# PHMSA HMEP Guide (PDF)

- **operation:** document
- **citation:** PHMSA Guidance, PHMSA HMEP Guide (PDF)
- **title:** PHMSA HMEP Guide (PDF)
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2019-03-19
- **effective on:** 2019-03-19
- **summary:** PHMSA HMEP Guide (PDF) Document PHMSA-HMEP-Grant-Guide-10-11-23.pdf (1.12 MB) PHMSA HMEP Guide (PDF) Issued Date: Tuesday, March 19, 2019
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-guidance-hmep-expenditures-guide-pdf-4a83becd.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-guidance-hmep-expenditures-guide-pdf-4a83becd.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-guidance-hmep-expenditures-guide-pdf-4a83becd
- **source url:** https://www.phmsa.dot.gov/grants/hazmat/hmep-expenditures-guide-pdf
**body:**

PHMSA HMEP Guide (PDF)

Document

 PHMSA-HMEP-Grant-Guide-10-11-23.pdf (1.12 MB)

        PHMSA HMEP Guide (PDF)

          Issued Date: Tuesday, March 19, 2019

<<<PAGE 1>>>

HAZARDOUS
MATERIALS
EMERGENCY
PREPAREDNESS
GRANT GUIDE
Catalog of Federal Domestic Assistance Program No. 20.703
1
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 2>>>

Table of Contents
I. Introduction ........................................................................................................................... 3
II. HMEP Grant Overview ........................................................................................................ 3
III. Expenditure Guidelines ........................................................................................................ 4
4.2 Allowable Planning and Preparedness Activities................................................. 4
4.3 Allowable Training Courses................................................................................... 7
4.5 Allowable Equipment, Supplies, and Materials ....................................................... 9
4.5 Conditionally Allowable Expenditures ............................................................... 11
4.5.1 Costs Requiring Prior Approval ................................................................ 11
4.6 Unallowable Expenditures ................................................................................... 13
IV. Grant Lifecycle .................................................................................................................... 14
5.1 Pre-Award Phase .................................................................................................. 14
5.1.1 Planning an Opportunity ............................................................................ 14
5.1.2 Announcing an Opportunity ...................................................................... 15
5.1.3 Searching for Opportunities ....................................................................... 15
5.1.4 Registering on Grants.gov .......................................................................... 15
5.1.5 Completing an Application ......................................................................... 15
5.1.6 Retrieving an Application ........................................................................... 16
5.1.7. Risk Assessment........................................................................................... 16
5.1.8 Programmatic Review ................................................................................. 16
5.1.9 Completing the Review Process ................................................................. 17
5.1.10 Tracking Application Status ...................................................................... 17
5.2 Award Phase .......................................................................................................... 17
5.2.1 Notifying Award Recipient ......................................................................... 18
5.2.2 Awarding Grant .......................................................................................... 18
5.3 Post Award Phase .................................................................................................. 18
5.3.1 Support and Oversight................................................................................ 19
5.3.2 Obligation of Funds ..................................................................................... 19
5.3.3 Reporting Progress ...................................................................................... 20
5.3.4 Reimbursement of Expenditures ............................................................... 20
5.3.5 Post-Award Adjustments ............................................................................ 21
5.3.6 Award Closeout ........................................................................................... 21
APPENDIX C – Recipient Financial System Requirements................................................... 33
APPENDIX D – Matching Information .................................................................................... 37
APPENDIX E – Categories of Expenditures ............................................................................ 39
APPENDIX F – Subrecipient Management and Monitoring ................................................. 40
APPENDIX G – Procurement Standards ................................................................................. 45
APPENDIX H – Property Standards ........................................................................................ 48
APPENDIX I – Sample Application .......................................................................................... 54
APPENDIX J – Indirect Costs ................................................................................................... 70
2
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 3>>>

