# Failure Report- Transcontinental Gas Pipeline Company 6/9/15

- **operation:** document
- **citation:** PHMSA FIR, Transcontinental Gas Pipeline Company, 2015-06-09
- **title:** Failure Report- Transcontinental Gas Pipeline Company 6/9/15
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2016-06-09
- **effective on:** 2015-06-09
- **summary:** Transcontinental Gas Pipeline Company; Gas Transmission; PA; failure 2015-06-09; apparent cause: Material Failure - Cracking.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-transcontinental-gas-pipeline-company-6915.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-transcontinental-gas-pipeline-company-6915.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-failure-report-transcontinental-gas-pipeline-company-6915
- **source url:** https://www.phmsa.dot.gov/safety-reports/failure-report-transcontinental-gas-pipeline-company-6915
**body:**

<<<PAGE 1>>>

DOT US Department of Transportation
PHMSA Pipeline and Hazardous Materials Safety Administration
OPS Office of Pipeline Safety
Eastern Region
Principal
Investigator
Michael Yazemboski
Senior Accident
Investigator
Michael Yazemboski
Region Director Byron E. Coy
Date of Report 1/13/2016
Subject Failure Investigation Report –
Williams Partners L.P./Transco 24”
Leidy Line B Failure, Unityville, PA
Operator, Location, & Consequences
Date of Failure 6/9/2015
Commodity Released Natural Gas
City/County & State Unityville, Lycoming County, Pennsylvania
OpID & Operator Name 19570 Williams Pipeline L.P./ Transcontinental Gas
Unit # & Unit Name 2841 White Haven
SMART Activity # 150663
Milepost / Location Station # 4693+50 (MP 118.6) ; ‐
Type of Failure Fatalities 0
Injuries 0
Description of area
impacted
Total Costs $751,154
Rupture; Near‐neutral Stress Corrosion Cracking (SCC)
Non‐HCA, Rural Class 1 Area

<<<PAGE 2>>>

Failure Investigation Report – Williams Partners L.P./Transco 24” Leidy Line B Failure, Unityville, PA
6/9/2015
Executive Summary
On June 9, 2015, at approximately 21:30 Eastern Standard
Time (EST), a rupture occurred on the Transcontinental’s Leidy
line B, resulting in the release of approximately 96,379 Mcf1 of
natural gas in a rural class 1 area near Unityville, PA.
Approximately 150 people in the surrounding area were
evacuated by local emergency response personnel as a
precaution. Pursuant to 49 U.S.C. § 60117, the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of
Pipeline Safety (OPS), initiated an investigation on June 10,
2015. As a result of the investigation, PHMSA issued a
Corrective Action Order on June 12, 2015, requiring Williams
Partners, L.P, operator of the Transcontinental Pipeline, to take
certain corrective actions with respect to the Leidy line B failure (CPF No. 1‐2015‐1013H). The cause of
the failure was near‐neutral stress corrosion cracking (SCC) of the pipe. Localized shielding and coating
failure, in addition to cyclic pressures during bidirectional flow, were identified as possible contributing
factors to the incident. The incident caused minimal environmental damage to the surrounding area.
Damage consisted of soil and rock debris ejected onto the right‐of‐way by the pipeline rupture.
Waterways were not impacted. Williams Partners L.P., operator of the Transcontinental Pipeline
(Transco) made a notification to the National Response Center reporting the incident. There were no
fires, injuries, or significant property damage resulting from the release.
System Details
Transcontinental Gas Pipe Line Co. LLC, an affiliate of Williams Partners, L.P., is a 10,500‐mile interstate
natural gas pipeline system extending from Texas, Louisiana, Mississippi, and the Gulf of Mexico through
Alabama, Georgia, South Carolina, North Carolina, Virginia, Maryland, Pennsylvania, and New Jersey to
the New York City metropolitan area. The system's total delivery capacity is approximately 8.4 million
dekatherms.
Leidy line B is a 24‐inch diameter pipeline, 194.06 miles in length, that originates at station 505 at
milepost (mp) 0.14 and terminates at the Leidy Storage Field located in Tamarack, PA. Line B passes
through Potter, Clinton, Lycoming, Columbia, Luzerne, and Monroe Counties in Pennsylvania and
Warren, Hunterdon, and Somerset Counties in New Jersey (Appendix A).
The “Affected Segment”, a term used throughout this report, is the segment of Leidy line B from
compressor station 517 main line valve to Leidy Storage Field (MP
194.06). The length of Affected Segment is 78.9 miles.
The “Isolated Segment” is the 14.3‐mile segment of Leidy line B from compressor station 517 main line
valve MLV 517LB0 to MLV 517LB10. The Isolated Segment is the portion of the Affected Segment that
was shut‐in after the failure.
There is no history of previous incidents or significant releases from the failed pipeline.
1 Mcf = thousand cubic feet
Page 2 of 5

