# Failure Report- Panhandle Eastern Pipeline Co 8/25/08

- **operation:** document
- **citation:** PHMSA FIR, Panhandle Eastern Pipeline Co, 2008-08-25
- **title:** Failure Report- Panhandle Eastern Pipeline Co 8/25/08
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-10-25
- **effective on:** 2008-08-25
- **summary:** Panhandle Eastern Pipeline Co; Gas Transmission; MO; failure 2008-08-25; apparent cause: Corrosion External.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-panhandle-eastern-pipeline-co-82508.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-panhandle-eastern-pipeline-co-82508.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-panhandle-eastern-pipeline-co-82508
- **source url:** https://www.phmsa.dot.gov/safety-reports/failure-report-panhandle-eastern-pipeline-co-82508
**body:**

<<<PAGE 1>>>

Pipeline System: Houstonia 200 Line Pipeline Failure Investigation Report
Operator: Panhandle Eastern Pipeline Company, LP
Location: Mile Post 21.6 Medium Released: Natural gas Date of Occurrence: 8/25/2008
Quantity: 13,518,578 CF
PHMSA Arrival Time & Date: 8/25/08 1:00 p.m. Total Damages $ 1,046,359
Investigation Responsibility: State PHMSA NTSB Other
Company Reported Apparent Cause: Corrosion Excavation
Natural Forces Incorrect Operation Other Outside Force Damage
Material and/or Welds Equipment and Operations Other
Rupture Yes No
Leak Yes No
Fire Yes No
Explosion Yes No
Evacuation Yes No Number of Persons Area
Narrative Summary
Short summary of the Incident/Accident which will give interested persons sufficient information to make them aware of the basic scenario and
facts.
Panhandle Eastern Pipeline Company (PEPL) experienced failure of the Houstonia 200 line near Mile Post 21.6. There were no
evacuations, road closings, fires, injuries or fatalities as a result of the failure. The failure did not occur in a high consequence
area (HCA).
The failure occurred on August 25, 2008, at approximately 8:51 a.m. CDT. The failure is located on a rocky hillside in a rural
area west of Pilot Grove, Missouri in Cooper County. The failure was identified by PEPL when Houston Gas Control detected a
pressure drop in the Houstonia 200 Line. The failure was located at approximately 9:00 a.m. when a PEPL field technician
reported gas blowing near Mile Post 21.6. PEPL isolated the segment at approximately 9:30 a.m., by manually closing mainline
valves 2 Gate and 3 Gate. The distance between 2 Gate and 3 Gate is approximately 16 miles.
The pipeline experienced a longitudinal rupture in the pipe body. The rupture created a 50 feet by 33 ft by 7 feet deep crater in
the ground. Two pipeline segments totalling 28 feet in length and a coupling were ejected from the crater a distance up to 300
feet from the rupture site. The failure origin was a 16 inch long area of reduced wall thickness located at the 6:00 orientation.
The portion of the pipeline containing the failure is comprised of 24-inch diameter by 0.281-inch wall thickness, API 5L-X48,
manufactured by A.O. Smith and contains a longitudinal electric flash welded (EFW) seam. The reported maximum allowable
operating pressure (MAOP) is 800 psig, which corresponds to 71% of the specified minimum yield strength (SMYS). The
pressure at the time and location of failure was 795 psig, which corresponds to 70% of the SMYS (99% of MAOP). The MAOP
was established in accordance with 192.619 ( c ), the highest actual operating pressure to which the segment was subjected during
the five years preceding July 1, 1970. A hydrostatic test of the pipeline was performed in 1955. Details of the hydrostatic test are
unknown.
The pipeline, installed in 1937, is joined by circumferential girth welds and Dresser couplings. The pipeline external coating is
coal tar. The pipeline has an impressed curent cathodic protection system that was reportedly energized in 1955.
The findings of PEPL's investigation are as follows:
1) The failure occurred due to tensile overload at a region of wall thinning caused by external corrosion.
2) The maximum wall loss measured at the rupture surface was 0.21 inches depth (75% of wall thickness).
- 1 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 2>>>

Pipeline Failure Investigation Report
PEPL submitted a return to service plan to PHMSA that included a temporary 20% pressure reduction and remediation of
anomalies found in a high resoultion MFL tool run. They subsequently remediated 30 anomalies with RPR less than 1.15 and
replaced 912 feet of pipe. On 12/19/2009 the temporary pressure restriction was removed.
ACTIVITY #: 122653
OPERATOR ID #: 15105
UNIT ID #: 4093
NRC REPORT #: 881717
INCIDENT REPORT # (FORM 7100.2): 20090030 -- 5319
Region/State __Central
_______________________ Reviewed by: __David Barrett
__original initialed
_______
Principal Investigator: _Roger Sneegas________ Title: __Director – Central Region___________________
Date: _10/12/2010
________________________ Date: __10/13/2010
_________________________
- 2 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 3>>>