I. Introduction
The Hazardous Materials Emergency Preparedness (HMEP) Grant Guide provides information
on grant management processes and compliance needed to successfully manage HMEP Grant
funds. It is designed to reduce risk and error, while increasing efficiencies to help grantees
effectively administer their programs.
The HMEP Grant Guide is produced by the United States Department of Transportation
(USDOT), Pipeline and Hazardous Materials Safety Agency (PHMSA). PHMSA's mission is to
protect people and the environment by advancing the safe transportation of energy and other
hazardous materials that are essential to our daily lives. The agency produces the Emergency
Response Guidebook (ERG), establishes national policy, sets and enforces standards, educates,
and conducts research to prevent incidents.
PHMSA collects registration fees from HAZMAT shippers and carriers. Those fees are then
redistributed by PHMSA through several grant programs to include: The Hazardous Materials
Emergency Preparedness (HMEP) Grant; Assistance for Local Emergency Response Training
(ALERT) Grant; Hazardous Materials Instructor Training (HMIT); Supplemental Public Sector
Training (SPST) Grant; and Community Safety (CS) Grant.
II. HMEP Grant Overview
The HMEP grant program was established under The Hazardous Materials Transportation
Uniform Safety Act of 1990 (P.L. 101-615), to assist States, Territories, and Native American
Tribes to "develop, improve, and carry out emergency plans" within the National Response
System and the Emergency Planning and Community Right-To-Know Act of 1986 (EPCA). This
includes awarding grants for planning and training activities related to HAZMAT incidents in
commercial transportation.
This grant does not fund operational expenditures.
The HMEP grant program is designed to allow grantees the flexibility to implement training and
planning programs that address differing needs for each location based on demographics,
emergency response capabilities, commodity flow studies, and hazard analysis. Relevant
trainings are found in the National Fire Protection Association (NFPA) 472: Standard for
Competence of Responders to Hazardous Materials/Weapons of Mass Destruction Incidents
publication and the Occupational Safety and Health Administration (OSHA) regulations found in
29 CFR § 1910.120.
3
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 4>>>

Planning efforts fall under the Emergency Planning and Community Right-to-Know Act
(EPCRA) of 1986 (Title 42 U.S.C. Chapter 116), Emergency Planning (301-303). This includes
three sections and provisions intended to help communities prepare for chemical emergencies:
• 301 - State and Tribal Emergency Response Commissions (SERCS and TERCs) and
Local and Tribal Emergency Planning Committees (LEPCs and TECs)
• 302 - Regulated Substances and Facilities; Emergency Planning Notification), and
• 303 - Comprehensive Emergency Response Plans
Training efforts must be directed towards public sector HAZMAT emergency response
employee’s ability to respond to accidents and incidents involving HAZMAT in commercial
transportation. This may also include course evaluation to determine effectiveness of delivery
and student retention. HMEP training must adhere to either the requirements set forth by the
National Fire Protection Association (NFPA) 472 or Occupational Safety and Health
Administration (OSHA) 29 CFR § 1910.120 Competencies.
The following sections in this document provide listed reference examples of what a grantee can
do to support planning and training efforts.
III. Expenditure Guidelines
This section provides direct examples of allowable, generally unallowable, and conditionally
allowable activities. These examples are for reference only.
4.1 Allowable Management and Administration Costs (M&A)
M&A costs (sometimes referred to as general expenditures) are allowable administrative
expenditures incurred during the administration of an award and that do not fall under
preparedness or response efforts. These must be directly related to the management and
administration of the HMEP grant award. This includes but is not limited to: Grants Management
Courses, Continuing Education Specific to Grants Management
4.2 Allowable Planning and Preparedness Activities
ALLOWABLE PLANNING AND PREPAREDNESS ACTIVITIES
This list is not all inclusive
Activity Description and Summary Additional Guidance and Materials
Commodity Flow
Studies
A hazardous materials
PHMSA published document,
commodity flow survey
“Hazardous Materials Commodity
(HMCFS) identifies
Flow Data and Analysis” and EPA’s
HAZMAT transported into,
Sample Commodity Flow Studies
out of, within, and through a
https://www.epa.gov/epcra/sample-
specified area.
commodity-flow-studies
Other Commodity
Flow Study Related
Costs
Example: Aerial photography
for use with Commodity Flow
Study research using drones.
Expenses must be HMEP related and
only charged to the HMEP grant at
the rate of use for this program.
4
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 5>>>