<<<PAGE 3>>>

Failure Investigation Report - Williams Partners L.P./Transco 24" Leidy Line B Failure, Unityville, PA
6/9/2015
Events Leading up to the Failure
On the morning of Tuesday, June 9, 2015,
Williams' personnel repositioned valves on
line B to allow gas to flow west to Leidy
Storage. According to SCADA pressure
records, the switch took place at 09:24. Prior
to the incident, gas was flowing east under
compression from the turbines at station
520. When the turbines are not in operation,
gas from producers flows into line B, moving
west toward Leidy. The records also show station 520 was shut down on Monday, June 8, 2015, and
bypassed in preparation for the flow reversal on June 9. A review of the pressure records leading
up to the failure showed pressure slowly increasing in line B throughout the day on June 9. The
operating pressure in line B at the time of failure was 1,141 psig, which was below the 1,200 psig
Maximum Allowable Operating Pressure (MAOP).
Emergency Response
On June 9, 2015, at approximately 21:30 EST, Pipeline Control in Houston, Texas was alerted by a SCADA
low pressure alarm on line B, and proceeded to isolate the line by remotely closing
near the town of Benton, PA. Local operations responded and verified that
valves 517LB0 and S4 at station 517 were closed, and confirmed that the failed section of pipeline had
been isolated. Valves 517LBO and S4 had been closed prior to the incident due to construction activities
at station 517. Isolation of the failed pipeline segment was completed within approximately 30 minutes
and Transco personnel, including emergency managers, were on-site within 1 hour. Emergency
responders, including seven local fire companies, responded and began evacuating a 2-mile radius
around the failure site. The nearest home was located approximately 0.2 miles away from the failure
location. Approximately 150 people were evacuated as a precaution due to the escaping natural gas.
State Routes 118 and 42 were temporarily closed to traffic in the affected area. There were no fires or
injuries reported as a result of the pipeline rupture. Williams Pipeline notified the National Response
Center (NRC) at 22:41 EST on June 9, 2015 (NRC No. 1119244).
Summary of Return-to-Service
There are three pipelines, lines A, B, and C, within
the Transco Pipeline right-of-way. Due to the
proximity of line C to the line B rupture, Williams
conducted an integrity assessment of line C on June
11, 2015, by exposing 100 feet of line closest to the
failure location. No damage was identified. Line A
was not exposed. Lines A and C were returned to
normal operating pressures on June 12, 2015.
Following the assessment of lines A and C, PHMSA
issued a corrective action order (CAO) on June 12,
2015, requiring Williams Partners, L.P, operator of
the Transcontinental Pipeline, to take certain corrective actions with respect to Leidy line B (CPF No. 1-
2015-1013H). The CAO imposed a 20% reduction in pressure on the Affected Segment and imposed an
operating restriction on the Isolated Segment of Leidy line B. The CAO also required the development
Page 3 of 5

<<<PAGE 4>>>

Failure Investigation Report – Williams Partners L.P./Transco 24” Leidy Line B Failure, Unityville, PA
6/9/2015
and submittal of a restart plan, prior to operation of the isolated segment. The order also required an
instrumented leakage survey, confirmation of MAOP, review of prior inline inspection (ILI) results,
mechanical and metallurgical testing, failure analysis of the failed pipe, root cause failure analysis, and a
review of the effectiveness of its Emergency Response Plan and Public Awareness Program with regards
to the failure.
The Isolated Segment of line B will remain out of operation and the 20% reduction in operating pressure
on the Affected Segment will remain in place pending completion of the CAO requirements and PHSMA
approval to remove the operating restrictions.
Investigation Details
The failure occurred on line B in a rural, non‐HCA area within Transco’s right‐of‐way approximately
1,000 feet west of Bradley Road at mile post 118.6. There are 3 Transco pipelines, line A (24 inch
diameter), line B (24‐inch diameter), and line C (36‐inch diameter), within the common right‐of‐way at
this location. The section of line B that failed was constructed in 1963, and consists of 24‐inch diameter,
0.344 inch wall thickness, Grade X60, electric flash welded (EFW) seam pipe.
At the time of the failure, line B was operating at a pressure of 1,141 psig, which is below the Maximum
Allowable Operating Pressure (MAOP) of 1,200 psig, as established by a hydrostatic test in 1987.
The rupture consisted of a 34‐foot longitudinal fracture originating at the one‐o'clock position on the
pipeline. Based on visual and laboratory examination of the pipe, the failure was not near or associated
with the longitudinal weld seam on the pipe. The incident occurred between stations 4701+33 and
4683+36. Minimum cover over the pipe was measured to be 43 inches on the upper slope of the failure
site.
Operation and Maintenance records for line B were reviewed from 2010 through 2015. The records
included Cathodic Protection, Leak Survey/Patrolling, performed by Eagle Sky Patrol Inc. No issues were
identified. Launchers and receivers are located at station 515 at mp 68.95, Picture Rocks at mp 129.52,
and station 520 at mp 157.68
Line B was installed in 1963 and is EFW X60 pipe with an external coal tar coating. There is no history of
internal corrosion. Based on a review of the SCADA system pressure data, there is no excessive pressure
cycling. The majority of the line B is located in a class 1‐2 area with some class 3 areas between station
515 and station 505. There are no class 3 areas west of station 515.
Line A was installed in the 1950’s and it has an external coal tar coating. According to the Williams Root
Cause Analysis (Appendix E) “the Leidy A and B Lines on the Pennsylvania System should be assessed
with in line inspection crack (Electro Magnetic Acoustic Transducer or EMAT) tools as the pipeline and
coating vintage are all similar on the west side of the Delaware River.”
Line C was installed in 1987 and it has a 3 layer external phenolic epoxy coating.
Prior Assessments of the Failed Pipeline:
The original hydrostatic test on line B was conducted in 1963. The pipe was retested in 1987 from mile
post 113.76 to 123.79 due to a class location change from 1 to 2 on the segment. The minimum
pressure during the retest was 1,795 psig.
On September 30, 2010, a mag flux leakage tool (MFL), caliper tool, and internal mapping unit tool (IMU)
was run on 88.73 miles of the Leidy loop line B from station 515 to station 520. A total of 29 locations
were selected for digs (mp 0 to 44.84, and mp 113.74 to 157.63 for total of 87.73 miles). Remediation
work was completed in 2011.
Page 4 of 5