Pipeline Failure Investigation Report
Failure Location & Response
Location (City, Township, Range, County/Parish): Pilot Grove, Missouri
(Acquire Map)
Address or M.P. on Pipeline: 21.6 (1) Type of Area (Rural, City): Rural
(1)
Date: 8/25/2008 Time of Failure: 8:51 a.m.
Time Detected: 9:00 a.m. Time Located: 9:10 a.m.
How Located: A technician - Jerry Miller - heard the pipeline blowing from the nearest road at about 9:00 a.m. Gas control
had previously noted a pressure drop at 8:51 a.m.
NRC Report #: 881717 (Attach Report) Time Reported to NRC: 10:15 a.m. on 8/25/2008 Type of Pipeline:
Reported by:
Liz Rutherford
Gas Distribution Gas Transmission Hazardous Liquid LNG
LP Interstate Gas Interstate Liquid LNG Facility
Municipal Intrastate Gas Intrastate Liquid
Public Utility Jurisdictional Gas Gathering Offshore Liquid
Master Meter Offshore Gas Jurisdictional Liquid Gathering
Offshore Gas - High H2S CO2
Pipeline Configuration (Regulator Station, Pump Station, Pipeline, etc.):
Mainline Houstonia 200
Operator/Owner Information
Owner: Panhandle Eastern Pipeline Address: 5444 Westheimer Road
Houston TX
Company Official: Eric Amundsen Phone No.: 713-989-7460 Fax No.: Operator: Panhandle Eastern Pipeline
Address:
5444 Westheimer Road
Houston TX
Company Official: Eric Amundsen
Phone No. 713-989-7460 Fax No.
Drug and Alcohol Testing Program Contacts Drug Program Contact & Phone: Brett Laaser
Alcohol Program Contact & Phone: 713-989-7549
N/A
Damages
Product/Gas Loss or Spill(2) 13,518,578 CF Estimated Property Damage $ 25,000
Amount Recovered 0 Associated Damages(3) $ 628,063
1 Photo documentation
2 Initial volume lost or spilled
3 Including cleanup cost
- 3 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 4>>>

Pipeline Failure Investigation Report
Damages
Estimated Amount $ 393,296
Description of Property Damage:
The failure caused a crater in the right-of-way measuring about 50 X 33 feet and 7 feet deep. Two segments of pipe (46 feet
total) were ejected from the crater.
Customers out of Service: Yes No Number:
Suppliers out of Service: Yes No Number:
Fatalities and Injuries
Fatalities: Yes No Company: Contractor: Public:
Injuries - Hospitalization: Yes No Company: Contractor: Public:
Injuries - Non-Hospitalization: Yes No Company: Contractor: Public:
Total Injuries (including Non-Hospitalization): Company: Contractor: Public:
Name Job Function Yrs w/
Comp.
Yrs.
Exp.
Type of Injury
Drug/Alcohol Testing N/A
Were all employees that could have contributed to the incident, post-accident tested within the 2 hour time frame for alcohol or
the 32 hour time frame for all other drugs?
Yes No
Results
Job Function Test Date & Time Location
Type of Drug
Pos Neg
Gas System Controller 8/25/2008 Houston TX
- 4 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 5>>>

Pipeline Failure Investigation Report
System Description
Describe the Operator's System:
The Houstonia 200 line runs from Liberal KS to Howell MI. It is 24-inch diameter 0.281-inch wall X48 pipe installed in 1937.
Pipe Failure Description N/A
Length of Failure (inches, feet, miles): 46 feet (1)
Position (Top, Bottom, include position on pipe, 6 O'clock): Bottom 6 O'clock (1)
 Description of Failure (Corrosion Gouge, Seam Split): (1)
External corrosion.
Laboratory Analysis: Yes No
Performed by: CC Technologies Inc.
Preservation of Failed Section or Component: Yes No
If Yes - Method: Wrapped
In Custody of: Panhandle
Develop a sketch of the area including distances from roads, houses, stress inducing factors, pipe configurations, etc. Bar Hole
Test Survey Plot should be outlined with concentrations at test points. Direction of Flow.
Component Failure Description N/A
Component Failed: (1)
Manufacturer: Model:
Pressure Rating: Size
Other (Breakout Tank, Underground Storage):
Pipe Data N/A
Material: steel Wall Thickness/SDR: 0.281- inch
Diameter (O.D.): 24-inch Installation Date: 1937
SMYS: 48,000 Manufacturer: A. O. Smith
Longitudinal Seam: Electric Flash Weld Type of Coating: Coal Tar
Pipe Specifications (API 5L, ASTM A53, etc.): API 5L, X48
Joining N/A
Type: Girth weld with Coupling every other joint Procedure:
NDT Method: Unknown Inspected: Yes No
- 5 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 6>>>

