# Texas Gas Transmission, LLC-9/9/15

- **operation:** document
- **citation:** PHMSA FIR, Texas Gas Transmission LLC, 2015-09-09
- **title:** Texas Gas Transmission, LLC-9/9/15
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-06-22
- **effective on:** 2015-09-09
- **summary:** Texas Gas Transmission LLC; Hazardous Liquid; LA; failure 2015-09-09; apparent cause: Material Failure of Pipe or Weld.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-fir-texas-gas-transmission-llc-9915.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-fir-texas-gas-transmission-llc-9915.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-fir-texas-gas-transmission-llc-9915
- **source url:** https://www.phmsa.dot.gov/inspections-and-investigations/texas-gas-transmission-llc-9915
**body:**

<<<PAGE 1>>>

DOT U.S. Department of Transportation
PHMSA Pipeline and Hazardous Materials Safety Administration
OPS Office of Pipeline Safety
Southwest Region
Principal Investigator Molly Atkins
Region Director R.M. Seeley
Date of Report 6/10/2016
Subject Failure Investigation Report – Texas Gas Transmission, LLC, Gas
Pipeline Rupture in Farmerville, LA
Operator, Location, & Consequences
Date of Failure September 9, 2015
Commodity Released Natural Gas – 42,100.00 MCF
City/Parish & State Farmerville, Union Parish, Louisiana
OpID & Operator Name 19270, Texas Gas Transmission, LLC
Unit # & Unit Name
3964, Sharon-Haughton Area
Inspection System ID
3020
SMART Activity # 151281
Milepost/Location MLS 26-1, Mile Post (MP) 28.8
Fatalities 0
Injuries
0
Evacuations
General public – 16 people in the surrounding area
Description of Area Impacted Pipeline right-of-way in a rural area
Property Damage $220,000 of estimated property damage and $248,000 of gas loss. Total
cost: $468,000.

<<<PAGE 2>>>

Failure Investigation Report – Texas Gas Transmission, LLC
September 9, 2015 | Farmerville, LA
Executive Summary
On September 9, 2015, at approximately 4:33 p.m. Central Time (CT), a pipeline rupture occurred on Texas Gas
Transmission, LLC’s (TGT), No. 1 line (MLS 26-1). MLS 26-1 is a 26-inch-diameter pipeline that is part of TGT’s
main line natural gas pipeline system located near mile post (MP) 28.8 in Farmerville, Union Parish, Louisiana.
The rupture ejected a piece of pipe 45 feet and 10 inches long from the ditch into a wooded area adjacent to
the pipeline right-of-way (ROW). This pipeline failure did not result in ignition of the escaping gas, injuries, or
fatalities; however, 16 people were evacuated from the surrounding area overnight as a precautionary
measure.
At 5:23 p.m. CT the TGT reported the incident to the Pipeline and Hazardous Materials Safety Administration
(PHMSA) in National Response Center (NRC) report #1128025. PHMSA dispatched an investigator to perform
an on-site investigation.
Metallurgical failure analyses determined that the cause of the accident was a combination of corrosion and
near-neutral pH stress corrosion cracking at a point located on the bottom of the pipeline where the pipe was
installed over an area of sandy clay and rocky material.
Page 2 of 10

<<<PAGE 3>>>

Failure Investigation Report – Texas Gas Transmission, LLC
September 9, 2015 | Farmerville, LA
System Details
The TGT is a long-haul interstate natural gas pipeline that transports gas from Gulf Coast supply areas to on-
system markets in the Midwest and off-system markets in the Northeast. The TGT is a wholly owned
operating subsidiary of Boardwalk Pipeline Partners, LP (BWP).
1
BWP is a midstream master limited partnership that provides transportation, storage, gathering, and
processing of natural gas and liquids. It owns and operates approximately 14,090 miles of interconnected
natural gas pipelines through its subsidiaries, directly serving customers in 13 States and indirectly serving
customers throughout the Northeastern and Southeastern United States via numerous interconnections with
unaffiliated pipelines. BWP also owns and operates more than 435 miles of natural gas liquid pipelines in
Louisiana and Texas. The BWP system is represented by the map shown in Figure 1:
Figure 1 – Boardwalk Partners Pipeline, LP, System Map2
The TGT runs north and east from Louisiana, eastern Texas, and Arkansas through Louisiana, Arkansas,
Mississippi, Tennessee, Kentucky, and Indiana; it also travels into Ohio and, via smaller-diameter lines, Illinois.
The market area directly served by the TGT encompasses eight States in the South and Midwest, including the
following metropolitan areas: Memphis, Tennessee; Louisville, Kentucky; Cincinnati and Dayton, Ohio; and
Evansville and Indianapolis, Indiana. The TGT also has indirect market access to the Northeast through
interconnections with unaffiliated pipelines.
²
1 Texas Gas Transmission, LLC. Welcome to Texas Gas. Retrieved from: http://www.txgt.com/.
2 Boardwalk Pipeline Partners. Fact Sheet. Retrieved from: http://www.bwpmlp.com/AboutUs.aspx?id=146.
Page 3 of 10

