# 2021 Guidelines for States Participating in the Pipeline Safety Program

- **operation:** document
- **citation:** PHMSA Guidance, 2021 Guidelines for States Participating in the Pipeline Safety Program
- **title:** 2021 Guidelines for States Participating in the Pipeline Safety Program
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** 2021 Guidelines for States Participating in the Pipeline Safety Program Document 2021-State-Guidelines-Final-With-Appendices.pdf (26.45 MB) Guidelines for States Participating in the Pipeline Safety Program PDF Effective Date: Wednesday, June 26, 2024
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-guidance-2021-guidelines-states-participating-pipeline-safety-program-a6928d94.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-guidance-2021-guidelines-states-participating-pipeline-safety-program-a6928d94.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-guidance-2021-guidelines-states-participating-pipeline-safety-program-a6928d94
- **source url:** https://www.phmsa.dot.gov/about-phmsa/working-phmsa/state-programs/2021-guidelines-states-participating-pipeline-safety-program
**body:**

2021 Guidelines for States Participating in the Pipeline Safety Program

Document

 2021-State-Guidelines-Final-With-Appendices.pdf (26.45 MB)

        Guidelines for States Participating in the Pipeline Safety Program PDF

          Effective Date: Wednesday, June 26, 2024

<<<PAGE 1>>>

Guidelines for States
Participating in the
Pipeline Safety Program
Revised January 2021

<<<PAGE 2>>>

TA B LE OF C ONTENTS
GLOSSARY
v
__________________________________________________________________
ACRONYMS
xii
________________________________________________________________
Preface _____________________________________________________________________
1
1 The Federal/State Partnership ______________________________________________
3
1.1 Congressional Intent _________________________________________________________
3
1.2 Federal Role and Organizational Structure _______________________________________
3
1.3 State Role and Organizational Structure _________________________________________
4
1.4 Related Organizations ________________________________________________________
4
1.4.1 National Association of Pipeline Safety Representatives _____________________________________
4
1.4.2 National Association of Regulatory Utility Commissioners ___________________________________
5
1.5 Invitational Travel
5
___________________________________________________________
1.6 Mutual Aid
6
_________________________________________________________________
2 State Participation Requirements ____________________________________________
8
2.1 Section 60105 Certification
8
____________________________________________________
2.2 Section 60106 Agreement ______________________________________________________
9
2.3 Interstate Agent Agreement __________________________________________________
10
2.4 Time Defined Agreement _____________________________________________________
11
2.5 Joint Inspection of an Interstate Operator _______________________________________
11
2.6 Certification/Agreement Forms _______________________________________________
12
2.7 Progress Report ____________________________________________________________
12
2.7.1 Attachment #1: State Jurisdiction and Agent Status ________________________________________
12
2.7.2 Attachment #2: Total State Field Inspection Activity _______________________________________
13
2.7.3 Attachment #3: Facilities Subject to State Safety Jurisdiction ________________________________
13
2.7.4 Attachment #4: Pipeline Incidents/Accidents _____________________________________________
14
2.7.5 Attachment #5: State Compliance Actions
14
_______________________________________________
2.7.6 Attachment #6: State Record Maintenance and Reporting ___________________________________
14
2.7.7 Attachment #7: State Employees Directly Involved in the Pipeline Safety Program _______________
14
2.7.8 Attachment #8: State Compliance with Federal Requirements ________________________________
14
2.7.9 [RESERVED] _____________________________________________________________________
15
2.7.10 Attachment #10: Performance and Damage Prevention Questions ___________________________
15
2.8 Responsibility to Assist PHMSA in the Work Management System __________________
15
3 State Regulatory Responsibility _____________________________________________
17
3.1 Adoption of Federal Regulations and Requirements ______________________________
17
3.2 WinDOT
17
__________________________________________________________________
3.3 Waiver of Federal Regulations ________________________________________________
17
3.3.1 Interstate Pipelines __________________________________________________________________
17
3.3.2 Intrastate Pipelines __________________________________________________________________
17
4 Personnel
20
______________________________________________________________
4.1 State Agency Minimum Required Inspection Activity _____________________________
20
Guidelines for States Participating in the Pipeline Safety Program i
Revised January 2021

