# Failure Report-Buckeye Partners 7/13/12

- **operation:** document
- **citation:** PHMSA FIR, Buckeye Partners, LP, 2012-07-13
- **title:** Failure Report-Buckeye Partners 7/13/12
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-11-23
- **effective on:** 2012-07-13
- **summary:** Buckeye Partners, LP; Hazardous Liquid; PA; failure 2012-07-13; apparent cause: Corrosion Failure.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-buckeye-partners-71312.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-buckeye-partners-71312.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-buckeye-partners-71312
- **source url:** https://www.phmsa.dot.gov/safety-reports/failure-report-buckeye-partners-71312
**body:**

<<<PAGE 1>>>

DOT US Department of Transportation
PHMSA Pipeline and Hazardous Materials Safety Administration
OPS Office of Pipeline Safety
Eastern Region
Principal Investigator Alex Dankanich
Senior Accident Investigator Mike Yazemboski
Region Director Byron Coy
Date of Report 7/17/2013
Subject Failure Investigation Report – Buckeye Macungie Tank 230 bottom
weld failure
Operator, Location, & Consequences
Date of Failure 07/13/2012
Commodity Released Hazardous Liquid (Gasoline)
City/County & State Emmaus, Lehigh County, PA
OpID & Operator Name 1845 - Buckeye Partners, LP
Unit # & Unit Name 321 - Macungie - PA
SMART Activity # 140298
Milepost / Location Macungie Station, 5131 Buckeye Road, Emmaus, PA 18049
Latitude 40.513554, Longitude -75.53238
Type of Failure Leak from crack in weld between tank bottom and wall
Fatalities No
Injuries No
Description of area impacted Leak was contained to the tank dike area. Facility is located a High
Consequence Area (HCA).
Total Costs $380,538

<<<PAGE 2>>>

Failure Investigation Report – Buckeye Tank 230 Leak
[Failure Date 7/13/2012]
Executive Summary
At 11:30 am on July 13, 2012, gasoline was discovered in the dike area of Tank 230 in the Buckeye
Macungie Station located in Emmaus, Lehigh County, Pennsylvania. Tank 230 is designated as a break-
out tank and is thus regulated under 49 CFR, Part 195. The leak was caused by a low cycle fatigue weld
failure due to the filling and draining of the tank. Corrosion contributed to the weld failure.
Approximately 9 barrels of gasoline leaked into tank dike area. The gasoline was totally contained on
Operator-controlled property. Tank 230 is located in a designated high consequence area (HCA). There
were no injuries or fatalities, evacuations, or supply disruptions as a result of the incident.
An inspector from PHMSA Eastern Region was dispatched to the location on August 16, 2012 to conduct
an investigation into the cause of the release.
System Details
Buckeye Partners, LP owns and operates a break out tank farm in Macungie, PA (Appendix A). Refined
products are regularly delivered to the tank farm, temporarily stored, and shipped out by pipeline and
by truck to fill requests for product. A Buckeye owned system of pipelines enters and exits the tank
farm.
Tank 230 is an atmospheric storage tank that was built in 1974. It is 110 foot diameter by 48 feet high
and has an internal floating roof and a steel cone roof. It was last internally inspected on 4/2/1997 by
DJA Inspection Services, Inc (Appendix B / Appendix C). At that time it had a magnetic flux leakage scan
over 100% of the floor, and ultrasonic thickness readings taken on the bottom. Repairs were made on
all pits as needed to achieve a calculated floor life of about 24 years. A 2008 external inspection
(Appendix D) included ultrasonic thickness readings of the shell, nozzles and roof.
Events Leading up to the Failure
Prior to the leak that was discovered on July 13, 2012, Tank 230 was in normal service (Appendix E).
There were no leaks or operational issues reported since the tank bottom was repaired following the
1997 out-of-service inspection.
Emergency Response
At 11:30 am on July 13, 2012, while performing a monthly tank inspection on Tank 230 at Buckeye's
Macungie Station (Appendix F), a Buckeye operations employee noticed stained soil next to the tank.
Emergency response procedures were initiated and all appropriate notifications were made. The tank
was isolated and emptied. Three monitoring wells were excavated in the area of the stained soil.
Gasoline odor was detected in the well closest to the tank, but no free product was observed. The
monitoring wells were checked during the tank emptying process and no additional product was
discovered. The tank was emptied and cleaned.
Summary of Return-to-Service
The tank bottom was inspected and repaired. Below is a list of the repairs completed. The tank was
hydrostatically tested and returned to service in January of 2013.
1. New 30 inch wide annular ring installed
a. Vacuum box tested lap weld to existing tank bottom
b. Vacuum box and mag particle tested annular ring butt welds
c. Oil penetrant tested shell/annular ring corner weld
d. Helium tested entire tank bottom
140298 Buckeye 1845 Failure Investigation Report [Final for Sharepoint] Page 2 of 4