<<<PAGE 5>>>

Failure Investigation Report – Williams Partners L.P./Transco 24” Leidy Line B Failure, Unityville, PA
6/9/2015
A third‐party review of the ILI run from 2010 was performed by Enduro Pipeline Services on June 10,
2015. The results of the data review did not show any metal loss, cracking, or denting that would have
contributed to the failure. There were no anomalies identified associated with seams, wrinkles, buckles
or strain in the area of the failure.
Findings and Contributing Factors
Root Cause:
The SES metallurgical analysis report, dated August 25, 2015, identified the cause of the rupture to be
the result of near‐neutral pH SCC that initiated on the external surface of the pipe (Appendix D). The
report also indicates that groups of SCC colonies were found adjacent to the rupture origin, as well as
several locations remote from the rupture origin. Pits of depths that were less than 10% of the wall
thickness of the pipe were present on the outside surface of the pipe in the vicinity of the SCC colonies.
The pits were observed in areas where the exterior coating had locally disbonded from the pipe. The
combination of transgranular cracking, corrosion of the crack sides, external corrosion pitting, and
corrosion deposits containing iron carbonate (siderite) indicates that the cracking was the result of near‐
neutral pH SCC. The pipe analysis found no evidence of mechanical or third party damage that could
have contributed to the failure, and the properties of the pipe material met the requirements of API 5LX,
Grade X60, confirming that the pipe properties did not contribute to the rupture.
Contributing Factors:
Localized Coating Failure Combined with Shielding: Corrosion and rust staining on the area surrounding
the cracks were observed, indicating areas of coating failure. The coating failure could be due to
inadequate surface preparation prior to applying the coating or soil stresses on the coating.
Cyclical Stresses and Bidirectional Flow: In the past, the Leidy System was utilized as a storage lateral
moving gas from the southwestern United States to storage fields in Pennsylvania. The gas would then
be sent back to markets on the East Coast at times of peak delivery. Currently, the Leidy System is used
more as a Transmission pipeline moving gas from the Marcellus Shale production to New Jersey and
New York. The bidirectional flow and pressure variations may have been a contributing factor to the
formation of near‐neutral pH SCC on the pipeline.
Appendices
A
B
C
D
E
Maps and Photographs
NRC Report 1119244
Incident Report Form 7100.2 20150091 - 16805
Stress Engineering Services, Inc. Metallurgical Analysis Report
Williams Root Cause Analysis
Page 5 of 5

<<<PAGE 6>>>

Brantford
Catharines
Kocnester
Buffalo
Syracuse
Utica
System 1287
20
Erie.
ake
Unit 2841
Approx Failure
Albany
Nashua
location
MASSACHUSETTS
Lowell®
Worcester
Binghamsten
Springfield
/ 62
Hartford
Providence New E
49.
PENNSY
WIA
15
Scranton.
• Waterbury
CONNECTICUT
RHODE
/Fal
Youngstown
180
Bridgeport
ISLAND
State College
Pittsburgh
Altoona
22
111
Allen town
New York
219
99
Harrisburg
Reading
222
Trenton
Edison
115
Philadelphia
Toms River
MARYLAND
JERSEY
NEW
Adantic City
esri
Olean
Elmira
Binghamton®
Bradford
Kingston
220
219
Poughke
Saint Marys
PENNSYLVANIA
Scranton o
Middletown, Newburst Beacon
Williamsport
206
209
JERSEY
NEW
68
11
Hazleton
State College
209
Paterson
White Plainso
Yonke
Parsippany
281
Altoona
Allentown
New Yorko ass
Elizabeth
0930°k
202
•Edison
Reading
cos noi destin
Page 1 of 21

<<<PAGE 7>>>

Columbia
Penn Twp
SL
239-PA 239-State Route 239
Jackson
Twp
78037-3000
Jordan
Lairdsville
Franklin
TWp
Twp
(239
487
Unityville
(118)
Beach Glen Rd:
21830),
esni
Biggertown
Mordan Hollow Ra
Bobbons Spring In
Bradey Ro
Wilson Rd
Page 2 of 21

<<<PAGE 8>>>

Page 3 of 21

<<<PAGE 9>>>

Olean
Elmira
Jamestown
Binghamton
Bradford
Warren
220
219
62
44
11
PENNSYLVANIA
(15
il Gity
Saint Marys
Middletown Newburgh™
Scranton o
Willamsport
80
380
206
NEW
80
209
JERSEY
73°w
White PI
11
Hazleton
209
Paterson
80
State College
46
Parsippany
(422
New Yorko
Allentown
78
Elizabeth
Alto on a
22
OEdison
202
PENNSYLVANIA
99
Harrisburg
Reading
130
1 9
Lo
222
Trenton
Lancaster
322
Chamb ersbura
/15
(30-
Philadelphia
Toms Rii
31km
Page 4 of 21

