# Failure Report- Enbridge Pipelines 5/17/13

- **operation:** document
- **citation:** PHMSA FIR, Enbridge Pipelines, LLC, 2013-05-17
- **title:** Failure Report- Enbridge Pipelines 5/17/13
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2014-02-24
- **effective on:** 2013-05-17
- **summary:** Enbridge Pipelines, LLC; Hazardous Liquid; OK; failure 2013-05-17; apparent cause: Internal Corrosion.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-enbridge-pipelines-51713.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-enbridge-pipelines-51713.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-enbridge-pipelines-51713
- **source url:** https://www.phmsa.dot.gov/safety-reports/failure-report-enbridge-pipelines-51713
**body:**

<<<PAGE 1>>>

DOT U.S. Department of Transportation
PHMSA Pipelines and Hazardous Materials Safety Administration
OPS Office of Pipeline Safety
Southwest Region
Principal Investigator Molly Atkins
Region Director R.M. Seeley
Date of Report 2/24/2014
Subject Failure Investigation Report – Enbridge Pipelines, LLC, Tank 3013 24-
inch Fill Line failure in Cushing, OK
Operator, Location, & Consequences
Date of Failure 5/17/20131
Commodity Released West Texas Intermediate Crude Oil
City/County & State Cushing, Lincoln County, OK
OpID & Operator Name 31947, Enbridge Pipelines, LLC
Unit # & Unit Name 22464, Cushing Tank Farm
SMART Activity # 143591
Milepost/Location Cushing, OK, Tank Farm
Type of Failure Internal Corrosion, Microbiologically Influenced (MIC)
Fatalities 0
Injuries 0
Description of area
impacted
No off-site impacts; however, there were on-site impacts to vegetation,
containment ponds, and small animals/reptiles
Property Damage $13,844,274 (Final Report)2
1 Event occurred on May 17, 2013, but was not discovered or reported until May 18, 2013.
2 Enbridge Pipelines, LLC. (Revision: 12/18/2013). 7000.1 Report 20130208.

<<<PAGE 2>>>

Failure Investigation Report – Enbridge Cushing Tank Farm
May 17-18, 2013
Executive Summary
On the afternoon of May 18, 2013, Enbridge Pipelines, LLC (Enbridge), reported a release of
approximately 2,500 barrels of crude oil from its Tank 3013 fill line into on-site containment ponds. The
leak originated on the Tank 3013 fill line located outside of tank containment dike areas in a drainage
swale on the morning of Friday, May 17, 2013. The leak—which was not visible at the surface due to
vegetation in the drainage swale—was not identified until an odor was detected by operations
personnel, prompting further investigation into line balance calculations and site conditions. The leak
was observed and confirmed at 1:00 p.m. CT on Saturday, May 18, 2013.
Tank 3013 and its fill line were deinventoried and isolated, a unified command response center was set
up, and clean-up began. The Tank 3013 fill line was excavated to investigate the source of the leak,
which was found on the bottom of the pipe at the low point of the fill line. The failed pipe section was
removed and transported to a metallurgical laboratory for examination and testing. The Tank 3013 fill
line was replaced in its entirety. In December 2013, after the new line was tested, Tank 3013 and the fill
line were returned to service.
There were no injuries, fatalities, fires, explosions, or off-site impacts as a result of this leak. On-site
impacts were limited to vegetation, soil, and retainment pond areas. Approximately 2,246 barrels of
crude oil were released and 2,071 barrels were recovered. Forensic metallurgical analysis determined
that the immediate cause of failure was internal corrosion.
System Details
The Cushing Tank Farm is operated by Enbridge, which has a terminal located in Cushing, Oklahoma.
The Enbridge terminal is 2 miles long and comprised of three operating areas: the North, Central, and
South Terminals. The South Terminal is located in Lincoln County, Oklahoma, while the Central and
North Terminals are in Payne County, Oklahoma. The Enbridge terminal currently has 89 breakout
tanks, as well as several tanks in various stages of inspection or demolition and additional tanks
currently under construction. The tally of 89 tanks was taken at the time of the most recent inspection
and included 28 breakout tanks in the South Terminal, 34 breakout tanks in the Central Terminal, and 27
breakout tanks in the North Terminal. The terminal is operated by a local control room that is manned
24 hours, seven days per week.
Events Leading up to the Failure
Tank 3013 and the connecting tank fill lines were purchased by Enbridge from Skelly Oil Company in
1980. The tank has operated in crude oil service from the time of purchase to the present. Tank 3013
was out of service for an American Petroleum Institute (API) 653 internal inspection from May 2011
through May 8, 2013, when the tank roof was floated by injection of 50,000 barrels of oil. On May 10,
2013, the tank level radar gage was recalibrated, causing the calculated tank volume to increase by
1,879 barrels although no additional oil was added to the tank. Tank 3013 was refilled on May 14, 2013,
after which point no additional withdrawals or injections were made and the tank valves remained in
their normal open position for “ready for service” mode until the time of the release.
Page 2 of 8