<<<PAGE 4>>>

Figure 2 - Incident Vicinity Map and ROW Looking to the East
Failure Investigation Report – Texas Gas Transmission, LLC
September 9, 2015 | Farmerville, LA
The incident occurred on the TGT’s MLS 26-1 at approximately MP 28.8. Figure 2 is a post-incident view of the
general vicinity and the ROW, which is in Union
Parish in rural north-central Louisiana. Additional
photographs of the vicinity may be found in the
metallurgical failure analysis in Appendix A.
This pipeline system (ISID 3020) is in the PHMSA-
identified Sharon-Haughton Area (Unit ID 3964),
which is inspected by PHMSA’s Southern Region.
Pipe Specifications
The pipeline was constructed in 1949 using
American Petroleum Institute (API) 5LX Grade
X52 electric fusion-welded pipe manufactured by
the A.O. Smith Corporation. The pipe is 26 inches
in outside diameter with a nominal wall thickness
of 0.281 inches at the failure location. The
maximum allowable operating pressure (MAOP)
of the pipeline, as established by hydrostatic
testing, is 810 pounds per square inch gauge
(psig). The most recent test took place on
September 23, 1976, and included a 100%
specified minimum yield strength (SMYS) spike
test followed by a 90% SMYS eight-hour hold period without any failures. The pipeline was originally covered
with a coal tar-type coating and protected from external corrosion via an impressed current cathodic
protection (CP) system that was put into service in 1949.
Events Leading up to the Failure
The TGT was operating the pipeline at 766 psig immediately prior to the incident. The pipeline was flowing at
a lower pressure than normal due to maintenance activities that were being conducted in the area at the time
of the failure.
Emergency Response
The operator received a call from local emergency responders reporting an explosion and blowing gas in the
vicinity of the pipeline ROW at approximately the same time as the pipeline control center observed a
pressure drop on the supervisory control and data acquisition system. The TGT initiated its emergency
response procedures, isolated a 10-mile pipeline segment between the upstream and downstream valves on
either side of the failure location, and evacuated 16 people from the surrounding area as a precautionary
measure. The TGT notified the NRC of the accident at 5:23 p.m. CT in NRC Report #1128025, which PHMSA’s
Page 4 of 10

<<<PAGE 5>>>

Failure Investigation Report – Texas Gas Transmission, LLC
September 9, 2015 | Farmerville, LA
Southwest Region received via email from the Crisis Management Center at 5:43 p.m. CT. PHMSA dispatched
a Southwest Region accident investigator to the site at 6:00 p.m. CT.
Summary of Initial Start-up and Return-to-Service
The damaged area of the line was replaced with a new segment of pipe, at which time a pig launcher and
receivers were added to allow the TGT to perform in-line inspection (ILI) on the pipeline segment. Due to the
mode of failure, and based on the results of the root cause analysis, the TGT determined that they needed to
perform an ILI inspection using both magnetic flux leakage (MFL) and transverse flux inspection (TFI) tools
prior to restarting the system. The TGT purged the pipeline and maintained a maximum operating pressure of
648 psig—80% of the 810 pounds per square inch MAOP—while they performed the internal inspection. The
TGT operated the pipeline at the reduced pressure of 648 psig until after ILI data was received and actionable
anomalies were addressed. The pipeline was returned to full operating pressure on December 18, 2015.
The TGT used deformation tool inspection and the data from the MFL to identify signatures similar to the
anomaly that caused the pipeline failure. Of the 14 locations identified and excavated—all of which had
potential matching attributes and indications—none displayed stress corrosion cracking (SCC).
Investigation Details
At 7:30 a.m. CT on September 10, 2015, the PHMSA Southwest Region accident investigator arrived at the
failure site, which he toured after meeting operator personnel. At approximately 12:00 p.m. CT a staff
consultant/metallurgist from Stress Engineering Services, Inc. (SES), arrived onsite to begin evidence collection
and to perform a site survey. PHMSA accompanied the SES metallurgist during the site survey to monitor field
measurements and observations.
The origin of failure was identified on the bottom quarter of the segment of pipe that was ejected from the
ditch, as depicted in a diagram sketched by PHMSA and shown in Figure 3:
Page 5 of 10

<<<PAGE 6>>>

Figure 3 - Failure Origin Location Sketch by PHMSA

<<<PAGE 7>>>

Measurements were taken after the origin of failure was located. The photographs in Figure 4 depict the
correlation of the ejected pipe with the in-situ pipe and ditch location:
Figure 4 - Correlation of Ejected Pipe Segment with the Ditch and In Situ Pipe