Pipeline Failure Investigation Report
Pressure @ Time of Failure @ Failure Site N/A
Pressure @ Failure Site: 795 psig at the Houstonia Station Elevation @ Failure Site: 660
Pressure Readings @ Various Locations: Direction from Failure Site
Location/M.P./Station # Pressure (psig) Elevation (ft msl) Upstream Downstream
N/A
Upstream Pump Station Data N/A
Type of Product: API Gravity:
Specific Gravity: Flow Rate:
Pressure @ Time of Failure (4) Distance to Failure Site:
High Pressure Set Point: Low Pressure Set Point:
Upstream Compressor Station Data N/A
Specific Gravity: .55 Flow Rate:
Pressure @ Time of Failure (4) 795 psig Distance to Failure Site: 21.6 miles
High Pressure Set Point: 830 psig Low Pressure Set Point:
Operating Pressure N/A
Max. Allowable Operating Pressure: 800 psig Determination of MAOP: 192.619 (c)
Actual Operating Pressure: 795 psig
Method of Over Pressure Protection: Engine safeties - first engine speed and torque, then shutdown.
Relief Valve Set Point: 830 psig Capacity Adequate? Yes No
Integrity Test After Failure N/A
Pressure Test Conducted in place? (Conducted on Failed Components or Associated Piping): Yes No
If NO, Tested after removal? Yes No
Method: N/A
Describe any failures during the test.
Soil/water Conditions @ Failure Site N/A
Condition of and Type of Soil around Failure Site (Color, Wet, Dry, Frost Depth): Dry and very rocky
Type of Backfill (Size and Description): Rock
4 Obtain event logs and pressure recording charts
- 6 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 7>>>

Pipeline Failure Investigation Report
Soil/water Conditions @ Failure Site N/A
Type of Water (Salt, Brackish): N/A Water Analysis (5) Yes No
External Pipe or Component Examination N/A
External Corrosion? Yes No (1) Coating Condition (Disbonded, Non-existent):
Coal tar - some disbonded
(1)
Description of Corrosion:
The failed pipeline segments showed multiple areas of external corrosion with reduced wall thickness.
Description of Failure Surface (Gouges, Arc Burns, Wrinkle Bends, Cracks, Stress Cracks, Chevrons, Fracture Mode, Point of
Origin):
A 23 foot section of pipe was ejected and completely ruptured by the failure. Chevrons along the rupture pointed toward the
origin in an area of external corrosion with reduced wall thickness.
Above Ground: Yes No (1) Buried: Yes No (1)
Stress Inducing Factors: (1) Depth of Cover: 6 feet (1)
Cathodic Protection N/A
P/S (Surface): Readings taken this Spring were adequate - > .85
V - Recent reading in the area -2.1 V 3/26/08
P/S (Interface): Not taken
Soil Resistivity: No soil - rock pH: Date of Installation: 1955
Method of Protection: Rectifiers
Did the Operator have knowledge of Corrosion before the Incident? Yes No
How Discovered? (Close Interval Survey, Instrumented Pig, Annual Survey, Rectifier Readings, ECDA, etc): A close interval
survey was performed in 2000 from 2 Gate to 3 Gate. Some areas of low pipe to soil potential were found but not in the
area of the failure. See Appendix D.
Internal Pipe or Component Examination N/A
Internal Corrosion: Yes No (1) Injected Inhibitors: Yes No
Type of Inhibitors: N/A Testing: Yes No
Results (Coupon Test, Corrosion Resistance Probe): N/A
Description of Failure Surface (MIC, Pitting, Wall Thinning, Chevrons, Fracture Mode, Point of Origin):
The cause of the failure was external corrosion with reduced wall thickness.
Cleaning Pig Program: Yes No Gas and/or Liquid Analysis: Yes No
5 Attach copy of water analysis report
- 7 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 8>>>

Pipeline Failure Investigation Report
Internal Pipe or Component Examination N/A
Results of Gas and/or Liquid Analysis (6) N/A
Internal Inspection Survey: Yes No Results (7) ILI had been scheduled but not done.
Did the Operator have knowledge of Corrosion before the Incident? Yes No
How Discovered? (Instrumented Pig, Coupon Testing, ICDA, etc.): N/A
Outside Force Damage N/A
Responsible Party: Telephone No.:
Address:
Work Being Performed:
Equipment Involved: (1) Called One Call System? Yes No
One Call Name: One Call Report # (8)
Notice Date: Time:
Response Date: Time:
Details of Response:
Was Location Marked According to Procedures? Yes No
Pipeline Marking Type: (1) Location: (1)
State Law Damage Prevention Program Followed? Yes No No State Law
Notice Required: Yes No Response Required: Yes No
Was Operator Member of State One Call? Yes No Was Operator on Site? Yes No
Did a deficiency in the Public Awareness Program contribute to the accident? Yes No
Is OSHA Notification Required? Yes No
6 Attach copy of gas and/or liquid analysis report
7 Attach copy of internal inspection survey report
8 Attach copy of one-call report
- 8 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 9>>>

Pipeline Failure Investigation Report
Natural Forces N/A
Description (Earthquake, Tornado, Flooding, Erosion):
Failure Isolation N/A
Squeeze Off/Stopple Location and Method:
Panhandle isolated the failure by manually closing 2 Gate and 3 Gate.
(1)
Valve Closed - Upstream: 2 Gate Time: 9:38 AM I.D.:
M.P.: 12.97
Valve Closed - Downstream: 3 Gate Time: 9:23 I.D.:
M.P.: 28.43
Pipeline Shutdown Method: Manual Automatic SCADA Controller ESD
Failed Section Bypassed or Isolated: Isolated
Performed By: Field Tech. Valve Spacing: 16 miles
Odorization N/A
Gas Odorized: Yes No Concentration of Odorant (Post Incident at Failure Site):
Method of Determination: Yes No % LEL: Yes No % Gas In Air: Yes No
Time Taken: Yes No
Was Odorizer Working Prior to the Incident? Type of Odorizer (Wick, By-Pass):
Yes No
Odorant Manufacturer: Model:
Type of Odorant:
Amount Injected: Monitoring Interval (Weekly):
Odorization History (Leaks Complaints, Low Odorant Levels, Monitoring Locations, Distances from Failure Site):
- 9 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 10>>>

