# Failure Report- Columbia Gas Transmission 11/5/08

- **operation:** document
- **citation:** PHMSA FIR, Columbia Gas Transmission, 2008-11-05
- **title:** Failure Report- Columbia Gas Transmission 11/5/08
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-03-22
- **effective on:** 2008-11-05
- **summary:** Columbia Gas Transmission; Gas Transmission; PA; failure 2008-11-05; apparent cause: Material Failure - Cracking.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-columbia-gas-transmission-11508.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-columbia-gas-transmission-11508.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-columbia-gas-transmission-11508
- **source url:** https://www.phmsa.dot.gov/safety-reports/failure-report-columbia-gas-transmission-11508
**body:**

<<<PAGE 1>>>

Failure Investigation Report – Columbia Gas Transmission Rupture – Activity ID 122980
Principal Investigator Dave McMillan, PHMSA ER
Regional Director Byron Coy
Date of Report 2/18/2011
Subject Failure Investigation Report – Columbia Gas
Transmission Pipeline Rupture
Summary:
On November 5, 2008, at approximately 2:10 p.m., Columbia Line 1278 failed near Milford, PA, during an uprating
procedure to increase the pressure in the line from a reduced 800 psig operating pressure back to the original
1000 psig MAOP of the pipeline. Columbia had recently been given authorization by PHMSA to increase the
pressure in the pipeline back to the original MAOP after demonstrating that the integrity of the pipeline was
adequate. The pipeline failure resulted in a rupture that involved three lengths of pipe in a wetland area. The
failure occurred in the northern portion of the pipeline between Weber Road, Pike County, PA and Millrift, PA, 46
miles from the upstream compressor station at Easton, PA.
Pressure in the pipeline had been increased from 800 psig to 1000 psig in 50 psig increments. The operator then
began to reduce the pressure, and at 986 psig the pipeline failed. There were no injuries. There was no ignition of
gas. Valves were shut in both directions. No customers had service interrupted as a result of the pipeline failure.
The failure occurred in a rural area.
After the failed section was isolated, Columbia began its investigation of the incident and its remediation to
restore the line to service. Columbia installed 510 feet of new 14-inch, coated, steel pipeline in the wetland area
to replace the pipe that failed. On December 6, 2008, service was restored in the pipeline.
The failed section of pipe separated into four pieces. These pieces along with several other segment of the
pipeline were visually examined and analyzed by Kiefner and Associates, Inc. The lab tests results indicated that
the failure was caused by near-neutral-pH stress corrosion cracking (SCC). This has been noted in the company
reported apparent cause in Part G of Appendix 3.
Columbia pipeline 1278 runs from the Maryland/Pennsylvania state border to the Pennsylvania/NewYork state
border. The pipeline was constructed in 1948. Over several years beginning in 2002, the pipeline went through a
rehabilitation and replacement project due to a Corrective Action Order issued by the Department of
Transportation due to a previous incident with the pipeline and the discovery of extensive external corrosion. The
CAO required that the pressure in the pipeline be reduced from its original MAOP of 1000 psig to 600. The
pressure was subsequently approved by PHMSA to be increased to 800 psig based on the findings of an inspection
of the pipeline using an in-line inspection device.
122980 Summary DM CGT 2616 Easton 2901 Line 1278 I03 11052008.docx Page 1 of 4

<<<PAGE 2>>>

Failure Investigation Report – Columbia Gas Transmission Rupture – Activity ID 122980
Operator, Location, & Consequences
Date & Time of Failure: 11/5/2008
Commodity Released: Natural Gas
City/County & State: Milford Township, PA
OpID & Operator Name 2616 Columbia Gas Transmission Corporation
Unit # & Unit Name 2901 Easton Field Office-PA
SMART Activity #: 122980
Milepost / Location ½ mile at the intersection North of I84 and Route 6
Lat: 41.33269870
Long: 74.84080223
Type of Failure: Rupture
Fatalities: 0
Injuries 0
Description of area
impacted
Rural
Property damage Gas loss $164,000
Property Damage $1,685,692
122980 Summary DM CGT 2616 Easton 2901 Line 1278 I03 11052008.docx Page 2 of 4