<<<PAGE 8>>>

Failure Investigation Report – Texas Gas Transmission, LLC
September 9, 2015 | Farmerville, LA
Based on field observations, the SES and PHMSA stated that the preliminary determination of the cause of
failure was localized environmental cracking in combination with external corrosion. The failure originated on
the bottom of the pipe where it rested on a rock ledge outcrop in the otherwise relatively homogenous clay-
like material of the ditch. The photos in Figure 4 show this outcropping, which is the dark grey, rocky material
surrounded by orange clay soil. A more detailed description of the soil conditions can be found in the
metallurgical failure analysis report in Appendix D.
The affected pipe sections were identified, their edges protected, and the segments prepared for transport to
the SES laboratory in Houston, Texas. After that was accomplished the PHMSA investigator left the site.
The pipeline was located in a Class 1 rural area and no High Consequence Areas (HCA) were affected by the
incident.
Metallurgical Examination
The SES completed a metallurgical failure analysis of the pipe from the incident and issued their findings in a
report dated November 6, 2016. The report, which can be found in Appendix D, summarized the findings as
follows:
Based on visual examination and metallurgical analyses of the pipe samples provided to SES
along with information gathered during a visit to the Monroe failure site, SES concluded that the
subject failure was the result of external corrosion in combination with near-neutral pH stress
corrosion cracking (SCC). This damage occurred at about the 6:00 o’clock orientation where the
soil supporting the pipeline contained rocky material that damaged the coating and likely
shielded this area, rendering it difficult to maintain the CP potential. This rocky material
supporting the pipe was part of a black layer of sedimentary deposits (which were readily seen in
the ditch). The soil above and below this black layer consisted of sandy clay material and was not
compacted to form hard or rock-like material.
. . . .
Based on SES’s visual examination and metallurgical analyses of the samples provided, along
with observations from a visit to the site, SES concluded that the Monroe failure was caused by a
combination of corrosion and near-neutral pH stress corrosion cracking. The information
available to SES did not allow a determination of the precise timing or exact conditions that led
to the failure. However, it was apparent that corrosion enlarged cracks in the pipe, thereby
significantly contributing to the failure.
The mechanical properties of the pipe material were tested and found to meet the requirements
of API 5LX in effect in 1948 (as well as current requirements). While the material toughness was
low, this property alone did not play a significant role in the failure.
PHMSA concurs with the findings in SES’s metallurgical failure analysis report.
Page 8 of 10

<<<PAGE 9>>>

Failure Investigation Report – Texas Gas Transmission, LLC
September 9, 2015 | Farmerville, LA
Investigation Findings & Contributing Factors
The failure was caused by a combination of factors that exacerbated localized corrosion in a limited area of
low-pH stress corrosion cracking, thereby expanding the cracks until they led to failure. The failure, which was
not readily apparent from the surface of the ground, was likely related to placement of the pipe on an area of
rocky material that damaged the pipe’s coating and thus contributed to external corrosion.
The TGT’s subsequent examination of the MFL and TFI ILI data for 14 sites with similar signal indications
revealed no SCC. These findings reinforce the difficulty in finding or predicting the conditions or locations that
result in the combination of this type of low-level corrosion with SCC.
Page 9 of 10

<<<PAGE 10>>>

Failure Investigation Report – Texas Gas Transmission, LLC
September 9, 2015 | Farmerville, LA
Appendixes
A Maps
B NRC Report
C Operator Incident Reports to PHMSA
D Metallurgical Failure Analysis Report
Page 10 of 10

<<<PAGE 11>>>

NATIONAL PIPELINE MAPPING SYSTEM FOR OFFICIAL USE
ONLY
(b) (7)(F)
Legend
Queried Incidents (Gas)
Incidents (Gas)
Gas Transmission Pipelines
Pipelines depicted on this map represent gas
transmission and hazardous liquid lines only. Gas
gathering and gas distribution systems are not
represented.
This map should never be used as a substitute for
contacting a one-call center prior to excavation
activities. Please call 811 before any digging
occurs.
Questions regarding this map or its contents can be
directed to npms@dot.gov.
Projection: Geographic
Datum: NAD83
Map produced by the P MMA application at
www npms.phmsa dot gov
Date Printed: May 25, 2016

<<<PAGE 12>>>

From: CMC-01 (OST)
Sent: Wednesday, September 09, 2015 5:43 PM
To: PHMSA PHP80 Response; PHMSA PHP400 SOUTHWEST
Subject: NRC#1128025: Pipeline - Union County, LA (176 miles NW of Baton Rouge, LA), natural gas
release
This report is forwarded for your situational awareness. CMC 6-1863
NATIONAL RESPONSE CENTER 1-800-424-8802
***GOVERNMENT USE ONLY***GOVERNMENT USE ONLY***
Information released to a third party shall comply with any
applicable federal and/or state Freedom of Information and Privacy Laws
Incident Report # 1128025
INCIDENT DESCRIPTION
*Report taken by: CIV ANTONAY GREER at 18:22 on 09-SEP-15
Incident Type: PIPELINE
Incident Cause: UNKNOWN
Affected Area:
Incident occurred on 09-SEP-15 at 16:30 local incident time.
Affected Medium: AIR /ATMOSPHERE- NO OFF SITE IMPACT
REPORTING PARTY
Name:
JAY JONES
Organization: BOARDWALK PIPELINES/ TEXAS GAS
Address:
610 WEST 2ND ST.

