# Failure Report- SFPP LP 3/16/10

- **operation:** document
- **citation:** PHMSA FIR, SFPP LP, 2010-03-16
- **title:** Failure Report- SFPP LP 3/16/10
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-04-20
- **effective on:** 2010-03-16
- **summary:** SFPP LP; Hazardous Liquid; CA; failure 2010-03-16; apparent cause: Corrosion Internal.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-sfpp-lp-31610.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-sfpp-lp-31610.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-sfpp-lp-31610
- **source url:** https://www.phmsa.dot.gov/safety-reports/failure-report-sfpp-lp-31610
**body:**

<<<PAGE 1>>>

DOT US Department of Transportation
PHMSA Pipelines and Hazardous Materials Safety Administration
OPS Office of Pipeline Safety
Western Region
Principal Investigator Doug Allen, CA SFM
Senior Accident Investigator Peter Katchmar
Region Director Chris Hoidal
Date of Report 11/9/2010
Subject Failure Investigation Report – SFPP LP Bleed Fitting Corrosion
Operator, Location, & Consequences
Date of Failure 3/16/2010
Commodity Released Refined Products
City/County & State Sacramento, CA
OpID & Operator Name 18092 SFPP, LP
Unit # & Unit Name 33725 CSFM #1410F
SMART Activity # 129735
Milepost / Location 1111 Exposition Blvd, Sacramento, CA
Type of Failure Leak from Bleed Fitting due to Internal Corrosion
Fatalities 0
Injuries 0
Description of area
impacted
Mixed use suburban area
Property Damage $480,000

<<<PAGE 2>>>

Failure Investigation Report – SFPP Bleed Fitting Failure
3/16/2010
Executive Summary
On March 16, 2010 at 1108 hours (PST), Kinder Morgan discovered a release on their LS20 pipeline
(CSFM 0325) located at 1111 Exposition Blvd east of Building 601. By averaging the concentration of
product in soil, Kinder Morgan estimated 5.12 barrels of transmix product was released and recovered.
There were no injuries associated with the release. A leaking ½ inch body bleed fitting on a check valve
bypass valve was the source of the leak.
System Details
The Kinder Morgan LS20 12” pipeline transports refined product 23 miles from the Kinder Morgan
Sacramento Station to the Kinder Morgan Rocklin Station. The maximum operating pressure for LS20 is
1,434 psi. At the time of the incident, the line pressure at the American River North Check Valve was
417 psi. LS20 is classified as an Interstate pipeline.
Events Leading up to the Failure
Kinder Morgan discovered the release on March 16, 2010 while Kinder Morgan employees were
preparing to repair an access point to the check valve bypass on LS20. The bypass is located just
upstream of the American River North Block Valve at MP 76.75. Kinder Morgan inspects each check
valve bypass on the LS20 pipeline twice each calendar year. During these inspections, they operate the
bypass valves to flush any contaminates out of the bypass line. Additionally, they test for indications of
hydrocarbons at the bypass valve access point using a portable vapor detector. The last inspection of
this valve was on October 15, 2009 and while preparing for the April 2010 inspection Kinder Morgan
discovered that sand and dirt had migrated in the access point preventing the inspection of the check
valve bypass. Jason Brothers, Kinder Morgan Right of Way Specialist, discovered product in the soil
shortly after he arrived at the check valve to mark the pipeline at 1108 hours (PST). Kinder Morgan
began shutting down the pipeline while an investigation was started. Mr. Brothers reported the
incident to CalEMA at 1122 hours (PST) on A 16, 2010.
At the time of the accident, the Kinder Morgan Concord Station pumps were providing pressure to LS20.
These pumps were shutdown at 1116 hours (PST) on March 16, 2009. Kinder Morgan isolated the
release site by closing the Sacramento MOV-4 (MP 70.12) at 1118 hours (PST), the American River South
Block Valve (MP 75.32) at 1206 hours (PST), and the American River North Block Valve (MP 76.75) at
1208 hours (PST).
Emergency Response
Kinder Morgan excavated around both the American River North Block Valve and the American River
North Check Valve attempting to locate the source. As a vacuum truck drained the pipe section, a small
amount of product was seen dripping from a fitting on the Check Valve Bypass Valve. Further
excavation revealed a trail of product approximately 30 feet upstream of the Check Valve. There is a 1
percent grade from the Check Valve to the end of the contaminated soil indicating a possible additional
leak source. Kinder Morgan was unable to determine that the fitting was the only leak source. Because
they could not rule out the 30-foot section of line pipe, Kinder Morgan decided to remove a 41’ 3”
section of pipe that included the check valve, the bypass, and the pipe over the contaminated soil.
Kinder Morgan transported the removed pipe in two sections to their Rocklin Station.
Page 2 of 3