<<<PAGE 3>>>

Failure Investigation Report – Enbridge Cushing Tank Farm
May 17-18, 2013
On Friday, May 17, 2013, maintenance pigging was performed on a line that is part of the Basin Pipeline
System, owned by Plains All American Pipeline, L.P. Coordination of activities related to the interface of
that pipeline within the Enbridge Cushing Terminal was monitored by the controller on duty during the
day shift. Enbridge outside technicians worked with the Plains All American Pipeline personnel who
were performing the pigging and line-fill activities in the North Terminal area.
On Friday, May 17, 2013, a product movement alarm was acknowledged for Tank 3013 at 14:39:09
supervisory control and data acquisition (SCADA) time. The alarm noted a volume of
(b) (7)(F)
. Despite the controller’s acknowledgment of the
alarm, it was not cleared at that time. No further product movement alarms were received for Tank
3013. Because there was not a second alarm during that shift, and because the controller thought
the first movement alarm was related to weather and had cleared itself, the alarm remained in the
stack and was not discussed in the shift hand-off (SHO).
The SHO from night shift to day shift on Saturday, May 18, 2013, did not mention anything about Tank
3013. The daily balance performed at about 7:30 a.m. Central Time (CT) noted an imbalance of
approximately the same value as the tank bottom adjustment for Tank 3013; the coincidental similarity
was attributed to the accounting entry rather than a possible leak because the controller did not have
any indication of abnormal conditions in Tank 3013. The subsequent balance check performed Saturday
morning caused the controller to make a mental note of the imbalance, which he decided to investigate
further if it did not return to normal after lunch.
Around 1:00 p.m. CT on Saturday, May 18, 2013, an outside technician was returning to the control
room with lunch when he detected an odor. The outside technician communicated this information to
the controller, who instructed the outside technician to investigate the Tank 3013 area while he began
further review of the balance information and trending data. The outside technician reported to the
controller that there were no visible signs of a leak in the vicinity of Tank 3013. However, the controller
asked the outside technician to continue looking and indicated that the issue might be related to Tank
3013. By this time the product was just becoming visible on the surface of the dirt bank and the
containment pond, into which it was flowing. The following aerial view depicts the site layout:
Page 3 of 8

<<<PAGE 4>>>

Failure Investigation Report – Enbridge Cushing Tank Farm
May 17-18, 2013
Tank 3013 Site Layout
Shortly after 1:00 p.m. CT, operations personnel confirmed that oil was leaking from the 24-inch-
diameter line connected to Tank 3013 at a low point in the line where it crossed below a drainage ditch.
Oil was found to have migrated from the drainage ditch into a nearby containment pond and then into a
second, larger containment pond via a connecting drainage creek. Upon confirmation of the leak, all
connecting tank and manifold valves were closed to stop the outflow of oil. The outside technician
closed the Tank 3013 isolation valve and provided the controller with leak confirmation on the Tank
3013 fill line. The controller initiated spill response notifications and set up the incident command at
the Cushing Terminal office location.
Emergency Response
Operator Response
The operator identified the release shortly after 1:00 p.m. CT on May 18, 2013, after which the operator
initiated its spill response plan and recovered approximately 2,071 barrels of the 2,246 barrels released.
All product was contained onsite and within planned containment areas. The clean-up operations were
carried out in extremely severe weather, yet did not result in injury or further release of product.
The operator reported the release to the National Response Center (NRC) Office 1047579 at 2:33 p.m.
CT on May 18, 2013. The original release volume was estimated at 1,500 barrels (Appendix B).
PHMSA Response
PHMSA dispatched an accident investigator to the site. The accident investigator arrived on Sunday,
May 19, 2013, and remained onsite until Wednesday, May 22, 2013.
Investigation Details
PHMSA’s investigation included a detailed review of the events and associated procedures related to
internal corrosion prevention, alarm response, and terminal balancing activities, as well as the
numerous control room processes related to leak detection and suspected leak investigation.
Page 4 of 8