<<<PAGE 13>>>

OWENSBORO, KY 42301
Email Address: jay.jones@bwpmlp.com
PRIMARY Phone: (270)6886800
Type of Organization: PRIVATE ENTERPRISE
_______________________________________________________________________
SUSPECTED RESPONSIBLE PARTY
Name: JAY JONES
Organization: BOARDWALK PIPELINES/ TEXAS GAS
Address: 610 WEST 2ND ST.
OWENSBORO, KY 42301
PRIMARY Phone: (270)6886800
________________________________________________________________________
INCIDENT LOCATION
County: UNION
State: LA
Latitude: 38° 50' 53" N
Longitude: 092° 28' 00" W
NEAR FOWLER RD. & TIGER BEND
_______________________________________________________________________
RELEASED MATERIAL(S)
CHRIS Code: ONG Official Material Name: NATURAL GAS
Also Known As:
Qty Released: 0 UNKNOWN AMOUNT
________________________________________________________________________

<<<PAGE 14>>>

DESCRIPTION OF INCIDENT
NATURAL GAS IS RELEASING FROM A 26" TRANSMISSION PIPELINE, DUE TO
UNKNOWN CAUSES.
________________________________________________________________________
SENSITIVE INFORMATION
OSC,
THE POSITION THE RP PROVIDED IS INACCURATE. GIS PLACED THE NEAREST
COORDINATES AT
LATITUDE: 32.844491N
LONGITUDE: -92. 283871
________________________________________________________________________
INCIDENT DETAILS
Pipeline Type: TRANSMISSION
DOT Regulated: YES
Pipeline Above/Below Ground: BELOW
Exposed or Under Water: NO
Pipeline Covered: UNKNOWN
______________________________________________________________________
IMPACT
Fire Involved: NO Fire Extinguished: UNKNOWN
INJURIES: NO Hospitalized: Empl/Crew: Passenger:
FATALITIES: NO Empl/Crew: Passenger: Occupant:
EVACUATIONS:NO Who Evacuated: Radius/Area:

<<<PAGE 15>>>

Damages: NO
Hours Direction of
Closure Type Description of Closure Closed Closure
N
Air:
N Major
Road: Artery:N
N
Waterway:
N
Track:
Environmental Impact: NO
Media Interest: UNKNOWN Community Impact due to Material:
______________________________________________________________________
REMEDIAL ACTIONS
BLOCK VALVES ARE BEING CLOSED, CREW ONSITE.
Release Secured: NO
Release Rate:
Estimated Release Duration:
______________________________________________________________________
WEATHER
Weather: UNKNOWN, ºF
______________________________________________________________________
ADDITIONAL AGENCIES NOTIFIED
Federal:

<<<PAGE 16>>>

State/Local:
State/Local On Scene:
State Agency Number:
_______________________________________________________________________
NOTIFICATIONS BY NRC
AR DEPT OF ENVIRONMENTAL QUALITY (COMMAND CENTER)
09-SEP-15 18:37 (501)6820713
ARKANSAS POISON CENTER (MAIN OFFICE)
09-SEP-15 18:37 (501)6866161
AR STATE EMERGENCY SERVICES (MAIN OFFICE)
09-SEP-15 18:37 (501)6836700
CENTERS FOR DISEASE CONTROL (GRASP)
09-SEP-15 18:37 (770)4887100
DOT CRISIS MANAGEMENT CENTER (MAIN OFFICE)
09-SEP-15 18:37 (202)3661863
U.S. EPA VI (MAIN OFFICE)
(866)3727745
FLD INTEL SUPPORT TEAM NEW ORLEANS (SUPERVISOR, FIST NEW ORLEANS)
09-SEP-15 18:37 (504)5894224
JFO-LA (COMMAND CENTER)
09-SEP-15 18:37 (225)3366513
JFO-LA (FEMA JFO LA)
09-SEP-15 18:37 (225)3366513
LA DEPT OF ENV QUAL (MAIN OFFICE)
09-SEP-15 18:37 (225)2193640

<<<PAGE 17>>>

LA DEPT OF NATURAL RESOURSES (OFFICE OF CONSERVATION)
09-SEP-15 18:37 (225)3425524
LA DEPT OF WILDLIFE AND FISHERIES (MAIN OFFICE)
09-SEP-15 18:37 (337)
LA GOV OFFICE HS AND EMERGENCY PREP (MAIN OFFICE)
09-SEP-15 18:37 (225)9257500
LA GOV OFFICE HS AND EMERGENCY PREP (SITUATIONAL AWARENESS N.E. LOUISIA
09-SEP-15 18:37 (225)9257500
LA OFFICE OF GOV (MAIN OFFICE)
09-SEP-15 18:37 (225)2195800
LA OFFICE OF PUBLIC HEALTH (MAIN OFFICE)
09-SEP-15 18:37 (888)2937020
NATIONAL INFRASTRUCTURE COORD CTR (MAIN OFFICE)
09-SEP-15 18:37 (202)2829201
NOAA RPTS FOR LA (MAIN OFFICE)
09-SEP-15 18:37 (206)5264911
NATIONAL RESPONSE CENTER HQ (AUTOMATIC REPORTS)
09-SEP-15 18:37 (202)2671136
NTSB PIPELINE (MAIN OFFICE)
09-SEP-15 18:37 (202)3146293
REPORTING PARTY (RP SUBMITTER)
09-SEP-15 18:37
SECTOR LOWER MISSISSIPPI RIVER (AUTO NRC NOTIFICATIONS)
09-SEP-15 18:37 (225)2985400
LA STATE POLICE (MAIN OFFICE)