<<<PAGE 3>>>

Failure Investigation Report – Buckeye Tank 230 Leak
[Failure Date 7/13/2012]
2. Repaired 4 soilside pits
3. Installed new epoxy floor coating
4. Removed leak detection tubes
5. Installed new man-way and door sheet
6. Painted tank exterior shell course 1 (up to first horizontal weld – 8’)
Investigation Details
PHMSA Eastern Region received an NRC report 1017664 on 7-14-2012 regarding a possible tank leak
after a routine plant patrol found gasoline at the chime area of Tank 230 at the Buckeye Macungie PA
tank farm. The gasoline appeared to be coming from under the tank bottom. The gasoline was
transferred to another tank, and the tank was cleaned and taken out of service for inspection. An
internal inspection and investigation revealed a crack in the fillet weld at the base of the tank wall and
bottom plate.
A metallurgical analysis (Appendix G) was performed on the failed weld. A summary of the metallurgical
analysis is below. Tank 230 was repaired and returned to service.
A soil boring investigation was conducted and soil samples were sent for laboratory analysis. Soil results
indicated that concentrations of target constituents of concern are below PADEP approved risk-based
site specific standards for the Macungie Station; therefore, no additional environmental Investigation or
remediation was conducted.
Metallurgical Analysis Summary:
The analysis states: “We believe the crack that ultimately formed the leak had initiated and propagated
under cyclic fatigue loading. Specifically, the failure mechanism was low-cycle fatigue (LCF). LCF occurs
under high-amplitude low-frequency loading. In this instance cyclic loading was a function of the
applied pressure variations directly related to changing gasoline levels in the tank. While LCF can also
be associated with thermal stress, this is not likely in this instance as such thermal stress changes are a
function of temperature change. Since the tank only saw ambient temperatures, changes in thermal
stresses would have been negligible. This initiated the crack from the inside of the tank that propagated
through-wall, causing the leak. As previously noted, we were unable to identify features associated
with fatigue from fracture surface evaluation. However, the presence of multiple cracks adjacent to the
leak was an indicator of LCF. Multiple parallel cracks are common under LCF as the high strain
amplitude can initiate several cracks. Only one preferential crack will continue to propagate while the
others stop. The presence of these multiple transgranular cracks is a good indicator of an LCF
mechanism. We are of the opinion that the root cause of cracking really resulted directly from the loss
of wall associated with external pitting corrosion. The degree of external pitting observed would have
increased the stress from applied service loads, in some cases more than doubling local stress. We
believe the increase in stress caused by wall loss was sufficient to initiate and propagate an LCF crack
adjacent to the weld toe in the floor plate”
.
Findings and Contributing Factors
The source of the release was determined to be a small crack in the floor plate near the tank shell.
Laboratory analysis revealed that corrosion contributed to the weld failure. Weld failure was due to
Low Cycle Fatigue from the filling and draining of the tank.
There were leak detection tubes near the failure location which had been placed there after the tank
was built. The tubes were no longer being used, however, Buckeye believes that the placement of these
140298 Buckeye 1845 Failure Investigation Report [Final for Sharepoint] Page 3 of 4

<<<PAGE 4>>>

Failure Investigation Report – Buckeye Tank 230 Leak
[Failure Date 7/13/2012]
tubes displaced the firm soil foundation in the area where the leak occurred. This may have contributed
to the cycling effect of the floor plate during filling and draining of the tank.
Appendices
Appendix Description
A 140298 Appendix A Maps
B 140298 Appendix B Bottom Inspection Report - 1997
C 140298 Appendix C Tank 230_mrt_calc 1997
D 140298 Appendix D API-653 In-Service Inspection - 2008
E 140298 Appendix E NRC Report 1017664
F 140298 Appendix F Buckeye O&M Inspection procedures
G 140298 Appendix G Metallurgical Test Report
H 140298 Appendix H Accident Report 20120232 - 17205
140298 Buckeye 1845 Failure Investigation Report [Final for Sharepoint] Page 4 of 4