<<<PAGE 5>>>

Failure Investigation Report – Enbridge Cushing Tank Farm
May 17-18, 2013
Terminal piping leak detection is managed by monitoring flow rates, pressures, and tank volumes, as
supplemented by the SCADA alarm system. In addition, a tank volume balance procedure is used to
identify imbalances in tank levels that could indicate product loss either directly from a tank or from the
associated piping.
The SCADA system was designed and is managed by the Enbridge Pipeline Control Systems and Leak
Detection group in Edmonton, Canada; however, various inputs to the system are set by operations
technicians in Cushing, Oklahoma.
(b) (7)(F)
—which is set when no tank movement is anticipated
and will trigger an alarm if the calculated tank movement exceeds the set value.
(b) (7)(F)
(b) (7)(F)
. This
volume was chosen due to the size of the tank (capacity greater than 100,000 barrels) and to avoid
nuisance alarms during weather events due to shifting of floating roofs and product movement inside
the tank, which can generate barrel movement volume ranging from 200 to 300 barrels. Fluctuation of
the floating roof during weather events can be an inch or more. If the volume is not set high enough to
account for such movements the tank movement alarms would not be meaningful during adverse
weather events. In addition to tank balancing, other leak detection methods include visual checks and
surveillance by camera. These methods are intended to work in concert with the tank alarms as a
comprehensive set of actions designed to detect leaks as early as possible.
Terminal monitoring by outside technician personnel includes a drive-through of the facility on a two-
hour cycle, use of the Commodity Movement Tracking System for volumetric measurements on both a
two-hour and a daily basis, and surveillance cameras installed inside the tank areas.
Metallurgical Examination
Following initial clean-up, an 8.5-foot section of the failed pipe was sent to Det Norske Veritas
Germanischer Lloyd (DNVGL) in Columbus, Ohio, for metallurgical analysis. A summary of DNVGL’s
findings may be found later in this section, and the complete metallurgical report is provided in
Appendix D.
DNVGL’s report indicated that the leak in the 24-inch pipe originated from a hole 1.4 inches long
and 0.8 inches wide (circumference) that was located beneath black deposits in an area of discrete
internal corrosion on the bottom of the pipe. In total, there were four corrosion pits found in the
pipe. The leak hole was 100 percent through the pipe wall, while the remaining three pits were
between 35 percent and 53 percent through the pipe wall. There was no evidence of general
Page 5 of 8

<<<PAGE 6>>>

Failure Investigation Report – Enbridge Cushing Tank Farm
May 17-18, 2013
corrosion or pitting on the external surface of the pipe, and the pipe coating was well adhered in
areas away from the leak site.
The pipeline steel’s tensile properties, Charpy properties, and chemical composition were shown to
meet the API 5LX Grade X70 line pipe steel requirements in place at the time of manufacture. The
average wall thickness measured was 0.284 inches, slightly greater than the specified value of 0.281
inches shown on the construction drawings.
High to very high concentrations of aerobic, anaerobic, acid-producing, sulfate-reducing, and iron-
related bacteria were detected on the inside surface of the pipe at the leak site. Additionally, low
to moderate concentrations of all five bacteria types were detected in deposits removed from the
leak location in an area with no significant corrosion. The presence of microorganisms on the pipe
surfaces, combined with higher levels of bacteria present at the leak site, indicates that
microbiologically induced corrosion (MIC) is likely the primary corrosion mechanism.
DNVGL’s analysis determined that the leak occurred as a result of internal corrosion that
propagated through the pipe wall at the 6:17 o’clock position. The internal corrosion was likely
exacerbated due to the accumulation of deposits/sediments caused by non-flowing conditions.
There was no indication that the failure involved a mechanical (i.e. strength-related) component.
Figure 1 provides a field photograph of the failure location and a close-up view of the pipe leak location:
Findings & Contributing Factors
Enbridge completed a detailed incident investigation and shared their findings with PHMSA, including
the following analysis of the events that delayed the detection of the release (Appendix E). These
events corroborated the findings of on-site interviews of operations personnel conducted by PHMSA
immediately after the release. The following is a summary of findings from the operator’s analysis of
the delayed detection:
Page 6 of 8

<<<PAGE 7>>>

Failure Investigation Report – Enbridge Cushing Tank Farm
May 17-18, 2013
A tank movement alarm was received approximately 2.5 hours after the leak began when a tank
movement limit of 310 barrels was exceeded. This was mistakenly believed to be a false alarm due to
normal variations in calculated volume caused by weather effects.
Tank balancing calculations conducted every 2 hours on May 17-18 also revealed unexplained losses in
tank volume. These were not acted upon, however, because the utilized volume limit was not exceeded
in any of the 2-hour time periods.
Finally, a 1,573-barrel-loss in tank volume was recorded by the 24-hour tank balance procedure
conducted the morning of May 18. This also was not acted upon, as it was mistakenly believed to be
related to a previous instrumentation calibration correction.
These issues allowed a significantly larger volume of crude oil to be released than otherwise would if the
SCADA information had been correctly interpreted and acted upon.
In their investigation findings, Enbridge also provided a summary of the events that took place on the
day of the intial leak and the actions undertaken following the discovery of the leak. Their findings
detailed actions Enbridge personnel should have taken in reponse to the original leak on May 17, 2013,
and identified potential shortcomings in their procedures. These findings included a detailed
investigation regarding why the leak went undetected for nearly 24 hours, resulting in a significantly
increased volume release.
Conclusions
PHMSA concurs with the Enbridge investigation team determination that:
1. The primary cause of the leak was the presence of an undetected internal corrosion defect
that extended through the pipe wall and produced a substantial crude oil release that went undetected
for almost 24 hours; and
2. The consequences increased in severity due to misinterpretation of SCADA alarm and tank
balance information, thereby delaying the discovery of the real reason for loss of product from the tank.
The Enbridge investigation team identified the following items that may also have contributed to this
incident:
1. Existing procedures to assess alarm conditions provide Cushing CC operations technicians
with little guidance regarding how such assessments should be conducted;
2. A large number of nuisance alarms went off in the control center at the same time that the
tank movement alarm was received, which may have partially obscured the importance of that
alarm;
3. (b) (7)(F)
Page 7 of 8