<<<PAGE 10>>>

меге
220
Creek Twp
Plunketts
PA-3005
Shrewsbury
Twp
42
41022°30N
Muncy
Valley
Glen State
Ricketts
Davidson
Park
Mill
Twp
Creek
Fairfield
Upper
(864)
Twp
118
Twp
Fairm ount
Wolf Twp
Twp
Picture
Sugarloaf
Rocks
Penn Twp
Twp
(220)
(239
Fairfield
Jackson
MossvilleRdRedHill Ra
Twp
Jordan
Twp
Bethel Hill Ru
Broadway!
Muncy
Lyconing Mall Dr
Iwp
76°37 30"VF ranklin
Twp
7653'30"W
Hughesville
Lairdsville
Twp
-118
*Ro
Unityville
Moreland
Larasville Rd
(42)
exdı eton po
Twp
Puntock Harveyvin. Rd
Muncy
reek Twi
Bentor
Twp
Pine Twp
Benton
shickshinny Rd
Huntington
on
Mills
(442)
Uni
Montgomery
Lycoming
New
Tw
Colum bus
Nor thumberlun d
Sunshine Rd
Stillwater
Greenwood
Waterton Rd
405
Twp
Shickshinny Valley
Delaware
Twp
Anthony
Mil |V199°30°N
Roge Rd
Twp
White Hall Ro
Madison
Rohroburg Rd
Winding Rd
Dewart
Twp
Briar
ung/e int
Turbotville
487
Creek
Lewis
Twp
a Nasr
Watsontown
Twp
Mt Pleasant
Alsup
Page 5 of 21

<<<PAGE 11>>>

118
Woods Rd
Keller Hollow.Rd,
Kellen Hollow Rd.
118
165 m
Page 6 of 21

<<<PAGE 12>>>

Bradley Rd
Appalachian Mountains
Bradley Rd
Page 7 of 21

<<<PAGE 13>>>



<<<PAGE 14>>>

Page 9 of 21

<<<PAGE 15>>>

Page 10 of 21

<<<PAGE 16>>>

Page 11 of 21

<<<PAGE 17>>>

Page 12 of 21

<<<PAGE 18>>>

Page 13 of 21

<<<PAGE 19>>>

Page 14 of 21

<<<PAGE 20>>>

Page 15 of 21

<<<PAGE 21>>>

Page 16 of 21

<<<PAGE 22>>>

Page 17 of 21

<<<PAGE 23>>>

Page 18 of 21

<<<PAGE 24>>>

Page 19 of 21

<<<PAGE 25>>>

Page 20 of 21

<<<PAGE 26>>>

Page 21 of 21

<<<PAGE 27>>>

TeleDetail
Page 1 of 4
150663 Appendix B NRC Report 1119244
HMIS->INCI
Pipeline & Hazardous
PHMSA
Materials Safety
(Version 4.0.0
Administration
PROD)
Rules of Beha
[Return to Search]
NRC Number:
1119244
Call Date:
06/09/2015
Call Time:
22:41:00
Caller Information
First Name:
WILLIAM
Last Name: NEUBAUER
Company Name: WILLIAMS GAS PIPELINE
Address:
2800 POST OAK BLVD
City:
HOUSTON
State:
Country:
USA
Zip:
77056
Phone 1:
8002311290
Phone 2:
7135918409
Organization
Type:
PRIVA
Is caller the
@ Yes ONo ONo
spiller?
Response
Confidential:
•Yes •No ONo Response
Discharger Information
First Name:
WILLIAM
Last Name: NEUBAUER
Company Name: WILLIAMS GAS PIPELINE
Address:
2800 POST OAK BLVD
City:
HOUSTON
State:
TX
Country:
USA
Zip:
77056
Phone 1:
8002311290
Phone 2:
7135918409
Organization
Type:
PRIVAT
Page 1 of 4
http://hmis.phmsa.dot.gov/hmis/telephonics/Teledetail.aspx?sho... 11/12/2015

<<<PAGE 28>>>

TeleDetail
Page 2 of 4
150663 Appendix B NRC Report 1119244
Spill Information
State:
PA
County:
MERCER
Nearest City:
UNITYVILLE
Zip Code:
Location
Spill Date:
06/09/2015 (mm/dd/yyyy) Spill Time:
20:40:00
_ (24hh:mm:ss)
DTG Type:
<- Select DTG Type -> V
Reported
Incident Type
ALL
Incident
PIPELINE
Type
Description
NATURAL GAS RELEASED FROM A 24 INCH PIPELINE DUE TO AN UNKNOWN CAUSE AT THIS
Materials Involved
Material / Chris Name
Chris Code Total Qty.
Water Qty.
NATURAL GAS
ONG
O UNKNOWN AMOUNT
Medium Type:
<- Select Medium Type V
Additional Medium Information:
ATMOSPHERE
Injuries:
Fatalites:
Evacuations:
• Yes • No O Unknown
No. of
Evacuations:
Page 2 of 4
http://hmis.phmsa.dot.gov/hmis/telephonics/Teledetail.aspx?sho. 11/12/2015