<<<PAGE 3>>>

Failure Investigation Report – Columbia Gas Transmission Rupture – Activity ID 122980
System Details
The Line 1278 System traverses the eastern counties of Pennsylvania beginning in Lancaster County and ending in
Pike County. The Line 1278 system totals 146.5 miles, consisting of 14” and 20” pipe. Gas flow is predominantly
south to north.
Events Leading up to the Failure
Over several years beginning in 2002, the pipeline went through a rehabilitation and replacement project due to a
Corrective Action Order issued by the Department of Transportation due to a previous incident with the pipeline
and the discovery of extensive external corrosion. The CAO required that the pressure in the pipeline be reduced
from its original MAOP of 1000 psig to 600. The pressure was subsequently approved by PHMSA to be increased
to 800 psig based on the findings of an inspection of the pipeline using an in-line inspection device. On November
5, 2008, at approximately 2:10 p.m., Columbia Line 1278 failed near Milford, PA, during an uprating procedure to
increase the pressure in the line from a reduced 800 psig operating pressure back to the original 1000 psig MAOP
of the pipeline.
Emergency Response
Time
Event
950 psig.
Began leak patrols of pipeline segment, with a total of four patrols at 800, 850, 900, and
11:45 AM, 11/04/08
4:10 PM, 11/04/08 Attained 950 psig increment with pressure held overnight.
10:30 AM, 11/05/08 Began leak patrol of pipeline segment
1:58 PM Telemetry Record Rupture
2:14 PM Gas Controller notices pressure drop on SCADA
2:15 PM Smith dispatched to Weber Road facility
2:19 PM Weitzel contacted by Gas Control
2:23 PM Palmer returns call to Gas Control and reports personnel are responding
2:40 PM Telemetry indicates closure of Milford mainline valve
3:37 PM Compliance & Technical Training; incident reported to NRC (Report No. 889241).
3:48 PM Telemetry indicates closure of Weber Road mainline valve (launcher)
4:06 PM Palmer reports to Gas Control the site is secure and reports rupture location
5:45 PM Personnel leave the rupture site for the night
6:00 PM Gas Control conducts conference call to review events and status
5:45 AM, 11/06/08 Burnley arrives at site to preserve evidence and begin preliminary investigative process
pending arrival of Federal and third party investigators.
Note: Investigative process and repair activities continued 12 hours per day through to 11/24/08.
Summary of initial start-up plan and return-to-service, including preliminary safety measures
Columbia installed 510 feet of new 14-inch, coated, steel pipeline in the wetland area to replace the pipe that
failed. On December 6, 2008, service was restored in the pipeline.
122980 Summary DM CGT 2616 Easton 2901 Line 1278 I03 11052008.docx Page 3 of 4

<<<PAGE 4>>>

Failure Investigation Report – Columbia Gas Transmission Rupture – Activity ID 122980
Investigation Findings & Contributing Factors
The failed section of pipe separated into four pieces. These pieces along with several other segment of the
pipeline were visually examined and analyzed by Kiefner and Associates, Inc. The lab tests results indicated that
the failure was caused by near-neutral-pH stress corrosion cracking (SCC). This has been noted in the company
reported apparent cause in Part G of Appendix 3.
Appendices
1
Photo Documentation
2 NRC Report
3 CGT Incident Report
4 CGT Pressure Test Chart
5 CGT Rupture Map
6 Line 1278 and Line K
122980 Summary DM CGT 2616 Easton 2901 Line 1278 I03 11052008.docx Page 4 of 4

<<<PAGE 5>>>

Appendix 1 - Photos - 122980
Pipeline Failure Investigation Report
Figure 1: Severed 14.9 foot section of pipeline
Figure 2: Severed 37.1 foot section of pipeline
Page 1 of 5

<<<PAGE 6>>>

Appendix 1 - Photos - 122980
Pipeline Failure Investigation Report
Figure 3: Severed 9 foot section of pipeline
Figure 4: Severed 4.7 foot section of pipeline, piece 4
Page 2 of 5

<<<PAGE 7>>>

Appendix 1 - Photos - 122980
Pipeline Failure Investigation Report
Figure 5: End of severed 37.1 foot section of pipeline
Figure 6: End of 21.7 foot section of pipe in swamp
Page 3 of 5