<<<PAGE 3>>>

Failure Investigation Report – SFPP Bleed Fitting Failure
3/16/2010
Summary of initial start-up plan and return-to-service, including preliminary safety
measures
At 1800 hours (PST) on March 17, 2010, Kinder Morgan removed the pipe section. In its place, a straight
12.75”, X60, 0.0250” pipe was installed. Before they installed this straight pipe section, Kinder Morgan
engineers determined that LS20 was able to operate safety without the American River North Check
Valve in place. The new pipe had the CSFM hydrostatic test id #02-175 stenciled on the side. ARB
Contractors, Scott Rogers and Sam Wegner, welded the pipe section in place. Both welders were
certified on November 4, 2009 and had current operator qualifications. The weld successfully passed
the NDT (xray) examination at 2240 hours (PST).
The startup procedure included a stand up pressure test for 30 minutes. The pipe was pressured to 400
psi at the Kinder Morgan Rocklin Station and was monitored at the release site and at the Kinder
Morgan Orange Control Center. Kinder Morgan then conducted a running pressure test for an
additional 30 minutes. They held 300 psi at the Kinder Morgan Rocklin Station while monitoring the
line. The line successfully passed the stand up pressure test and the running pressure test. LS20 was
returned to service at 0116 hours (PST) on March 18. I returned to the release site on March 18-19 to
observe the coating of the new pipe section. The pipe coating material was Denso-Protal, an epoxy
coating that was brush applied.
Investigation Findings & Contributing Factors
Kinder Morgan had Jose R. Rodriguez from the Mistras Group perform an examination on the removed
section of pipe from LS20 at the Rocklin Station on June 1-4, 2010. He assessed the coating and
conducted an NDT examination prior to the hydrostatic test. The pipeline had a FBE coating that was
wrapped with Polyken tape. The tape was well bonded and the only damage to the existing FBE coating
was attributed to the removal and transportation of the pipe. The NDT included magnet particle testing
and ultrasonic examinations. Kinder Morgan contractor, ARB, sandblasted the pipeline and check valve
with a sand and walnut hull mix in preparation for a magnetic particle inspection. Prior to the
examination, Kinder Morgan reviewed the raw ILI data and found three areas that they wanted to
review during the examination. The examination found these areas to be small flat spots on the pipe.
Kinder Morgan believes they may be grind marks from the factory. A negligible amount of wall loss was
found in these areas but did not contribute to the release. No indications of cracks or corrosion were
found on the pipe, the check valve, or the check valve bypass. The hydrostatic test was performed on
June 3, 2010 by ARB. A drip developed on a ½ inch fitting on the 4” check valve bypass valve as the pipe
section was pressured to 83 psi. Kinder Morgan continued to pressure the pipe to 651 psi searching for
additional leak sources; however, no other leaks were found.
The March 16, 2010 release on the LS20 pipeline originated from a ½-inch body bleed fitting on a 4-inch
check valve bypass valve. The release was caused by corrosion in the body bleed fitting. Residual water
may have been trapped in the fitting assembly initiating the corrosion. Kinder Morgan was unable to
determine the source of the water.
Appendices
Photographs
NRC Report
Operator Accident Written Report
Page 3 of 3

<<<PAGE 4>>>

Removing 41' section of pipe
Save
03/17/2010
Photol by: D. Allen
03/17/2010
Photo2 by: D. Allen

<<<PAGE 5>>>

New 41' section of pipe
Rhoto3 birD
03/17/2010
Coating new 41' section
03/19/2010
Photo4 by: D. Allen.

<<<PAGE 6>>>

valve - after NDT and Hydrostatic test
American River North check valve and bypass
1/2" body bleed fitting
(leak source)
Photo5 by: D. Allen
06/04/2010
durin hydostatic test
Drip developed here
06/04/2010
Photo6 by: D. Allen