Pipeline Failure Investigation Report
Odorization N/A
Weather Conditions N/A
Temperature: 85 F Wind (Direction & Speed): light
Climate (Snow, Rain): Sunny Humidity:
Was Incident preceded by a rapid weather change? Yes No
Weather Conditions Prior to Incident (Cloud Cover, Ceiling Heights, Snow, Rain, Fog):
Clear
Gas Migration Survey N/A
Bar Hole Test of Area: Yes No Equipment Used:
Method of Survey (Foundations, Curbs, Manholes, Driveways, Mains, Services) (9) (1)
Environment Sensitivity Impact N/A
Location (Nearest Rivers, Body of Water, Marshlands, Wildlife Refuge, City Water Supplies that could be or were affected
by the medium loss):
(1)
OPA Contingency Plan Available? Yes No Followed? Yes No
Class Location/High Consequence Area N/A
Class Location: 1 2 3 4
Determination:
HCA Area? Yes No N/A
Determination:
Odorization Required? Yes No N/A
Pressure Test History N/A
(Expand List as Necessary)
9 Plot on site description page
- 10 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 11>>>

Pipeline Failure Investigation Report
Pressure Test History N/A
(Expand List as Necessary)
Req’d (10)Assessment
Deadline Date Test Date Test Medium Pressure
(psig)
Duration
(hrs) % SMYS
Installation N/A
Next N/A 1955 Water Unknown Unknown Unknown
Next
Most Recent
Describe any problems experienced during the pressure tests.
Hydrostatic test done in 1955 - details unknown.
Internal Line Inspection/Other Assessment History N/A
(Expand List as Necessary)
Req’d (10) Assessment
Deadline Date
Assessment
Date
Type of ILI
Tool (11)
Other Assessment
Method (12)
Indicated Anomaly
If yes, describe below
Initial 2012 Yes No
Next Yes No
Next Yes No
Most Recent Yes No
Describe any previously indicated anomalies at the failed pipe, and any subsequent pipe inspections (anomaly digs) and remedial
actions.
Not scheduled until 2012. Not in top 50%. Gauge tool run already.
Pre-Failure Conditions and Actions N/A
Was there a known pre-failure condition requiring (10) the operator to schedule evaluation and remediation?
Yes (describe below or on attachment) No
If there was such a known pre-failure condition, had the operator established and adhered to a required (10) evaluation and
remediation schedule? Describe below or on attachment. Yes No N/A
Prior to the failure, had the operator performed the required (10) actions to address the threats that are now known to be related to
the cause of this failure? Yes No N/A
List below or on an attachment such operator-identified threats, and operator actions taken prior to the accident.
Describe any previously indicated anomalies at the failed pipe, and any subsequent pipe inspections (anomaly digs) and remedial
actions.
N/A
Maps & Records N/A
10 As required of Pipeline Integrity Management regulations in 49CFR Parts 192 and 195
11 MFL, geometry, crack, etc.
12 ECDA, ICDA, SCCDA, “other technology,” etc.
- 11 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 12>>>

Pipeline Failure Investigation Report
Are Maps and Records Current? (13) Yes No
Comments:
Leak Survey History N/A
Leak Survey History (Trend Analysis, Leak Plots):
Leak survey on 6/25/2007. No leaks were found in the area of the failure.
Pipeline Operation History N/A
Description (Repair or Leak Reports, Exposed Pipe Reports):
N/A
Did a Safety Related Condition Exist Prior to Failure? Yes No Reported? Yes No
Unaccounted For Gas: None before the incident.
Over & Short/Line Balance (24 hr., Weekly, Monthly/Trend):
Operator/Contractor Error N/A
Name: Job Function:
Title: Years of Experience:
Training (Type of Training, Background):
Was the person “Operator Qualified” as applicable to a precursor abnormal operating condition? Yes No N/A
Was qualified individual suspended from performing covered task Yes No N/A
Type of Error (Inadvertent Operation of a Valve):
Procedures that are required:
Actions that were taken:
Pre-Job Meeting (Construction, Maintenance, Blow Down, Purging, Isolation):
Prevention of Accidental Ignition (Tag & Lock Out, Hot Weld Permit):
Procedures conducted for Accidental Ignition:
Was a Company Inspector on the Job? Yes No
Was an Inspection conducted on this portion of the job? Yes No
13 Obtain copies of maps and records
- 12 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 13>>>

