# Failure Report- Southern Natural Gas 12/31/09

- **operation:** document
- **citation:** PHMSA FIR, Southern Natural Gas, 2009-12-31
- **title:** Failure Report- Southern Natural Gas 12/31/09
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-06-09
- **effective on:** 2009-12-31
- **summary:** Southern Natural Gas; Gas Transmission; AL; failure 2009-12-31; apparent cause: Material Failure Pipe.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-southern-natural-gas-123109.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-southern-natural-gas-123109.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-southern-natural-gas-123109
- **source url:** https://www.phmsa.dot.gov/safety-reports/failure-report-southern-natural-gas-123109
**body:**

<<<PAGE 1>>>

DOT US Department of Transportation
PHMSA Pipelines and Hazardous Materials Safety Administration
OPS Office of Pipeline Safety
Southern Region
Principal Investigators Gabriel Kotsis and Chris Taylor
Region Director Wayne T. Lemoi
Date of Report April 21, 2011
Subject Failure Investigation Report – Southern Natural Gas Wrinkle Bend
Failure
Operator, Location, & Consequences
Date of Failure 12/31/2009
Commodity Released Natural Gas
City/County & State Heflin/Cleburne County, Alabama
OpID & Operator Name 18516, Southern Natural Gas
Unit # & Unit Name 8142, AL‐3
SMART Activity # 128232
Milepost / Location 399.642/In an open field east of Heflin County Road (CR) 488, south of
CR 62
Type of Failure Pipe ruptured due to a failed wrinkle in a four‐wrinkle underbend
configuration. The pipe’s longitudinal seam was incorporated into the
wrinkles during the fabrication of the bend.
Fatalities 0
Injuries 0
Description of area
impacted
Class 2 Location, not an HCA.
Property Damage There was minimal property damage. Escaping high pressure natural gas
displaced soil and created a narrow hole on SNG’s ROW.

<<<PAGE 2>>>

Failure Investigation Report – Southern Natural Gas, Wrinkle Bend Failure
12/31/2009
Executive Summary
On December 31, 2009, at approximately 11:23 pm central standard time (CST), a rupture occurred on
Southern Natural Gas’ (SNG) 24‐inch North Main Loop pipeline in Cleburne County, Alabama,
approximately 9 miles east‐southeast of the town of Heflin, Alabama. The rupture occurred on a
pipeline segment near County Road 488 (CR 488) at Milepost (MP) 399.642 and was discovered by a
nearby resident who reported a “jet engine sound” near his residence.
The resident called Cleburne County Emergency 911, who subsequently contacted SNG, Turkey Heaven
Volunteer Fire Department as well as the Heflin City and Cleburne County law enforcement
departments.
SNG responded to this event by isolating the rupture. That is, SNG closed the nearest upstream valve at
Heflin Gate (MP 391.982) and the nearest downstream valve at Rome‐Calhoun Gate (MP 400.244),
isolating 8.26 miles of pipeline.
There were no fatalities or injuries, however, six residents whose homes were near the rupture site
along CR 488 self evacuated as a precaution. The residents assembled at the Pine Grove Baptist Church
(Appendix A) located north on County Road 62; approximately three‐quarters of a mile from the rupture
site. The Turkey Heaven Volunteer Fire Department established the emergency operations center
(EOC), for staging and coordination of all emergency response for this event, at this same church.
SNG reported the incident to the National Response Center (NRC) via telephone on January 1, 2010, at
12:55 am CST (1:55 am Eastern Standard Time (EST) on the NRC report) (Appendix B).
The rupture occurred due to a failed wrinkle bend in the 24‐inch pipe. The failed pipeline section had
four wrinkles in an under bend (sag) configuration with the pipe’s longitudinal seam near the center of
the wrinkles. The pipeline right‐of‐way in the failure area consisted of rolling hills in both the upstream
and downstream directions.
System Details
SNG’s pipelines operate under the El Paso Pipeline Group (El Paso), which consists of several operating
subsidiaries with approximately 42,000 miles of interstate natural gas transmission pipelines throughout
the United States.
SNG’s North Main Loop is part of SNG’s North Main Pipeline System, which is comprised of three parallel
lines at the failure location:
 20‐inch North Main Line
 24‐inch North Main Loop (failure occurred on this pipeline)
 24‐inch 2nd North Main Loop
The North Main Loop pipeline is approximately 455 miles long. It originates in Ouachita Parish,
Louisiana, and traverses several parishes in Louisiana and several counties in Mississippi, Alabama, and
Georgia. The pipeline terminates at Newman Gate, a natural gas delivery location in Douglas County,
Georgia.
Page 2 of 7