<<<PAGE 29>>>

TeleDetail
Page 3 ot 4
150663 Appendix B NRC Report 1119244
Damages:
• Yes O No • Unknown
Damage
Amount:
Federal Agency
State
Notified:
• Yes O No • Unknown Agency
• Yes O No • Unknown
Notified:
Other Agency
Notified:
• Yes O No • Unknown
Remedial Actions
THEY CLOSED REMOTE VALVES TO ISOLATE THE SECTION.
Additional Info
THE ROAD CLOSURE IS STILL ONGOING.
Latitude
Degrees: L
Minutes:
Seconds:
Quadrant:
Longitude
Degrees: L
Minutes:
Seconds:
Quadrant: |
Distance from
City:
Direction:
Section:
Township:
Range:
Milepost:
]Rescinded
Comments (max 250 characters)
^
1..1 of 1
Page 3 of 4
http://hmis.phmsa.dot.gov/hmis/telephonics/Teledetail.aspx?sho... 11/12/2015

<<<PAGE 30>>>

TeleDetail
Page 4 of 4
150663 Appendix B NRC Report 1119244
<< Previous
<< Save >>
Page 4 of 4
http://hmis.phmsa.dot.gov/hmis/telephonics/Teledetail.aspx?sho... 11/12/2015

<<<PAGE 31>>>

150663 Appendix C Incident Report Form 7100.2 20150091-16805
NOTICE: This report is required by 49 CFR Part 191. Failure to report can result in a civil penalty not to
exceed 100,000 for each violation for each day that such violation persists except that the maximum civil
penalty shall not exceed $1,000,000 as provided in 49 USC 60122.
OMB NO: 2137-0522
EXPIRATION DATE: 10/31/2016
Original Report
Date: 07/09/2015
U.S Department of Transportation
Pipeline and Hazardous Materials Safety Administration
No. 20150091 - 16805
--------------------------------------------------
(DOT Use Only)
INCIDENT REPORT - GAS TRANSMISSION AND
GATHERING PIPELINE SYSTEMS
A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply
with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid
OMB Control Number. The OMB Control Number for this information collection is 2137-0522. All responses to this collection of information are
mandatory. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing the
burden to: Information Collection Clearance Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590.
INSTRUCTIONS
Important: Please read the separate instructions for completing this form before you begin. They clarify the information requested and provide specific
examples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page at
http://www.phmsa.dot.gov/pipeline/library/forms.
PART A - KEY REPORT INFORMATION
Report Type: (select all that apply) Original: Supplemental: Final:
Yes
Last Revision Date:
1. Operator's OPS-issued Operator Identification Number (OPID): 19570
2. Name of Operator TRANSCONTINENTAL GAS PIPE LINE COMPANY
3. Address of Operator:
3a. Street Address 2800 POST OAK BLVD
3b. City HOUSTON
3c. State Texas
3d. Zip Code: 77056
4. Local time (24-hr clock) and date of the Incident: 06/09/2015 21:30
5. Location of Incident:
Latitude:
Longitude:
6. National Response Center Report Number (if applicable): 1119244
7. Local time (24-hr clock) and date of initial telephonic report to the
National Response Center (if applicable): 06/09/2015 22:41
8. Incident resulted from: Unintentional release of gas
9. Gas released: (select only one, based on predominant volume
released) Natural Gas
- Other Gas Released Name:
10. Estimated volume of commodity released unintentionally - Thousand
Cubic Feet (MCF): 96,379.00
11. Estimated volume of intentional and controlled release/blowdown -
Thousand Cubic Feet (MCF) 16,812.00
12. Estimated volume of accompanying liquid release (Barrels):
13. Were there fatalities? No
- If Yes, specify the number in each category:
13a. Operator employees
13b. Contractor employees working for the Operator
13c. Non-Operator emergency responders
13d. Workers working on the right-of-way, but NOT
associated with this Operator
13e. General public
13f. Total fatalities (sum of above)
14. Were there injuries requiring inpatient hospitalization? No
- If Yes, specify the number in each category:
14a. Operator employees
14b. Contractor employees working for the Operator
14c. Non-Operator emergency responders
14d. Workers working on the right-of-way, but NOT
associated with this Operator
14e. General public
14f. Total injuries (sum of above)
15. Was the pipeline/facility shut down due to the incident? Yes
- If No, Explain:
Form PHMSA F 7100.2 Page 1 of 13
Reproduction of this form is permitted
Page 1 of 13