<<<PAGE 5>>>

Appendices A-D
Removed
Files available at PHMSA

<<<PAGE 6>>>

Page 1 of 2
140298 Appendix E NRC Report 1017664
NATIONAL RESPONSE CENTER 1-800-424-8802
*** For Public Use ***
Information released to a third party shall comply with any
applicable federal and/or state Freedom of Information and Privacy Laws
Incident Report # 1017664
INCIDENT DESCRIPTION
*Report taken at 14:41 on 13-JUL-12
Incident Type: STORAGE TANK
Incident Cause: EQUIPMENT FAILURE
Affected Area:
The incident was discovered on 13-JUL-12 at 13:00 local time.
Affected Medium: OTHER DIKED AREA
____________________________________________________________________________
SUSPECTED RESPONSIBLE PARTY
Organization: BUCKEYE PARTNERS
EMMAUS, PA 18049
Type of Organization: PRIVATE ENTERPRISE
____________________________________________________________________________
INCIDENT LOCATION
5131 BUCKEYE RD County: LEHIGH
City: EMMAUS State: PA Zip: 18049
____________________________________________________________________________
RELEASED MATERIAL(S)
CHRIS Code: GAS Official Material Name: GASOLINE: AUTOMOTIVE (UNLEADED)
Also Known As:
Qty Released: 25 BARREL(S)
________________________________________________________________________
DESCRIPTION OF INCIDENT
THE CALLER REPORTED THAT WHILE DOING A TANK INSPECTION, PRODUCT STAINING WAS
DISCOVERED ON THE DIKE FLOOR. THERE WAS A DEVIATION IN THE PRODUCT LEVELS LAST
NIGHT WHICH WOULD INDICATE 25 BBLS OF GASOLINE HAD DISCHARGED.
____________________________________________________________________________
INCIDENT DETAILS
Description of Tank: GASOLINE
Tank Above/Below Ground: ABOVE
Transportable Container: NO
Tank Regulated: YES
Tank Regulated By: PHMSA
Tank ID: 23
Capacity of Tank: 73600 BARREL(S)
Actual Amount: 60074 BARREL(S)
____________________________________________________________________________
DAMAGES
Fire Involved: NO Fire Extinguished: UNKNOWN
INJURIES: NO Hospitalized: Empl/Crew: Passenger:
FATALITIES: NO Empl/Crew: Passenger: Occupant:
EVACUATIONS: NO Who Evacuated: Radius/Area:
Damages: NO
Length of Direction of
Closure Type Description of Closure Closure Closure
Air: N
Road: N Major
Artery: N
Waterway: N
Track: N
Page 1 of 2
http://www.nrc.uscg.mil/reports/rwservlet?standard
web+inc
_
_
seq=1017664
7/13/2013

<<<PAGE 7>>>

Page 2 of 2
140298 Appendix E NRC Report 1017664
Passengers Transferred: NO
Environmental Impact: UNKNOWN
Media Interest: NONE Community Impact due to Material:
____________________________________________________________________________
REMEDIAL ACTIONS
TANK WILL BE EMPTIED/ INVESTIGATION UNDERWAY
Release Secured: YES
Release Rate:
Estimated Release Duration:
____________________________________________________________________________
WEATHER
Weather: CLEAR, ºF
____________________________________________________________________________
ADDITIONAL AGENCIES NOTIFIED
Federal:
State/Local: DEP/ FD
State/Local On Scene:
State Agency Number:
____________________________________________________________________________
NOTIFICATIONS BY NRC
ATLANTIC STRIKE TEAM (MAIN OFFICE)
13-JUL-12 14:49
DHS PROTECTIVE SECURITY ADVISOR (PSA DESK)
13-JUL-12 14:49
DOT CRISIS MANAGEMENT CENTER (MAIN OFFICE)
13-JUL-12 14:49
U.S. EPA III (MAIN OFFICE)
13-JUL-12 14:50
FLD INTEL SUPPORT TEAM PHILADELPHIA (MAIN OFFICE)
13-JUL-12 14:49
NATIONAL INFRASTRUCTURE COORD CTR (MAIN OFFICE)
13-JUL-12 14:49
NJ STATE POLICE (MARINE SERVICES BUREAU)
13-JUL-12 14:49
NOAA RPTS FOR PA (MAIN OFFICE)
13-JUL-12 14:49
PA STATE POLICE (BUREAU OF CRIMINAL INVESTIGATION)
13-JUL-12 14:49
PA EMERG MGMT AGCY (MAIN OFFICE)
13-JUL-12 14:49
____________________________________________________________________________
ADDITIONAL INFORMATION
___________________________________________________________________________
*** END INCIDENT REPORT # 1017664 ***
Page 2 of 2
http://www.nrc.uscg.mil/reports/rwservlet?standard
web+inc
_
_
seq=1017664
7/13/2013