<<<PAGE 8>>>

Failure Investigation Report – Enbridge Cushing Tank Farm
May 17-18, 2013
4. Cushing CC operations technicians do not have dedicated, 24-hour support staff available to
help evaluate and manage alarms;
5. No documented guidance was provided to operations regarding when inhibition and/or
flushing should be used as mitigation strategies;
6. Heavy vegetation in site drainage ditches and around ponds may have prevented early
detection during routine drive-around site inspections; and
7. An undetected maintenance issue with an underflow pipe flume (a large corrosion hole in the
pipe) allowed oil to migrate out of the upper pond, through a second drainage ditch, and into a
lower pond, resulting in increased contamination and clean-up costs.
As a result of the Enbridge investigation team’s key findings, the following areas received
recommendations and procedural improvements aimed at the prevention of similar incidents in the
future:
• Procedures for locating, inspecting, and mitigating corrosion-prone facilities’ piping segments;
• Terminal operating practices related to infrequently used piping;
• Tank movement tracking and terminal alarm systems related to leak detection; and
• Control center procedures regarding recognizing and assessing leak-related alarms.
The procedures related to the prevention of internal corrosion within terminal piping were expanded to
incorporate the lessons learned from this accident. Additionally, the replacement tank fill line piping
was installed with an internal coating in order to minimize the likelihood of interior corrosion.
Appendices
A Enbridge Cushing Terminal Map
B NRC Report
C Operator Accident/Incident Report to PHMSA
D Laboratory Analysis PP07 8181
E Operator Incident Investigation Report and Findings
Page 8 of 8

<<<PAGE 9>>>

Appendix A
Enbridge Cushing Terminal Map
This document is on file at PHMSA

<<<PAGE 10>>>

NATIONAL RESPONSE CENTER 1-800-424-8802
*** For Public Use ***
Information released to a third party shall comply with any
applicable federal and/or state Freedom of Information and Privacy Laws
Incident Report # 1047579
INCIDENT DESCRIPTION
*Report taken at 15 : 33 on 18- MAY - 13
Incident Type: FIXED
Incident Cause : EQUIPMENT FAILURE
Affected Area :
The incident occurred on 18-MAY-13 at 14:00 local time.
Affected Medium: OTHER CONTAINMENT ON-SITE
SUSPECTED RESPONSIBLE PARTY
Organization: ENBRIDGE
CUSHING, OK 74023
Type of Organization: PRIVATE ENTERPRISE
INCIDENT LOCATION
2101 S. LINWOOD AVE . County: LINCOLN
City : CUSHING State : OK Zip: 74023
WITHIN CUSHING TERMINAL SOUTH TANK FARM
RELEASED MATERIAL(S)
Official Material Name: OIL: CRUDE
CHRIS Code: OIL
Also Known As:
Qty Released: 1500 BARREL(S)
DESCRIPTION OF INCIDENT
A TRUNK LINE GOING TO A TANK ON THE PROPERTY IS LEAKING, THE LEAK HAS MIGRATED
OUTSIDE OF A BERM AND IS SETTLING INTO A CONTAINMENT POND . CAUSE IS UNKNOWN . LINE
WILL BE SEALED, DUG UP AND REPLACED.
INCIDENT DETAILS
Package: N/A
Building ID:
Type of Fixed Object: TANK FARM
Power Generating Facility: UNKNOWN
Generating Capacity:
Type of Fuel :
NPDES:
NPDES Compliance: UNKNOWN
Fire Involved: NO
INJURIES: NO
FATALITIES: NO
EVACUATIONS : NO
Damages: NO
DAMAGES
Fire Extinguished: UNKNOWN
Hospitalized:
Empl/Crew:
Who Evacuated:
Empl/Crew:
Passenger:
Radius/Area:
Passenger :
Occupant :
Length of
Closure
Direction of
Closure
Closure Type Description of Closure
Air: N
Road : N
Waterway: N
Major
Artery : N