<<<PAGE 8>>>

Appendix 1 - Photos - 122980
Pipeline Failure Investigation Report
Figure 7: Bent 21.7 foot section of pipe in swamp
Figure 8: Ruptured pipe in swamp
Page 4 of 5

<<<PAGE 9>>>

Appendix 1 - Photos - 122980
Pipeline Failure Investigation Report
Figure 9: Piece 4 exhibiting corrosion
Page 5 of 5

<<<PAGE 10>>>

Page 1 of 2
NATIONAL RESPONSE CENTER 1-800-424-8802
*** For Public Use ***
Information released to a third party shall comply with any
applicable federal and/or state Freedom of Information and Privacy Laws
Incident Report # 889241
INCIDENT DESCRIPTION
*Report taken at 15:46 on 05-NOV-08
Incident Type: PIPELINE
Incident Cause: UNKNOWN
Affected Area:
The incident occurred on 05-NOV-08 at 14:10 local time.
Affected Medium: AIR ATMOSPHERE
____________________________________________________________________________
SUSPECTED RESPONSIBLE PARTY
Organization: COLUMBIA GAS TRANSMISSION
CHARLESTON, WV 25314
Official Material Name: NATURAL GAS
Type of Organization: PRIVATE ENTERPRISE
____________________________________________________________________________
INCIDENT LOCATION
RT. 6 AND INTERSTATE I-84 County: PIKE
State: PA
Section: N/A Township: N/A Range: N/A
____________________________________________________________________________
RELEASED MATERIAL(S)
CHRIS Code: ONG Also Known As:
Qty Released: 0 UNKNOWN AMOUNT
____________________________________________________________________________
DESCRIPTION OF INCIDENT
THE CALLER STATED THAT A PIPELINE (#1278) WAS IN THE PROCESS RAISING THE PSI AND A
LEAK WAS DETECTED CAUSING A FIRE TO SHOOT UP FROM THE PIPELINE. NO INJURIES OR
FATALITIES HAVE BEEN REPORTED. THE FIRE HAS BEEN EXTINGUISHED AND THE VALVES WERE
SHUT OFF SECURING THE RELEASE. NO CUSTOMER SERVICE WAS LOST IN THE INCIDENT. THE
CAUSE OF THE LEAK IS STILL UNDER INVESTIGATION.
____________________________________________________________________________
INCIDENT DETAILS
Pipeline Type: TRANSMISSION
DOT Regulated: YES
Pipeline Above/Below Ground: ABOVE
Exposed or Under Water: NO
Pipeline Covered: UNKNOWN
____________________________________________________________________________
DAMAGES
Fire Involved: YES Fire Extinguished: YES
INJURIES: NO Hospitalized: Empl/Crew: Passenger:
FATALITIES: NO Empl/Crew: Passenger: Occupant:
EVACUATIONS: NO Who Evacuated: Radius/Area:
Damages: NO
Length of Direction of
Closure Type Description of Closure Closure Closure
Air:
N
Road: N
Major
Artery:
N
Waterway: N
Track: N
http://www.nrc.uscg.mil/reports/rwservlet?standard
web+inc
_
_
seq=889241
3/15/2011