<<<PAGE 3>>>

TA B LE OF C ONTENTS
4.1.1 Determination of Inspection Activity ___________________________________________________
20
4.1.2 Peer Review
23
_______________________________________________________________________
4.1.3 Inspection Activity Examples _________________________________________________________
23
4.1.4 Updates to SICT ___________________________________________________________________
24
4.2 Allocation of Effort
29
__________________________________________________________
4.3 Training ___________________________________________________________________
29
4.3.1 Required Training __________________________________________________________________
29
4.3.2 Course Re-Testing __________________________________________________________________
32
4.3.3 Waivers from Training ______________________________________________________________
32
4.3.4 Procedures for Requesting a Training Waiver _____________________________________________
33
4.4 Continuing Education and State Inspector Mentoring Program _____________________
33
4.5 Changes in State Agency Personnel ____________________________________________
34
4.6 Individual Qualifications _____________________________________________________
34
4.7 Program Manager Training __________________________________________________
36
4.8 New Program Manager Orientation ____________________________________________
36
5 Inspection and Compliance Program ________________________________________
37
5.1 Inspection _________________________________________________________________
37
5.2 Compliance ________________________________________________________________
45
5.2.1 Procedures for State Agencies with a Section 60105 Certification
46
_____________________________
5.2.2 Procedures for State Agencies with a Section 60106 Agreement or Interstate Agents ______________
46
5.2.3 PHMSA Orders to Operators __________________________________________________________
46
5.2.4 Referring Concerns of Possible Criminal Activity to the Office of Inspector General (OIG): ________
47
6 Failure Investigation and Safety-Related Conditions
47
___________________________
6.1 Investigation of Pipeline Failures ______________________________________________
47
6.2 On-scene investigations ______________________________________________________
48
6.3 Basic Investigative Procedures ________________________________________________
51
6.4 Incident Investigation Procedures _____________________________________________
51
6.5 PHMSA AID Daily Telephonic Investigation Report ______________________________
51
6.6 Access to NRC Reports ______________________________________________________
52
6.7 Safety-Related Conditions
52
____________________________________________________
7 Damage Prevention Program and One Call Notification ________________________
54
7.1 Damage Prevention _________________________________________________________
54
7.2 One Call Notification
55
________________________________________________________
7.3 Damage Prevention and One-Call Grants
57
_______________________________________
8 State Agency Program Performance _________________________________________
58
8.1 Annual Program Evaluation __________________________________________________
58
8.2 Compliance with Program Requirements _______________________________________
60
8.3 Recordkeeping _____________________________________________________________
61
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
ii

<<<PAGE 4>>>

TA B LE OF C ONTENTS
8.4 Attendance at NAPSR Meetings _______________________________________________
61
8.5 State Pipeline Safety Training and/or Seminars __________________________________
62
9 DOT Grant-in-Aid Program _______________________________________________
63
9.1 Scope of Grant _____________________________________________________________
63
9.2 Address
63
___________________________________________________________________
9.3 Eligibility __________________________________________________________________
63
9.4 General Obligations _________________________________________________________
64
9.5 Application ________________________________________________________________
64
9.5.1 Attachment #1: Description of State Pipeline Safety Program. ________________________________
64
9.5.2 Attachment #2: Pipeline Safety Program Estimated Budget. _________________________________
66
9.6 Annual Funding Level _______________________________________________________
66
9.7 Grant Allocation and Percentage of Funding ____________________________________
9.7.1 Grant Allocation Formula for Grant Award
______________________________________________
9.7.2 State Performance Score
66
67
67
_____________________________________________________________
9.8 Payment Agreement (Notice of Grant Award) ___________________________________
70
9.9 Certification Regarding Lobbying and Disclosure of Lobbying Activities _____________
71
9.10 Mid-Year Request for Reimbursement _________________________________________
71
9.11 Request for Advance Payment - Travel to NAPSR Meetings ________________________
72
9.12 Year-end Request for Reimbursement and Cost Summary _________________________
72
9.13 Special Initiatives
73
___________________________________________________________
9.14 Withholding of Grant Funds - Suspension and/or Termination of Grants _____________
73
9.15 Deposit of Grant Funds ______________________________________________________
74
9.16 Eligibility of Program Costs __________________________________________________
74
9.16.1 Direct Costs
74
_____________________________________________________________________
9.16.2 Indirect Costs
77
____________________________________________________________________
9.16.3 Standards for Documentation of Personnel Expenses _____________________________________
78
9.16.4 Unallowable Costs
78
________________________________________________________________
9.17 Pipeline Safety Grant Program Review _________________________________________
78
9.17.1 Pre-Review
79
______________________________________________________________________
9.17.2 Grant Review
79
____________________________________________________________________
9.17.3 Post-Review
79
_____________________________________________________________________
9.17.4 Adjustments and Penalties __________________________________________________________
79
9.17.5 Appeal of Findings ________________________________________________________________
80
9.18 Procurement Standards
80
______________________________________________________
9.19 Procurement Procedures
80
_____________________________________________________
9.20 Contracts Management ______________________________________________________
80
9.21 Internal Controls
80
___________________________________________________________
9.22 Real Property ______________________________________________________________
81
9.23 Personal Property ___________________________________________________________
81
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
iii