<<<PAGE 11>>>

Track : N
Passengers Transferred : NO
Environmental Impact : UNKNOWN
Media Interest : NONE Community Impact due to Material:
REMEDIAL ACTIONS
EVACUATING LINE, DIGGING UP LINE, CLEANUP UNDERWAY, ALL MATERIAL CONTAINED ON-SITE
Release Secured: YES
Release Rate :
Estimated Release Duration:
WEATHER
ADDITIONAL AGENCIES NOTIFIED
Federal :
State/Local: OK cc
State/Local On Scene:
State Agency Number :
NOTIFICATIONS BY NRC
COLORADO INFO ANALYSIS CENTER (FUSION CENTER)
18-MAY-13 15:39
DHS PROTECTIVE SECURITY ADVISOR (PSA DESK)
18-MAY- 13 15 : 39
DOT CRISIS MANAGEMENT CENTER (MAIN OFFICE)
18 - MAY - 13 15 : 39
U.S. EPA VI (MAIN OFFICE)
18-MAY-13 15:45
GULF STRIKE TEAM (MAIN OFFICE)
18- MAY-13 15:39
NATIONAL INFRASTRUCTURE COORD CTR (MAIN OFFICE)
18-MAY- 13 15 : 39
NOAA RPTS FOR OK (MAIN OFFICE)
18-MAY-13 15:39
NATIONAL RESPONSE CENTER HQ (AUTOMATIC REPORTS)
18-MAY- 13 15 : 39
NRC SENIOR WATCH OFFICER (MAIN OFFICE)
18 - MAY-13 15:45
OFC OF ENV SVC CHEROKEE NATIONS OK (MAIN OFFICE)
18-MAY- 13 15 : 39
SAC AND FOX NATION (EMERGENCY MANAGEMENT)
18-MAY-13 15 : 39
DEQ OKLAHOMA (MAIN OFFICE)
18-MAY-13 15 : 39
ADDITIONAL INFORMATION
ALL MATERIAL EXPECTED TO STAY ON PROPERTY, WILL NOTIFY LOCAL AUTHORITIES
*** END INCIDENT REPORT # 1047579 ***

<<<PAGE 12>>>

NOTICE: This report is required by 49 CFR Part 195. Failure to report can result in a civil penalty not to
exceed $100,000 for each violation for each day that such violation persists except that the maximum civil
penalty shall not exceed $1,000,000 as provided in 49 USC 60122.
OMB NO: 2137-0047
EXPIRATION DATE: 01/31/2014
Original Report
Date: 06/14/2013
U.S Department of Transportation
Pipeline and Hazardous Materials Safety Administration
No. 20130208 - 18846
--------------------------
(DOT Use Only)
ACCIDENT REPORT - HAZARDOUS LIQUID
PIPELINE SYSTEMS
A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply
with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid
OMB Control Number. The OMB Control Number for this information collection is 2137-0047. Public reporting for this collection of information is estimated
to be approximately 10 hours per response (5 hours for a small release), including the time for reviewing instructions, gathering the data needed, and
completing and reviewing the collection of information. All responses to this collection of information are mandatory. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: Information Collection Clearance
Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590.
INSTRUCTIONS
Important: Please read the separate instructions for completing this form before you begin. They clarify the information requested and provide specific
examples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page at
http://www.phmsa.dot.gov/pipeline.
PART A - KEY REPORT INFORMATION
Report Type: (select all that apply) Original: Supplemental: Yes Final:
Yes
Last Revision Date: 12/18/2013
1. Operator's OPS-issued Operator Identification Number (OPID): 31947
2. Name of Operator ENBRIDGE PIPELINES (OZARK) L.L.C.
3. Address of Operator:
3a. Street Address 1100 LOUISIANA , SUITE 3300
3b. City HOUSTON
3c. State Texas
3d. Zip Code 77002
4. Local time (24-hr clock) and date of the Accident: 05/18/2013 14:00
5. Location of Accident:
Latitude: 35.95885
Longitude: -96.75655
6. National Response Center Report Number (if applicable): 1047579
7. Local time (24-hr clock) and date of initial telephonic report to the
National Response Center (if applicable): 05/18/2013 14:25
8. Commodity released: (select only one, based on predominant
volume released) Crude Oil
- Specify Commodity Subtype:
- If "Other" Subtype, Describe:
- If Biofuel/Alternative Fuel and Commodity Subtype is
Ethanol Blend, then % Ethanol Blend:
%:
- If Biofuel/Alternative Fuel and Commodity Subtype is
Biodiesel, then Biodiesel Blend (e.g. B2, B20, B100):
B
9. Estimated volume of commodity released unintentionally (Barrels): 2,246.00
10. Estimated volume of intentional and/or controlled release/blowdown
(Barrels):
11. Estimated volume of commodity recovered (Barrels): 2,071.00
12. Were there fatalities? No
- If Yes, specify the number in each category:
12a. Operator employees
12b. Contractor employees working for the Operator
12c. Non-Operator emergency responders
12d. Workers working on the right-of-way, but NOT
associated with this Operator
12e. General public
12f. Total fatalities (sum of above)
13. Were there injuries requiring inpatient hospitalization? No
- If Yes, specify the number in each category:
13a. Operator employees
13b. Contractor employees working for the Operator
13c. Non-Operator emergency responders
Form PHMSA F 7000.1 (Rev. 12-2012)