<<<PAGE 7>>>

Page 1 of 2
NATIONAL RESPONSE CENTER 1-800-424-8802
*** For Public Use ***
Information released to a third party shall comply with any
applicable federal and/or state Freedom of Information and Privacy Laws
Incident Report # 934156
INCIDENT DESCRIPTION
*Report taken at 14:29 on 16-MAR-10
Incident Type: PIPELINE
Incident Cause: UNKNOWN
Affected Area:
The incident was discovered on 16-MAR-10 at 11:10 local time.
Affected Medium: SUBSURFACE
____________________________________________________________________________
SUSPECTED RESPONSIBLE PARTY
XX
Type of Organization: UNKNOWN
____________________________________________________________________________
INCIDENT LOCATION
1111 EXPOSITION BLVD County: SACRAMENTO
NEAR BUILDING 601
City: SACRAMENTO State: CA
150 FT FROM ADDRESS LISTED BELOW
____________________________________________________________________________
RELEASED MATERIAL(S)
CHRIS Code: GAS Official Material Name: GASOLINE: AUTOMOTIVE (UNLEADED)
Also Known As:
Qty Released: 0 UNKNOWN AMOUNT
CHRIS Code: ODS Official Material Name: OIL: DIESEL
Also Known As:
Qty Released: 0 UNKNOWN AMOUNT
____________________________________________________________________________
DESCRIPTION OF INCIDENT
WHILE DIGGING A CHECK VALVE ON A PIPELINE, A GAS / DIESEL MIXTURE WAS OBSERVED IN
THE SOIL. THE CAUSE HAS NOT BEEN DETERMINED.
____________________________________________________________________________
INCIDENT DETAILS
Pipeline Type: OTHER
DOT Regulated: YES
Pipeline Above/Below Ground: ABOVE
Exposed or Under Water: NO
Pipeline Covered: UNKNOWN
____________________________________________________________________________
DAMAGES
Fire Involved: NO Fire Extinguished: UNKNOWN
INJURIES: NO Hospitalized: Empl/Crew: Passenger:
FATALITIES: NO Empl/Crew: Passenger: Occupant:
EVACUATIONS: NO Who Evacuated: Radius/Area:
Damages: NO
Length of Direction of
Closure Type Description of Closure Closure Closure
Air: N
Road: N Major
Artery: N
Waterway: N
http://www.nrc.uscg.mil/reports/rwservlet?standard
web+inc
_
_
seq=934156
4/11/2011

<<<PAGE 8>>>

Page 2 of 2
Track: N
Passengers Transferred: NO
Environmental Impact: UNKNOWN
Media Interest: NONE Community Impact due to Material:
____________________________________________________________________________
REMEDIAL ACTIONS
CLEAN UP TBD
Release Secured: UNKNOWN
Release Rate:
Estimated Release Duration:
____________________________________________________________________________
WEATHER
Weather: CLEAR, ºF
____________________________________________________________________________
ADDITIONAL AGENCIES NOTIFIED
Federal: FEMA
State/Local: NONE
State/Local On Scene: NONE
State Agency Number: NONE
____________________________________________________________________________
NOTIFICATIONS BY NRC
CA U.S. ATTORNEY'S OFFICE NORTH (MAIN OFFICE)
16-MAR-10 14:35
USCG ICC (ICC ONI)
16-MAR-10 14:35
CONTRA COSTA OFC OF SHERIFF (HOMELAND SECURITY UNIT)
16-MAR-10 14:35
DOT CRISIS MANAGEMENT CENTER (MAIN OFFICE)
16-MAR-10 14:35
U.S. EPA IX (MAIN OFFICE)
16-MAR-10 14:37
U.S. EPA IX (SECONDARY)
16-MAR-10 14:35
FEMA REGION 09 (SITUATION AWARENESS UNIT)
16-MAR-10 14:35
NATIONAL INFRASTRUCTURE COORD CTR (MAIN OFFICE)
16-MAR-10 14:35
NOAA RPTS FOR CA (MAIN OFFICE)
16-MAR-10 14:35
PIPELINE & HAZMAT SAFETY ADMIN (OFFICE OF PIPELINE SAFETY (AUTO))
16-MAR-10 14:35
CA STATE EMERGENCY SERVICES (MAIN OFFICE)
16-MAR-10 14:35
STATE TERRORISM & THREAT ASSESS CTR (COMMAND CENTER SACRAMENTO)
16-MAR-10 14:35
CITY OF YUMA EMERGENCY MANAGEMENT (COMMAND CENTER)
16-MAR-10 14:35
____________________________________________________________________________
ADDITIONAL INFORMATION
NO ADDITIONAL INFORMATION.
___________________________________________________________________________
*** END INCIDENT REPORT # 934156 ***
http://www.nrc.uscg.mil/reports/rwservlet?standard
web+inc
_
_
seq=934156
4/11/2011