<<<PAGE 5>>>

TA B LE OF C ONTENTS
9.24 Code of Conduct
81
____________________________________________________________
9.25 Conflict of Interest and Mandatory Disclosures __________________________________
81
9.26 Audit Requirements (2 CFR 200 Subpart F) _____________________________________
81
9.27 PHMSA Office of Civil Rights Review – Title VI
82
_________________________________
9.28 Grant-in-Aid Program Calendar of Events ______________________________________
83
9.29 Description of Activities ______________________________________________________
84
9.29.1 Base Grant Application (Gas & Hazardous Liquid) _______________________________________
84
9.29.2 One Call Grant
84
___________________________________________________________________
9.29.3 Year End Payment Process __________________________________________________________
84
9.29.4 One Call Progress Report ___________________________________________________________
84
9.29.5 One Call Allocation
84
_______________________________________________________________
9.29.6 Progress Report __________________________________________________________________
84
9.29.7 Allocation
84
_______________________________________________________________________
9.29.8 Payment Agreement – (Notice of Grant Award) _________________________________________
84
9.29.9 Mid-Year Reimbursement
85
__________________________________________________________
9.29.10 Program Evaluation ______________________________________________________________
85
10 Federal-State Tracking and Reporting – “FedSTAR”
86
___________________________
10.1 Purpose ___________________________________________________________________
86
10.2 Location and Procedures
86
_____________________________________________________
10.3 Facilitating Various Program Documentation
87
____________________________________
10.4 Facilitating Grant Financials __________________________________________________
87
10.5 Other FedSTAR Functions
89
___________________________________________________
10.6 PHMSA State Program Management Functions _________________________________
89
Appendix Summary __________________________________________________________
90
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
iv

<<<PAGE 6>>>

Glossary
GLOSSARY
Act See Chapter 601, Title 49 of the U.S. Code (2011 version)
Agency See State Agency
Agreement Certification The State agency assumes inspection responsibility for facilities
and reports probable violations to PHMSA for compliance
action.
The State agency assumes safety responsibility with respect to
intrastate facilities over which it has jurisdiction under State law.
Each grantee who receives a Federal grant exceeding
$100,000 must submit a certification form.
Certification Regarding
Lobbying
CFDA Catalog of Federal Domestic Assistance. A reference
compilation of all grant programs sponsored by the Federal
government. PHMSA’s CFDA number is 20.700 for the Pipeline
Safety Grant Program.
Chapter 601, Title 49 of
the U.S. Code (2016)
Throughout this manual, Sections 60101 – 60140 refer to
Chapter 601, Title 49 of the United States Code (2016). Chapter
601 is the recodification of the Natural Gas Pipeline Safety Act
of 1968, as amended (49 USC app 1671 et seq.), and the
Hazardous Liquids Pipeline Safety Act of 1979, as amended (49
USC app 2001 et seq.).
Code of Federal Regulations, Title 49 (49 CFR)-Pipeline Safety
Part 40 Procedures for Transportation Workplace Drug Testing Programs
Part 190 Pipeline Safety Programs and Rulemaking Procedures
Part 191 Transportation of Natural and Other Gas by Pipeline: Annual Reports
Incident Reports, and Safety-Related Condition Reports
Part 192 Transportation of Natural and Other Gas by Pipeline: Minimum
Federal Safety Standards
Part 193 Liquefied Natural Gas Facilities: Federal Safety Standards
Part 194 Response Plans for Onshore Oil Pipelines
Part 195 Transportation of Hazardous Liquids by Pipeline
Part 196 Protection of Underground Pipelines from Excavation Activity
Guidelines for States Participating in the Pipeline Safety Program v
Revised January 2021