ALLOWABLE PLANNING AND PREPAREDNESS ACTIVITIES
This list is not all inclusive
Tier II Chemical Inventory
Reports and Databases
HMEP does not pay for operational
costs.
GAP Analysis/Needs
Assessment Costs
expenses tied to a commodity
flow study.
A needs assessment is the
process to determine existing
gaps between current
conditions and desired
conditions.
HMEP Sample Application, Page 6
https://www.phmsa.dot.gov/working
-phmsa/grants/hmep-sample-
application
EPCRA Compliance
Per EPCRA 301, Local or
Refer to Appendix B Resources for
Costs. Section 301
Tribal Emergency Planning
Committees (LEPCs or
additional EPCRA information and
EPCRA Compliance Costs Section
State and Tribal
TEPCs) must develop an
301 (cont.) for a breakdown of the
Emergency Response
Commissions
emergency response plan,
review the plan at least
required elements of a community
emergency response plan.
(SERCS and TERCs)
and Local and Tribal
annually, and provide
information about chemicals
Emergency Planning
Committees (LEPCs
in the community to citizens.
and TEPCs)
EPCRA Compliance
Costs. Section 301
(cont.)
This list is not all
inclusive
• Identification of facilities
and transportation routes
of extremely hazardous
substances.
• Description of emergency
response procedures, on
and off site.
• Outline of emergency
notification procedures.
• Outline of evacuation
plans.
• A training program for
emergency responders
(including schedules).
• Methods and schedules for
exercising emergency
response plans.
Full list of required elements of a
community emergency response plan
can be found from the
Environmental Protection Agency
(EPA)
https://www.epa.gov/epcra/local-
emergency-planning-
committees#Local%20Emergency%
20Planning%20Committee%20Reso
urces
5
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 6>>>

ALLOWABLE PLANNING AND PREPAREDNESS ACTIVITIES
This list is not all inclusive
EPCRA Compliance
HMEP funds must be used for
Refer to EPCRA Section 302:
Costs. Section 302
the benefit of the first
responder.
Emergency Planning notification
https://www.epa.gov/system/files/do
cuments/2022-01/chapter-2-epcra-
Emergency Planning
Notification
The HMEP grant may cover
costs associated with
section-302.pdf
incorporation information
derived from EPCRA 302
requirements into their
Emergency Operations Plan
(EOP).
EPCRA Compliance
Costs. Section 303.
Comprehensive
Emergency Response
Plans Local and
Tribal Emergency
Planning Committee
(LEPC and TEPC)
Responsibilities
Facility
Responsibilities State
and Tribal
Emergency Response
Commission (SERC
and TERC)
Responsibilities
Costs include, but are not
limited to:
• LEPCs/TEPCs developing
and maintaining
comprehensive emergency
response plans and
submitting these plans to
the State or Tribal
Emergency Response
Commission.
• LEPCs/TEPCs to review
the plans annually, or
more frequently as
circumstances change
within the community or
at any facility.
All plans should contain:
• Analysis of the emergencies
likely to occur.
• Assessment of available
resources and existing
capabilities.
• HAZMAT Planning Curriculum
response operations strategies
and assignments that address
notification, command and
control, life safety, and other
functional requirements; and
identification of prevention
measures that can mitigate the
seriousness of an emergency or
prevent it from occurring.
See: Appendix B - Resources
Conference
Attendance and/or
HMEP may fund costs
associated with conference
See: 4.2 Allowable Planning and
Preparedness Conferences for a list
Hosting Costs for
Emergency Planners
attendance as they relate
allowable HMEP grant
activities.
of examples
HMEP Planning
Program Manager
Personnel Costs
Only include compensation
paid for employees engaged in
HMEP grant related activities.
Costs should be consistent
with that paid for similar types
of work within the
organization.
Grantees must meet the grants pass-
through requirement: 75% of the
total award must be to the direct
benefit of the first responder. No
more than 25% of a total grant award
may be attributable towards M&A
costs.
See: HMEP Sample Application,
Page 6
6
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 7>>>