<<<PAGE 3>>>

Failure Investigation Report – Southern Natural Gas, Wrinkle Bend Failure
12/31/2009
The failed 24‐inch North Main Loop pipe had the following specifications:
 Manufacturer and Year: Republic Steel manufactured in 1948
 Wall thickness: 0.25‐inch wall thickness
 Grade: X52
 Longitudinal seam: double submerged arc welded (DSAW)
 Coating: coal tar enamel
The operator established the maximum allowable operating pressure (MAOP) on this segment in
accordance with 49 Code of Federal Regulation (CFR) §192.619(c), Maximum Allowable Operating
Pressure‐Steel or Plastic Pipelines, and was 500 psig at the time of the incident; the estimated pressure
at the failure location was 462 psig.
Events Leading up to the Failure
To understand the events leading up to the incident, PHMSA investigators reviewed SNG’s records,
written procedures, and conducted interviews with SNG’s staff to determine if any operations,
maintenance, or procedural deficiency (or inadequacy) may have contributed to the incident. Only the
records and procedures related to this failed pipeline segment were reviewed.
Interviews with SNG personnel found that anomaly repair activities took place in 2008 on the North
Main Loop, approximately 100 feet upstream of the rupture location. These repair activities may have
introduced additional external forces on the pipeline, which may have contributed to the wrinkle
failure, as further explained in the “Investigation Findings and Contributing Factors” section of this
report.
It should also be noted, that on January 26, 2008, SNG experienced an in‐service wrinkle bend rupture
on the same 24‐inch North Main Loop pipeline at MP 401.210, approximately 2.5 miles downstream of
the December 31, 2009, wrinkle bend failure. That rupture was in a Class 1 location. There were no
fatalities or injuries, but two people were evacuated from a single family residence. The PHMSA
Southern Region took no enforcement action against SNG with regards to the January 2008 rupture
because, at that time, it appeared to be an isolated incident. PHMSA had no record of any previous
wrinkle bend failures on SNG’s pipelines. However, PHMSA did review and approve the pipe repair and
system restart plans after the January 2008 failure.
Emergency Response
This incident did not require a substantial emergency response effort, because there were no fatalities
or injuries; however, six residents, whose homes were near the rupture site along CR 488, self evacuated
as a precaution. The residents assembled at the Pine Grove Baptist Church, located approximately one‐
third of a mile north of the rupture on CR 62. The Turkey Heaven Volunteer Fire Department
established the Pine Grove Baptist Church as EOC for this event. All emergency response staging and
coordination took place at this site until the emergency was over.
SNG responded to this event by isolating the rupture. That is, SNG closed the nearest upstream valve at
Heflin Gate (MP 391.982) and the nearest downstream valve at Rome‐Calhoun Gate (MP 400.244),
isolating 8.26 miles of pipeline.
Page 3 of 7

<<<PAGE 4>>>

Failure Investigation Report – Southern Natural Gas, Wrinkle Bend Failure
12/31/2009
While the Turkey Heaven Volunteer Fire Department was in charge of this incident response, five other
fire departments provided assistance, as needed, under mutual aid agreements.
SNG reported the incident to the National Response Center (NRC) via telephone on January 1, 2010, at
12:55 am CST (1:55 am Eastern Standard Time on the NRC report).
Summary of Restart Plan and Return‐to‐Service, Including Preliminary Safety
Measures
Taking into account the 2008 wrinkle bend failure referenced above in the “Events Leading up to the
Failure” section of this report, the age of the North Main Loop pipeline, the close proximity of this
pipeline to areas of public access and roadways (including Interstate 20), and the hazardous nature of
natural gas, PHMSA issued a Corrective Action Order (CAO)1 to SNG on January 7, 2010.
With the exception of the instrumented aerial or instrumented ground leak survey SNG was required to
conduct between the Tarrant Compressor Station (MP 321.9) and the Carrollton Gate (MP 421.3), the
CAO applied to the North Main Loop, i.e. “the Affected Pipeline,” from the DeArmanville Compressor
Station at MP 380.600 to the Rome‐Calhoun Gate at MP 400.244; a total of 19.6 pipeline miles. Below is
a condensed description of significant CAO requirements. The CAO required SNG to
 Not operate the 8.26‐mile isolated segment from Heflin Gate (MP 391.982) to the Rome‐
Calhoun Gate (MP 400.244) until authorized by the Southern Region Director (Director),
 Maintain a 20% pressure reduction in the operating pressure (i.e. do not exceed 369 psig)
between the DeArmanville Compressor Station (MP 380.600) and the Rome‐Calhoun Gate (MP
400.244) until it received written approval from the Director to remove the pressure restriction,
 Complete mechanical and metallurgical testing and failure site analysis of the failed pipe within
30 days of receiving the CAO,
 Develop and submit a return‐to‐service plan to the Director within 60 days of receiving the CAO,
 Perform either instrumented aerial or instrumented ground leak survey between Tarrant
Compressor Station (MP 321.9) and Carrollton Gate (MP 421.3) within 30 days of receiving the
CAO and submit survey documentation to the Director within 45 days; and,
 Perform a Root Cause Analysis of this incident within 60 days, specifically including a study and
analysis of environmental and other factors that may have caused stresses on the pipeline and
submit a report to the Director within 90 days.
While excavating the pipeline to expose and remove the failed wrinkle bend section, SNG crews
discovered two additional overbend configurations, from the original construction, that used the wrinkle
bend method to create the bend radii (Appendix A). SNG removed these bends as well as the failed bend
for a total of 21 wrinkles removed.
SNG replaced the removed bends with 240 feet (six joints) of pre‐tested and pre‐bent pipe and used
radiography (X‐rays) to non‐destructively inspect each of the girth welds connecting the six new pipe
joints. PHMSA requested an additional 4‐hour above the ditch hydrostatic pressure test to assure the
integrity of the girth welds for the replacement pipe. On January 6, 2010, SNG successfully hydrotested
the pipe; the tie‐in welds and subsequent X‐rays were completed the same day.
The replaced pipe had the following specifications:
1 PHMSA Compliance Progress File (CPF) 2-2010-1001H
Page 4 of 7

