# Gas Distribution Inspection Questions: Control Room Management

- **operation:** document
- **citation:** PHMSA GD.2020.02
- **title:** Gas Distribution Inspection Questions: Control Room Management
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2020-07-01
- **effective on:** Not available
- **summary:** Inspection prompts used to assess controller fatigue risk, scheduling, alarm management, performance, records, and program effectiveness.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-gas-distribution-inspection-crm.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-gas-distribution-inspection-crm.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-gas-distribution-inspection-crm
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2020-07/phmsa-gas-distribution-ia-question-set-2020-02.pdf
**body:**

PHMSA inspection questions test whether an operator identifies fatigue risks, reduces those risks, considers fatigue during incident investigations, designates accountable fatigue management, and establishes an adequate technical basis for controller schedules. The question set also examines alarm management, controller performance, deficiency resolution, records, annual reviews, and compliance with 49 CFR 192.631.
- **truncated:** false
- **body characters:** 418