ALLOWABLE PLANNING AND PREPAREDNESS ACTIVITIES
This list is not all inclusive
https://www.phmsa.dot.gov/working
-phmsa/grants/hmep-sample-
application
Attending and/or
Hosting Workshops,
Drills and Exercises
Events must be related to
HMEP Sample Application, budget
narrative
allowable HMEP grant
activities and have a
connection to HAZMAT in
commercial transportation
https://www.phmsa.dot.gov/working
-phmsa/grants/hmep-sample-
application
Capability
Assessments
Evaluate the ability for first
responders, non-governmental
organizations, and other
involved stakeholders to
respond to a HAZMAT
emergency
Risk Assessments to
A risk assessment is a process
Hazardous Materials Incident
Response Curriculum Guidelines
https://www.phmsa.dot.gov/grants/h
azmat/response-guidelines
Mission Specific Planning
Competencies: Capability
Assessment. Page 49
Comprehensive
Enhance Plans
to identify potential hazards
and analyze what could
happen if a hazard occurs.
Preparedness Guide 201: Threat and
Hazard Identification and Risk
Assessment Guide
(FEMA CPG 201). Example:
https://www.phmsa.dot.gov/hazmat/r
eports/risk-assessment-hazmat-uavs
Computer-Aided
Management of
Emergency
Operations
(CAMEO) Training
Training towards the usage of
CAMEO
Developed by EPA and the National
Oceanic and Atmospheric
Administration to assist front-line
chemical emergency planners and
responders, CAMEO can access,
store, and evaluate information
critical for developing emergency
plans.
4.3 Allowable Training Courses
ALLOWABLE TRAINING COURSES
This list is not all inclusive
Air Monitoring and Sampling HAZMAT IQ Training (Above and Below the
line, Advanced IQ & ToxMedic, etc.)
Airport Rescue Fire Fighting (aircraft
rescue and response)
HAZMAT Risk Analysis Courses
Alternative Fuels Hazardous Waste Operations and Emergency
Response Standard (HAZWOPER)
Ammonia, Ethanol, Chlorine Response Industrial Fire Fighting (rail yards, fuel transfer
facilities, and ports)
7
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 8>>>

ALLOWABLE TRAINING COURSES
This list is not all inclusive
Cargo Tank Specialty Chemistry of Hazmat-Part I/II Commodity Flow Study courses Confined Space Rescue Courses aimed at developing, improving,
and implementing emergency plans under
the Emergency Planning and Community
Right-to-Know Act (EPCRA) §§ 301 and
303 (Title 42 U.S.C. Chapter 116)
Intermodal Tank Specialty
Level A/Level B Personal Protective
Liquid Natural Gas (LNG) rail training
LP Gas Emergencies/Propane Emerge
Lithium Ion-Battery training related to incidents
in commercial transportation
Crude Oil Training Decontamination: Mass, Technical,
Marine Operations - Ship-board rescue,
firefighting, HAZMAT focus
Marine Tank Vessel Specialty
Refresher
Developing Chemistry for Emergency
Responders
Emergency Medical Technician (EMT)
Training for HAZMAT
Employee HAZMAT Emergency Response
Readiness Training
Explosive Ordinance Disposal involving
transportation
NIMS ICS-100: Introduction to the Incident
Command System
NIMS ICS-200: Incident Command System for
Single Resources and Initial Action Incidents
NIMS ICS-300: Intermediate Incident
Command System
NIMS ICS-400: Advanced Incident Command
First Receiver Awareness Training Flammable Liquid Bulk Storage System
Pipeline Incident in Transportation Response
Training
Radiological (sources in transportation, but not
Weapons of Mass Destruction.)
Flammable Gas Bulk Storage Grants Management Training, Courses, and
continuing education
HAM Radio Training HAZ-CAT Training Cargo Tank Specialty Regional Response Strategy Selection courses
Rope Rescue (pre-requisite for Confined Space
Rescue)
Surveying a HAZMAT Incident
Tactical Chemistry
Tank Specialty: Car, Cargo, Marine Vessel,
Intermodal
HAZMAT Awareness, Operations,
TRANSCAER Training as it relates to HMEP
Technician, Specialist, and Refresher
Courses
HAZMAT Basic Life Support/Advance
Life Support
Using Personal Protective Equipment
HAZMAT Containers Victim Rescue/Recovery
HAZMAT for Dispatcher Financial Management courses with Grants
Management correlation
Victim Rescue/Recovery
HAZMAT for Emergency Management
System (EMS)
8
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 9>>>