Pipeline Failure Investigation Report
Operator/Contractor Error N/A
Additional Actions (Contributing factors may include number of hours at work prior to failure or time of day work being
conducted):
Training Procedures:
Operation Procedures:
Controller Activities:
Name Title Years
Experience
Hours on Duty
Prior to Failure Shift
Alarm Parameters:
High/Low Pressure Shutdown:
Flow Rate:
Procedures for Clearing Alarms:
Type of Alarm:
Company Response Procedures for Abnormal Operations:
Over/Short Line Balance Procedures:
Frequency of Over/Short Line Balance:
Additional Actions:
Additional Actions Taken by the Operator N/A
Make notes regarding the emergency and Failure Investigation Procedures (Pressure reduction, Reinforced Squeeze Off, Clean
Up, Use of Evacuators, Line Purging, closing Additional Valves, Double Block and Bleed, Continue Operating downstream
Pumps):
- 13 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 14>>>

Pipeline Failure Investigation Report
Additional Actions Taken by the Operator N/A
The failure was detected by Gas Control in Houston at 8:51 a.m. on 8/25/2008. Field crews located the failure at 9:10
a.m. The failure was isolated by closing valves at about 9:30 a.m.
Panhandle sent a team to investigate the failure on 8/26/08. After the initial investigation, the pipeline was repaired and
returned to service at 80% of the pressure at the time of the incident (795 psi) pending the results of the investigation.
- 14 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 15>>>

Pipeline Failure Investigation Report
Photo Documentation (1)
Overall Area from best possible view. Pictures from the four points of the compass. Failed Component, Operator Action, Damages in Area,
Address Markings, etc.
Photo
No.
Description Roll
No.
Photo
No.
Description
Roll
No.
1 View looking west at the crater 1
2 East view of exposed pipe in crater 2
3 West view of exposed pipe in crater 3
4 View of longer ejected pipe segment 4
5 Close view of longer segment 5
6 View of shorter ejected segment 6
7 Another view of shorter segment 7
8 Possible failure origin on shorter segment 8
9 Side view of possible failure. 9
10 View of coupling ejected into the woods 10
11 Close up of corrosion at possible failure
origin. 11
12 View of another area of external corrosion
near the failure origin 12
13 View of failure origin after the pipe was
moved. 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
Type of Camera:
- 15 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 16>>>

Pipeline Failure Investigation Report
Photo Documentation (1)
Film ASA:
Video Counter Log (Attach Copy):
Additional Information Sources
Agency Name Title Phone Number
Police: Cooper County Sheriff
Fire Dept.: Pilot Grove Fire Dept
State Fire Marshall:
State Agency: Missouri DOT Emergency
Response Team
NTSB:
EPA:
FBI:
ATF:
OSHA:
Insurance Co.:
FRA:
MMS:
Television: No
Newspaper:
Other:
- 16 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 17>>>

Pipeline Failure Investigation Report
Persons Interviewed
Name Title Phone Number
Brad Howard Operations Specialist 660-568-1221
Mike Dawson
Steve Atkinson Technical Specialist Jerry Rau Director Pipeline Integrity 913-906-1522
713-989-7417
Rob Wesch
Liz Rutherford
Brian Kraft Measurement Tech
Dan Corpening Area Director
Ross Cummins CP Tech
Richard Gifford Corrosion Tech
Gerald Moore Environmental Coordinator
- 17 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 18>>>

Pipeline Failure Investigation Report
Event Log
Sequence of events prior, during, and after the incident by time. (Consider the events of all parties involved in the incident, Fire Department and
Police reports, Operator Logs and other government agencies.)
Time Event
8:51 a.m. 8/25/08 Gas Control detects a pressure drop on the Houstonia 200 line and asks field techs to check for a leak.
9:00 a.m. Filed techs hear blowing gas near mile post 21.6
9:10 a.m. Field techs locate the failure
9:23 a.m. 3 Gate at MP 28.43 is closed manually
9:38 a.m. 2 Gate at MP 12.97 is closed manually
9:00 -11:00 a.m. Panhandle, Fire and police check the area to see if evacuations are necessary
1:00 p.m. PHMSA investigator arrives on site.
1:00 - 8:00 p.m. Investigation by PHMSA and Panhandle
12:00 p.m. 8/26 Panhandle investigation team from Houston arrives
12:00 - 7:00 p.m. Investigation of the failure site by PHMSA and Panhandle.
- 18 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 19>>>

Pipeline Failure Investigation Report
Investigation Contact Log
Time Date Name Description
1:00
p.m.
8/26/08 Brad Howard Operations Specialist
1:30
p.m.
8/26/08 Steve Atkinson Technical Specialist
12:00
p.m.
8/27/08 Jerry Rau Director Pipeline Integrity
1:00
p.m.
8/26-
10/20
Brad Howard Follow up on various issues
10:00
a.m.
9/26/08 David McQuilling Principal Engineer - conference call on cathodic protection
10:00
a.m.
9/26/08 Steve Atkinson Same conference call.
- 19 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 20>>>

Pipeline Failure Investigation Report
Failure Investigation Documentation Log
Operator: Unit #: CPF #: Date:
Appendix Number Documentation Description
Date FOIA
Received Yes No
A Investigation Pictures 8/25/08 X
B Panhandle Incident Report 9/18/08 X
C Panhandle Laboratory Failure Analysis 10/29/08 X
D Panhandle Close Interval Survey 9/18/08 X
- 20 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 21>>>

