tool
Most recent year:
- Ultrasonic
Most recent year:
- Geometry
Most recent year:
- Caliper
Most recent year:
- Crack
Most recent year:
- Hard Spot
Most recent year:
- Combination Tool
Most recent year:
- Transverse Field/Triaxial
Most recent year:
- Other
Most recent year:
Descr be:
16. Has one or more hydrotest or other pressure test been conducted since
original construction at the point of the Accident?
If Yes -
Most recent year tested:
Test pressure:
17. Has one or more Direct Assessment been conducted on this segment?
- If Yes, and an investigative dig was conducted at the point of the Accident::
Most recent year conducted:
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
18. Has one or more non-destructive examination been conducted at the
point of the Accident since January 1, 2002?
18a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year conducted:
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Descr be:
Form PHMSA F 7000.1
Page 7 of 13

<<<PAGE 32>>>

149469 Appendix C_Incident Report Form 7000.1
G2 - Natural Force Damage - only one sub-cause can be picked from shaded left-handed column
Natural Force Damage – Sub-Cause:
- If Earth Movement, NOT due to Heavy Rains/Floods:
1. Specify:
- If Other, Descr be:
- If Heavy Rains/Floods:
2. Specify:
- If Other, Descr be:
- If Lightning:
3. Specify:
- If Temperature:
4. Specify:
- If Other, Descr be:
- If Other Natural Force Damage:
5. Describe:
Complete the following if any Natural Force Damage sub-cause is selected.
6. Were the natural forces causing the Accident generated in
conjunction with an extreme weather event?
6a. If Yes, specify: (select all that apply)
- Hurricane
- Tropical Storm
- Tornado
- Other
- If Other, Descr be:
G3 - Excavation Damage - only one sub-cause can be picked from shaded left-hand column
Excavation Damage – Sub-Cause:
- If Previous Damage due to Excavation Activity: Complete Questions 1-5 ONLY IF the "Item Involved in Accident" (from PART
C, Question 3) is Pipe or Weld.
1. Has one or more internal inspection tool collected data at the point of
the Accident?
1a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage
Most recent year conducted:
- Ultrasonic
Most recent year conducted:
- Geometry
Most recent year conducted:
- Caliper
Most recent year conducted:
- Crack
Most recent year conducted:
- Hard Spot
Most recent year conducted:
- Combination Tool
Most recent year conducted:
- Transverse Field/Triaxial
Most recent year conducted:
- Other
Most recent year conducted:
Descr be:
2. Do you have reason to believe that the internal inspection was
completed BEFORE the damage was sustained?
3. Has one or more hydrotest or other pressure test been conducted since
original construction at the point of the Accident?
- If Yes:
Most recent year tested:
Test pressure (psig):
4. Has one or more Direct Assessment been conducted on the pipeline
segment?
- If Yes, and an investigative dig was conducted at the point of the Accident:
Most recent year conducted:
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
5. Has one or more non-destructive examination been conducted at the
point of the Accident since January 1, 2002?
Form PHMSA F 7000.1
Page 8 of 13

<<<PAGE 33>>>

149469 Appendix C_Incident Report Form 7000.1
5a. If Yes, for each examination, conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year conducted:
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Descr be:
Complete the following if Excavation Damage by Third Party is selected as the sub-cause.
6. Did the operator get prior notification of the excavation activity?
6a. If Yes, Notification received from: (select all that apply) -
- One-Call System
- Excavator
- Contractor
- Landowner
Complete the foll
- **truncated:** true
- **body characters:** 52460