<<<PAGE 18>>>

09-SEP-15 18:37 (225)9256595
LA STATE POLICE (ANALYTICAL AND FUSION EXCHANGE)
09-SEP-15 18:37 (225)9254192
MSU BATON ROUGE (MAIN OFFICE)
09-SEP-15 18:37 (225)2985400
DEPT OF ENERGY STPR (STRATEGIC PETROLEUM RESERVE-EMERGENCY MGMT)
09-SEP-15 18:37 (504)7344113
USCG DISTRICT 8 (MAIN OFFICE)
09-SEP-15 18:37 (504)5896225
USCG DISTRICT 8 (PLANNING)
09-SEP-15 18:37 (504)6712080
_______________________________________________________________________
ADDITIONAL INFORMATION
______________________________________________________________________
*** END INCIDENT REPORT #1128025 ***
Report any problems by calling 1-800-424-8802
PLEASE VISIT OUR WEB SITE AT http://www.nrc.uscg.mil
The information contained in this communication from the Department of Transportation’s Crisis
Management Center (CMC) Watch may be sensitive or privileged and is intended for the sole use of
persons or entities named. If you are not an intended recipient of this transmission, you are prohibited
from disseminating, distributing, copying or using the information. If you have received this
communication in error, please immediately contact the CMC Watch at (202) 366-1863 to arrange for
the return of this information.

<<<PAGE 19>>>

NOTICE: This report is required by 49 CFR Part 191. Failure to report can result in a civil penalty not to
exceed 100,000 for each violation for each day that such violation persists except that the maximum civil
penalty shall not exceed $1,000,000 as provided in 49 USC 60122.
OMB NO: 2137-0522
EXPIRATION DATE: 10/31/2017
Original Report
Date: 10/08/2015
U.S Department of Transportation
Pipeline and Hazardous Materials Safety Administration
No. 20150120 - 17094
--------------------------------------------------
(DOT Use Only)
INCIDENT REPORT - GAS TRANSMISSION AND
GATHERING PIPELINE SYSTEMS
A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply
with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid
OMB Control Number. The OMB Control Number for this information collection is 2137-0522. All responses to this collection of information are
mandatory. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing the
burden to: Information Collection Clearance Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590.
INSTRUCTIONS
Important: Please read the separate instructions for completing this form before you begin. They clarify the information requested and provide specific
examples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page at
http://www.phmsa.dot.gov/pipeline/library/forms.
PART A - KEY REPORT INFORMATION
Report Type: (select all that apply) Original: Supplemental: Yes Final:
Yes
Last Revision Date: 05/23/2016
1. Operator's OPS-issued Operator Identification Number (OPID): 19270
2. Name of Operator TEXAS GAS TRANSMISSION, LLC
3. Address of Operator:
3a. Street Address 9 GREENWAY PLAZA SUITE 2800
3b. City HOUSTON
3c. State Texas
3d. Zip Code: 77046
4. Local time (24-hr clock) and date of the Incident: 09/09/2015 16:30
5. Location of Incident:
Latitude: 32.848632
Longitude: -92.285693
6. National Response Center Report Number (if applicable): 1128025
7. Local time (24-hr clock) and date of initial telephonic report to the
National Response Center (if applicable): 09/09/2015 17:23
8. Incident resulted from: Unintentional release of gas
9. Gas released: (select only one, based on predominant volume
released) Natural Gas
- Other Gas Released Name:
10. Estimated volume of commodity released unintentionally - Thousand
Cubic Feet (MCF): 42,100.00
11. Estimated volume of intentional and controlled release/blowdown -
Thousand Cubic Feet (MCF)
12. Estimated volume of accompanying liquid release (Barrels):
13. Were there fatalities? No
- If Yes, specify the number in each category:
13a. Operator employees
13b. Contractor employees working for the Operator
13c. Non-Operator emergency responders
13d. Workers working on the right-of-way, but NOT
associated with this Operator
13e. General public
13f. Total fatalities (sum of above)
14. Were there injuries requiring inpatient hospitalization? No
- If Yes, specify the number in each category:
14a. Operator employees
14b. Contractor employees working for the Operator
14c. Non-Operator emergency responders
14d. Workers working on the right-of-way, but NOT
associated with this Operator
14e. General public
14f. Total injuries (sum of above)
15. Was the pipeline/facility shut down due to the incident? No
- If No, Explain: Rerouted gas flow
Form PHMSA F 7100.2 Page 1 of 13
Reproduction of this form is permitted