4.4 Allowable Planning and Training Preparedness Conferences
Costs associated with attending conferences are allowed. When requesting these costs grantees
must state what projects, goals, and deliverables the events support. For example, attendance to a
planning conference where the HMEP Grant manager participates in Tabletop Exercises (TTX)
will provide lessons learned that the HMEP Grant manager can apply when performing the
annual Emergency Operations Plan (EOP) update and review for they LEPCs/TEPCs.
ALLOWABLE PLANNING AND TRAINING PREPAREDNESS CONFERENCES
This list is not all inclusive
Conference Location Website
Arizona Tribal Hazardous Materials
(HAZMAT) Training and
Information Conference
Flagstaff, AZ http://itcaonline.com
International Hazardous Materials
Baltimore, MD https://www.iafc.org/
Response Teams Conference (IAFC)
PHMSA HMEP Conference Varies https://www.phmsa.dot.gov/grants
/hazmat/hmep-resources
Virginia Hazardous Materials
Conference
Harrisonburg, VA http://www.virginiahazmat.org
The Continuing Challenge Sacramento, CA http://www.hazmat.org
National Association of SARA Title
Houston, TX
https://nasttpo.com/
III Program Officials Annual and
Mid-Year and Annual Conference
(mid-year),
Varies (annual)
HOTZONE Houston, TX https://hotzone.mobi/
COLDZONE Midwest HAZMAT Conference Northwest Tribal Emergency
Management Council (NWTEMC)
Annual Conference
Minneapolis, MN Northbrook, IL Spokane, WA http://coldzone.org/
https://emerysafety.com/
http://nwtemc.org/Conferences_N
WTEMC.aspx
TRANSCAER Conferences and
Events
Varies http://www.transcaer.com/
4.5 Allowable Equipment, Supplies, and Materials
Equipment, materials and supplies necessary to conduct HMEP planning, and training related
activities are allowable. The list below provides examples of previously approved items.
ALLOWABLE EQUIPMENT, SUPPLIES AND MATERIALS
This list is not all inclusive
Airline connection Oxygen meter
Aerial Photography Equipment for Commodity
Flow Studies/Exercises/Training – usage must be
entirely HMEP or charged to HMEP by proportion
of HMEP use
Passive dosimeters
Bottom outlet valve Personal Protective Equipment (PPE)
Carbon monoxide meter pH indicators and/or pH meters
9
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 10>>>

ALLOWABLE EQUIPMENT, SUPPLIES AND MATERIALS
This list is not all inclusive
Colorimetric tubes Portable pumps (air, electrical,
Combustible gas indicator Compressors or compressed gas Computing Devices - machines used to acquire,
store, analyze, process, and publish data and other
information electronically, including accessories (or
“peripherals”) for printing, transmitting, and
receiving, or storing electronic information
Equipment Trailer Sample valve
gasoline/diesel
Power-take-off (PTO) driven pumps
Pressure gauge
Publication materials
Gauging device Self-Contained Breathing Apparatus
(SCBA)
General Purpose Equipment Simulators for HAZMAT Training and
Exercise
HAZMAT Suits Thermometer
Information Technology Systems computing
devices, ancillary equipment, software, firmware,
and similar procedures, services (including support
services), and related resources.
Training trailer
Inventory management system Liquid or vapor valve Vacuum trucks
Vehicle not for operational usage (i.e.,
required to tow training trailers and to
carry out planning related activities
such as a vehicle for a HAZMAT
planner solely dedicated to the HMEP
Grant that travels to local emergency
responders to carry out the duties to
meet EPCRA requirements)
Office supplies related to HMEP activities Foam for specific HAZMAT
transportation related planning and
training related activities
Equipment is tangible personal property (including information technology systems) having a
useful life of more than one year and costs more than $5,000 per item.
Supplies are all tangible personal property other than those described in the definition of
equipment and cost less than $5,000 per item.
A computing device is a supply if the acquisition cost is less than the lesser of the capitalization
level established by the non-Federal entity for financial statement purposes or $5,000, regardless
of the length of its useful life.
Refer to Appendix A – Definitions and Appendix E – Category of expenditures for additional
details.
10
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 11>>>

4.5 Conditionally Allowable Expenditures
Conditionally allowable expenditures are expenditures that are generally allowable but require
additional or specific conditions.
CONDITIONALLY ALLOWABLE EXPENDITURES
This list is not all inclusive
Expenditure Conditions
Tier II Chemical Inventory Reports and
Databases
Allowable: Duties and costs related to planning
and training for the benefit of first responders,
i.e., information gathering for a commodity flow
study. CAMEO. See below.
Unallowable: Operational costs.
Note: Information Systems/Computing devises
related to Tier II reporting may be considered
allowable in full or in part with PHMSA
approval
See Appendix A - Definitions for Tier II
Inventory Reports and Databases more
information.
Emergency Operating Center (EOC)
Leadership Exercises
Leadership exercises for events concerning
HAZMAT preparedness and responses
Hospital Drills LEPC Meeting Expenses Decontamination from a transportation incident
(radiological, chemical, or other HAZMAT)
HMEP covers the portion of costs as related to
EPCRA Sections 301-303
Food and Refreshments Fixed-facility HAZMAT preparedness Food must be necessary for the safety of
participants, i.e., hydration, remote location,
dietary necessities, cultural accommodations etc.
Exercises and plans that include transportation of
materials to and from fixed facilities; exercises
that test the same capabilities that would
be used to respond to a HAZMAT transportation
incident
Fire Department Instructors Conference
(FDIC)
Transportation HAZMAT-themed schedule
4.5.1 Costs Requiring Prior Approval
Conditionally allowable expenditures may also include costs requiring prior approval the table
below includes examples of when a grantee needs to do so.
COSTS REQUIRING PRIOR APPROVAL
This list is not all inclusive
Cost Type Sole Source
Approval
Cost Description and Information
A request to enter a non-competitive contractual relationship for equipment,
technology, or services more than the simplified acquisition threshold must be
11
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 12>>>