<<<PAGE 9>>>

NOTICE: This report is required by 49 CFR Part 195. Failure to report can result in a civil penalty not to
exceed $100,000 for each violation for each day that such violation persists except that the maximum civil
penalty shall not exceed $1,000,000 as provided in 49 USC 60122.
OMB NO: 2137-0047
EXPIRATION DATE: 01/31/2013
Report Date: 04/14/2010
U.S Department of Transportation
Pipeline and Hazardous Materials Safety Administration
No. 20100042 - 15676
--------------------------
(DOT Use Only)
ACCIDENT REPORT - HAZARDOUS LIQUID
PIPELINE SYSTEMS
A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply
with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid
OMB Control Number. The OMB Control Number for this information collection is 2137-0047. Public reporting for this collection of information is estimated
to be approximately 10 hours per response (5 hours for a small release), including the time for reviewing instructions, gathering the data needed, and
completing and reviewing the collection of information. All responses to this collection of information are mandatory. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: Information Collection Clearance
Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590.
INSTRUCTIONS
Important: Please read the separate instructions for completing this form before you begin. They clarify the information requested and provide specific
examples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page at
http://www.phmsa.dot.gov/pipeline.
PART A - KEY REPORT INFORMATION
Report Type: (select all that apply) Original: Supplemental: Final:
Yes Yes
Report Status: Submitted
Create Date: 03/11/2011
1. Operator's OPS-issued Operator Identification Number (OPID): 18092
2. Name of Operator SFPP, LP
3. Address of Operator:
3a. Street Address 500 DALLAS STREET
3b. City HOUSTON
3c. State Texas
3d. Zip Code 77002
4. Local time (24-hr clock) and date of the Accident: 03/16/2010 11:10
5. Location of Accident:
Latitude: 38.5997
Longitude: -121.4483
6. National Response Center Report Number (if applicable): 934156
7. Local time (24-hr clock) and date of initial telephonic report to the
National Response Center (if applicable): 03/16/2010 11:25
8. Commodity released: (select only one, based on predominant
volume released)
Refined and/or Petroleum Product (non-HVL) which is a
Liquid at Ambient Conditions
- Specify Commodity Subtype: Mixture of Refined Products (transmix or other mixture)
- If "Other" Subtype, Describe:
- If Biofuel/Alternative Fuel and Commodity Subtype is
Ethanol Blend, then % Ethanol Blend:
%:
- If Biofuel/Alternative Fuel and Commodity Subtype is
Biodiesel, then Biodiesel Blend (e.g. B2, B20, B100):
B
9. Estimated volume of commodity released unintentionally (Barrels): 48.00
10. Estimated volume of intentional and/or controlled release/blowdown
(Barrels):
11. Estimated volume of commodity recovered (Barrels): 5.12
12. Were there fatalities? No
- If Yes, specify the number in each category:
12a. Operator employees
12b. Contractor employees working for the Operator
12c. Non-Operator emergency responders
12d. Workers working on the right-of-way, but NOT
associated with this Operator
12e. General public
12f. Total fatalities (sum of above)
13. Were there injuries requiring inpatient hospitalization? No
- If Yes, specify the number in each category:
13a. Operator employees
13b. Contractor employees working for the Operator
13c. Non-Operator emergency responders
Page 1 of 14

<<<PAGE 10>>>

13d. Workers working on the right-of-way, but NOT
associated with this Operator
13e. General public
13f. Total injuries (sum of above)
14. Was the pipeline/facility shut down due to the Accident? Yes
- If No, Explain:
- If Yes, complete Questions 14a and 14b: (use local time, 24-hr clock)
14a. Local time and date of shutdown: 03/16/2010 11:16
14b. Local time pipeline/facility restarted: 03/18/2010 01:16
- Still shut down? (* Supplemental Report Required)
15. Did the commodity ignite? No
16. Did the commodity explode? No
17. Number of general public evacuated: 0
18. Time sequence (use local time, 24-hour clock):
18a. Local time Operator identified Accident: 03/16/2010 11:10
18b. Local time Operator resources arrived on site: 03/16/2010 11:10
PART B - ADDITIONAL LOCATION INFORMATION
1. Was the origin of Accident onshore? Yes
If Yes, Complete Questions (2-12)
If No, Complete Questions (13-15)
- If Onshore:
2. State: California
3. Zip Code: 95815
4. City Sacramento
5. County or Parish Sacramento
6. Operator-designated location: Milepost/Valve Station
Specify: 76.75
7. Pipeline/Facility name: LS 20
8. Segment name/ID: LS 20
9. Was Accident on Federal land, other than the Outer Continental Shelf
(OCS)? No
10. Location of Accident: Pipeline Right-of-way
11. Area of Accident (as found): Underground
Specify: Under soil
- If Other, Describe:
Depth-of-Cover (in): 60
12. Did Accident occur in a crossing? No
- If Yes, specify below:
- If Bridge crossing –
Cased/ Uncased:
- If Railroad crossing –
Cased/ Uncased/ Bored/drilled
- If Road crossing –
Cased/ Uncased/ Bored/drilled
- If Water crossing –
Cased/ Uncased
- Name of body of water, if commonly known:
- Approx. water depth (ft) at the point of the Accident:
- Select:
- If Offshore:
13. Approximate water depth (ft) at the point of the Accident:
14. Origin of Accident:
- In State waters - Specify:
- State:
- Area:
- Block/Tract #:
- Nearest County/Parish:
- On the Outer Continental Shelf (OCS) - Specify:
- Area:
- Block #:
15. Area of Accident:
PART C - ADDITIONAL FACILITY INFORMATION
1. Is the pipeline or facility: Interstate
2. Part of system involved in Accident: Onshore Pipeline, Including Valve Sites
- If Onshore Breakout Tank or Storage Vessel, Including Attached
Appurtenances, specify:
3. Item involved in Accident: Valve
Page 2 of 14