<<<PAGE 7>>>

Glossary
Part 198 Part 199 Regulations for Grants to Aid State Pipeline Safety Programs
Drug and Alcohol Testing
Compliance Action Department of
Transportation (“DOT”)
A compliance action is an action or series of sequential actions
taken to enforce federal or state pipeline regulations. One
compliance action can cover multiple probable violations. A
compliance action may take the form of a letter warning of future
penalties for continued violation, an administratively imposed
monetary sanction or order directing compliance with the
regulations, an order directing corrective action under
hazardous conditions, a show-cause order, a criminal sanction,
a court injunction, or a similar formal action.
Reference may include any or all the following: U.S. Department
of Transportation, Pipeline and Hazardous Materials Safety
Administration, Office of Pipeline Safety.
This is the computer application available over the internet
which is used by Pipeline Safety program offices to enter the
required federal documentation and information.
Federal State Tracking
and Reporting
(“FedSTAR”)
Grant Grant Agreement Grant Application Grantee Grant Period Grants.gov Funds or aid in kind to carry out specified programs, services,
or activities.
All provisions and requirements of the Pipeline Safety Grant
Program, including those specified in the Grant Application,
Payment Agreement (Notice of Grant Award), these Guidelines,
and any instructions or directives issued by the PHMSA, DOT,
or other Federal agency relative to the management of Federal
grant programs.
This form is to provide PHMSA with information concerning the
State agency’s need for Federal financial support for its pipeline
safety program.
The department or agency of State government which is
responsible for the administration of the pipeline safety grant.
Also referred to as “recipient” or “State agency.”
The grant period extends from the effective date of the Payment
Agreement (Notice of Grant Award), January 1, to the expiration
date, December 31, unless otherwise arranged. Also referred to
as the “program year.”
Grants.gov is a central storehouse for information on federal
grants.
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
vi

<<<PAGE 8>>>

Glossary
Grant Program Inspection, Standard Inspection Person-Day Inspection Unit • Privately Owned
Distribution
System
Those activities and operations of the State agency which are
necessary to carry out the purposes of the grant, including any
portion of the program financed by the grantee. This technical
usage of the phrase should not be confused with the Pipeline
Safety Grant Program (sometimes shortened to “Grant
Program”), which is the Federal assistance program in support
of the State agency’s pipeline safety program.
An on-site evaluation of an inspection unit for compliance with
all applicable Federal or State standards. This includes a
thorough compliance review of the operator’s plans,
procedures, programs, records, physical plant, and work in
progress. This would include inspections on LNG facilities. See
Chapter 5 for guidance.
All or part of a day spent by Agency staff – Supervisor(s) and/or
Inspector(s)/Investigator(s) (including travel) in on-site or virtual
evaluation of an operator’s system to determine compliance
with Federal or State pipeline safety regulations; or in on-site
investigation of a pipeline incident; or in job-site training of an
operator. (See section 5.1 for description of inspection types)
Time counted for such activities should be reported as a
maximum of one inspection person-day for each day devoted to
safety issues, regardless of the number of operators visited
during that day. (e.g. You may evaluate two operators in the
same day and record each inspection visit as 0.5 person-day,
or actual fraction of a day, for each operator provided the total
does not exceed 1.0 person-day) On a limited basis, the
inspector may count in-office inspection time to review operator
written: plans, procedures, programs and records to effectively
use on-site inspection time, as approved by the program
manager and as noted in the annual progress report. In-office
inspection time must be adequately documented and made part
of the State agency’s inspection records.
All or part of an operator’s pipeline facilities under the control of
an administrative unit that provides sufficient communication
and controls to ensure uniform design, construction, operation,
and maintenance procedures for the facilities.
The application of the inspection unit concept will ensure
inspection coverage of an operator’s entire system and
enhance Federal/State management of work load and program
evaluation. Determination of inspections will be based on the
following guidelines, but where unique situations exist, good
logic and judgment must be exercised when identifying the
parameters of the unit.
The inspection unit could be an operating area such as a
specific city or metropolitan area, or a group of towns,
and may include high pressure distribution operated and
maintained by the operator. The unit selected should be
that which provides the desired commonality. However,
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
vii