<<<PAGE 32>>>

150663 Appendix C Incident Report Form 7100.2 20150091-16805
- If Yes, complete Questions 15a and 15b: (use local time, 24-hr clock)
15a. Local time and date of shutdown 06/09/2015 22:07
15b. Local time pipeline/facility restarted
- Still shut down? (* Supplemental Report Required) Yes
16. Did the gas ignite? No
17. Did the gas explode? No
18. Number of general public evacuated: 150
19. Time sequence (use local time, 24-hour clock):
19a. Local time operator identified Incident– effective 10-2014,
changed from "Incident" to "failure" 06/09/2015 21:30
19b. Local time operator resources arrived on site 06/09/2015 23:03
PART B - ADDITIONAL LOCATION INFORMATION
1. Was the origin of the Incident onshore? Yes
- Yes (Complete Questions 2-12)
- No (Complete Questions 13-15)
If Onshore:
2. State: Pennsylvania
3. Zip Code: 17814-7935
4. City Benton
5. County or Parish Lycoming County
6. Operator designated location Milepost/Valve Station
Specify: MP 118.6
7. Pipeline/Facility name: Leidy Line B
8. Segment name/ID: 517LB10 to 517LB0
9. Was Incident on Federal land, other than the Outer Continental Shelf
(OCS)? No
10. Location of Incident : Pipeline Right-of-way
11. Area of Incident (as found) : Underground
Specify: Under soil
Other – Describe:
Depth-of-Cover (in): 43
12. Did Incident occur in a crossing? No
- If Yes, specify type below:
- If Bridge crossing –
Cased/ Uncased:
- If Railroad crossing –
Cased/ Uncased/ Bored/drilled
- If Road crossing –
Cased/ Uncased/ Bored/drilled
- If Water crossing –
Cased/ Uncased
Name of body of water (If commonly known):
Approx. water depth (ft) at the point of the Incident:
Select:
If Offshore:
13. Approx. water depth (ft) at the point of the Incident:
14. Origin of Incident:
- If "In State waters":
- State:
- Area:
- Block/Tract #:
- Nearest County/Parish:
- If "On the Outer Continental Shelf (OCS)":
- Area:
- Block #:
15. Area of Incident:
PART C - ADDITIONAL FACILITY INFORMATION
1. Is the pipeline or facility: - Interstate - Intrastate Interstate
2. Part of system involved in Incident: Onshore Pipeline, Including Valve Sites
3. Item involved in Incident: Pipe
- If Pipe – Specify: Pipe Body
3a. Nominal diameter of pipe (in): 24
3b. Wall thickness (in): .344
3c. SMYS (Specified Minimum Yield Strength) of pipe (psi): 1,720
Form PHMSA F 7100.2 Page 2 of 13
Reproduction of this form is permitted
Page 2 of 13

<<<PAGE 33>>>

150663 Appendix C Incident Report Form 7100.2 20150091-16805
3d. Pipe specification: 60000
3e. Pipe Seam – Specify: Flash Welded
- If Other, Describe:
3f. Pipe manufacturer: AO SMITH
3g. Year of manufacture: Unknown
3h. Pipeline coating type at point of Incident – Specify: Coal Tar
- If Other, Describe:
- If Weld, including heat-affected zone – Specify:
- If Other, Describe:
- If Valve – Specify:
- If Mainline – Specify:
- If Other, Describe:
3i. Mainline valve manufacturer:
3j. Year of manufacture:
- If Other, Describe:
4. Year item involved in Incident was installed: 1963
5. Material involved in Incident: Carbon Steel
- If Material other than Carbon Steel or Plastic – Specify:
6. Type of Incident involved: Rupture
- If Mechanical Puncture – Specify Approx. size:
in. (axial) by
in. (circumferential)
- If Leak - Select Type:
- If Other – Describe:
- If Rupture - Select Orientation: Longitudinal
- If Other – Describe:
Approx. size: in. (widest opening): 408
by in. (length circumferentially or axially): 24
- If Other – Describe:
PART D - ADDITIONAL CONSEQUENCE INFORMATION
1. Class Location of Incident: Class 1 Location
2. Did this Incident occur in a High Consequence Area (HCA)? No
- If Yes:
2a. Specify the Method used to identify the HCA:
3. What is the PIR (Potential Impact Radius) for the location of this
Incident? Feet: 574
4. Were any structures outside the PIR impacted or otherwise damaged
due to heat/fire resulting from the Incident? No
5. Were any structures outside the PIR impacted or otherwise damaged
NOT by heat/fire resulting from the Incident? No
6. Were any of the fatalities or injuries reported for persons located
outside the PIR? No
7. Estimated Property Damage :
7a. Estimated cost of public and non-Operator private
property damage paid/reimbursed by the Operator – effective 6-
2011, "paid/reimbursed by the Operator" removed
$ 0
Estimated cost of gas released unintentionally – effective 6-2011,
moved to item 7f
Estimated cost of gas released during intentional and controlled
blowdown – effective 6-2011, moved to item 7g
7b. Estimated cost of Operator's property damage & repairs $ 420,000
7c. Estimated cost of Operator's emergency response $ 10,000
7d. Estimated other costs $ 0
Describe:
7e. Property damage subtotal (sum of above) $ 430,000
Cost of Gas Released
7f. Estimated cost of gas released unintentionally $ 273,454
7g. Estimated cost of gas released during intentional and
controlled blowdown $ 47,700
7h. Total estimated cost of gas released (sum of 7.f & 7.g above) $ 321,154
Total of all costs $ 751,154
Form PHMSA F 7100.2 Page 3 of 13
Reproduction of this form is permitted
Page 3 of 13