<<<PAGE 11>>>

- If Pipe, specify:
3a. Nominal diameter of pipe (in):
3b. Wall thickness (in):
3c. SMYS (Specified Minimum Yield Strength) of pipe (psi):
3d. Pipe specification:
3e. Pipe Seam , specify:
- If Other, Describe:
3f. Pipe manufacturer:
3g. Year of manufacture:
3h. Pipeline coating type at point of Accident, specify:
- If Other, Describe:
- If Weld, including heat-affected zone, specify:
- If Other, Describe:
- If Valve, specify: Auxiliary or Other Valve
- If Mainline, specify:
- If Other, Describe:
3i. Manufactured by:
3j. Year of manufacture:
- If Tank/Vessel, specify:
- If Other - Describe:
- If Other, describe:
4. Year item involved in Accident was installed: 1987
5. Material involved in Accident: Carbon Steel
- If Material other than Carbon Steel, specify:
6. Type of Accident Involved: Leak
- If Mechanical Puncture – Specify Approx. size:
in. (axial) by
in. (circumferential)
- If Leak - Select Type: Other
- If Other, Describe:
- If Rupture - Select Orientation:
- If Other, Describe:
Approx. size: in. (widest opening) by
in. (length circumferentially or axially)
- If Other – Describe:
PART D - ADDITIONAL CONSEQUENCE INFORMATION
1. Wildlife impact: No
1a. If Yes, specify all that apply:
- Fish/aquatic
- Birds
- Terrestrial
2. Soil contamination: Yes
3. Long term impact assessment performed or planned: Yes
4. Anticipated remediation: Yes
4a. If Yes, specify all that apply:
- Surface water
- Groundwater
- Soil Yes
- Vegetation
- Wildlife
5. Water contamination: No
5a. If Yes, specify all that apply:
- Ocean/Seawater
- Surface
- Groundwater
- Drinking water: (Select one or both)
- Private Well
- Public Water Intake
5b. Estimated amount released in or reaching water (Barrels):
5c. Name of body of water, if commonly known:
6. At the location of this Accident, had the pipeline segment or facility
been identified as one that "could affect" a High Consequence Area
(HCA) as determined in the Operator's Integrity Management Program?
Yes
7. Did the released commodity reach or occur in one or more High
Consequence Area (HCA)? Yes
7a. If Yes, specify HCA type(s): (Select all that apply)
- Commercially Navigable Waterway:
Was this HCA identified in the "could affect"
Page 3 of 14

<<<PAGE 12>>>

determination for this Accident site in the Operator's
Integrity Management Program?
- High Population Area: Yes
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Integrity Management Program?
Yes
- Other Populated Area
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Integrity Management Program?
- Unusually Sensitive Area (USA) - Drinking Water
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Integrity Management Program?
- Unusually Sensitive Area (USA) - Ecological
Was this HCA identified in the "could affect"
determination for this Accident site in the Operator's
Integrity Management Program?
8. Estimated cost to Operator :
8a. Estimated cost of public and non-Operator private
property damage paid/reimbursed by the Operator $ 0
8b. Estimated cost of commodity lost $ 490
8c. Estimated cost of Operator's property damage & repairs $ 60,000
8d. Estimated cost of Operator's emergency response $ 70,000
8e. Estimated cost of Operator's environmental remediation $ 299,510
8f. Estimated other costs $ 50,000
Describe: Testing/Investigation for cause
8g. Estimated total costs (sum of above) $ 480,000
PART E - ADDITIONAL OPERATING INFORMATION
1. Estimated pressure at the point and time of the Accident (psig): 417.00
2. Maximum Operating Pressure (MOP) at the point and time of the
Accident (psig): 1,440.00
3. Describe the pressure on the system or facility relating to the
Accident (psig): Pressure did not exceed MOP
4. Not including pressure reductions required by PHMSA regulations
(such as for repairs and pipe movement), was the system or facility
relating to the Accident operating under an established pressure
restriction with pressure limits below those normally allowed by the
MOP?
No
- If Yes, Complete 4.a and 4.b below:
4a. Did the pressure exceed this established pressure
restriction?
4b. Was this pressure restriction mandated by PHMSA or the
State?
5. Was "Onshore Pipeline, Including Valve Sites" OR "Offshore
Pipeline, Including Riser and Riser Bend" selected in PART C, Question
2?
Yes
- If Yes - (Complete 5a. – 5f. below)
5a. Type of upstream valve used to initially isolate release
source: Remotely Controlled
5b. Type of downstream valve used to initially isolate release
source:
Manual
5c. Length of segment isolated between valves (ft): 7,550
5d. Is the pipeline configured to accommodate internal
inspection tools? Yes
- If No, Which physical features limit tool accommodation? (select all that apply)
- Changes in line pipe diameter
- Presence of unsuitable mainline valves
- Tight or mitered pipe bends
- Other passage restrictions (i.e. unbarred tee's,
projecting instrumentation, etc.)
- Extra thick pipe wall (applicable only for magnetic
flux leakage internal inspection tools)
- Other -
- If Other, Describe:
5e. For this pipeline, are there operational factors which
significantly complicate the execution of an internal inspection tool
run?
No
- If Yes, Which operational factors complicate execution? (select all that apply)
- Excessive debris or scale, wax, or other wall buildup
Page 4 of 14