<<<PAGE 5>>>

Failure Investigation Report – Southern Natural Gas, Wrinkle Bend Failure
12/31/2009
 Wall thickness: 0.343‐inch wall thickness
 API 5L Grade X70
 Longitudinal seam: double submerged arc welded (DSAW)
 Coating: Fushion bonded epoxy (FBE)
 6 joints of 24‐inch diameter pre‐tested pipe
The pipeline segment upstream of the rupture, between DeArmanville Compressor Station and Heflin
Gate, remained in service immediately after the rupture, but operated at a 20% reduced pressure of
369 psig, as required by the CAO. On January 15, 2010, SNG submitted the return‐to‐service plan for the
Heflin Gate to Rome‐Calhoun Gate segment, to the Director for review and approval. On February 3,
2010, the Director approved the restart plan for the Heflin Gate to Rome‐Calhoun Gate segment.
Investigation Findings & Contributing Factors
The investigation findings and contributing factors listed below were compiled from the operator’s Root
Cause Analysis (RCA), which was required by the CAO.
The PHMSA investigation, which began on site on January 2, 2010, revealed the following:
 During the field portion of this incident investigation, PHMSA investigators and SNG personnel
observed a circumferential split along a wrinkle bend in the 24‐inch North Main Loop pipe at the
location of the failure. The split appeared to run from the 9 o’clock to 3 o’clock position around
the pipe. The pipe’s DSAW longitudinal seam (long seam) appeared to be near the center of the
wrinkle bend.
 As SNG crews completed the initial cut to remove the failed pipe section, the failed section
shifted (sprang) upward. The centerline of the pipe was offset by about 1½ inches from the
centerline of the un‐deflected pipe, indicating the pipeline had been subject to external forces
that may have contributed to the failure (Appendix A).
The metallurgical and hydrogeological reports written subsequent to the failure, revealed additional,
possible sources of these forces:
1) Stresses due to the wrinkle bend containing the pipe longitudinal seam.
El Paso’s Metallurgy Laboratory examined the failed pipe’s longitudinal seam and determined
the fracture started on (or near) the inner pipe diameter surface in the center of the long seam.
The metallurgical testing determined the long seam welds were more brittle than the base
metal and the yield strength was considerably higher (72,600 psig for long seam vs. 56,200 psig
for base metal). El Paso also conducted micro‐hardness evaluations on the base metal outside
of any wrinkled areas as well as from the wrinkle bend decay to the fracture surface. The
hardness values were highest in the wrinkle bends due to slight strain hardening that occurred
during bending.
2) External stresses from probable shifting of the surrounding soil in the area of the failure.
According to SNG’s hydrogeological study, which was part of the RCA, both activities described
in “a” and “b” below caused significant soil disturbance in close proximity to the failed pipe. The
soil disturbance altered or decreased the support provided by the soil in the failure area.
Page 5 of 7

<<<PAGE 6>>>

Failure Investigation Report – Southern Natural Gas, Wrinkle Bend Failure
12/31/2009
a) Pipe replacement in 1998. The area along SNG’s right‐of‐way at the failure location had a
cross slope of approximately 25 degrees. There were three North Main Pipelines in this
right‐of‐way, from north to south, the 20‐inch North Main, the 24‐inch North Main Loop
(ruptured line), and the 24‐inch 2nd North Main Loop. The 20‐inch North Main Line, which
was located the furthest down slope, was replaced in this area in 1998, disrupting the soil
close to the ruptured pipe.
b) Anomaly repairs in 2008. In May 2007, the North Main Loop valve section from the Heflin
Gate to the Rome‐Calhoun Gate was inspected with a high‐resolution magnetic flux leakage
(MFL) in‐line inspection (ILI) tool. By April 2008, SNG had identified all ILI features requiring
remediation and had completed all the required pipeline repairs. The April 2008 repair
included approximately 61 feet of the North Main Loop pipeline at MP 399.000,
approximately 100 feet upstream of the rupture. This activity disrupted the soil close to the
ruptured pipe. It should also be noted that the failed wrinkle bend was not identified as an
anomaly requiring remediation during the ILI analysis.
3) Stresses from natural soil movement due to the geological characteristics of the area combined
with the presence of water. The hydrogeologic evaluation conducted by SNG’s contracted
geologists noted the following: 1) the failure occurred in silty clay derived from weathered
phyllite of the Lay Dam Formation, and 2) the failure was in a topographically low area that was
a natural surface water drainage feature.
a) Background
Almost all of Cleburne County, Alabama, including the failure location is in the Northern
Piedmont physiographic province. The Lay Dam Formation of the Talladega Group is a
geological unit within the Northern Piedmont province. In Cleburne County the Lay Dam
Formation consists primarily of phyllite as well as other irregularly bedded metamorphic
rock. Rocks observed on land and in the excavation trench at MP 399.642 were consistent
with those comprising the Lay Dam Formation.
In the Piedmont province, precipitation that seeps into the ground tends to move
downward through the soil into weathered bedrock. If the bedrock is fractured, water will
continue to move downward through the fractures and on to discharge points. If the
bedrock is not fractured, ground water will move laterally along the top of the bedrock to a
discharge point. As ground water travels to a discharge point along the top of the bedrock,
its lubricating property can simultaneously facilitate soil movement.
b) Discussion
SNG’s contract geologists visually observed relatively unfractured slightly weathered phyllite
and undisturbed clay of low permeability, at the failure location. Moisture was observed in a
zone above the slightly weathered phyllite indicating the phyllite probably served as a
barrier to downward water migration.
Additionally, the geologists noted the actual rainfall totals for Cleburne County in calendar
year 2009 exceeded the normal rainfall estimates by approximately 19%, however, the
actual rainfalls in October and December 2009 exceeded the normal rainfall estimates by
approximately 207% and 50%, respectively.
Page 6 of 7