<<<PAGE 9>>>

Glossary
because of the greater number of pipeline facilities in
some large metropolitan distribution areas, multiple units
may be appropriate. In selecting the unit, consideration
should be given to the size of the area covered, work
location, record location, and line of supervision.
If the distribution system contains transmission lines
where transmission integrity management plans are
required, those system(s) should be considered separate
intrastate transmission inspection unit(s).
• Gas Transmission
and Hazardous
Liquid Pipeline
System (including
Ethanol)
The inspection unit should include up to 500 miles of
pipeline right-of-way including any compressor stations
or pumping facilities within the designated limits. In some
circumstances, such as densely populated areas and/or
environmentally sensitive areas, and/or where judged
necessary based on local conditions, a separate
inspection unit can be established.
• Liquefied Natural
Gas (LNG) Facility
Each LNG facility should be considered a single
inspection unit.
• Master Meter
System
Each master meter system should be considered a
single inspection unit. However, more than one master
meter system should be considered a single inspection
unit if all facilities involved are owned, operated and
maintained under common supervisory control.
• Municipality Each municipality should be considered a single
inspection unit unless its system, similar to privately
owned distribution systems, contains transmission lines
where transmission integrity management inspections
are done in which case the transmission system should
be a separate inspection unit. Also operating
conditions/characteristics could suggest additional
inspection units be considered.
• Propane-Air
System/Petroleum
Gas System
Propane-Air System/Petroleum Gas System- Each
system should be considered a single inspection unit.
However, more than one propane-air/petroleum gas
system should be considered a single inspection unit if all
facilities involved are owned, operated and maintained
under common supervisory control.
• Regulated
Gathering Pipeline
System
Each regulated gathering pipeline system can be
considered as a single inspection unit. Circumstances
may exist when an operator has more than one regulated
gathering system separated into individual inspection
units.
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
viii

<<<PAGE 10>>>

Glossary
Interstate Agent Mid-year Request for
Reimbursement
The State agency assumes inspection responsibility for
interstate facilities and reports probable violations to PHMSA for
compliance action.
If a State desires mid-year payment, it may return one copy of a
completed OMB Standard Form 270 to PHMSA requesting a
mid-year payment.
Used to amend the Federal grant amount in the Payment
Agreement (Notice of Grant Award).
Modifications to
Payment Agreement
(Notice of Grant
Award)
National Response
Center (NRC) (1-800-
424-8802)
National
Transportation Safety
Board (NTSB)
Noncompliance Office of Pipeline
Safety (OPS)
The federal government’s national communications center,
which is staffed 24 hours a day by U.S. Coast Guard officers
and marine science technicians. The NRC receives all reports
of releases involving hazardous substances and oil that trigger
the federal notification requirements under several laws. This
“telephonic” report data is shared with PHMSA via an
information system.
This Federal agency was created by Congress in the
Department of Transportation Act of 1966. Although NTSB’s
authority is limited to transportation failure investigations, its
mission relating to pipeline safety is to:
1. Investigate significant failures and report the
circumstances relating to each failure and its
probable cause.
2. Make recommendations to the Secretary, the
pipeline operators, manufacturers, associations,
and interested parties to minimize the possibility of
recurrence of similar failures.
3. Release reports deemed to be in the public
interest.
4. Conduct special studies and investigations on
matters regarding safety in pipeline transportation
and failure prevention.
A violation or probable violation of any section or any subsection
of Federal or State pipeline safety regulations.
For the purpose of this manual, OPS is the U.S. Department of
Transportation, Pipeline and Hazardous Materials Safety
Administration’s Office of Pipeline Safety.
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
ix