COSTS REQUIRING PRIOR APPROVAL
This list is not all inclusive
submitted to PHMSA in writing certifying that the award of a contract through
full and open competition is infeasible.
Prior
Written prior approval must be obtained for some costs, as specified in 2 C.F.R.
Approval of
Certain
Part 200 (specifically in 2 C.F.R.§ 200.407). The following are some examples of
costs that require prior approval:
Costs
• Costs incurred prior to the date of the subaward period
Changes to
the Scope of
the Award
• Foreign travel (only applicable to territories)
Recipients must initiate an Activity Request (AR) for changes in scope, duration,
activities, or other significant areas. In general, a change in scope is a cost that is
10% of the total award or more.
These changes include but are not limited to:
• Altering programmatic activities
• Changing the purpose of the project
• Changing the project site
• Experiencing or making changes to the organization or staff with primary
responsibility for implementation of the award, contracting out,
subawarding (if authorized by law), or otherwise obtaining the services of
a third party to perform activities which are central to the purpose of the
award
• Changes in scope that affect the budget
Equipment
If recipients or subrecipients have received prior approval for expenditures for
and Other
Capital
equipment and other capital assets, including repairs which materially increase
the useful life of equipment, then these expenditures are allowable. See 2 C.F.R. §
Expenditures
200.439.
Expenditures for equipment must be fully justified in the budget and budget
narrative; otherwise, the grant- making component may require that the type,
quantity estimated, unit, or other information be provided before the final budget
can be issued.
In reviewing equipment acquisition budgets and proposals, the following
principles should be followed:
• No other equipment owned by the recipient/subrecipient is suitable for the
project.
• No luxury vehicles will be approved.
If the vehicle request is approved, the vehicle should be reasonable, and the
recipients must follow the Internal Revenue Service guidelines.
If the vehicle(s) was purchased as part of a unit of government fleet by the State
or local central procurement activities, it is generally accepted as reasonable.
• Federal funds are not used to provide reimbursement for the purchase of
equipment already owned by the recipient/subrecipient.
• Equipment purchased and used commonly for two or more programs
should be appropriately divided among each activity.
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE
12

<<<PAGE 13>>>

COSTS REQUIRING PRIOR APPROVAL
This list is not all inclusive
• An expenditure for equipment purchased for a common pool is generally
allowable as a charge to the award at cost value.
• Equipment that has already been purchased and charged to other activities
of the organization is not an allowable expense to the award.
4.6 Unallowable Expenditures
Unallowable expenditures are costs which may never be used with HMEP Grant funding dollars.
Examples of generally unallowable expenses include but are not limited to the below.
GENERALLY UNALLOWABLE EXPENDITURES
This list is not all inclusive
Active Shooter Training FRI (Fire Rescue International): Fire Rescue
International (FRI) annual conference for fire
and emergency service leaders from across
North America and around the globe for 5
days of networking, learning, and
collaboration
Alcohol Joint Terrorism Task Force (JTTK) Exercises
All-Hazards Warning System Drills Any costs disallowable or stated as ineligible
in 49 CFR part 110 and 2 CFR 200 Subpart E
Lobbying
Mobile Meth Lab Training
Any cost specifically prohibited in the
General Terms and Conditions of the grant
award, or identified in PHMSA policy
guidance, or as a Special Terms and
Conditions listed on the NGA (Remarks
Natural Disaster Exercises without a
commercial transportation in HAZMAT tie-in
section).
Bonuses or Commissions See 2 C.F.R. §
200.430(g)
Corporate Formation Operational Expenses
Pro Board® accreditation and certification
Courses not related to HAZMAT emergency
response (except for the pipeline training
listed in section 4.1 above)
School Violence Prevention
Emergency Preparedness Presentation to
Child Care Providers
State and Local Sales Taxes
Entertainment Costs Tips
Fines and Penalties Weapons of Mass Destruction (WMD)
Radiological Training and Terrorism courses
Unallowable expenditures and disallowed costs are costs prohibited by law or regulation, Federal
cost principles, PHMSA policy, or special terms and condition of award. Disallowed costs are
charges to a federal award that the Federal awarding agency or pass-through entity determines to
13
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 14>>>