<<<PAGE 8>>>

Appendix F
O&M Inspection Procedures
Removed
Files available at PHMSA

<<<PAGE 9>>>

Appendix G
Metallurgical Test Report
Removed
Files available at PHMSA

<<<PAGE 10>>>

140298 Appendix H Accident Report 20120232 - 17205
NOTICE: This report is required by 49 CFR Part 195. Failure to report can result in a civil penalty not to
exceed $100,000 for each violation for each day that such violation persists except that the maximum civil
penalty shall not exceed $1,000,000 as provided in 49 USC 60122.
OMB NO: 2137-0047
EXPIRATION DATE: 01/31/2014
Original Report
Date: 08/10/2012
U.S Department of Transportation
Pipeline and Hazardous Materials Safety Administration
No. 20120232 - 17205
--------------------------
(DOT Use Only)
ACCIDENT REPORT - HAZARDOUS LIQUID
PIPELINE SYSTEMS
A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply
with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid
OMB Control Number. The OMB Control Number for this information collection is 2137-0047. Public reporting for this collection of information is estimated
to be approximately 10 hours per response (5 hours for a small release), including the time for reviewing instructions, gathering the data needed, and
completing and reviewing the collection of information. All responses to this collection of information are mandatory. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: Information Collection Clearance
Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590.
INSTRUCTIONS
Important: Please read the separate instructions for completing this form before you begin. They clarify the information requested and provide specific
examples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page at
http://www.phmsa.dot.gov/pipeline.
PART A - KEY REPORT INFORMATION
Report Type: (select all that apply) Original: Supplemental: Final:
Yes Yes
Last Revision Date: 02/04/2013
1. Operator's OPS-issued Operator Identification Number (OPID): 1845
2. Name of Operator BUCKEYE PARTNERS, LP
3. Address of Operator:
3a. Street Address FIVE TEK PARK
3b. City BREINIGSVILLE
3c. State Pennsylvania
3d. Zip Code 18031
4. Local time (24-hr clock) and date of the Accident: 07/13/2012 11:30
5. Location of Accident:
Latitude: 40.513554
Longitude: -75.53238
6. National Response Center Report Number (if applicable): 1017664
7. Local time (24-hr clock) and date of initial telephonic report to the
National Response Center (if applicable): 07/13/2012 14:40
8. Commodity released: (select only one, based on predominant
volume released)
Refined and/or Petroleum Product (non-HVL) which is a
Liquid at Ambient Conditions
- Specify Commodity Subtype: Gasoline (non-Ethanol)
- If "Other" Subtype, Describe:
- If Biofuel/Alternative Fuel and Commodity Subtype is
Ethanol Blend, then % Ethanol Blend:
%:
- If Biofuel/Alternative Fuel and Commodity Subtype is
Biodiesel, then Biodiesel Blend (e.g. B2, B20, B100):
B
9. Estimated volume of commodity released unintentionally (Barrels): 8.70
10. Estimated volume of intentional and/or controlled release/blowdown
(Barrels):
11. Estimated volume of commodity recovered (Barrels): .02
12. Were there fatalities? No
- If Yes, specify the number in each category:
12a. Operator employees
12b. Contractor employees working for the Operator
12c. Non-Operator emergency responders
12d. Workers working on the right-of-way, but NOT
associated with this Operator
12e. General public
12f. Total fatalities (sum of above)
13. Were there injuries requiring inpatient hospitalization? No
- If Yes, specify the number in each category:
13a. Operator employees
13b. Contractor employees working for the Operator
13c. Non-Operator emergency responders
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 1 of 14

<<<PAGE 11>>>

140298 Appendix H Accident Report 20120232 - 17205
13d. Workers working on the right-of-way, but NOT
associated with this Operator
13e. General public
13f. Total injuries (sum of above)
14. Was the pipeline/facility shut down due to the Accident? No
- If No, Explain: THE TANK WAS ISOLATED AND EMPTIED
- If Yes, complete Questions 14a and 14b: (use local time, 24-hr clock)
14a. Local time and date of shutdown:
14b. Local time pipeline/facility restarted:
- Still shut down? (* Supplemental Report Required)
15. Did the commodity ignite? No
16. Did the commodity explode? No
17. Number of general public evacuated: 0
18. Time sequence (use local time, 24-hour clock):
18a. Local time Operator identified Accident: 07/13/2012 11:30
18b. Local time Operator resources arrived on site: 07/13/2012 11:30
PART B - ADDITIONAL LOCATION INFORMATION
1. Was the origin of Accident onshore? Yes
If Yes, Complete Questions (2-12)
If No, Complete Questions (13-15)
- If Onshore:
2. State: Pennsylvania
3. Zip Code: 18049
4. City EMMAUS
5. County or Parish LEHIGH
6. Operator-designated location:
Specify:
7. Pipeline/Facility name: MACUNGIE STATION
8. Segment name/ID: ZG
9. Was Accident on Federal land, other than the Outer Continental Shelf
(OCS)? No
10. Location of Accident: Totally contained on Operator-controlled property
11. Area of Accident (as found): Tank, including attached appurtenances
Specify:
- If Other, Describe:
Depth-of-Cover (in):
12. Did Accident occur in a crossing? No
- If Yes, specify below:
- If Bridge crossing –
Cased/ Uncased:
- If Railroad crossing –
Cased/ Uncased/ Bored/drilled
- If Road crossing –
Cased/ Uncased/ Bored/drilled
- If Water crossing –
Cased/ Uncased
- Name of body of water, if commonly known:
- Approx. water depth (ft) at the point of the Accident:
- Select:
- If Offshore:
13. Approximate water depth (ft) at the point of the Accident:
14. Origin of Accident:
- In State waters - Specify:
- State:
- Area:
- Block/Tract #:
- Nearest County/Parish:
- On the Outer Continental Shelf (OCS) - Specify:
- Area:
- Block #:
15. Area of Accident:
PART C - ADDITIONAL FACILITY INFORMATION
1. Is the pipeline or facility: Interstate
2. Part of system involved in Accident: Onshore Breakout Tank or Storage Vessel, including
Attached Appurtenances
- If Onshore Breakout Tank or Storage Vessel, Including Attached
Appurtenances, specify: Atmospheric or Low Pressure
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 2 of 14