<<<PAGE 11>>>

Glossary
OMB Standard Form
270-Request for
Advance or
Reimbursement
Payment Agreement
(Notice of Grant
Award)
Performance Criteria Personal Property Submitted by a State agency for Mid-Year Request for
Reimbursement, Year-end Request for Reimbursement, and
Request for Advance Payment - Travel to NAPSR Meetings
The formal document that allocates a specific amount of Federal
funds to a State agency for the reimbursement of not more than
80 percent of the expenses of a pipeline safety program.
Criteria used in assigning points for allocation of grant funds.
Property of any kind except real property. It may be tangible
(having physical existence), or intangible (having no physical
existence), such as patents, inventions, and copyrights, both
having a useful life of more than 1 year and an acquisition cost
of at least $5,000.
Pipeline and Hazardous Materials Safety Administration is the
agency under the U.S. Department of Transportation
responsible for pipeline safety oversight.
Pipeline and Hazardous
Materials Safety
Administration
(PHMSA)
PHMSA Inspector
Training and
Qualifications Division
(TQ)
Pipeline Program Cost
Summary
The safety training organization operated by PHMSA located at
3700 S. MacArthur Blvd, Suite B, Oklahoma City, OK 73179-
7612. The contact telephone number is 405-686-2310.
Probable Violation This form compares estimated budget figures with final
expenses incurred for the program, and is submitted by a State
agency with the Year-end Request for Reimbursement.
A probable violation is a potential non-compliance with any
section or, where a section is divided into subsections (a), (b),
(c), etc., any subsection of federal or state pipeline regulations.
Each numbered section should be counted separately. Multiple
non-compliances of a numbered section discovered on the
same inspection should be counted as one probable violation
with multiple pieces of evidence (i.e. during a unit inspection it was
discovered that an operator failed to check and service 6 distribution
valves, in reference to §192.747 Valve maintenance: Distribution
systems, this is one probable violation of section 192.747(a) with six
Program pieces of evidence and not six probable violations).
The planned undertaking of the State agency’s pipeline safety
activities as stated in the application for Federal assistance.
Guidelines for States Participating in the Pipeline Safety Program x
Revised January 2021

<<<PAGE 12>>>

Glossary
Program Budget A schedule of proposed expenditures that is allowable,
necessary, and reasonable for proper and efficient execution of
the pipeline safety program.
Program Costs All allowable costs (as set forth in 2 CFR 200) incurred by a
State agency in accomplishing the objectives of the Pipeline
Safety Grant Program during the grant period.
Program Manager The person designated by the State agency as responsible for
all activities of the pipeline safety program
Program Year See “Grant Period.”
Real Property Land, land improvements, structures, and appurtenances
thereto, Excluding movable machinery and equipment.
Recipient See “Grantee.”
Region Director (RD) The individual responsible for all activities of the designated
PHMSA region
Region Office One of five offices delegated the authority to carry out the field
activities for PHMSA
Special Initiatives State Agency State Program
Personnel
Supervisor Year-End Request for
Reimbursement
Initiatives occasionally issued by PHMSA for a limited purpose.
The division of each State, including the District of Columbia and
Puerto Rico, authorized through a certification or agreement
with the Department of Transportation (DOT) to administer a
pipeline safety program. Also referred to as “grantee” or
“recipient.”
The PHMSA headquarters staff person (i.e. State Liaison) who
provides technical assistance, support and evaluates State
agency programs.
Individual in a State Agency supervising pipeline safety
inspectors/investigators and so designated in Attachment 7 of
the annual Progress Report. This does not include individuals
solely supervising damage prevention/technical staff.
One copy of a completed OMB Standard Form 270 is
completed by a State agency to submit total program costs for
the previous year to PHMSA
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
xi

<<<PAGE 13>>>

Acronyms
ACRONYMS
AID Accident Investigation Division
CFDA Catalog of Federal Domestic Assistance
CFR Code of Federal Regulations
DOT U.S. Department of Transportation
FedSTAR Federal State Tracking and Reporting
LNG Liquefied Natural Gas
LPG Liquefied Petroleum Gas
MOU Memorandum of Understanding
NAPSR National Association of Pipeline Safety Representatives
NARUC National Association of Regulatory Utility Commissioners
NRC National Response Center
NTSB National Transportation Safety Board
O & M Operation and Maintenance
OMB Office of Management and Budget
PHMSA
Pipeline and Hazardous Materials Safety Administration
PSP
PHMSA State Programs
PY Person-Year
RCFA Root Cause Failure Analysis
RD Region Director
SUDS
State Uploaded Document System (within FedSTAR)
TQ
PHMSA Inspector Training and Qualifications Division
USC United States Code
Guidelines for States Participating in the Pipeline Safety Program Revised January 2021
xii