<<<PAGE 34>>>

150663 Appendix C Incident Report Form 7100.2 20150091-16805
PART E - ADDITIONAL OPERATING INFORMATION
1. Estimated pressure at the point and time of the Incident (psig): 1,141.00
2. Maximum Allowable Operating Pressure (MAOP) at the point and
time of the Incident (psig): 1,200.00
Added 10-2014 2a. MAOP established by 49 CFR section: 192.619(a)(1)
- If Other, specify:
3. Describe the pressure on the system or facility relating to the
Incident: Pressure did not exceed MAOP
4. Not including pressure reductions required by PHMSA regulations
(such as for repairs and pipe movement), was the system or facility
relating to the Incident operating under an established pressure
restriction with pressure limits below those normally allowed by the
MAOP?
No
- If Yes - (Complete 4a and 4b below)
4a. Did the pressure exceed this established pressure
restriction?
4b. Was this pressure restriction mandated by PHMSA or the
State?
5. Was "Onshore Pipeline, Including Valve Sites" OR "Offshore Pipeline,
Including Riser and Riser Bend" selected in PART C, Question 2? Yes
- If Yes - (Complete 5a. – 5e. below):
5a. Type of upstream valve used to initially isolate release source: Remotely Controlled
5b. Type of downstream valve used to initially isolate release
source: Remotely Controlled
5c. Length of segment isolated between valves (ft): 75,504
5d. Is the pipeline configured to accommodate internal inspection
tools? Yes
- If No – Which physical features limit tool accommodation? (select all that apply)
- Changes in line pipe diameter
- Presence of unsuitable mainline valves
- Tight or mitered pipe bends
- Other passage restrictions (i.e. unbarred tee's, projecting
instrumentation, etc.)
- Extra thick pipe wall (applicable only for magnetic flux
leakage internal inspection tools)
- Other
- If Other, Describe:
5e. For this pipeline, are there operational factors which
significantly complicate the execution of an internal inspection tool
run?
No
- If Yes, which operational factors complicate execution? (select all that apply)
- Excessive debris or scale, wax, or other wall build-up
- Low operating pressure(s)
- Low flow or absence of flow
- Incompatible commodity
- Other
- If Other, Describe:
5f. Function of pipeline system: Transmission System
6. Was a Supervisory Control and Data Acquisition (SCADA)-based
system in place on the pipeline or facility involved in the Incident? Yes
- If Yes:
6a. Was it operating at the time of the Incident? Yes
6b. Was it fully functional at the time of the Incident? Yes
6c. Did SCADA-based information (such as alarm(s), alert(s),
event(s), and/or volume or pack calculations) assist with the
detection of the Incident?
Yes
6d. Did SCADA-based information (such as alarm(s), alert(s),
event(s), and/or volume calculations) assist with the confirmation of
the Incident?
Yes
7. How was the Incident initially identified for the Operator? SCADA-based information (such as alarm(s), alert(s),
event(s), and/or volume or pack calculations)
- If Other – Describe:
7a. If "Controller", "Local Operating Personnel, including
contractors", "Air Patrol", or "Ground Patrol by Operator or its
contractor" is selected in Question 7, specify:
8. Was an investigation initiated into whether or not the controller(s) or
control room issues were the cause of or a contributing factor to the
Incident?
No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary
due to: (provide an explanation for why the Operator did not
Form PHMSA F 7100.2 Page 4 of 13
Reproduction of this form is permitted
Page 4 of 13

<<<PAGE 35>>>

150663 Appendix C Incident Report Form 7100.2 20150091-16805
investigate)
- If No, the operator did not find that an investigation of the
controller(s) actions or control room issues was necessary due to:
(provide an explanation for why the operator did not investigate)
Controller Actions did not appear to cause the incident
- If Yes, Descr be investigation result(s) (select all that apply):
- Investigation reviewed work schedule rotations, continuous
hours of service (while working for the operator), and other
factors associated with fatigue
- Investigation did NOT review work schedule rotations,
continuous hours of service (while working for the Operator)
and other factors associated with fatigue
- Provide an explanation for why not:
- Investigation identified no control room issues
- Investigation identified no controller issues
- Investigation identified incorrect controller action or
controller error
- Investigation identified that fatigue may have affected the
controller(s) involved or impacted the involved controller(s)
response
- Investigation identified incorrect procedures
- Investigation identified incorrect control room equipment
operation
- Investigation identified maintenance activities that affected
control room operations, procedures, and/or controller
response
- Investigation identified areas other than those above –
Describe:
PART F - DRUG & ALCOHOL TESTING INFORMATION
1. As a result of this Incident, were any Operator employees tested
under the post-accident drug and alcohol testing requirements of DOT's
Drug & Alcohol Testing regulations?
Yes
- If Yes:
1a. How many were tested: 3
1b. How many failed: 0
2. As a result of this Incident, were any Operator contractor employees
tested under the post-accident drug and alcohol testing requirements of
DOT's Drug & Alcohol Testing regulations?
Yes
- If Yes:
2a. How many were tested: 3
2b. How many failed: 0
PART G - APPARENT CAUSE
Select only one box from PART G in the shaded column on the left representing the APPARENT Cause of the Incident, and answer the
questions on the right. Describe secondary, contributing, or root causes of the Incident in the narrative (PART H).
Apparent Cause: G5 - Material Failure of Pipe or Weld
G1 - Corrosion Failure - only one sub-cause can be picked from shaded left-hand column
Corrosion Failure – Sub-cause:
- If External Corrosion:
1. Results of visual examination:
- If Other, Describe:
2. Type of corrosion: (select all that apply)
- Galvanic
- Atmospheric
- Stray Current
- Microbiological
- Selective Seam
- Other
- If Other – Describe:
3. The type(s) of corrosion selected in Question 2 is based on the following: (select all that apply)
- Field examination
- Determined by metallurgical analysis
- Other
- If Other – Describe:
Form PHMSA F 7100.2 Page 5 of 13
Reproduction of this form is permitted
Page 5 of 13