<<<PAGE 7>>>

Failure Investigation Report – Southern Natural Gas, Wrinkle Bend Failure
12/31/2009
The geologists concluded the above‐normal precipitation in 2009 was the water source in this
area that provided for the subsurface soil movement in the pipeline right‐of‐way and caused soil
movement near the pipe. This movement of subsurface materials along the slope resulted in
redistribution of stresses on the pipe, which contributed to the pipe failure.
Appendices
A Map and Photographs
B NRC Report
C Southern Natural Gas Incident Report to PHMSA
D El Paso Metallurgical Analysis
E P.E. LaMoreaux & Associates, Inc. Hydrogeologic Evaluation of Area Near Pipeline Milepost
399.642
Page 7 of 7

<<<PAGE 8>>>

Appendix A Maps and Photographs
Aerial Map
PINE GROVE BAPTIST CHURCH
EMERGENCY OPERATIONS CENTER /EVACUEES’
MUSTER LOCATION
RUPTURE LOCATION
MP 399.642
SOUTHERN NATURAL GAS
24‐IN NORTH MAIN LOOP
RIGHT‐OF‐WAY
Page 1 of 8

<<<PAGE 9>>>

Appendix A Maps and Photographs
24‐in North Main Loop Failed Wrinkle, MP 399.642. One of four wrinkles in underbend configuration.
Page 2 of 8

<<<PAGE 10>>>

Appendix A Maps and Photographs
Pipe’s DSAW longitudinal seam is perpendicular and roughly centered in failed wrinkle bend.
Page 3 of 8

<<<PAGE 11>>>

Appendix A Maps and Photographs
Additional wrinkles used to create the underbend configuration during original construction
Page 4 of 8

<<<PAGE 12>>>

Appendix A Maps and Photographs
Four‐wrinkle underbend section with coating removed. The second downstream wrinkle is
where the pipe rupture occurred (pipeline natural gas flow was from right to left).
Observe the cut and reference lines downstream of last wrinkle (importance next photo)
Page 5 of 8

<<<PAGE 13>>>

Appendix A Maps and Photographs
Cut pipe shifted off the reference line indicating external load(s) on pipe
Page 6 of 8

<<<PAGE 14>>>

Appendix A Maps and Photographs
Additional pipe bends uncovered, upstream and downstream of removed failed section
REMOVED
WRINKLE BEND
(UNDERBEND)
Page 7 of 8

<<<PAGE 15>>>

Appendix A Maps and Photographs
Replacement pipe hydrostatically pressure tested above the ditch as one unit
Page 8 of 8

<<<PAGE 16>>>

Page 1 of 2
NATIONAL RESPONSE CENTER 1-800-424-8802
*** For Public Use ***
Information released to a third party shall comply with any
applicable federal and/or state Freedom of Information and Privacy Laws
Incident Report # 927518
INCIDENT DESCRIPTION
*Report taken at 01:55 on 01-JAN-10
Incident Type: PIPELINE
Incident Cause: EQUIPMENT FAILURE
Affected Area:
The incident occurred on 31-DEC-09 at 23:07 local time.
Affected Medium: AIR ATOMSPHERE
____________________________________________________________________________
SUSPECTED RESPONSIBLE PARTY
Organization: SOUTHERN NATURAL GAS COMPANY
BIRMINGHAM, AL 35209
Type of Organization: PRIVATE ENTERPRISE
____________________________________________________________________________
INCIDENT LOCATION
NEAREST ROAD IS CLEBURNE CTY RD 488 County: CLEBURNE
LAT 33.62998 N
LONG -85.46087 W
State: AL
Latitude: 33° 37' 48" N
Longitude: 085° 24' 25" W
RUPTURE SITE IS 5 MILES EAST OF HEFLIN, ALABAMA
____________________________________________________________________________
RELEASED MATERIAL(S)
CHRIS Code: ONG Official Material Name: NATURAL GAS
Also Known As:
Qty Released: 0 UNKNOWN AMOUNT
____________________________________________________________________________
DESCRIPTION OF INCIDENT
CALLER IS REPORTING A RELEASE OF NATURAL GAS FROM A PIPELINE DUE TO THE PIPELINE
RUPTURING. THE CAUSE IS UNKNOWN AT THIS TIME.
____________________________________________________________________________
INCIDENT DETAILS
Pipeline Type: TRANSMISSION
DOT Regulated: UNKNOWN
Pipeline Above/Below Ground: BELOW
Exposed or Under Water: NO
Pipeline Covered: UNKNOWN
____________________________________________________________________________
DAMAGES
Fire Involved: NO Fire Extinguished: UNKNOWN
INJURIES: NO Hospitalized: Empl/Crew: Passenger:
FATALITIES: NO Empl/Crew: Passenger: Occupant:
EVACUATIONS: YES Who Evacuated: PRIVATE
Radius/Area:
CITIZENS
Damages: UNKNOWN
Length of Direction of
Closure Type Description of Closure Closure Closure
Air: N
Road: N Major
Artery: N
Waterway: N
Track: N
Passengers Transferred: NO
Environmental Impact: NO