<<<PAGE 12>>>

140298 Appendix H Accident Report 20120232 - 17205
3. Item involved in Accident: Tank/Vessel
- If Pipe, specify:
3a. Nominal diameter of pipe (in):
3b. Wall thickness (in):
3c. SMYS (Specified Minimum Yield Strength) of pipe (psi):
3d. Pipe specification:
3e. Pipe Seam , specify:
- If Other, Describe:
3f. Pipe manufacturer:
3g. Year of manufacture:
3h. Pipeline coating type at point of Accident, specify:
- If Other, Describe:
- If Weld, including heat-affected zone, specify:
- If Other, Describe:
- If Valve, specify:
- If Mainline, specify:
- If Other, Describe:
3i. Manufactured by:
3j. Year of manufacture:
- If Tank/Vessel, specify: Single Bottom System
- If Other - Describe:
- If Other, describe:
4. Year item involved in Accident was installed: 1974
5. Material involved in Accident: Carbon Steel
- If Material other than Carbon Steel, specify:
6. Type of Accident Involved: Leak
- If Mechanical Puncture – Specify Approx. size:
in. (axial) by
in. (circumferential)
- If Leak - Select Type: Crack
- If Other, Describe:
- If Rupture - Select Orientation:
- If Other, Describe:
Approx. size: in. (widest opening) by
in. (length circumferentially or axially)
- If Other – Describe:
PART D - ADDITIONAL CONSEQUENCE INFORMATION
1. Wildlife impact: No
1a. If Yes, specify all that apply:
- Fish/aquatic
- Birds
- Terrestrial
2. Soil contamination: Yes
3. Long term impact assessment performed or planned:
4. Anticipated remediation:
4a. If Yes, specify all that apply:
- Surface water
- Groundwater
- Soil
- Vegetation
- Wildlife
5. Water contamination: No
5a. If Yes, specify all that apply:
- Ocean/Seawater
- Surface
- Groundwater
- Drinking water: (Select one or both)
- Private Well
- Public Water Intake
5b. Estimated amount released in or reaching water (Barrels):
5c. Name of body of water, if commonly known:
6. At the location of this Accident, had the pipeline segment or facility
been identified as one that "could affect" a High Consequence Area
(HCA) as determined in the Operator's Integrity Management Program?
Yes
7. Did the released commodity reach or occur in one or more High
Consequence Area (HCA)? Yes
7a. If Yes, specify HCA type(s): (Select all that apply)
- Commercially Navigable Waterway:
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 3 of 14

<<<PAGE 13>>>

140298 Appendix H Accident Report 20120232 - 17205
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Integrity Management Program?
- High Population Area: Yes
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Integrity Management Program?
Yes
- Other Populated Area
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
- Unusually Sensitive Area (USA) - Drinking Water Yes
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
Yes
- Unusually Sensitive Area (USA) - Ecological
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
8. Estimated Property Damage:
8a. Estimated cost of public and non-Operator private property
damage $ 0
8b. Estimated cost of commodity lost $ 0
8c. Estimated cost of Operator's property damage & repairs $ 370,115
8d. Estimated cost of Operator's emergency response $ 10,423
8e. Estimated cost of Operator's environmental remediation $ 0
8f. Estimated other costs $ 0
Describe:
8g. Total estimated property damage (sum of above) $ 380,538
PART E - ADDITIONAL OPERATING INFORMATION
1. Estimated pressure at the point and time of the Accident (psig): .00
2. Maximum Operating Pressure (MOP) at the point and time of the
Accident (psig): .00
3. Describe the pressure on the system or facility relating to the
Accident (psig): Pressure did not exceed MOP
4. Not including pressure reductions required by PHMSA regulations
(such as for repairs and pipe movement), was the system or facility
relating to the Accident operating under an established pressure
restriction with pressure limits below those normally allowed by the
MOP?
No
- If Yes, Complete 4.a and 4.b below:
4a. Did the pressure exceed this established pressure
restriction?
4b. Was this pressure restriction mandated by PHMSA or the
State?
5. Was "Onshore Pipeline, Including Valve Sites" OR "Offshore
Pipeline, Including Riser and Riser Bend" selected in PART C, Question
2?
No
- If Yes - (Complete 5a. – 5e. below)
5a. Type of upstream valve used to initially isolate release
source:
5b. Type of downstream valve used to initially isolate release
source:
5c. Length of segment isolated between valves (ft):
5d. Is the pipeline configured to accommodate internal
inspection tools?
- If No, Which physical features limit tool accommodation? (select all that apply)
- Changes in line pipe diameter
- Presence of unsuitable mainline valves
- Tight or mitered pipe bends
- Other passage restrictions (i.e. unbarred tee's,
projecting instrumentation, etc.)
- Extra thick pipe wall (applicable only for magnetic
flux leakage internal inspection tools)
- Other -
- If Other, Describe:
5e. For this pipeline, are there operational factors which
significantly complicate the execution of an internal inspection tool
run?
- If Yes, Which operational factors complicate execution? (select all that apply)
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 4 of 14