<<<PAGE 36>>>

150663 Appendix C Incident Report Form 7100.2 20150091-16805
4. Was the failed item buried under the ground?
- If Yes:
4a. Was failed item considered to be under cathodic protection at
the time of the incident?
- If Yes, Year protection started:
4b. Was shielding, tenting, or disbonding of coating evident at the
point of the incident?
4c. Has one or more Cathodic Protection Survey been conducted
at the point of the incident?
If "Yes, CP Annual Survey" – Most recent year conducted:
If "Yes, Close Interval Survey" – Most recent year conducted:
If "Yes, Other CP Survey" – Most recent year conducted:
- If No:
4d. Was the failed item externally coated or painted?
5. Was there observable damage to the coating or paint in the vicinity of
the corrosion?
- If Internal Corrosion:
6. Results of visual examination:
- If Other, Describe:
7. Cause of corrosion (select all that apply):
- Corrosive Commodity
- Water drop-out/Acid
- Microbiological
- Erosion
- Other
- If Other, Describe:
8. The cause(s) of corrosion selected in Question 7 is based on the following (select all that apply):
- Field examination
- Determined by metallurgical analysis
- Other
- If Other, Describe:
9. Location of corrosion (select all that apply):
- Low point in pipe
- Elbow
- Drop-out
- Other
- If Other, Describe:
10. Was the gas/fluid treated with corrosion inh bitors or biocides?
11. Was the interior coated or lined with protective coating?
12. Were cleaning/dewatering pigs (or other operations) routinely
utilized?
13. Were corrosion coupons routinely utilized?
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Incident" (from PART C,
Question 3) is Pipe or Weld.
14. Has one or more internal inspection tool collected data at the point
of the Incident?
14a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run:
- Magnetic Flux Leakage Tool
Most recent year run:
- Ultrasonic
Most recent year run:
- Geometry
Most recent year run:
- Caliper
Most recent year run:
- Crack
Most recent year run:
- Hard Spot
Most recent year run:
- Combination Tool
Most recent year run:
- Transverse Field/Triaxial
Most recent year run:
- Other
Most recent year run:
If Other, Describe:
15. Has one or more hydrotest or other pressure test been conducted
since original construction at the point of the Incident?
Form PHMSA F 7100.2 Page 6 of 13
Reproduction of this form is permitted
Page 6 of 13

<<<PAGE 37>>>

150663 Appendix C Incident Report Form 7100.2 20150091-16805
- If Yes,
Most recent year tested:
Test pressure (psig):
16. Has one or more Direct Assessment been conducted on this
segment?
- If Yes, and an investigative dig was conducted at the point of the Incident:
Most recent year conducted:
- If Yes, but the point of the Incident was not identified as a dig site:
Most recent year conducted:
17. Has one or more non-destructive examination been conducted at
the point of the Incident since January 1, 2002?
17a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year examined:
- Guided Wave Ultrasonic
Most recent year examined:
- Handheld Ultrasonic Tool
Most recent year examined:
- Wet Magnetic Particle Test
Most recent year examined:
- Dry Magnetic Particle Test
Most recent year examined:
- Other
Most recent year examined:
If Other, Describe:
G2 - Natural Force Damage - only one sub-cause can be picked from shaded left-handed column
Natural Force Damage – Sub-Cause:
- If Earth Movement, NOT due to Heavy Rains/Floods:
1. Specify:
- If Other, Descr be:
- If Heavy Rains/Floods:
2. Specify:
- If Other, Descr be:
- If Lightning:
3. Specify:
- If Temperature:
4. Specify:
- If Other, Descr be:
- If Other Natural Force Damage:
5. Describe:
Complete the following if any Natural Force Damage sub-cause is selected.
6. Were the natural forces causing the Incident generated in conjunction
with an extreme weather event?
6a. If yes, specify: (select all that apply):
- Hurricane
- Tropical Storm
- Tornado
- Other
- If Other, Describe:
G3 - Excavation Damage only one sub-cause can be picked from shaded left-hand column
Excavation Damage – Sub-Cause:
- If Previous Damage Due to Excavation Activity: Complete Questions 1-5 ONLY IF the "Item Involved in Incident" (From Part C,
Question 3) is Pipe or Weld.
1. Has one or more internal inspection tool collected data at the point of
the Incident?
1a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run:
- Magnetic Flux Leakage
Year:
- Ultrasonic
Year:
- Geometry
Year:
Form PHMSA F 7100.2 Page 7 of 13
Reproduction of this form is permitted
Page 7 of 13

<<<PAGE 38>>>

150663 Appendix C Incident Report Form 7100.2 20150091-16805
- Caliper
Year:
- Crack
Year:
- Hard Spot
Year:
- Combination Tool
Year:
- Transverse Field/Triaxial
Year:
- Other:
Year:
Describe:
2. Do you have reason to believe that the internal inspection was
completed BEFORE the damage was sustained?
3. Has one or more hydrotest or other pressure test been conducted
since original construction at the point of the Incident?
- If Yes:
Most recent year tested:
Test pressure (psig):
4. Has one or more Direct Assessment been conducted on the pipeline
segment?
- If Yes, and an investigative dig was conducted at the point of the Incident:
Most recent year conducted:
- If Yes, but the point of the Incident was not identified as a dig site:
Most recent year
- **truncated:** true
- **body characters:** 51810