<<<PAGE 17>>>

Page 2 of 2
Media Interest: NONE Community Impact due to Material:
____________________________________________________________________________
REMEDIAL ACTIONS
CALLER STATED THEY HAVE ISOLATED THE AREA AND THE PIPELINE IS BEING EVACUATED OF
PRESSURE.
Release Secured: YES
Release Rate:
Estimated Release Duration:
____________________________________________________________________________
WEATHER
Weather: PARTLY CLOUDY, 50ºF
____________________________________________________________________________
ADDITIONAL AGENCIES NOTIFIED
Federal: NONE
State/Local: CLEBURNE COUNTY EMA
State/Local On Scene: NONE
State Agency Number: NONE
____________________________________________________________________________
NOTIFICATIONS BY NRC
ALABAMA DEPT OF ENV MGMT (MAIN OFFICE)
01-JAN-10 02:05
AL U.S. ATTORNEY'S OFFICE (COMMAND CENTER)
01-JAN-10 02:05
USCG ICC (ICC ONI)
01-JAN-10 02:05
DOT CRISIS MANAGEMENT CENTER (MAIN OFFICE)
01-JAN-10 02:05
EPA OEM (MAIN OFFICE)
01-JAN-10 02:08
EPA OEM (AFTER HOURS SECONDARY)
01-JAN-10 02:08
U.S. EPA IV (MAIN OFFICE)
01-JAN-10 02:08
FEDERAL EMERGENCY MANAGEMENT AGENCY (MAIN OFFICE)
01-JAN-10 02:05
USCG NATIONAL COMMAND CENTER (MAIN OFFICE)
01-JAN-10 02:09
JFO-LA (COMMAND CENTER)
01-JAN-10 02:05
NATIONAL INFRASTRUCTURE COORD CTR (MAIN OFFICE)
01-JAN-10 02:05
NOAA RPTS FOR AL (MAIN OFFICE)
01-JAN-10 02:05
NATIONAL RESPONSE CENTER HQ (MAIN OFFICE)
01-JAN-10 02:09
HOMELAND SEC COORDINATION CENTER (MAIN OFFICE)
01-JAN-10 02:05
PIPELINE & HAZMAT SAFETY ADMIN (OFFICE OF PIPELINE SAFETY (AUTO))
01-JAN-10 02:05
PIPELINE & HAZMAT SAFETY ADMIN (OFFICE OF PIPELINE SAFETY WEEKDAYS (VERBAL))
01-JAN-10 02:09
SECTOR MOBILE (COMMAND CENTER)
01-JAN-10 02:10
GEORGIA EMERGENCY MNGMT AGENCY (MAIN OFFICE)
01-JAN-10 02:05
____________________________________________________________________________
ADDITIONAL INFORMATION
CALLER STATED THE PRIVATE CITIZENS EVACUATED THE AREA ON THEIR OWN.
___________________________________________________________________________
*** END INCIDENT REPORT # 927518 ***