<<<PAGE 20>>>

- If Yes, complete Questions 15a and 15b: (use local time, 24-hr clock)
15a. Local time and date of shutdown
15b. Local time pipeline/facility restarted
- Still shut down? (* Supplemental Report Required)
16. Did the gas ignite? No
17. Did the gas explode? No
18. Number of general public evacuated: 16
19. Time sequence (use local time, 24-hour clock):
19a. Local time operator identified Incident– effective 10-2014,
changed from "Incident" to "failure" 09/09/2015 16:33
19b. Local time operator resources arrived on site 09/09/2015 17:30
PART B - ADDITIONAL LOCATION INFORMATION
1. Was the origin of the Incident onshore? Yes
- Yes (Complete Questions 2-12)
- No (Complete Questions 13-15)
If Onshore:
2. State: Louisiana
3. Zip Code: 71241
4. City Farmerville
5. County or Parish Union
6. Operator designated location Milepost/Valve Station
Specify: 28+4276
7. Pipeline/Facility name: Main Line System
8. Segment name/ID: MLS
9. Was Incident on Federal land, other than the Outer Continental Shelf
(OCS)? No
10. Location of Incident : Pipeline Right-of-way
11. Area of Incident (as found) : Underground
Specify: Under soil
Other – Describe:
Depth-of-Cover (in): 48
12. Did Incident occur in a crossing? No
- If Yes, specify type below:
- If Bridge crossing –
Cased/ Uncased:
- If Railroad crossing –
Cased/ Uncased/ Bored/drilled
- If Road crossing –
Cased/ Uncased/ Bored/drilled
- If Water crossing –
Cased/ Uncased
Name of body of water (If commonly known):
Approx. water depth (ft) at the point of the Incident:
Select:
If Offshore:
13. Approx. water depth (ft) at the point of the Incident:
14. Origin of Incident:
- If "In State waters":
- State:
- Area:
- Block/Tract #:
- Nearest County/Parish:
- If "On the Outer Continental Shelf (OCS)":
- Area:
- Block #:
15. Area of Incident:
PART C - ADDITIONAL FACILITY INFORMATION
1. Is the pipeline or facility: - Interstate - Intrastate Interstate
2. Part of system involved in Incident: Onshore Pipeline, Including Valve Sites
3. Item involved in Incident: Pipe
- If Pipe – Specify: Pipe Body
3a. Nominal diameter of pipe (in): 26
3b. Wall thickness (in): .281
3c. SMYS (Specified Minimum Yield Strength) of pipe (psi): 52,000
Form PHMSA F 7100.2 Page 2 of 13
Reproduction of this form is permitted

<<<PAGE 21>>>

3d. Pipe specification: API 5L
3e. Pipe Seam – Specify: Flash Welded
- If Other, Describe:
3f. Pipe manufacturer: A. O. Smith
3g. Year of manufacture: 1949
3h. Pipeline coating type at point of Incident – Specify: Coal Tar
- If Other, Describe:
- If Weld, including heat-affected zone – Specify:
- If Other, Describe:
- If Valve – Specify:
- If Mainline – Specify:
- If Other, Describe:
3i. Mainline valve manufacturer:
3j. Year of manufacture:
- If Other, Describe:
4. Year item involved in Incident was installed: 1949
5. Material involved in Incident: Carbon Steel
- If Material other than Carbon Steel or Plastic – Specify:
6. Type of Incident involved: Rupture
- If Mechanical Puncture – Specify Approx. size:
in. (axial) by
in. (circumferential)
- If Leak - Select Type:
- If Other – Describe:
- If Rupture - Select Orientation: Longitudinal
- If Other – Describe:
Approx. size: in. (widest opening): 26
by in. (length circumferentially or axially): 552
- If Other – Describe:
PART D - ADDITIONAL CONSEQUENCE INFORMATION
1. Class Location of Incident: Class 1 Location
2. Did this Incident occur in a High Consequence Area (HCA)? No
- If Yes:
2a. Specify the Method used to identify the HCA:
3. What is the PIR (Potential Impact Radius) for the location of this
Incident? Feet: 511
4. Were any structures outside the PIR impacted or otherwise damaged
due to heat/fire resulting from the Incident? No
5. Were any structures outside the PIR impacted or otherwise damaged
NOT by heat/fire resulting from the Incident? No
6. Were any of the fatalities or injuries reported for persons located
outside the PIR? No
7. Estimated Property Damage :
7a. Estimated cost of public and non-Operator private
property damage paid/reimbursed by the Operator – effective 6-
2011, "paid/reimbursed by the Operator" removed
$ 5,000
Estimated cost of gas released unintentionally – effective 6-2011,
moved to item 7f
Estimated cost of gas released during intentional and controlled
blowdown – effective 6-2011, moved to item 7g
7b. Estimated cost of Operator's property damage & repairs $ 207,439
7c. Estimated cost of Operator's emergency response $ 7,500
7d. Estimated other costs $ 0
Describe:
7e. Property damage subtotal (sum of above) $ 219,939
Cost of Gas Released
7f. Estimated cost of gas released unintentionally $ 133,367
7g. Estimated cost of gas released during intentional and
controlled blowdown $ 114,655
7h. Total estimated cost of gas released (sum of 7.f & 7.g above) $ 248,022
Total of all costs $ 467,961
Form PHMSA F 7100.2 Page 3 of 13
Reproduction of this form is permitted