<<<PAGE 13>>>

13d. Workers working on the right-of-way, but NOT
associated with this Operator
13e. General public
13f. Total injuries (sum of above)
14. Was the pipeline/facility shut down due to the Accident? No
- If No, Explain: The tank line was idle at the time of the leak
- If Yes, complete Questions 14a and 14b: (use local time, 24-hr clock)
14a. Local time and date of shutdown:
14b. Local time pipeline/facility restarted:
- Still shut down? (* Supplemental Report Required)
15. Did the commodity ignite? No
16. Did the commodity explode? No
17. Number of general public evacuated: 0
18. Time sequence (use local time, 24-hour clock):
18a. Local time Operator identified Accident: 05/18/2013 14:00
18b. Local time Operator resources arrived on site: 05/18/2013 14:30
PART B - ADDITIONAL LOCATION INFORMATION
1. Was the origin of Accident onshore? Yes
If Yes, Complete Questions (2-12)
If No, Complete Questions (13-15)
- If Onshore:
2. State: Oklahoma
3. Zip Code: 74023
4. City Cushing
5. County or Parish Lincoln
6. Operator-designated location:
Specify:
7. Pipeline/Facility name: Cushing Terminal
8. Segment name/ID: Tank 3013 Line Fill
9. Was Accident on Federal land, other than the Outer Continental Shelf
(OCS)? No
10. Location of Accident: Totally contained on Operator-controlled property
11. Area of Accident (as found): Underground
Specify: Under soil
- If Other, Describe:
Depth-of-Cover (in): 18
12. Did Accident occur in a crossing? No
- If Yes, specify below:
- If Bridge crossing –
Cased/ Uncased:
- If Railroad crossing –
Cased/ Uncased/ Bored/drilled
- If Road crossing –
Cased/ Uncased/ Bored/drilled
- If Water crossing –
Cased/ Uncased
- Name of body of water, if commonly known:
- Approx. water depth (ft) at the point of the Accident:
- Select:
- If Offshore:
13. Approximate water depth (ft) at the point of the Accident:
14. Origin of Accident:
- In State waters - Specify:
- State:
- Area:
- Block/Tract #:
- Nearest County/Parish:
- On the Outer Continental Shelf (OCS) - Specify:
- Area:
- Block #:
15. Area of Accident:
PART C - ADDITIONAL FACILITY INFORMATION
1. Is the pipeline or facility: Interstate
2. Part of system involved in Accident: Onshore Terminal/Tank Farm Equipment and Piping
- If Onshore Breakout Tank or Storage Vessel, Including Attached
Appurtenances, specify:
3. Item involved in Accident: Pipe
Form PHMSA F 7000.1 (Rev. 12-2012)

<<<PAGE 14>>>

- If Pipe, specify: 3a. Nominal diameter of pipe (in): 3b. Wall thickness (in): 3c. SMYS (Specified Minimum Yield Strength) of pipe (psi): 3d. Pipe specification: 3e. Pipe Seam , specify: - If Other, Describe: 3f. Pipe manufacturer: 3g. Year of manufacture: 3h. Pipeline coating type at point of Accident, specify: - If Other, Describe:
- If Weld, including heat-affected zone, specify:
- If Other, Describe:
- If Valve, specify:
- If Mainline, specify:
- If Other, Describe:
3i. Manufactured by:
3j. Year of manufacture:
- If Tank/Vessel, specify:
- If Other - Describe:
- If Other, describe:
4. Year item involved in Accident was installed: 5. Material involved in Accident: - If Material other than Carbon Steel, specify:
6. Type of Accident Involved: - If Mechanical Puncture – Specify Approx. size:
in. (axial) by
in. (circumferential)
- If Leak - Select Type: - If Other, Describe:
- If Rupture - Select Orientation:
- If Other, Describe:
Approx. size: in. (widest opening) by
in. (length circumferentially or axially)
- If Other – Describe:
PART D - ADDITIONAL CONSEQUENCE INFORMATION
1. Wildlife impact: 1a. If Yes, specify all that apply:
- Fish/aquatic - Birds - Terrestrial 2. Soil contamination: 3. Long term impact assessment performed or planned: 4. Anticipated remediation: 4a. If Yes, specify all that apply:
- Surface water - Groundwater
- Soil - Vegetation - Wildlife 5. Water contamination: 5a. If Yes, specify all that apply:
- Ocean/Seawater
- Surface - Groundwater
- Drinking water: (Select one or both)
- Private Well
- Public Water Intake
5b. Estimated amount released in or reaching water (Barrels): 5c. Name of body of water, if commonly known: 6. At the location of this Accident, had the pipeline segment or facility
been identified as one that "could affect" a High Consequence Area
(HCA) as determined in the Operator's Integrity Management Program?
7. Did the released commodity reach or occur in one or more High
Consequence Area (HCA)? 7a. If Yes, specify HCA type(s): (Select all that apply)
- Commercially Navigable Waterway:
Was this HCA identified in the "could affect"
Form PHMSA F 7000.1 (Rev. 12-2012)
Pipe Body
24
.281
24,000
Unknown
Other
Unknown
Unknown
1978
Coal Tar
1979
Carbon Steel
Leak
Other
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2,246.00
Unnamed tributary to Wildhorse Creek
No
No