be unallowable, in accordance with the applicable Federal statutes, regulations, or the terms and
conditions of the Federal award (2 CFR 200.31)
IV. Grant Lifecycle
The grant lifecycle timeline previews the overall steps and process of a grant. There are three
phases. Each phase has steps, responsible parties, and required actions. This section provides an
overview of the grants management process and lifecycle in three phases: Pre-Award, Award
Phase, Post Award.
5.1 Pre-Award Phase
The pre-award phase occurs before a grant is awarded.
Planning an Opportunity Lifecycle Steps Responsible
Party
PHMSA Actions
Plan and develop funding priorities based on
the mission, the Administration, and
Announcing an Opportunity PHMSA Searching for Opportunities Applicant congressional initiatives.
Formally announce the availability of funds and
publish details on grants.gov
Search for CFDA 20.703 on grants.gov and stay
up to date with announcements
Registering on grants.gov Applicant Regularly check grants.gov for funding
opportunities and requirements.
Completing an application Applicant Allow for enough time to complete an
application. Download the application and save
offline. Submit prior to the closing date and
time.
Retrieving the application Applicant Applicant will be notified of receipt via e-mail
when completed. PHMSA beings review of
application.
Staying in the Loop Applicant Finishing the review process PHMSA Applicants can track the status of their
application by communicating with the grant-
making agency. The application status process
is handled differently by each agency.
As the funding agency reviews applications, a
range of program stakeholders will participate.
The review process takes time and varies based
on grant type. As the review process takes
place, grant-making agencies may update
applicants on the status of their application.
5.1.1 Planning an Opportunity
The Department of Transportation (DOT) makes awards for a specified period, referred to as the
award or project period. The award period is established for each award and is included in the
14
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 15>>>

Notice of Grant Award (NGA) document. Award periods range from 1 year for tribes up to 3
years for states and territories. The performance periods may vary depending on the specific
program, and if there are extensions necessary.
Local and Tribal Emergency Planning Committees (LEPCs and TEPCs) are responsible for
developing and maintaining comprehensive emergency response plans and submitting these
plans to the State or Tribal Emergency Response Commission (SERC or TERC). Local or Tribal
Emergency Planning Committees (LEPCs or TEPCs) should review the plans annually, or more
frequently as circumstances change within the community or at any facility.
5.1.2 Announcing an Opportunity
PHMSA formally announces the funding opportunity, advertising it to applicant communities
and inviting proposals tailored to address the program mission. The grant-making agency will
publish details of the funding opportunity on Grants.gov.
5.1.3 Searching for Opportunities
Applicants will use the Grants.gov search tool to find funding opportunities that they are eligible
for and are a mission match for their organization. HMEP Funds are announced and issued
annually. Applicants are encouraged to e-mail HMEP.Grants@dot.gov to join the grants program
contact list.
5.1.4 Registering on Grants.gov
HMEP Grant applicants are required to complete the registration process on grants.gov and
sam.gov. System for Award Management (SAM) is the Official U.S. Government system that
consolidated the capabilities of the Central Contractor Registration (CCR), Federal Agency
Registration (FedReg), the Online Representations and Certifications Application (ORCA), and
the Excluded Parties List System (EPLS). It became operational in August 2012. Recipients must
have registered their Unique Entity ID (UEI) https://www.sam.gov/ portal/SAM/ to receive an
award.
Unless exempted from this requirement under 2 CFR § 25.110, the recipient must maintain the
information in SAM until the final financial report required under this award is submitted or the
Recipient receives the final payment, whichever is later. This requires that the Recipient review
and update the information at least annually after the initial registration, and more frequently if
required by changes in your information or another award term.
5.1.5 Completing an Application
Completing a grant application can take weeks. The application package can be downloaded
from Grants.gov in the form of a PDF, and progress can be saved as form fields are filled in.
These fields require everything from basic organizational information to explanations of
15
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE

<<<PAGE 16>>>

proposed work and financial data. When an application package has been completed per the
opportunity instructions and checked for errors, it can be submitted through Grants.gov
A sample application can be found in Appendix I Sample Application.
5.1.6 Retrieving an Application
Once an application has been retrieved by the agency from Grants.gov, the applicant is
automatically notified via email. At this point, the grantor application processing begins.
5.1.7. Risk Assessment
PHMSA is required to review and assess the potential risks presented by applicants for Federal
grants prior to making an award (2 C.F.R. § 200.205). This includes financial capabilities and
past performance in a risk-based approach. PHMSA applicants may be required to complete a
questionnaire and submit it to PHMSA before they can be approved for an award.
It is PHMSA’s goal for each recipient to be successful. Each HMEP Grantee has an assigned
Grant Specialist to assist in meeting the needs of each grantee, to include special attention to
high-risk grantees providing guidance, technical assistance, and best practices. Each category
will be clearly listed in each Notice of Grant Award (NGA) and include details of what
conditions apply to each category. Requirements for each status are specific to each grantee.
In general, a recipient may be designated as high-risk if the following conditions are met:
• Is a first time HMEP Grant recipient.
• Has a history of unsatisfactory performance
• Is not financially stable.
• Has a management system that does not meet the standards set forth in 2 C.F.R. Part 200
(Subpart D-Post Federal Award Requirements (Standards for Financial and Program
Management)).Recipient has audit reports with recommendation(s) that have been open
for more than one year and has not submitted documentation adequate to close the
recommendation(s).
• Recipient has not provided a corrective action plan to the DOT, PHMSA within 105 days
of transmission of the audit report to the recipient.
• Recipient has audit reports with questioned costs more than $500,000 (regardless of the
amount of time the audit report has been open).
• Recipient has been referred to the Department of Treasury for collection because of their
failure to timely repay funds.
If a high-risk grantee does not comply with additional conditions imposed or fails to make timely
progress in addressing the issues that resulted in the high-risk designation, PHMSA must
consider farther action.
5.1.8 Programmatic Review
PHMSA will complete a programmatic review of the grant application to ensure that recipients
are financially capable and have the financial integrity to administer Federal funds.
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE
16

<<<PAGE 17>>>

As part of this review, PHMSA will take the following steps:
• Perform a cost analysis of the project. Obtain cost breakdowns, verify cost data, evaluate
specific elements of cost, and examine data to determine the necessity, reasonableness,
allowability, allocability, and appropriateness of the proposed cost.
• Review the current indirect cost rates or rates approved by other Federal agencies.
• Non-Federal entities that have never received a negotiated indirect cost rate, except for
those non-Federal entities described in Appendix VII to 2 C.F.R. Part 200—States and
Local Government and Indian Tribe Indirect Cost Proposals, may elect to negotiate a rate
or, if eligible, charge a de minimis rate of 10% of modified total direct costs (MTDC)
which may be used indefinitely.
• Determine the adequacy of the accounting system and operations to ensure that Federal
funds, if awarded, will be expended in a reasonable manner.
• Non-Federal entities that have not received an award within the past three years may
require an additional financial review.
Review the status of any Federal debt that the applicant may have to ensure the debt is
not delinquent, and other prescreening information, including checking SAM to ensure
the organization is not suspended or debarred from receiving Federal funds.
5.1.9 Completing the Review Process
PHMSA is required to ensure that awards meet certain legislative, regulatory, and administrative
requirements. This requires that PHMSA review and assess each application to determine the
following:
• The applicant is eligible for the specified program.
• The costs and activities in the application are for allowable, allocable, necessary, and
reasonable costs.
• The applicant possesses the responsibility, financial management, fiscal integrity, and
financial capability to administer Federal funds adequately and appropriately.
5.1.10 Tracking Application Status
Applicants can track the status of their application by communicating with the grant-making
agency. The application status process is handled differently by each agency. Further inquiry can
be made by contacting HMEP.Grants@dot.gov.
5.2 Award Phase
The award phase is the Period of Performance listed on award documentation.
Lifecycle Steps Responsible
Party
PHMSA Actions
Notifying the Award
Recipient
When the review process has been completed, the
funding agency notifies the applicants whether they
have been awarded a grant. The agency also begins
working with the award recipient to finalize the legal
HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS GRANT GUIDANCE
17

<<<PAGE 18>>>

Lifecycle Steps Responsible
Party
Actions
framework for the funding agreement. F