<<<PAGE 13>>>

- Low operating pressure(s)
- Low flow or absence of flow
- Incompatible commodity
- Other -
- If Other, Describe:
5f. Function of pipeline system: > 20% SMYS Regulated Trunkline/Transmission
6. Was a Supervisory Control and Data Acquisition (SCADA)-based
system in place on the pipeline or facility involved in the Accident? Yes
If Yes -
6a. Was it operating at the time of the Accident? Yes
6b. Was it fully functional at the time of the Accident? Yes
6c. Did SCADA-based information (such as alarm(s),
alert(s), event(s), and/or volume calculations) assist with
the detection of the Accident?
No
6d. Did SCADA-based information (such as alarm(s),
alert(s), event(s), and/or volume calculations) assist with
the confirmation of the Accident?
No
7. Was a CPM leak detection system in place on the pipeline or facility
involved in the Accident? No
- If Yes:
7a. Was it operating at the time of the Accident?
7b. Was it fully functional at the time of the Accident?
7c. Did CPM leak detection system information (such as
alarm(s), alert(s), event(s), and/or volume calculations) assist
with the detection of the Accident?
7d. Did CPM leak detection system information (such as
alarm(s), alert(s), event(s), and/or volume calculations) assist
with the confirmation of the Accident?
8. How was the Accident initially identified for the Operator? Local Operating Personnel, including contractors
- If Other, Specify:
8a. If "Controller", "Local Operating Personnel", including
contractors", "Air Patrol", or "Guard Patrol by Operator or its
contractor" is selected in Question 8, specify the following:
Operator employee
9. Was an investigation initiated into whether or not the controller(s) or
control room issues were the cause of or a contributing factor to the
Accident?
No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary
due to: (provide an explanation for why the Operator did not
investigate)
- If No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary due to:
(provide an explanation for why the operator did not investigate)
The performance of an informal investigation into the pre-
existing condition of the pipeline (i.e. pressure, flow, line
balance, etc.) was shown to provide no evidence of an
existing problem the Controller(s) should have identified.
- If Yes, specify investigation result(s): (select all that apply)
- Investigation reviewed work schedule rotations,
continuous hours of service (while working for the
Operator), and other factors associated with fatigue
- Investigation did NOT review work schedule rotations,
continuous hours of service (while working for the
Operator), and other factors associated with fatigue
Provide an explanation for why not:
- Investigation identified no control room issues
- Investigation identified no controller issues
- Investigation identified incorrect controller action or
controller error
- Investigation identified that fatigue may have affected the
controller(s) involved or impacted the involved controller(s)
response
- Investigation identified incorrect procedures
- Investigation identified incorrect control room equipment
operation
- Investigation identified maintenance activities that affected
control room operations, procedures, and/or controller
response
- Investigation identified areas other than those above:
Describe:
PART F - DRUG & ALCOHOL TESTING INFORMATION
1. As a result of this Accident, were any Operator employees tested
under the post-accident drug and alcohol testing requirements of DOT's
Drug & Alcohol Testing regulations?
No
- If Yes:
1a. Specify how many were tested:
Page 5 of 14