<<<PAGE 15>>>

determination for this Accident site in the Operator's
Integrity Management Program?
- High Population Area:
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Integrity Management Program?
- Other Populated Area
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
- Unusually Sensitive Area (USA) - Drinking Water
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
- Unusually Sensitive Area (USA) - Ecological
Was this HCA identified in the "could affect" determination
for this Accident site in the Operator's Integrity
Management Program?
8. Estimated Property Damage:
8a. Estimated cost of public and non-Operator private property
damage $ 0
8b. Estimated cost of commodity lost $ 30,000
8c. Estimated cost of Operator's property damage & repairs $ 754,000
8d. Estimated cost of Operator's emergency response $ 5,600,000
8e. Estimated cost of Operator's environmental remediation $ 7,460,274
8f. Estimated other costs $ 0
Describe:
8g. Total estimated property damage (sum of above) $ 13,844,274
PART E - ADDITIONAL OPERATING INFORMATION
1. Estimated pressure at the point and time of the Accident (psig): 15.00
2. Maximum Operating Pressure (MOP) at the point and time of the
Accident (psig): 250.00
3. Describe the pressure on the system or facility relating to the
Accident (psig): Pressure did not exceed MOP
4. Not including pressure reductions required by PHMSA regulations
(such as for repairs and pipe movement), was the system or facility
relating to the Accident operating under an established pressure
restriction with pressure limits below those normally allowed by the
MOP?
No
- If Yes, Complete 4.a and 4.b below:
4a. restriction?
Did the pressure exceed this established pressure
4b. State?
Was this pressure restriction mandated by PHMSA or the
5. 2?
Was "Onshore Pipeline, Including Valve Sites" OR "Offshore
Pipeline, Including Riser and Riser Bend" selected in PART C, Question
No
- If Yes - (Complete 5a. – 5e. below)
5a. Type of upstream valve used to initially isolate release
source:
5b. Type of downstream valve used to initially isolate release
source:
5c. Length of segment isolated between valves (ft):
5d. Is the pipeline configured to accommodate internal
inspection tools?
- If No, Which physical features limit tool accommodation? (select all that apply)
- Changes in line pipe diameter
- Presence of unsuitable mainline valves
- Tight or mitered pipe bends
- Other passage restrictions (i.e. unbarred tee's,
projecting instrumentation, etc.)
- Extra thick pipe wall (applicable only for magnetic
flux leakage internal inspection tools)
- Other -
- If Other, Describe:
5e. For this pipeline, are there operational factors which
significantly complicate the execution of an internal inspection tool
run?
- If Yes, Which operational factors complicate execution? (select all that apply)
- Excessive debris or scale, wax, or other wall buildup
Form PHMSA F 7000.1 (Rev. 12-2012)

<<<PAGE 16>>>

- Low operating pressure(s)
- Low flow or absence of flow
- Incompatible commodity
- Other -
- If Other, Describe:
5f. Function of pipeline system: 6. Was a Supervisory Control and Data Acquisition (SCADA)-based
system in place on the pipeline or facility involved in the Accident? If Yes -
6a. Was it operating at the time of the Accident? 6b. Was it fully functional at the time of the Accident? 6c. Did SCADA-based information (such as alarm(s),
alert(s), event(s), and/or volume calculations) assist with
the detection of the Accident?
6d. Did SCADA-based information (such as alarm(s),
alert(s), event(s), and/or volume calculations) assist with
the confirmation of the Accident?
7. Was a CPM leak detection system in place on the pipeline or facility
involved in the Accident? - If Yes:
7a. Was it operating at the time of the Accident?
7b. Was it fully functional at the time of the Accident?
7c. Did CPM leak detection system information (such as
alarm(s), alert(s), event(s), and/or volume calculations) assist
with the detection of the Accident?
7d. Did CPM leak detection system information (such as
alarm(s), alert(s), event(s), and/or volume calculations) assist
with the confirmation of the Accident?
8. How was the Accident initially identified for the Operator?
- If Other, Specify:
8a. If "Controller", "Local Operating Personnel", including
contractors", "Air Patrol", or "Guard Patrol by Operator or its
contractor" is selected in Question 8, specify the following:
9. Was an investigation initiated into whether or not the controller(s) or
control room issues were the cause of or a contributing factor to the
Accident?
- If No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary due to:
(provide an explanation for why the operator did not investigate)
- If Yes, specify investigation result(s): (select all that apply)
- Investigation reviewed work schedule rotations,
continuous hours of service (while working for the
Operator), and other factors associated with fatigue
- Investigation did NOT review work schedule rotations,
continuous hours of service (while working for the
Operator), and other factors associated with fatigue
Provide an explanation for why not:
- Investigation identified no control room issues
- Investigation identified no controller issues
- Investigation identified incorrect controller action or
controller error - Investigation identified that fatigue may have affected the
controller(s) involved or impacted the involved controller(s)
response
- Investigation identified incorrect procedures - Investigation identified incorrect control room equipment
operation
- Investigation identified maintenance activities that affected
control room operations, procedures, and/or controller
response
- Investigation identified areas other than those above:
Describe:
PART F - DRUG & ALCOHOL TESTING INFORMATION
Form PHMSA F 7000.1 (Rev. 12-2012)
=< 20% SMYS Regulated Trunkline/Transmission
Yes
Yes
Yes
Yes
Yes
No
CPM leak detection system or SCADA-based information
(such as alarm(s), alert(s), event(s), and/or volume
calculations)
Yes, specify investigation result(s): (select all that apply)
Yes
Yes
Yes
Yes