<<<PAGE 14>>>

140298 Appendix H Accident Report 20120232 - 17205
- Excessive debris or scale, wax, or other wall buildup
- Low operating pressure(s)
- Low flow or absence of flow
- Incompatible commodity
- Other -
- If Other, Describe:
5f. Function of pipeline system:
6. Was a Supervisory Control and Data Acquisition (SCADA)-based
system in place on the pipeline or facility involved in the Accident? Yes
If Yes -
6a. Was it operating at the time of the Accident? Yes
6b. Was it fully functional at the time of the Accident? Yes
6c. Did SCADA-based information (such as alarm(s),
alert(s), event(s), and/or volume calculations) assist with
the detection of the Accident?
No
6d. Did SCADA-based information (such as alarm(s),
alert(s), event(s), and/or volume calculations) assist with
the confirmation of the Accident?
No
7. Was a CPM leak detection system in place on the pipeline or facility
involved in the Accident? Yes
- If Yes:
7a. Was it operating at the time of the Accident? Yes
7b. Was it fully functional at the time of the Accident? Yes
7c. Did CPM leak detection system information (such as
alarm(s), alert(s), event(s), and/or volume calculations) assist
with the detection of the Accident?
No
7d. Did CPM leak detection system information (such as
alarm(s), alert(s), event(s), and/or volume calculations) assist
with the confirmation of the Accident?
No
8. How was the Accident initially identified for the Operator? Local Operating Personnel, including contractors
- If Other, Specify:
8a. If "Controller", "Local Operating Personnel", including
contractors", "Air Patrol", or "Guard Patrol by Operator or its
contractor" is selected in Question 8, specify the following:
Operator employee
9. Was an investigation initiated into whether or not the controller(s) or
control room issues were the cause of or a contributing factor to the
Accident?
- If No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary due to:
(provide an explanation for why the operator did not investigate)
No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary
due to: (provide an explanation for why the Operator did not
investigate)
THE RELEASE VOLUME WAS TOO SMALL TO BE
DETECTED BY THE CONTROLLER
- If Yes, specify investigation result(s): (select all that apply)
- Investigation reviewed work schedule rotations,
continuous hours of service (while working for the
Operator), and other factors associated with fatigue
- Investigation did NOT review work schedule rotations,
continuous hours of service (while working for the
Operator), and other factors associated with fatigue
Provide an explanation for why not:
- Investigation identified no control room issues
- Investigation identified no controller issues
- Investigation identified incorrect controller action or
controller error
- Investigation identified that fatigue may have affected the
controller(s) involved or impacted the involved controller(s)
response
- Investigation identified incorrect procedures
- Investigation identified incorrect control room equipment
operation
- Investigation identified maintenance activities that affected
control room operations, procedures, and/or controller
response
- Investigation identified areas other than those above:
Describe:
PART F - DRUG & ALCOHOL TESTING INFORMATION
1. As a result of this Accident, were any Operator employees tested
under the post-accident drug and alcohol testing requirements of DOT's
Drug & Alcohol Testing regulations?
No
- If Yes:
1a. Specify how many were tested:
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 5 of 14