Pipeline Failure Investigation Report
Site Description
Provide a sketch of the area including distances from roads, houses, stress inducing factors, pipe configurations, etc. Bar Hole Test Survey Plot
should be outlined with concentrations at test points. Photos should be taken from all angles with each photo documented. Additional areas
may be needed in any area of this guideline.
The Failure location was about two miles northwest of Pilot Grove (Cooper County) Missouri near Highway HH.
The location was near milepost 21.6 on the Houstonia 200 line on a rocky hillside in a rural area. No structures were close to the
failure location. The following page shows a sketch of the location provided by Panhandle. The image below shows the Panhandle
system map.
Panhandle Eastern Pipe Line Company, LP
Panhandle Eastern Pipe Line Company operates a 6,500-mile
pipeline system with access to diverse supply sources and can
deliver 2.8 Bcf/d of natural gas to Midwest and East Coast
markets. Tie-ins to Chicago, Dayton and Cincinnati have added
to a Midwest customer base that includes some of the nation's
largest utility and industrial natural gas users. We lead the way
in offering competitive rates and a constantly evolving array of
customer-friendly service options.
Panhandle Eastern provides:
 Access to diverse Midcontinent and Canadian supply
sources and to major Midwest and Northeast markets.
 Access to 74 Bcf of storage facilities.
To request a receipt and delivery point map, please
contact Customer Service at 1-800-275-7375.
- 21 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 22>>>

Pipeline Failure Investigation Report
- 22 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 23>>>

Pipeline Failure Investigation Report
Appendix A
Houstonia 200 failure Pictures – 8/25/08 near Pilot Grove MO.
- 23 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 24>>>

Pipeline Failure Investigation Report
8/25/08 – #1- views looking West at the crater caused by the Houstonia 200 failure.
- 24 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 25>>>

Pipeline Failure Investigation Report
8/25/08 #2 - East view of the exposed pipe.
8/25/08 #3 -West close up.
- 25 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 26>>>

Pipeline Failure Investigation Report
8/25/08 #4 - One of two pipe sections ejected – the longer one – about 30 feet.
8/25/08 #5 -Closer view of the longer ejected section.
- 26 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 27>>>

Pipeline Failure Investigation Report
8/25/08 #6 -View of the shorter section ejected – about 23 feet – ruptured full length.
8/25/08 #7 -Another view of same looking north.
- 27 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 28>>>

Pipeline Failure Investigation Report
#8 - Areas with external corrosion and reduced wall thickness – possible failure origin.
8/25/08 #9 -Side view of the failure origin site with reduced wall thickness.
- 28 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 29>>>

Pipeline Failure Investigation Report
8/25/08 #10 -View of coupling ejected from pipeline.
8/25/08 #11 -Close up of external corrosion on the possible origin site.
- 29 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 30>>>

Pipeline Failure Investigation Report
8/25/08 #12 - Another area of external corrosion on the shorter section near the possible failure.
8/26/08 #13 -Different view of the possible failure origin after the pipe was turned over.
- 30 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 31>>>

Pipeline Failure Investigation Report
Appendix B
Panhandle Incident Report
- 31 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 32>>>

NOTICE: This report is required by 49 CFR Part 191. Failure to report can result in a civil penalty not to exceed $25,000 for each violation for each day that such violation persists except that the maximum civil penalty shall not exceed $500,000 as provided in 49 USC 1678. Form Approved
OMB No. 2137-0522
U.S. Department of Transportation
Research and Special Programs
Administration
INCIDENT REPORT - GAS TRANSMISSION AND
GATHERING SYSTEMS
Report Date
No.
(DOT Use Only)
INSTRUCTIONS
Important: Please read the separate instructions for completing this form before you begin. They clarify the
information requested and provide specific examples. If you do not have a copy of the instructions, you
can obtain one from the Office Of Pipeline Safety Web Page at http://ops.dot.gov .
Nearest street or road
City and County or Parrish
a.
b.
c.
State and Zip Code
d. Mile Post/Valve Station
e. Survey Station No.
f. Latitude: Longitude:
(if not available, see instructions for how to provide specific location)
g. Class location description
Onshore: Class 1 Class 2 Class 3 Class 4
Offshore: Class 1 (complete rest of this item)
Area ___________________ Block # ___________
State / / or Outer Continental Shelf
h. Incident on Federal Land other than Outer Continental Shelf
Yes No
i. Is pipeline Interstate Yes No
4. Type of leak or rupture
Leak: Pinhole Connection Failure (complete sec. F5)
Puncture, diameter (inches)
Rupture: Circumferential – Separation
Longitudinal – Tear/Crack, length (inches)
Propagation Length, total, both sides (feet)
N/A
Other:
PART A – GENERAL REPORT INFORMATION
Operator Name and Address
Original Report Supplemental Report Final Report
a. Operator's 5-digit Identification Number (when known) / /
b. If Operator does not own the pipeline, enter Owner’s 5-digit Identification Number (when known) / /
c. Name of Operator ______________________________ _______________________________________________________
d. Operator street address ________________________________________________________________________________________
e. Operator address _______________________
City, County or Parrish, State and Zip Code
2. Time and date of the incident
/ / / / / / / /
hr. month day year
3. Location of incident
5. Consequences (check and complete all that apply)
a. Fatality Total number of people: / /
Employees: / / General Public: / /
Non-employee Contractors: / /
b. Injury requiring inpatient
hospitalization Total number of people: / /
Employees: / / General Public: / /
Non-employee Contractors: / /
c. Property damage/loss (estimated) Total $
Gas loss $ Operator damage $
Public/private property damage $
d. Release Occurred in a ‘High Consequence Area’
e. Gas ignited – No explosion f. Explosion
g. Evacuation (general public only) / / people
Reason for Evacuation:
Emergency worker or public official ordered, precautionary
Threat to the public Company policy
6. Elapsed time until area was made safe:
/ / hr. / / min.
7. Telephone Report
/ / / / / / / /
NRC Report Number month day year
8. a. Estimated pressure at point and time of incident:
PSIG
b. Max. allowable operating pressure (MAOP): PSIG
c. MAOP established by 49 CFR section:
192.619 (a)(1) 192. 619 (a)(2) 192. 619 (a)(3)
192.619 (a)(4) 192. 619 (c)
d. Did an overpressurization occur relating to the incident? Yes No
PART B – PREPARER AND AUTHORIZED SIGNATURE
(type or print) Preparer's Name and Title
Preparer's E-mail Address Area Code and Telephone Number
Area Code and Facsimile Number
Date Area Code and Telephone Number
Authorized Signature (type or print) Name and Title
Form RSPA F 7100.2 ( 01-2002 ) OPS Data Facsimile Page 1 of 3