<<<PAGE 11>>>

Page 2 of 2
Passengers Transferred: NO
Environmental Impact: NO
Media Interest: NONE Community Impact due to Material:
____________________________________________________________________________
REMEDIAL ACTIONS
RELEASE SECURED, FIRE EXTINGUISHED WHEN VALVE WAS CLOSED
Release Secured: YES
Release Rate:
Estimated Release Duration:
____________________________________________________________________________
WEATHER
Weather: PARTLY CLOUDY, ºF Wind speed: 5 MPH
____________________________________________________________________________
ADDITIONAL AGENCIES NOTIFIED
Federal: NONE
State/Local: FIRE, POLICE
State/Local On Scene: FIRE, POLICE
State Agency Number: NONE
____________________________________________________________________________
NOTIFICATIONS BY NRC
ATLANTIC STRIKE TEAM (MAIN OFFICE)
05-NOV-08 15:54
USCG ICC (ICC ONI)
05-NOV-08 15:54
DOT CRISIS MANAGEMENT CENTER (MAIN OFFICE)
05-NOV-08 15:54
U.S. EPA III (MAIN OFFICE)
05-NOV-08 15:56
FLD INTEL SUPPORT TEAM PHILADELPHIA (MAIN OFFICE)
05-NOV-08 15:54
USCG COMMAND CENTER (MAIN OFFICE)
05-NOV-08 15:55
NATIONAL INFRASTRUCTURE COORD CTR (MAIN OFFICE)
05-NOV-08 15:54
NJ STATE POLICE (MARINE SERVICES BUREAU)
05-NOV-08 15:54
NOAA RPTS FOR PA (MAIN OFFICE)
05-NOV-08 15:54
NATIONAL RESPONSE CENTER HQ (MAIN OFFICE)
05-NOV-08 15:55
BUREAU TOXIC SUBSTANCE R. WILBURN (MAIN OFFICE)
05-NOV-08 15:54
NJ DEP POC: DUTY OFFICER (MAIN OFFICE)
05-NOV-08 15:54
PA EMERG MGMT AGCY (MAIN OFFICE)
05-NOV-08 15:54
____________________________________________________________________________
ADDITIONAL INFORMATION
THE CALLER HAD NO ADDITIONAL INFORMATION.
___________________________________________________________________________
*** END INCIDENT REPORT # 889241 ***
http://www.nrc.uscg.mil/reports/rwservlet?standard
web+inc
_
_
seq=889241
3/15/2011

<<<PAGE 12>>>

122980 Appendix 3 Incident Report
NOTICE: This report is required by 49 CFR Part 191. Failure to report can result in a civil penalty not to exceed $25,000 for each violation Form Approved
for each day that such violation persists except that the maximum civil penalty shall not exceed $500,000 as provided in 49 USC 1678. OMB No. 2137-0522
U.S. Department of Transportation
Research and Special Programs
Administration
INCIDENT REPORT - GAS TRANSMISSION AND
GATHERING SYSTEMS
Report Date
No.
(DOT Use Only)
INSTRUCTIONS
Important: Please read the separate instructions for completing this form before you begin. They clarify the
information requested and provide specific examples. If you do not have a copy of the instructions, you
can obtain one from the Office Of Pipeline Safety Web Page at http://ops.dot.gov .
PART A – GENERAL REPORT INFORMATION
Nearest street or road
City and County or Parrish
a.
b.
c.
State and Zip Code
d. Mile Post/Valve Station
e. Survey Station No.
f. Latitude: Longitude:
(if not available, see instructions for how to provide specific location)
g. Class location description
Onshore: Class 1 Class 2 Class 3 Class 4
Offshore: Class 1 (complete rest of this item)
Area ___________________ Block # ___________
State / / or Outer Continental Shelf
h. Incident on Federal Land other than Outer Continental Shelf
Yes No
i. Is pipeline Interstate Yes No
4. Type of leak or rupture
Leak: Pinhole Connection Failure (complete sec. F5)
Puncture, diameter (inches)
Rupture: Circumferential – Separation
Longitudinal – Tear/Crack, length (inches)
Propagation Length, total, both sides (feet)
N/A
Other:
Operator Name and Address
Original Report Supplemental Report Final Report
a. Operator's 5-digit Identification Number (when known) / /
b. If Operator does not own the pipeline, enter Owner’s 5-digit Identification Number (when known) / /
c. Name of Operator ______________________________ _______________________________________________________
d. Operator street address ________________________________________________________________________________________
e. Operator address _______________________
City, County or Parrish, State and Zip Code
2. Time and date of the incident
/ / / / / / / /
hr. month day year
3. Location of incident
5. Consequences (check and complete all that apply)
a. Fatality Total number of people: / /
Employees: / / General Public: / /
Non-employee Contractors: / /
b. Injury requiring inpatient
hospitalization Total number of people: / /
Employees: / / General Public: / /
Non-employee Contractors: / /
c. Property damage/loss (estimated) Total $
Gas loss $ Operator damage $
Public/private property damage $
d. Release Occurred in a ‘High Consequence Area’
e. Gas ignited – No explosion f. Explosion
g. Evacuation (general public only) / / people
Reason for Evacuation:
Emergency worker or public official ordered, precautionary
Threat to the public Company policy
6. Elapsed time until area was made safe:
/ / hr. / / min.
7. Telephone Report
/ / / / / / / /
NRC Report Number month day year
8. a. Estimated pressure at point and time of incident:
PSIG
b. Max. allowable operating pressure (MAOP): PSIG
c. MAOP established by 49 CFR section:
192.619 (a)(1) 192. 619 (a)(2) 192. 619 (a)(3)
192.619 (a)(4) 192. 619 (c)
d. Did an overpressurization occur relating to the incident? Yes No
PART B – PREPARER AND AUTHORIZED SIGNATURE
Area Code and Telephone Number
(type or print) Preparer's Name and Title
Preparer's E-mail Address Area Code and Facsimile Number
Date Area Code and Telephone Number
Authorized Signature (type or print) Name and Title
Form RSPA F 7100.2 ( 01-2002 ) OPS Data Facsimile Page 1 of 3
1 of 3