<<<PAGE 18>>>

NOTICE: This report is required by 49 CFR Part 191. Failure to report can result in a civil penalty not to exceed $25,000 for each violation Form Approved
for each day that such violation persists except that the maximum civil penalty shall not exceed $500,000 as provided in 49 USC 1678. OMB No. 2137-0522
U.S. Department of Transportation
Research and Special Programs
Administration
INCIDENT REPORT - GAS TRANSMISSION AND
GATHERING SYSTEMS
Report Date
No.
(DOT Use Only)
INSTRUCTIONS
Please read the separate instructions for completing this form before you begin. They clarify the
information requested and provide specific examples. If you do not have a copy of the instructions, you
can obtain one from the Office Of Pipeline Safety Web Page at http://ops.dot.gov .
PART A – GENERAL REPORT INFORMATION
Operator Name and Address
Original Report Supplemental Report Final Report
a. Operator's 5-digit Identification Number (when known) / /
b. If Operator does not own the pipeline, enter Owner’s 5-digit Identification Number (when known) / /
c. Name of Operator ______________________________ _______________________________________________________
d. Operator street address ________________________________________________________________________________________
e. Operator address _______________________
City, County or Parrish, State and Zip Code
5. Consequences (check and complete all that apply)
2. Time and date of the incident
a. Fatality Total number of people: / /
/ / / / / / / /
Employees: / / General Public: / /
hr. month day year
3. Location of incident
Non-employee Contractors: / /
a.
b. Injury requiring inpatient
Nearest street or road
hospitalization Total number of people: / /
b.
Employees: / / General Public: / /
City and County or Parrish
Non-employee Contractors: / /
c.
State and Zip Code
c. Property damage/loss (estimated) Total $
d. Mile Post/Valve Station
Gas loss $ Operator damage $
Check one or more boxes as appropriate:
e. Survey Station No.
Public/private property damage $
f. Latitude: Longitude:
d. Release Occurred in a ‘High Consequence Area’
(if not available, see instructions for how to provide specific location)
e. Gas ignited – No explosion f. Explosion
g. Class location description
g. Evacuation (general public only) / / people
Onshore: Class 1 Class 2 Class 3 Class 4
Reason for Evacuation:
Offshore: Class 1 (complete rest of this item)
Emergency worker or public official ordered, precautionary
Area ___________________ Block # ___________
Threat to the public Company policy
State / / or Outer Continental Shelf
6. Elapsed time until area was made safe:
h. Incident on Federal Land other than Outer Continental Shelf
/ / hr. / / min.
Yes No
7. Telephone Report
i. Is pipeline Interstate Yes No
/ / / / / / / /
4. Type of leak or rupture
NRC Report Number month day year
Leak: Pinhole Connection Failure (complete sec. F5)
8. a. Estimated pressure at point and time of incident:
Puncture, diameter (inches)
PSIG
Rupture: Circumferential – Separation
b. Max. allowable operating pressure (MAOP): PSIG
Longitudinal – Tear/Crack, length (inches)
c. MAOP established by 49 CFR section:
Propagation Length, total, both sides (feet)
192.619 (a)(1) 192. 619 (a)(2) 192. 619 (a)(3)
N/A
192.619 (a)(4) 192. 619 (c)
Other:
d. Did an overpressurization occur relating to the incident? Yes No
PART B – PREPARER AND AUTHORIZED SIGNATURE
Area Code and Telephone Number
(type or print) Preparer's Name and Title
Preparer's E-mail Address Area Code and Facsimile Number
Date Area Code and Telephone Number
Authorized Signature (type or print) Name and Title
Form RSPA F 7100.2 ( 01-2002 ) Page 1 of 3

<<<PAGE 19>>>

PART C - ORIGIN OF THE INCIDENT
1. Incident occurred on
Transmission System
Gathering System
Transmission Line of Distribution System
2. Failure occurred on
Body of pipe Pipe Seam
Joint
Component
Other:
3. Material involved (pipe, fitting, or other component)
Steel
Plastic (If plastic, complete all items that apply in a-c)
Plastic failure was: a.ductile b.brittle c.joint failure
Material other than plastic or steel: _________
4. Part of system involved in incident
Pipeline Regulator/Metering System
Compressor Station Other:
5. Year the pipe or component which failed was installed: / /
PART D – MATERIAL SPECIFICATION (if applicable) PART E – ENVIRONMENT
1. Area of incident In open ditch
Under pavement Above ground
Under ground Under water
Inside/under building Other:
2. Depth of cover: inches
1. Nominal pipe size (NPS) / / in.
2. Wall thickness / / in.
3. Specification SMYS / /
4. Seam type
5. Valve type
6. Pipe or valve manufactured by in year / /
PART F – APPARENT CAUSE
There are 25 numbered causes in this section. Check the box to the left of the
cause of the incident. Check one circle in each of the supplemental items to the right of or below the
cause you indicate. See the instructions for this form for guidance.
F1 – CORROSION If either F1 (1) External Corrosion, or F1 (2) Internal Corrosion is checked, complete all subparts a – e.
1. External Corrosion
a. Pipe Coating
Bare
Coated
b. Visual Examination
c. Cause of Corrosion
Galvanic Stray Current
Localized Pitting
Improper Cathodic Protection
General Corrosion
Microbiological
Other: ____________________
Stress Corrosion Cracking
Other: ____________________
2. Internal Corrosion
d. Was corroded part of pipeline considered to be under cathodic protection prior to discovering incident?
No Yes, Year Protection Started: / /
e. Was pipe previously damaged in the area of corrosion?
No Yes, How long prior to incident: / / years / / months
F2 – NATURAL FORCES
3. Earth Movement => Earthquake Subsidence Landslide Other:
4. Lightning
5. Heavy Rains/Floods => Washouts Flotation Mudslide Scouring Other:
6. Temperature => Thermal stress Frost heave Frozen components Other:
7. High Winds
F3 - EXCAVATION
8. Operator Excavation Damage (including their contractors) / Not Third Party
9. Third Party Excavation Damage (complete a-d)
a. Excavator group
General Public Government Excavator other than Operator/subcontractor
b. Type: Road Work Pipeline Water Electric Sewer Phone/Cable Landowner Railroad
Other:
c. Did operator get prior notification of excavation activity?
No Yes: Date received: / / mo. / / day / / yr.
Notification received from: One Call System Excavator Contractor Landowner
d. Was pipeline marked?
No Yes (If Yes, check applicable items i – iv)
i. Temporary markings: Flags Stakes Paint
ii. Permanent markings: Yes No
iii. Marks were (check one) Accurate Not Accurate
iv. Were marks made within required time? Yes No
F4 – OTHER OUTSIDE FORCE DAMAGE
10. Fire/Explosion as primary cause of failure => Fire/Explosion cause: Man made Natural
11. Car, truck or other vehicle not relating to excavation activity damaging pipe
12. Rupture of Previously Damaged Pipe
13. Vandalism
Form RSPA F 7100.2 ( 01-2002 ) Page 2 of 3