<<<PAGE 15>>>

140298 Appendix H Accident Report 20120232 - 17205
1b. Specify how many failed:
2. As a result of this Accident, were any Operator contractor employees
tested under the post-accident drug and alcohol testing requirements of
DOT's Drug & Alcohol Testing regulations?
No
- If Yes:
2a. Specify how many were tested:
2b. Specify how many failed:
PART G – APPARENT CAUSE
Select only one box from PART G in shaded column on left representing the APPARENT Cause of the Accident, and answer
the questions on the right. Describe secondary, contributing or root causes of the Accident in the narrative (PART H).
Apparent Cause: G1 - Corrosion Failure
G1 - Corrosion Failure - only one sub-cause can be picked from shaded left-hand column
External Corrosion: Yes
Internal Corrosion:
- If External Corrosion:
1. Results of visual examination: Localized Pitting
- If Other, Describe:
2. Type of corrosion: (select all that apply)
- Galvanic Yes
- Atmospheric
- Stray Current
- Microbiological
- Selective Seam
- Other:
- If Other, Describe:
3. The type(s) of corrosion selected in Question 2 is based on the following: (select all that apply)
- Field examination
- Determined by metallurgical analysis Yes
- Other:
- If Other, Describe:
4. Was the failed item buried under the ground? No
- If Yes :
4a. Was failed item considered to be under cathodic
protection at the time of the Accident?
If Yes - Year protection started:
4b. Was shielding, tenting, or disbonding of coating evident at
the point of the Accident?
4c. Has one or more Cathodic Protection Survey been
conducted at the point of the Accident?
If "Yes, CP Annual Survey" – Most recent year conducted:
If "Yes, Close Interval Survey" – Most recent year conducted:
If "Yes, Other CP Survey" – Most recent year conducted:
- If No:
4d. Was the failed item externally coated or painted? No
5. Was there observable damage to the coating or paint in the vicinity of
the corrosion? No
- If Internal Corrosion:
6. Results of visual examination:
- Other:
7. Type of corrosion (select all that apply): -
- Corrosive Commodity
- Water drop-out/Acid
- Microbiological
- Erosion
- Other:
- If Other, Describe:
8. The cause(s) of corrosion selected in Question 7 is based on the following (select all that apply): -
- Field examination
- Determined by metallurgical analysis
- Other:
- If Other, Describe:
9. Location of corrosion (select all that apply): -
- Low point in pipe
- Elbow
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 6 of 14

<<<PAGE 16>>>

140298 Appendix H Accident Report 20120232 - 17205
- Other:
- If Other, Describe:
10. Was the commodity treated with corrosion inhibitors or biocides?
11. Was the interior coated or lined with protective coating?
12. Were cleaning/dewatering pigs (or other operations) routinely
utilized?
13. Were corrosion coupons routinely utilized?
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
Question 3) is Tank/Vessel.
14. List the year of the most recent inspections:
14a. API Std 653 Out-of-Service Inspection Yes
- No Out-of-Service Inspection completed 1997
14b. API Std 653 In-Service Inspection Yes
- No In-Service Inspection completed 2008
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
Question 3) is Pipe or Weld.
15. Has one or more internal inspection tool collected data at the point of the
Accident?
15a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage Tool
Most recent year:
- Ultrasonic
Most recent year:
- Geometry
Most recent year:
- Caliper
Most recent year:
- Crack
Most recent year:
- Hard Spot
Most recent year:
- Combination Tool
Most recent year:
- Transverse Field/Triaxial
Most recent year:
- Other
Most recent year:
Describe:
16. Has one or more hydrotest or other pressure test been conducted since
original construction at the point of the Accident?
If Yes -
Most recent year tested:
Test pressure:
17. Has one or more Direct Assessment been conducted on this segment?
- If Yes, and an investigative dig was conducted at the point of the Accident::
Most recent year conducted:
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
18. Has one or more non-destructive examination been conducted at the
point of the Accident since January 1, 2002?
18a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year conducted:
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
G2 - Natural Force Damage - only one sub-cause can be picked from shaded left-handed column
Natural Force Damage – Sub-Cause:
- If Earth Movement, NOT due to Heavy Rains/Floods:
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 7 of 14

<<<PAGE 17>>>

140298 Appendix H Accident Report 20120232 - 17205
1. Specify:
- If Other, Describe:
- If Heavy Rains/Floods:
2. Specify:
- If Other, Describe:
- If Lightning:
3. Specify:
- If Temperature:
4. Specify:
- If Other, Describe:
- If High Winds:
- If Other Natural Force Damage:
5. Describe:
Complete the following if any Natural Force Damage sub-cause is selected.
6. Were the natural forces causing the Accident generated in
conjunction with an extreme weather event?
6a. If Yes, specify: (select all that apply)
- Hurricane
- Tropical Storm
- Tornado
- Other
- If Other, Describe:
G3 - Excavation Damage - only one sub-cause can be picked from shaded left-hand column
Excavation Damage – Sub-Cause:
- If Excavation Damage by Operator (First Party):
- If Excavation Damage by Operator's Contractor (Second Party):
- If Excavation Damage by Third Party:
- If Previous Damage due to Excavation Activity:
Complete Questions 1-5 ONLY IF the "Item Involved in Accident" (from PART C, Question 3) is Pipe or Weld.
1. Has one or more internal inspection tool collected data at the point of
the Accident?
1a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage
Most recent year conducted:
- Ultrasonic
Most recent year conducted:
- Geometry
Most recent year conducted:
- Caliper
Most recent year conducted:
- Crack
Most recent year conducted:
- Hard Spot
Most recent year conducted:
- Combination Tool
Most recent year conducted:
- Transverse Field/Triaxial
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
2. Do you have reason to believe that the internal inspection was
completed BEFORE the damage was sustained?
3. Has one or more hydrotest or other pressure test been conducted since
original construction at the point of the Accident?
- If Yes:
Most recent year tested:
Test pressure (psig):
4. Has one or more Direct Assessment been conducted on the pipeline
segment?
- If Yes, and an investigative dig was conducted at the point of the Accident:
Most recent year conducted:
- If Yes, but the point of the Accident was not identified as a dig site:
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 8 of 14