<<<PAGE 17>>>

1. As a result of this Accident, were any Operator employees tested
under the post-accident drug and alcohol testing requirements of DOT's
Drug & Alcohol Testing regulations?
Yes
- If Yes:
1a. Specify how many were tested: 3
1b. Specify how many failed: 0
2. As a result of this Accident, were any Operator contractor employees
tested under the post-accident drug and alcohol testing requirements of
DOT's Drug & Alcohol Testing regulations?
No
- If Yes:
2a. Specify how many were tested:
2b. Specify how many failed:
PART G – APPARENT CAUSE
Select only one box from PART G in shaded column on left representing the APPARENT Cause of the Accident, and answer
the questions on the right. Describe secondary, contributing or root causes of the Accident in the narrative (PART H).
Apparent Cause: G1 - Corrosion Failure
G1 - Corrosion Failure - only one sub-cause can be picked from shaded left-hand column
External Corrosion:
Internal Corrosion: Yes
- If External Corrosion:
1. Results of visual examination:
- If Other, Describe:
2. Type of corrosion: (select all that apply)
- Galvanic
- Atmospheric
- Stray Current
- Microbiological
- Selective Seam
- Other:
- If Other, Describe:
3. The type(s) of corrosion selected in Question 2 is based on the following: (select all that apply)
- Field examination
- Determined by metallurgical analysis
- Other:
- If Other, Describe:
4. Was the failed item buried under the ground?
- If Yes :
4a. Was failed item considered to be under cathodic
protection at the time of the Accident?
If Yes - Year protection started:
4b. Was shielding, tenting, or disbonding of coating evident at
the point of the Accident?
4c. Has one or more Cathodic Protection Survey been
conducted at the point of the Accident?
If "Yes, CP Annual Survey" – Most recent year conducted:
If "Yes, Close Interval Survey" – Most recent year conducted:
If "Yes, Other CP Survey" – Most recent year conducted:
- If No:
4d. Was the failed item externally coated or painted?
5. Was there observable damage to the coating or paint in the vicinity of
the corrosion?
- If Internal Corrosion:
6. Results of visual examination: Localized Pitting
- Other:
7. Type of corrosion (select all that apply): -
- Corrosive Commodity
- Water drop-out/Acid
- Microbiological Yes
- Erosion
- Other:
- If Other, Describe:
8. The cause(s) of corrosion selected in Question 7 is based on the following (select all that apply): -
- Field examination
- Determined by metallurgical analysis Yes
Form PHMSA F 7000.1 (Rev. 12-2012)

<<<PAGE 18>>>

- Other:
- If Other, Describe:
9. Location of corrosion (select all that apply): -
- Low point in pipe Yes
- Elbow
- Other:
- If Other, Describe:
10. Was the commodity treated with corrosion inhibitors or biocides? No
11. Was the interior coated or lined with protective coating? No
12. Were cleaning/dewatering pigs (or other operations) routinely
utilized? Not applicable - Not mainline pipe
13. Were corrosion coupons routinely utilized? Not applicable - Not mainline pipe
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
Question 3) is Tank/Vessel.
14. List the year of the most recent inspections:
14a. API Std 653 Out-of-Service Inspection
- No Out-of-Service Inspection completed
14b. API Std 653 In-Service Inspection
- No In-Service Inspection completed
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
Question 3) is Pipe or Weld.
15. Has one or more internal inspection tool collected data at the point of the
Accident? No
15a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage Tool
Most recent year:
- Ultrasonic
Most recent year:
- Geometry
Most recent year:
- Caliper
Most recent year:
- Crack
Most recent yea