<<<PAGE 33>>>

PART C - ORIGIN OF THE INCIDENT
1. Incident occurred on
Transmission System
Gathering System
Transmission Line of Distribution System
2. Failure occurred on
Body of pipe Pipe Seam
Joint
Component
Other:
3. Material involved (pipe, fitting, or other component)
Steel
Plastic (If plastic, complete all items that apply in a-c)
Plastic failure was: a.ductile b.brittle c.joint failure
Material other than plastic or steel: _________
4. Part of system involved in incident
Pipeline Regulator/Metering System
Compressor Station Other:
5. Year the pipe or component which failed was installed: / /
PART D – MATERIAL SPECIFICATION (if applicable) 1. Nominal pipe size (NPS) / / in.
2. Wall thickness / / in.
3. Specification SMYS / /
4. Seam type
5. Valve type
6. Pipe or valve manufactured by PART E – ENVIRONMENT
1. Area of incident In open ditch
Under pavement Above ground
Under ground Under water
Inside/under building Other:
2. Depth of cover: inches
in year / /
PART F – APPARENT CAUSE
Important: There are 25 numbered causes in this section. Check the box to the left of the primary
cause of the incident. Check one circle in each of the supplemental items to the right of or below the
cause you indicate. See the instructions for this form for guidance.
F1 – CORROSION 1. External Corrosion
2. Internal Corrosion
If either F1 (1) External Corrosion, or F1 (2) Internal Corrosion is checked, complete all subparts a – e.
a. Pipe Coating
Bare
Coated
b. Visual Examination
c. Cause of Corrosion
Galvanic Stray Current
Localized Pitting
General Corrosion
Improper Cathodic Protection
Other: ____________________
Microbiological
Stress Corrosion Cracking
Other: ____________________
d. Was corroded part of pipeline considered to be under cathodic protection prior to discovering incident?
No Yes, Year Protection Started: / /
e. Was pipe previously damaged in the area of corrosion?
No Yes, How long prior to incident: / / years / / months
F2 – NATURAL FORCES
3. Earth Movement => Earthquake Subsidence Landslide Other:
4. Lightning
5. Heavy Rains/Floods => Washouts Flotation Mudslide Scouring Other:
6. Temperature => Thermal stress Frost heave Frozen components Other:
7. High Winds
F3 - EXCAVATION
8. Operator Excavation Damage (including their contractors) / Not Third Party
9. Third Party Excavation Damage (complete a-d)
a. Excavator group
General Public Government Excavator other than Operator/subcontractor
b. Type: Road Work Pipeline Water Electric Sewer Phone/Cable Landowner Railroad
Other:
c. Did operator get prior notification of excavation activity?
No Yes: Date received: / / mo. / / day / / yr.
Notification received from: One Call System Excavator Contractor Landowner
d. Was pipeline marked?
No Yes (If Yes, check applicable items i – iv)
i. Temporary markings: Flags Stakes Paint
ii. Permanent markings: Yes No
iii. Marks were (check one) Accurate Not Accurate
iv. Were marks made within required time? Yes No
F4 – OTHER OUTSIDE FORCE DAMAGE
10. Fire/Explosion as primary cause of failure => Fire/Explosion cause: Man made Natural
11. Car, truck or other vehicle not relating to excavation activity damaging pipe
12. Rupture of Previously Damaged Pipe
13. Vandalism
Form RSPA F 7100.2 ( 01-2002 ) Page 2 of 3