<<<PAGE 18>>>

140298 Appendix H Accident Report 20120232 - 17205
Most recent year conducted:
5. Has one or more non-destructive examination been conducted at the
point of the Accident since January 1, 2002?
5a. If Yes, for each examination, conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year conducted:
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
Complete the following if Excavation Damage by Third Party is selected as the sub-cause.
6. Did the operator get prior notification of the excavation activity?
6a. If Yes, Notification received from: (select all that apply) -
- One-Call System
- Excavator
- Contractor
- Landowner
Complete the following mandatory CGA-DIRT Program questions if any Excavation Damage sub-cause is selected.
7. Do you want PHMSA to upload the following information to CGA-
DIRT (www.cga-dirt.com)?
8. Right-of-Way where event occurred: (select all that apply) -
- Public
- If "Public", Specify:
- Private
- If "Private", Specify:
- Pipeline Property/Easement
- Power/Transmission Line
- Railroad
- Dedicated Public Utility Easement
- Federal Land
- Data not collected
- Unknown/Other
9. Type of excavator:
10. Type of excavation equipment:
11. Type of work performed:
12. Was the One-Call Center notified?
12a. If Yes, specify ticket number:
12b. If this is a State where more than a single One-Call Center
exists, list the name of the One-Call Center notified:
13. Type of Locator:
14. Were facility locate marks visible in the area of excavation?
15. Were facilities marked correctly?
16. Did the damage cause an interruption in service?
16a. If Yes, specify duration of the interruption (hours)
17. Description of the CGA-DIRT Root Cause (select only the one predominant first level CGA-DIRT Root Cause and then, where
available as a choice, the one predominant second level CGA-DIRT Root Cause as well):
Root Cause:
- If One-Call Notification Practices Not Sufficient, specify:
- If Locating Practices Not Sufficient, specify:
- If Excavation Practices Not Sufficient, specify:
- If Other/None of the Above, explain:
G4 - Other Outside Force Damage - only one sub-cause can be selected from the shaded left-hand column
Other Outside Force Damage – Sub-Cause:
- If Nearby Industrial, Man-made, or Other Fire/Explosion as Primary Cause of Incident:
- If Damage by Car, Truck, or Other Motorized Vehicle/Equipment NOT Engaged in Excavation:
1. Vehicle/Equipment operated by:
- If Damage by Boats, Barges, Drilling Rigs, or Other Maritime Equipment or Vessels Set Adrift or Which Have Otherwise Lost
Form PHMSA F 7000.1 (Rev. 12-2012)
Page 9 of 14

<<<PAGE 19>>>

140298 Appendix H Accident Report 20120232 - 17205
Their Mooring:
2. Select one or more of the following IF an extreme weather event was a factor:
- Hurricane
- Tropical Storm
- Tornado
- Heavy Rains/Flood
- Other
- If Other, Describe:
- If Routine or Normal Fishing or Other Maritime Activity NOT Engaged in Excavation:
- If Electrical Arcing from Other Equipment or Facility:
- If Previous Mechanical Damage NOT Related to Excavation:
Complete Questions 3-7 ONLY IF the "Item Involved in Accident" (from PART C, Question 3) is Pipe or Weld.
3. Has one or more internal inspection tool collected data at the point of
the Accident?
3a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run:
- Magnetic Flux Leakage
Most recent year conducted:
- Ultrasonic
Most recent year conducted:
- Geometry
Most recent year conducted:
- Caliper
Most recent year conducted:
- Crack
Most recent year conducted:
- Hard Spot
Most recent year conducted:
- Combination Tool
Most recent year conducted:
- Transverse Field/Triaxial
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
4. Do you have reason to believe that the internal inspection was
completed BEFORE the damage was sustained?
5. Has one or more hydrotest or other pressure test been conducted
since original construction at the point of the 
- **truncated:** true
- **body characters:** 49814