<<<PAGE 14>>>

The Federal/State Partnership
Preface
The Guidelines for States Participating in the Pipeline Safety Program
(Guidelines) contain guidance for how State Pipeline Safety Programs must
conduct and execute their responsibilities delegated through certification or
agreement by the Secretary of Transportation pursuant to certain sections of
Title 49 of the United States Code. The Secretary of Transportation has
delegated the administration of the certifications and agreements to the Pipeline
and Hazardous Materials Safety Administration (PHMSA). These Guidelines
are not regulations or rules promulgated by PHMSA.
This Guidelines are provided to promote consistency among the many state
agencies that participate under certifications and/or agreements. The guidance
contains expectations for the execution of a state agency’s responsibilities
which are evaluated annually. The performance evaluation results are utilized
to determine continued certification/agreement with a state agency and annual
grant funding amounts to the state agency.
The Guidelines and performance of expectations are administered by
PHMSA’s State Programs Division. The Guidelines are typically reviewed and
revised annually. The process for the annual review and revision are as follows:
1. PHMSA State Programs Division’s State Program Coordinator (SPC),
creates a copy of the recent edition of the Guidelines in MS Word.
“Track Changes” option is turned on in the document to illustrate the
revisions (redline copy).
2. Starting January 1, a listing of proposed changes is maintained by the
SPC. Changes are typically proposed by members of the State
Programs Division, Regional Directors, PHMSA Training and
Qualifications and members of the National Association of Pipeline
Safety Representatives (NAPSR).
3. Between January 1 and June 1, the SPC obtains proposed language
from the individuals proposing changes.
4. During the June Meeting of the NAPSR Grant Allocation Committee
(GAC), the listing of revisions and the redline copy is presented by the
SPC. Discussion and editing takes place during the meeting. A draft is
provided to the GAC members and NAPSR’s Administrative Manager.
5. NAPSR’s Administrative Manager distributes the listing and redline copy
to NAPSR Board Members.
Guidelines for States Participating in the Pipeline Safety Program 1
Revised January 2021

<<<PAGE 15>>>

The Federal/State Partnership
6. Between June and September additional proposed changes are
captured and added to the listing. Proposed language for the changes
are also captured. The redline copy is edited to include the additional
changes.
7. The SPC provides the listing and redline copy to all State Programs
Division team members for review and comments.
8. During the GAC’s October Meeting the SPC makes another
presentation which includes the additional changes received since the
June Meeting. Discussion and editing is completed during the meeting.
9. Following the GAC October Meeting, the SPC distributes the listing and
redline copy to all members of NAPSR, all Regional Directors and
PHMSA Training and Qualifications for review and comments (at least
30 days is given for review).
10. The SPC compiles all comments. State Programs Division reviews
comments. Comments usually result in further edits or if not, the
commenter is provided with reasons why it was not accepted for
inclusion. Upon completion of this step the document is prepared for
publication and distribution.
The updated Guidelines are distributed by December 31st
.
Guidelines for States Participating in the Pipeline Safety Program 2
Revised January 2021