<<<PAGE 14>>>

1b. Specify how many failed:
2. As a result of this Accident, were any Operator contractor employees
tested under the post-accident drug and alcohol testing requirements of
DOT's Drug & Alcohol Testing regulations?
No
- If Yes:
2a. Specify how many were tested:
2b. Specify how many failed:
PART G – APPARENT CAUSE
Select only one box from PART G in shaded column on left representing the APPARENT Cause of the Accident, and answer
the questions on the right. Describe secondary, contributing or root causes of the Accident in the narrative (PART H).
Apparent Cause: G1 - Corrosion Failure
G1 - Corrosion Failure - only one sub-cause can be picked from shaded left-hand column
Corrosion Failure – Sub Cause:
- If External Corrosion:
1. Results of visual examination:
- If Other, Describe:
2. Type of corrosion: (select all that apply)
- Galvanic
- Atmospheric
- Stray Current
- Microbiological
- Selective Seam
- Other:
- If Other, Describe:
3. The type(s) of corrosion selected in Question 2 is based on the following: (select all that apply)
- Field examination
- Determined by metallurgical analysis
- Other:
- If Other, Describe:
4. Was the failed item buried under the ground?
- If Yes :
4a. Was failed item considered to be under cathodic
protection at the time of the Accident?
If Yes - Year protection started:
4b. Was shielding, tenting, or disbonding of coating evident at
the point of the Accident?
4c. Has one or more Cathodic Protection Survey been
conducted at the point of the Accident?
If "Yes, CP Annual Survey" – Most recent year conducted:
If "Yes, Close Interval Survey" – Most recent year conducted:
If "Yes, Other CP Survey" – Most recent year conducted:
- If No:
4d. Was the failed item externally coated or painted?
5. Was there observable damage to the coating or paint in the vicinity of
the corrosion?
- If Internal Corrosion:
6. Results of visual examination: Other
- Other: Galvanic
7. Type of corrosion (select all that apply): -
- Corrosive Commodity
- Water drop-out/Acid
- Microbiological
- Erosion
- Other: Yes
- If Other, Describe: Galvanic
8. The cause(s) of corrosion selected in Question 7 is based on the following (select all that apply): -
- Field examination
- Determined by metallurgical analysis
- Other: Yes
- If Other, Describe: Metallurgist's evaluation
9. Location of corrosion (select all that apply): -
- Low point in pipe
- Elbow
- Other: Yes
Page 6 of 14

<<<PAGE 15>>>

- If Other, Describe: Fitting
10. Was the commodity treated with corrosion inhibitors or biocides? No
11. Was the interior coated or lined with protective coating? No
12. Were cleaning/dewatering pigs (or other operations) routinely
utilized? Not applicable - Not mainline pipe
13. Were corrosion coupons routinely utilized? Not applicable - Not mainline pipe
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
Question 3) is Tank/Vessel.
14. List the year of the most recent inspections:
14a. API Std 653 Out-of-Service Inspection
- No Out-of-Service Inspection completed
14b. API Std 653 In-Service Inspection
- No In-Service Inspection completed
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Accident" (from PART C,
Question 3) is Pipe or Weld.
15. Has one or more internal inspection tool collected data at the point of the
Accident?
15a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage Tool
Most recent year:
- Ultrasonic
Most recent year:
- Geometry
Most recent year:
- Caliper
Most recent year:
- Crack
Most recent year:
- Hard Spot
Most recent year:
- Combination Tool
Most recent year:
- Transverse Field/Triaxial
Most recent year:
- Other
Most recent year:
Describe:
16. Has one or more hydrotest or other pressure test been conducted since
original construction at the point of the Accident?
If Yes -
Most recent year tested:
Test pressure:
17. Has one or more Direct Assessment been conducted on this segment?
- If Yes, and an investigative dig was conducted at the point of the Accident::
Most recent year conducted:
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
18. Has one or more non-destructive examination been conducted at the
point of the Accident since January 1, 2002?
18a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year conducted:
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
G2 - Natural Force Damage - only one sub-cause can be picked from shaded left-handed column
Natural Force Damage – Sub-Cause:
- If Earth Movement, NOT due to Heavy Rains/Floods:
1. Specify:
Page 7 of 14

<<<PAGE 16>>>

- If Other, Describe:
- If Heavy Rains/Floods:
2. Specify:
- If Other, Describe:
- If Lightning:
3. Specify:
- If Temperature:
4. Specify:
- If Other, Describe:
- If High Winds:
- If Other Natural Force Damage:
5. Describe:
Complete the following if any Natural Force Damage sub-cause is selected.
6. Were the natural forces causing the Accident generated in
conjunction with an extreme weather event?
6a. If Yes, specify: (select all that apply)
- Hurricane
- Tropical Storm
- Tornado
- Other
- If Other, Describe:
G3 - Excavation Damage - only one sub-cause can be picked from shaded left-hand column
Excavation Damage – Sub-Cause:
- If Excavation Damage by Operator (First Party):
- If Excavation Damage by Operator's Contractor (Second Party):
- If Excavation Damage by Third Party:
- If Previous Damage due to Excavation Activity:
Complete Questions 1-5 ONLY IF the "Item Involved in Accident" (from PART C, Question 3) is Pipe or Weld.
1. Has one or more internal inspection tool collected data at the point of
the Accident?
1a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: -
- Magnetic Flux Leakage
Most recent year conducted:
- Ultrasonic
Most recent year conducted:
- Geometry
Most recent year conducted:
- Caliper
Most recent year conducted:
- Crack
Most recent year conducted:
- Hard Spot
Most recent year conducted:
- Combination Tool
Most recent year conducted:
- Transverse Field/Triaxial
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
2. Do you have reason to believe that the internal inspection was
completed BEFORE the damage was sustained?
3. Has one or more hydrotest or other pressure test been conducted
since original construction at the point of the Accident?
- If Yes:
Most recent year tested:
Test pressure (psig):
4. Has one or more Direct Assessment been conducted on the pipeline
segment?
- If Yes, and an investigative dig was conducted at the point of the Accident:
Most recent year conducted:
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
Page 8 of 14