<<<PAGE 22>>>

PART E - ADDITIONAL OPERATING INFORMATION
1. Estimated pressure at the point and time of the Incident (psig): 766.00
2. Maximum Allowable Operating Pressure (MAOP) at the point and
time of the Incident (psig): 810.00
Added 10-2014 2a. MAOP established by 49 CFR section: 192.619(a)(1)
- If Other, specify:
3. Describe the pressure on the system or facility relating to the
Incident: Pressure did not exceed MAOP
4. Not including pressure reductions required by PHMSA regulations
(such as for repairs and pipe movement), was the system or facility
relating to the Incident operating under an established pressure
restriction with pressure limits below those normally allowed by the
MAOP?
No
- If Yes - (Complete 4a and 4b below)
4a. Did the pressure exceed this established pressure
restriction?
4b. Was this pressure restriction mandated by PHMSA or the
State?
5. Was "Onshore Pipeline, Including Valve Sites" OR "Offshore Pipeline,
Including Riser and Riser Bend" selected in PART C, Question 2? Yes
- If Yes - (Complete 5a. – 5e. below):
5a. Type of upstream valve used to initially isolate release source: Manual
5b. Type of downstream valve used to initially isolate release
source:
Manual
5c. Length of segment isolated between valves (ft): 52,800
5d. Is the pipeline configured to accommodate internal inspection
tools? Yes
- If No – Which physical features limit tool accommodation? (select all that apply)
- Changes in line pipe diameter
- Presence of unsuitable mainline valves
- Tight or mitered pipe bends
- Other passage restrictions (i.e. unbarred tee's, projecting
instrumentation, etc.)
- Extra thick pipe wall (applicable only for magnetic flux
leakage internal inspection tools)
- Other
- If Other, Describe:
5e. For this pipeline, are there operational factors which
significantly complicate the execution of an internal inspection tool
run?
No
- If Yes, which operational factors complicate execution? (select all that apply)
- Excessive debris or scale, wax, or other wall build-up
- Low operating pressure(s)
- Low flow or absence of flow
- Incompatible commodity
- Other
- If Other, Describe:
5f. Function of pipeline system: Transmission System
6. Was a Supervisory Control and Data Acquisition (SCADA)-based
system in place on the pipeline or facility involved in the Incident? Yes
- If Yes:
6a. Was it operating at the time of the Incident? Yes
6b. Was it fully functional at the time of the Incident? Yes
6c. Did SCADA-based information (such as alarm(s), alert(s),
event(s), and/or volume or pack calculations) assist with the
detection of the Incident?
Yes
6d. Did SCADA-based information (such as alarm(s), alert(s),
event(s), and/or volume calculations) assist with the confirmation of
the Incident?
Yes
7. How was the Incident initially identified for the Operator? Notification from Emergency Responder
- If Other – Describe:
7a. If "Controller", "Local Operating Personnel, including
contractors", "Air Patrol", or "Ground Patrol by Operator or its
contractor" is selected in Question 7, specify:
8. Was an investigation initiated into whether or not the controller(s) or
control room issues were the cause of or a contributing factor to the
Incident?
No, the Operator did not find that an investigation of the
controller(s) actions or control room issues was necessary
due to: (provide an explanation for why the Operator did not
investigate)
Form PHMSA F 7100.2 Page 4 of 13
Reproduction of this form is permitted

<<<PAGE 23>>>

- If No, the operator did not find that an investigation of the
controller(s) actions or control room issues was necessary due to:
(provide an explanation for why the operator did not investigate)
Incident occurred at a pressure below MAOP
- If Yes, Descr be investigation result(s) (select all that apply):
- Investigation reviewed work schedule rotations, continuous
hours of service (while working for the operator), and other
factors associated with fatigue
- Investigation did NOT review work schedule rotations,
continuous hours of service (while working for the Operator)
and other factors associated with fatigue
- Provide an explanation for why not:
- Investigation identified no control room issues
- Investigation identified no controller issues
- Investigation identified incorrect controller action or
controller error
- Investigation identified that fatigue may have affected the
controller(s) involved or impacted the involved controller(s)
response
- Investigation identified incorrect procedures
- Investigation identified incorrect control room equipment
operation
- Investigation identified maintenance activities that affected
control room operations, procedures, and/or controller
response
- Investigation identified areas other than those above –
Describe:
PART F - DRUG & ALCOHOL TESTING INFORMATION
1. As a result of this Incident, were any Operator employees tested
under the post-accident drug and alcohol testing requirements of DOT's
Drug & Alcohol Testing regulations?
No
- If Yes:
1a. How many were tested:
1b. How many failed:
2. As a result of this Incident, were any Operator contractor employees
tested under the post-accident drug and alcohol testing requirements of
DOT's Drug & Alcohol Testing regulations?
No
- If Yes:
2a. How many were tested:
2b. How many failed:
PART G - APPARENT CAUSE
Select only one box from PART G in the shaded column on the left representing the APPARENT Cause of the Incident, and answer the
questions on the right. Describe secondary, contributing, or root causes of the Incident in the narrative (PART H).
Apparent Cause: G5 - Material Failure of Pipe or Weld
G1 - Corrosion Failure - only one sub-cause can be picked from shaded left-hand column
Corrosion Failure – Sub-cause:
- If External Corrosion:
1. Results of visual examination:
- If Other, Describe:
2. Type of corrosion: (select all that apply)
- Galvanic
- Atmospheric
- Stray Current
- Microbiological
- Selective Seam
- Other
- If Other – Describe:
3. The type(s) of corrosion selected in Question 2 is based on the following: (select all that apply)
- Field examination
- Determined by metallurgical analysis
- Other
- If Other – Describe:
4. Was the failed item buried under the ground?
Form PHMSA F 7100.2 Page 5 of 13
Reproduction of this form is permitted