<<<PAGE 34>>>

F5 – MATERIAL AND WELDS
Material
14. Body of Pipe => Dent Gouge Wrinkle Bend Arc Burn Other:
15. Component => Valve Fitting Vessel Extruded Outlet Other:
16. Joint => Gasket O-Ring Threads Other:
Weld
17. Butt => Pipe Fabrication Other:
18. Fillet => Branch Hot Tap Fitting Repair Sleeve Other:
19. Pipe Seam => LF ERW DSAW Seamless Flash Weld
HF ERW SAW Spiral Other:
Complete a-g if you indicate any cause in part F5.
a. Type of failure:
Construction Defect => Poor Workmanship Procedure not followed Poor Construction Procedures
Material Defect
b. Was failure due to pipe damage sustained in transportation to the construction or fabrication site? Yes No
c. Was part which leaked pressure tested before incident occurred? Yes, complete d-g No
d. Date of test: / / mo. / / day / / yr.
e. Test medium: Water Natural Gas Inert Gas Other:
f. Time held at test pressure: / / hr.
g. Estimated test pressure at point of incident: PSIG
F6 – EQUIPMENT AND OPERATIONS
20. Malfunction of Control/Relief Equipment => Valve Instrumentation Pressure Regulator Other:
21. Threads Stripped, Broken Pipe Coupling => Nipples Valve Threads Mechanical Couplings Other:
22. Ruptured or Leaking Seal/Pump Packing
23. Incorrect Operation
a. Type: Inadequate Procedures Inadequate Safety Practices Failure to Follow Procedures Other:
b. Number of employees involved who failed post-incident drug test: / / Alcohol test: / /
c. Were most senior employee(s) involved qualified? Yes No d. Hours on duty: / /
F7 – OTHER
24. Miscellaneous, describe:
25. Unknown
Investigation Complete Still Under Investigation (submit a supplemental report when investigation is complete)
PART G – NARRATIVE DESCRIPTION OF FACTORS CONTRIBUTING TO THE EVENT (Attach additional sheets as necessary)
Form RSPA F 7100.2 ( 01-2002 ) OPS Data Facsimile Page 3 of 3

<<<PAGE 35>>>

Pipeline Failure Investigation Report
Appendix C
Panhandle Failure Analysis
- 32 -
Form 11 Pipeline Failure Investigation Report (Revised 03/07/08)

<<<PAGE 36>>>

Metallurgical Analysis of 24-Inch Houstonia
200 Service Failure at MP 21.6 (8/25/08)
Panhandle Eastern Pipe Line Company, LP
Final Report – 813 8385 1
October 29, 2008
.

<<<PAGE 37>>>

CC TECHNOLOGIES, INC.
Metallurgical Analysis of 24-Inch Houstonia
200 Service Failure at MP 21.6 (8/25/08)
for
Panhandle Eastern Pipe Line Company, L.P.
5444 Westheimer, Suite 432
Houston, TX 77056
5777 Frantz Road
Dublin, Ohio 43017-1386
U.S.A.
Tel: (614) 761-1214
Fax: (614) 761-1633
www.dnv.com
www.cctechnologies.com
Summary: Final Report
Prepared by: Gregory T. Quickel, M.S.
Staff Engineer
Reviewed by: John Beavers, Ph.D., FNACE .
Director – Failure Analysis
Approved by: Patrick H. Vieth
Senior VP – Integrity & Materials
Date of Issue: October 29, 2008
Project Number: 813 8385 1
No distribution without permission from the client or responsible organizational unit (however, free
distribution for internal use within DNV after 3 years)
No distribution without permission from the client or responsible organizational unit
Strictly confidential
Unrestricted distribution
All copyrights reserved CC Technologies, Inc. This publication, or parts thereof, may not be reproduced or
transmitted in any form or by any means, including photocopying or recording, without the prior written consent of
CC Technologies, Inc.
Reference to part of this report, which may lead to misinterpretation, is not permissible.
Q:\EAWUS813\Anderson\2008\GREG QUICKEL\PANHANDLE EASTERN PIPE LINE CO (813 8385 1) October 22\Panhandle
Final Report (813 8385 1) (October 29).doc

<<<PAGE 38>>>

Page ii
Disclaimer
This report documents work performed by CC Technologies, Inc. (CC Technologies) Dublin,
Ohio, for Panhandle Eastern Pipe Line Company, L.P. (Panhandle) Houston, Texas. Neither
CC Technologies nor any person acting on behalf of CC Technologies:
• assumes any liability for consequences or damages resulting from the use, misuse, or
reliance upon the information disclosed in this report.
• makes any warranty or representations that the use of any information, apparatus,
method, or process disclosed in this report may not infringe on privately-owned rights.
CC TECHNOLOGIES, INC.

<<<PAGE 39>>>

Page iii
Executive Summary
Panhandle Eastern Pipe Line Company, L.P (Panhandle) retained CC Technologies, Inc.
(CC Technologies) to perform a metallurgical analysis on a section of pipe from the 24-inch
diameter Houstonia 200 natural gas pipeline that failed during service. The failure occurred on
August 25, 2008 near Pilot Grove (Cooper County), Missouri at milepost (MP) 21.6.
The portion of the pipeline containing the failure is comprised of 24-inch diameter by 0.281-inch
wall thickness line pipe with an estimated yield strength (EYS) of 48.0 ksi that was
manufactured by A.O. Smith and contains an electric flash welded (EFW) 