<<<PAGE 17>>>

5. Has one or more non-destructive examination been conducted at the
point of the Accident since January 1, 2002?
5a. If Yes, for each examination, conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year conducted:
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
Complete the following if Excavation Damage by Third Party is selected as the sub-cause.
6. Did the operator get prior notification of the excavation activity?
6a. If Yes, Notification received from: (select all that apply) -
- One-Call System
- Excavator
- Contractor
- Landowner
Complete the following mandatory CGA-DIRT Program questions if any Excavation Damage sub-cause is selected.
7. Do you want PHMSA to upload the following information to CGA-
DIRT (www.cga-dirt.com)?
8. Right-of-Way where event occurred: (select all that apply) -
- Public
- If "Public", Specify:
- Private
- If "Private", Specify:
- Pipeline Property/Easement
- Power/Transmission Line
- Railroad
- Dedicated Public Utility Easement
- Federal Land
- Data not collected
- Unknown/Other
9. Type of excavator:
10. Type of excavation equipment:
11. Type of work performed:
12. Was the One-Call Center notified?
12a. If Yes, specify ticket number:
12b. If this is a State where more than a single One-Call Center
exists, list the name of the One-Call Center notified:
13. Type of Locator:
14. Were facility locate marks visible in the area of excavation?
15. Were facilities marked correctly?
16. Did the damage cause an interruption in service?
16a. If Yes, specify duration of the interruption (hours)
17. Description of the CGA-DIRT Root Cause (select only the one predominant first level CGA-DIRT Root Cause and then, where
available as a choice, the one predominant second level CGA-DIRT Root Cause as well):
Root Cause:
- If One-Call Notification Practices Not Sufficient, specify:
- If Locating Practices Not Sufficient, specify:
- If Excavation Practices Not Sufficient, specify:
- If Other/None of the Above, explain:
G4 - Other Outside Force Damage - only one sub-cause can be selected from the shaded left-hand column
Other Outside Force Damage – Sub-Cause:
- If Nearby Industrial, Man-made, or Other Fire/Explosion as Primary Cause of Incident:
- If Damage by Car, Truck, or Other Motorized Vehicle/Equipment NOT Engaged in Excavation:
1. Vehicle/Equipment operated by:
- If Damage by Boats, Barges, Drilling Rigs, or Other Maritime Equipment or Vessels Set Adrift or Which Have Otherwise Lost
Their Mooring:
Page 9 of 14

<<<PAGE 18>>>

2. Select one or more of the following IF an extreme weather event was a factor:
- Hurricane
- Tropical Storm
- Tornado
- Heavy Rains/Flood
- Other
- If Other, Describe:
- If Routine or Normal Fishing or Other Maritime Activity NOT Engaged in Excavation:
- If Electrical Arcing from Other Equipment or Facility:
- If Previous Mechanical Damage NOT Related to Excavation:
Complete Questions 3-7 ONLY IF the "Item Involved in Accident" (from PART C, Question 3) is Pipe or Weld.
3. Has one or more internal inspection tool collected data at the point of
the Accident?
3a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run:
- Magnetic Flux Leakage
Most recent year conducted:
- Ultrasonic
Most recent year conducted:
- Geometry
Most recent year conducted:
- Caliper
Most recent year conducted:
- Crack
Most recent year conducted:
- Hard Spot
Most recent year conducted:
- Combination Tool
Most recent year conducted:
- Transverse Field/Triaxial
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
4. Do you have reason to believe that the internal inspection was
completed BEFORE the damage was sustained?
5. Has one or more hydrotest or other pressure test been conducted
since original construction at the point of the Accident?
- If Yes:
Most recent year tested:
Test pressure (psig):
6. Has one or more Direct Assessment been conducted on the pipeline
segment?
- If Yes, and an investigative dig was conducted at the point of the Accident:
Most recent year conducted:
- If Yes, but the point of the Accident was not identified as a dig site:
Most recent year conducted:
7. Has one or more non-destructive examination been conducted at the
point of the Accident since January 1, 2002?
7a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year conducted:
- Guided Wave Ultrasonic
Most recent year conducted:
- Handheld Ultrasonic Tool
Most recent year conducted:
- Wet Magnetic Particle Test
Most recent year conducted:
- Dry Magnetic Particle Test
Most recent year conducted:
- Other
Most recent year conducted:
Describe:
- If Intentional Damage:
8. Specify:
- If Other, Describe:
- If Other Outside Force Damage:
9. Describe:
Page 10 of 14

<<<PAGE 19>>>

G5 - Material Failure of Pipe or Weld - only one sub-cause can be selected from the shaded left-hand column
Use this section to report material failu