<<<PAGE 16>>>

The Federal/State Partnership
1 The Federal/State Partnership
1.1 Congressional Intent
Chapter 601 provides the statutory basis for the pipeline safety program and
establishes a framework for promoting pipeline safety through exclusive
Federal authority for regulation of interstate pipeline facilities and State
Authority for all or part of the intrastate pipeline facilities under annual
certification or agreement. Chapter 601 authorizes Federal grants-in-aid of not
more than 80 percent of a State agency’s personnel, equipment, activities and
other allowable costs for its pipeline safety program. The resulting
Federal/State partnership is the cornerstone for ensuring uniform
implementation of the pipeline safety program nationwide. Chapter 601 can be
found in Appendix A.
1.2 Federal Role and Organizational Structure
The Pipeline and Hazardous Materials Safety Administration’s (PHMSA)
mission is to protect people and the environment from the risks inherent in
transportation of hazardous materials - by pipeline and other modes of
transportation. The agency’s goals are:
• Safety: To reduce the risk of harm to people due to the transportation
of hazardous materials by pipelines and other modes.
• Environmental Stewardship: To reduce the risk of harm to the
environment due to the transportation of oil and hazardous materials by
pipeline and other modes.
• Reliability: To help maintain and improve the reliability of systems that
deliver energy products and other hazardous materials.
• Global Connectivity: To harmonize and standardize the requirements
for pipeline and hazardous materials transportation internationally, to
facilitate efficient and safe transportation through ports of entry and
through the supply chain.
• Preparedness and Response: To reduce the consequences (harm to
people, environment, and economy) after a pipeline or hazmat failure
has occurred.
Under delegation from the Secretary of the Department of Transportation
(DOT), PHMSA directly administers the program and develops issues and
enforces minimum safety regulations for interstate and intrastate pipelines.
Guidelines for States Participating in the Pipeline Safety Program 3
Revised January 2021

<<<PAGE 17>>>

The Federal/State Partnership
These regulations are written to ensure safety in (1) the design, construction,
testing, operation, and maintenance of pipeline facilities and in (2) the siting,
construction, operation, and maintenance of liquefied natural gas (LNG)
facilities. PHMSA ensures compliance with regulations through operator
inspections, enforcement actions, and accident investigations. In addition, the
PHMSA Training and Qualification Program (TQ) conducts training in
application of the regulations. PHMSA also administers grant-in-aid funding to
States, conducts research, and collects and analyzes safety data.
PHMSA Headquarters, located in Washington D.C., administers the grant-in-
aid program to support State agencies conducting gas and hazardous liquid
pipeline safety programs.
The PHMSA Region Offices serve as the focal point for interstate pipeline
compliance activities and intrastate facilities not under state jurisdiction. The
region staff provides technical assistance and support to State agency
programs. Headquarters supports the work of the five PHMSA Region Offices.
State agencies are encouraged to contact their respective State Liaison or
Region Director if they have any questions about technical or other inspection
issues. The Director - State Programs should be contacted if the State Liaison
or Region Director cannot be reached.
1.3 State Role and Organizational Structure
A State delegates responsibility for pipeline safety to a State agency. The State
agency may be a Public Utility Commission, a State Fire Marshal, a State Public
Service Commission, or other office. State agencies under existing law have
jurisdiction over most intrastate gas, liquefied natural gas and hazardous liquid
facilities within their respective States. State agency duties normally consist of
operator inspections, compliance and enforcement, safety programs, accident
investigations, pipeline construction inspections, and record maintenance and
reporting.
1.4 Related Organizations
1.4.1 National Association of Pipeline Safety Representatives
The National Association of Pipeline Safety Representatives (NAPSR),
established in 1982, is an organization of State agency pipeline safety
managers, inspectors, and technical personnel who support, encourage,
develop, and enhance pipeline safety. NAPSR provides an effective
mechanism for fostering the Federal/State partnership. The NAPSR Articles of
Association set forth the purpose and objectives of the organization and the
procedures for electing national and region officers. More important, the Articles
of Association establish the steps for adopting resolutions to raise serious
pipeline safety concerns of national scope for PHMSA consideration in
regulatory and enforcement activities.
Guidelines for States Participating in the Pipeline Safety Program 4
Revised January 2021

<<<PAGE 18>>>

The Federal/State Partnership
1.4.2 National Association of Regulatory Utility
Commissioners
The National Association of Regulatory Utility Commissioners (NARUC) is an
organization of Federal and State agencies engaged in the regulation of utilities
and carriers. Its chief objective is to improve the quality and effectiveness of
utility regulation in the United States. Through its Staff Subcommittee on
Pipeline Safety under the Committee on Gas, NARUC provides a
communication channel among State public utility agencies, State agency
pipeline safety program managers, and Federal agencies. Like NAPSR, the
NARUC Staff Subcommittee on Pipeline Safety holds regular meetings, issues
resolutions, and establishes working groups to deal with safety issues.
1.5 Invitational Travel
In support of NAPSR and NARUC initiatives, PHMSA may provide invitational
travel (100% funding) for the following:
1. The current NAPSR Chair and
- **truncated:** true