<<<PAGE 24>>>

- If Yes:
4a. Was failed item considered to be under cathodic protection at
the time of the incident?
- If Yes, Year protection started:
4b. Was shielding, tenting, or disbonding of coating evident at the
point of the incident?
4c. Has one or more Cathodic Protection Survey been conducted
at the point of the incident?
If "Yes, CP Annual Survey" – Most recent year conducted:
If "Yes, Close Interval Survey" – Most recent year conducted:
If "Yes, Other CP Survey" – Most recent year conducted:
- If No:
4d. Was the failed item externally coated or painted?
5. Was there observable damage to the coating or paint in the vicinity of
the corrosion?
- If Internal Corrosion:
6. Results of visual examination:
- If Other, Describe:
7. Cause of corrosion (select all that apply):
- Corrosive Commodity
- Water drop-out/Acid
- Microbiological
- Erosion
- Other
- If Other, Describe:
8. The cause(s) of corrosion selected in Question 7 is based on the following (select all that apply):
- Field examination
- Determined by metallurgical analysis
- Other
- If Other, Describe:
9. Location of corrosion (select all that apply):
- Low point in pipe
- Elbow
- Drop-out
- Other
- If Other, Describe:
10. Was the gas/fluid treated with corrosion inh bitors or biocides?
11. Was the interior coated or lined with protective coating?
12. Were cleaning/dewatering pigs (or other operations) routinely
utilized?
13. Were corrosion coupons routinely utilized?
Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Incident" (from PART C,
Question 3) is Pipe or Weld.
14. Has one or more internal inspection tool collected data at the point
of the Incident?
14a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run:
- Magnetic Flux Leakage Tool
Most recent year run:
- Ultrasonic
Most recent year run:
- Geometry
Most recent year run:
- Caliper
Most recent year run:
- Crack
Most recent year run:
- Hard Spot
Most recent year run:
- Combination Tool
Most recent year run:
- Transverse Field/Triaxial
Most recent year run:
- Other
Most recent year run:
If Other, Describe:
15. Has one or more hydrotest or other pressure test been conducted
since original construction at the point of the Incident?
- If Yes,
Form PHMSA F 7100.2 Page 6 of 13
Reproduction of this form is permitted

<<<PAGE 25>>>

Most recent year tested:
Test pressure (psig):
16. Has one or more Direct Assessment been conducted on this
segment?
- If Yes, and an investigative dig was conducted at the point of the Incident:
Most recent year conducted:
- If Yes, but the point of the Incident was not identified as a dig site:
Most recent year conducted:
17. Has one or more non-destructive examination been conducted at
the point of the Incident since January 1, 2002?
17a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most
recent year the examination was conducted:
- Radiography
Most recent year examined:
- Guided Wave Ultrasonic
Most recent year examined:
- Handheld Ultrasonic Tool
Most recent year examined:
- Wet Magnetic Particle Test
Most recent year examined:
- Dry Magnetic Particle Test
Most recent year examined:
- Other
Most recent year examined:
If Other, Describe:
G2 - Natural Force Damage - only one sub-cause can be picked from shaded left-handed column
Natural Force Damage – Sub-Cause:
- If Earth Movement, NOT due to Heavy Rains/Floods:
1. Specify:
- If Other, Descr be:
- If Heavy Rains/Floods:
2. Specify:
- If Other, Descr be:
- If Lightning:
3. Specify:
- If Temperature:
4. Specify:
- If Other, Descr be:
- If Other Natural Force Damage:
5. Describe:
Complete the following if any Natural Force Damage sub-cause is selected.
6. Were the natural forces causing the Incident generated in conjunction
with an extreme weather event?
6a. If yes, specify: (select all that apply):
- Hurricane
- Tropical Storm
- Tornado
- Other
- If Other, Describe:
G3 - Excavation Damage only one sub-cause can be picked from shaded left-hand column
Excavation Damage – Sub-Cause:
- If Previous Damage Due to Excavation Activity: Complete Questions 1-5 ONLY IF the "Item Involved in Incident" (From Part C,
Question 3) is Pipe or Weld.
1. Has one or more internal inspection tool collected data at the point of
the Incident?
1a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run:
- Magnetic Flux Leakage
Year:
- Ultrasonic
Year:
- Geometry
Year:
- Caliper
Form PHMSA F 7100.2 Page 7 of 13
Reproduction of this form is permitted

<<<PAGE 26>>>

Year:
- Crack
Year:
- Hard Spot
Year:
- Combination Tool
Year:
- Transverse Field/Triaxial
Year:
- Other:
Year:
Describe:
2. Do you have reason to believe that the internal inspection was
completed BEFORE the damage was sustained?
3. Has one or more hydrotest or other pressure test been conducted
since original construction at the point of the Incident?
- If Yes:
Most recent year tested:
Test pressure (psig):
4. Has one or more Direct Assessment been conducted on the pipeline
segment?
- If Yes, and an investigative dig was conducted at the point of the Incident:
Most 
- **truncated:** true
- **body characters:** 52298