<<<PAGE 13>>>

122980 Appendix 3 Incident Report
PART C - ORIGIN OF THE INCIDENT
1. Incident occurred on
Transmission System
Gathering System
Transmission Line of Distribution System
2. Failure occurred on
Body of pipe Pipe Seam
Joint
Component
Other:
3. Material involved (pipe, fitting, or other component)
Steel
Plastic (If plastic, complete all items that apply in a-c)
Plastic failure was: a.ductile b.brittle c.joint failure
Material other than plastic or steel: _________
4. Part of system involved in incident
Pipeline Regulator/Metering System
Compressor Station Other:
5. Year the pipe or component which failed was installed: / /
PART D – MATERIAL SPECIFICATION (if applicable) PART E – ENVIRONMENT
1. Nominal pipe size (NPS) / / in.
2. Wall thickness / / in.
3. Specification SMYS / /
4. Seam type
5. Valve type
6. Pipe or valve manufactured by in year / /
1. Area of incident In open ditch
Under pavement Above ground
Under ground Under water
Inside/under building Other:
2. Depth of cover: inches
PART F – APPARENT CAUSE
Important: There are 25 numbered causes in this section. Check the box to the left of the primary
cause of the incident. Check one circle in each of the supplemental items to the right of or below the
cause you indicate. See the instructions for this form for guidance.
F1 – CORROSION If either F1 (1) External Corrosion, or F1 (2) Internal Corrosion is checked, complete all subparts a – e.
a. Pipe Coating
b. Visual Examination
c. Cause of Corrosion
Bare
Galvanic Stray Current
1. External Corrosion
Localized Pitting
Coated
General Corrosion
Improper Cathodic Protection
Other: ____________________
Microbiological
Stress Corrosion Cracking
Other: ____________________
2. Internal Corrosion
d. Was corroded part of pipeline considered to be under cathodic protection prior to discovering incident?
No Yes, Year Protection Started: / /
e. Was pipe previously damaged in the area of corrosion?
No Yes, How long prior to incident: / / years / / months
F2 – NATURAL FORCES
3. Earth Movement => Earthquake Subsidence Landslide Other:
4. Lightning
5. Heavy Rains/Floods => Washouts Flotation Mudslide Scouring Other:
6. Temperature => Thermal stress Frost heave Frozen components Other:
7. High Winds
F3 - EXCAVATION
8. Operator Excavation Damage (including their contractors) / Not Third Party
9. Third Party Excavation Damage (complete a-d)
a. Excavator group
General Public Government Excavator other than Operator/subcontractor
b. Type: Road Work Pipeline Water Electric Sewer Phone/Cable Landowner Railroad
Other:
c. Did operator get prior notification of excavation activity?
No Yes: Date received: / / mo. / / day / / yr.
Notification received from: One Call System Excavator Contractor Landowner
d. Was pipeline marked?
No Yes (If Yes, check applicable items i – iv)
i. Temporary markings: Flags Stakes Paint
ii. Permanent markings: Yes No
iii. Marks were (check one) Accurate Not Accurate
iv. Were marks made within required time? Yes No
F4 – OTHER OUTSIDE FORCE DAMAGE
10. Fire/Explosion as primary cause of failure => Fire/Explosion cause: Man made Natural
11. Car, truck or other vehicle not relating to excavation activity damaging pipe
12. Rupture of Previously Damaged Pipe
13. Vandalism
2 of 3
Form RSPA F 7100.2 ( 01-2002 ) Page 2 of 3