<<<PAGE 20>>>

F5 – MATERIAL AND WELDS
Material
14. Body of Pipe => Dent Gouge Wrinkle Bend Arc Burn Other:
15. Component => Valve Fitting Vessel Extruded Outlet Other:
16. Joint => Gasket O-Ring Threads Other:
Weld
17. Butt => Pipe Fabrication Other:
18. Fillet => Branch Hot Tap Fitting Repair Sleeve Other:
19. Pipe Seam => LF ERW DSAW Seamless Flash Weld
HF ERW SAW Spiral Other:
Complete a-g if you indicate cause in part F5.
a. Type of failure:
Construction Defect => Poor Workmanship Procedure not followed Poor Construction Procedures
Material Defect
b. Was failure due to pipe damage sustained in transportation to the construction or fabrication site? Yes No
c. Was part which leaked pressure tested before incident occurred? Yes, complete d-g No
d. Date of test: / / mo. / / day / / yr.
e. Test medium: Water Natural Gas Inert Gas Other:
f. Time held at test pressure: / / hr.
g. Estimated test pressure at point of incident: PSIG
F6 – EQUIPMENT AND OPERATIONS
20. Malfunction of Control/Relief Equipment => Valve Instrumentation Pressure Regulator Other:
21. Threads Stripped, Broken Pipe Coupling => Nipples Valve Threads Mechanical Couplings Other:
Form RSPA F 7100.2 ( 01-2002 ) Page 3 of 322. Ruptured or Leaking Seal/Pump Packing
23. Incorrect Operation
a. Type: Inadequate Procedures Inadequate Safety Practices Failure to Follow Procedures Other:
b. Number of employees involved who failed post-incident drug test: / / Alcohol test: / /
c. Were most senior employee(s) involved qualified? Yes No d. Hours on duty: / /
F7 – OTHER
24. Miscellaneous, describe:
25. Unknown
Investigation Complete Still Under Investigation (submit a supplemental report when investigation is complete)
PART G – NARRATIVE DESCRIPTION OF FACTORS CONTRIBUTING TO THE EVENT (Attach additional sheets as necessary)

<<<PAGE 21>>>

Appendix D El Paso Metallurgical Analysis
Report Date: 02/01/10
Request No: 5‐2010‐0014
This document is on file at PHMSA

<<<PAGE 22>>>

P. E. LaMoreaux & Associates, Inc.
Hydrogeologists, Geologists, Archaeologists,
& Environmental Scientists
Via Email: Raymond.Hayden@ElPaso.com
Juan.McLane@ElPaso.com
March 2, 2010
Mr. Raymond Hayden
Principal Compliance Specialist
SE Division – DOT Field Compliance
El Paso Pipeline Group
P. O. Box 2563
Birmingham, AL 35202
RE: Hydrogeologic Evaluation of Area Near Pipeline Milepost 399.642
Southern Natural Gas North Main Loop Line, Cleburne County, Alabama
PELA Reference No. 128301
Dear Mr. Hayden:
In accordance with the authorization by Mr. Chris Bradberry on January 1, 2010,
P.E. LaMoreaux & Associates, Inc. (PELA) has completed an evaluation of local
hydrogeologic conditions near pipeline milepost 399.642 on the Southern Natural Gas
North Main Loop Line in southern Cleburne County, Alabama. This letter report
provides documentation of activities and findings.
INTRODUCTION
A 24-inch gas pipeline leaked at milepost 399.642 on the Southern Natural Gas
North Main Loop Line in sec. 14, T. 16 S., R. 11 E., Cleburne County, Alabama (Figure
1), on December 31, 2009. To evaluate the possible influence of hydrogeologic
conditions on the failure, an examination of local conditions was performed.
Specific objectives of this investigation were to confirm the geologic formation,
lithology, topography, and local hydrologic influences at the site. Local surface water
drainage patterns were observed and data necessary to establish the hydrogeologic
setting in the vicinity of the pipeline failure were collected. This information also
provides a basis for recommending strategies for future studies along the pipeline.
P.O. Box 2310, Tuscaloosa, AL 35403 205/752-5543 FAX 752-4043 www.pela.com
273 Azalea Road, Two Office Park, Suite 519, Mobile, AL 36609 251/342-8714 FAX 251/342-8739 E-Mail: bdismukes@pela.com
1225 Barnett Bend Drive, Brandon, MS 39047 601/919-9940 FAX 919-1460 E-Mail: cjones@pela.com
106 Administration Rd. Ste 4, Oak Ridge, TN 37830 865/483-7483 FAX 483-7639 E-Mail: bbeck@pela-tenn.com
P.O. Box 6719, Lakeland, FL 33807 800/811-9366