<<<PAGE 14>>>

122980 Appendix 3 Incident Report
F5 – MATERIAL AND WELDS
Material
14. Body of Pipe => Dent Gouge Wrinkle Bend Arc Burn Other:
15. Component => Valve Fitting Vessel Extruded Outlet Other:
16. Joint => Gasket O-Ring Threads Other:
Weld
17. Butt => Pipe Fabrication Other:
18. Fillet => Branch Hot Tap Fitting Repair Sleeve Other:
19. Pipe Seam => LF ERW DSAW Seamless Flash Weld
HF ERW SAW Spiral Other:
Complete a-g if you indicate any cause in part F5.
a. Type of failure:
Construction Defect => Poor Workmanship Procedure not followed Poor Construction Procedures
Material Defect
b. Was failure due to pipe damage sustained in transportation to the construction or fabrication site? Yes No
c. Was part which leaked pressure tested before incident occurred? Yes, complete d-g No
d. Date of test: / / mo. / / day / / yr.
e. Test medium: Water Natural Gas Inert Gas Other:
f. Time held at test pressure: / / hr.
g. Estimated test pressure at point of incident: PSIG
F6 – EQUIPMENT AND OPERATIONS
20. Malfunction of Control/Relief Equipment => Valve Instrumentation Pressure Regulator Other:
21. Threads Stripped, Broken Pipe Coupling => Nipples Valve Threads Mechanical Couplings Other:
22. Ruptured or Leaking Seal/Pump Packing
23. Incorrect Operation
a. Type: Inadequate Procedures Inadequate Safety Practices Failure to Follow Procedures Other:
b. Number of employees involved who failed post-incident drug test: / / Alcohol test: / /
c. Were most senior employee(s) involved qualified? Yes No d. Hours on duty: / /
F7 – OTHER
24. Miscellaneous, describe:
25. Unknown
Investigation Complete Still Under Investigation (submit a supplemental report when investigation is complete)
PART G – NARRATIVE DESCRIPTION OF FACTORS CONTRIBUTING TO THE EVENT (Attach additional sheets as necessary)
Form RSPA F 7100.2 ( 01-2002 ) OPS Data Facsimile Page 3 of 3
3 of 3

<<<PAGE 15>>>

122980 Appendix 4 Columbia Pipeline Pressure test Graph
1 of 1

<<<PAGE 16>>>

122980 Appendix 5 - Columbia Gas Line 1278 Rupture map
1 of 1

<<<PAGE 17>>>

122980 Appendix 6 - Line 1278 and K
Columbia Gas Transmission Line 1278 and Line K
02/09/2011 02/09/2011
MP 7339+85 ‐ 11/05/2008
Failure Location in Pike Co.
MP 7338 17 7343 27 Sparrowbush
MP 7338+17 – 7343+27
Section C CS
replaced 510 ft with 14” pipe
Section A Section B
Hellertown CS
Easton CS Milford CS
Line K
Line 1278
Quakertown
Bangor Millrift
g g
Stroudsburg Bushkill Weber Road
PA‐NY State Line
Not Included in CAO
Replaced approximately 11 miles 14” pipe with 14” coated pipe Replaced approximately 42 miles of 14” pipe with 20” coated pipe “CGT Anticipates construction to
replace this section starting in May
2011 and ending in September 2011.
NGT&S commits to maintaining the
operating pressure at a restricted level
of 800 psig, as established by the CAO,
from Weber Road in PA to the
CAO Section A Quakertown M&R Station to the Hellertown M&R Station
Sparrowbush Compressor Station in
NY. This section contains the
CAO Section B Easton Compressor Station to the Delaware River Crossing at the PA‐NY State Line
remaining 14” bare pipe along Lines
CAO Section C All Uncoated Segments from Quakertown to Hellertown and from Easton to the PA‐NY State Line
CAO Section C All Uncoated Segments from Quakertown to Hellertown and from Easton to the PA NY State Line 1278 and Line K. NGT&S commits to
1278 d Li K NGT&S i
replace the remaining bare pipe in PA;
approximately 12 miles.” According to
Columbia letter dated November 30,
2010.
CPF# 1‐2002‐1004H
1 of 1