<<<PAGE 23>>>

Mr. Raymond Hayden
March 2, 2010
Page 2
METHODOLOGY
Publications (maps and reports) on the geology and hydrogeology of the region
were obtained and reviewed. After the regional setting was established, information at
the local scale was reviewed. Topographic contour maps were studied to relate specific
landforms in the area to the movement of ground water and surface water. A U.S.G.S.
7.5-minute quadrangle map was used as a base map for this effort (Figure 1).
Field reconnaissance began on January 4, 2010, with a visit to the site of the
December 31, 2009, pipeline failure by PELA personnel. A PELA hydrogeologist and a
geologist observed the excavation that had been made to remove the leaking section of
pipe. PELA personnel were able to access the trench near the point where the pipe had
failed, to make field observations of lithology and moisture content. Field samples of
subsurface material were visually examined.
Subsequent visits to the site were made on January 6 and February 10, 2010.
On January 6, 2010, the replacement section of pipe was being pressure tested and the
ditch was still exposed for observation. On February 10, 2010, repairs had been
completed and the right-of-way had been graded and erosion control measures had
been implemented.
Precipitation data were obtained from the National Oceanographic and
Atmospheric Administration’s Southeast Regional Climate Center (SERCC), a division
of the National Climatic Data Center. This information was used to identify recent
trends in rainfall in the area.
OBSERVATIONS
The pipeline failure occurred on the north slope of a hill (Photograph 1), within a
minor topographic low (Photograph 2) and change of slope. Examination on January 4,
2010, indicated the presence of a surface water drainage feature that extended
northward from the pipeline right-of-way at the failure point. Surface water was directed
from this area toward the north into a small stream that flowed eastward, downslope
from a pond (Photograph 3). The pond was about 200 feet long by 100 feet wide, and
approximately 300 feet northwest of the location of the pipeline failure.
During field reconnaissance, weathered phyllite, silty clay, and quartzite rubble
were observed at land surface immediately upslope (west) of the failure. Repair crews
had excavated the ditch to provide safe working conditions for replacement of a section
of the pipe, and the complete soil profile was not available for examination. However,
exposures of the lower portions of the walls of the ditch were accessible.
The majority of the ditch wall near the pipeline leak was composed of clay which
had weathered from phyllite. The clay was moderate reddish-orange (10 R 6/6) to
moderate reddish-brown (10 R 4/6), with minor dark yellowish-orange (10 YR 6/6) and
dark yellowish-brown (10 YR 4/2). The clay was silty and slightly sandy (in part) with

<<<PAGE 24>>>

Mr. Raymond Hayden
March 2, 2010
Page 3
very fine- to fine-grained, angular, poorly sorted quartz. The clay was saturated with
water in the topographically low area, near the pipeline leak. This section, near the
leak, appeared to have been wet more often than the surrounding area.
Relict bedding of weathered phyllite was common in the ditch walls. The phyllite
was moderate reddish-orange (10 R 6/6) to dark yellowish-orange (10 YR 6/6) to
grayish-orange (10 YR 7/4), weathered, silty in part, and micaceous with a weak phyllitic
sheen. The phyllite broke easily along foliation planes that dipped 25° toward the east-
southeast.
At the bottom of the ditch, in the area that was underneath the pipe before it was
removed, more competent (less weathered) bedrock was visible. Phyllite in this area
was pale olive (10 Y 6/2) to greenish-gray (5 GY 6/1) to light olive brown (5 Y 5/6), with
a well-developed phyllitic sheen. This phyllite was only slightly weathered, firm, and
also dipped about 25° east-southeastward (Photograph 4). This interval also included
moderate reddish-orange (10 R 6/6) phyllite that was more competent than the phyllite
in the walls of the ditch. This interval was hard, dry, and did not appear to readily
transmit water.
DISCUSSION
HYDROGEOLOGIC SETTING
Almost all of Cleburne County, Alabama, is in the Northern Piedmont physiographic
province. This region is a well-dissected upland developed on northeast-southwest
trending bands of metamorphic rocks. Common rock types in the Piedmont include
phyllite, metasiltstone, quartzite, schist, greenstone, and marble. In eastern Alabama,
the Piedmont is bounded on the north and west by the Valley and Ridge physiographic
province, and on the south by the East Gulf Coastal Plain physiographic province.
The Lay Dam Formation of the Talladega Group in Cleburne County (Figure 2)
consists of irregularly bedded metamorphic rocks, including phyllite, metasiltstone,
greywacke, and quartzite. Rocks observed at land surface and in the excavation at
milepost 399.642 are consistent with those comprising the Lay Dam Formation.
In the Piedmont province, precipitation that seeps into the ground tends to move
downward through the soil, then into the weathered bedrock (the saprolite). If the
bedrock is fractured, water will continue to move downward into the fractures and on to
discharge points. If the bedrock is not fractured, ground water will move laterally along
the top of the bedrock to a discharge point.
Visual observations of the rock at the bottom of the ditch near milepost 399.642 on
January 4 and 6, 2010, indicated a relatively unfractured, slightly weathered phyllite and
undisturbed clay of low permeability (Photograph 4). The moisture observed in the
dark, silty clay in the sides of the ditch on January 4, 2010, was in the zone above this
slightly weathered phyllit