{"operation":"document","citation":"PHMSA Guidance, Underground Natural Gas Storage Facility (UNGSF): FAQs","title":"Underground Natural Gas Storage Facility (UNGSF): FAQs","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"2021-12-14","effective_on":"2021-12-14","summary":"Underground Natural Gas Storage Facility (UNGSF): FAQs Document UNGS Frequently Asked Questions.pdf (247.85 KB) Frequently asked questions clarifying, explaining, and promoting better understanding of issues concerning integrity assessment of Underground Natural Gas Storage Facility (UNGSF). Issued Date: Tuesday, December 14, 2021","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-guidance-ungs-frequently-asked-questions-633d77c0.json","markdown":"https://regulus.evalyn.ai/document/phmsa-guidance-ungs-frequently-asked-questions-633d77c0.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-guidance-ungs-frequently-asked-questions-633d77c0","source_url":"https://www.phmsa.dot.gov/pipeline/underground-natural-gas-storage/ungs-frequently-asked-questions","body":"Underground Natural Gas Storage Facility (UNGSF): FAQs\n\nDocument\n\n UNGS Frequently Asked Questions.pdf (247.85 KB)\n\n        Frequently asked questions clarifying, explaining, and promoting better understanding of issues concerning integrity assessment of Underground Natural Gas Storage Facility (UNGSF).\n\n          Issued Date: Tuesday, December 14, 2021\n\n<<<PAGE 1>>>\n\nUNGSF FAQs – Published 12/14/2021 to Reflect the Final Rule\nUnderground Natural Gas Storage Facility (UNGSF): FAQs\nThese Frequently Asked Questions (FAQs) are intended to clarify, explain, and promote\nbetter understanding of issues concerning integrity assessment of Underground Natural\nGas Storage Facilities (UNGSFs). These FAQs are not substantive rules and do not create\nrights, assign duties, or impose new obligations not outlined in the existing regulations\nand standards. Requests for informal interpretations regarding specific situations may\nbe submitted to PHMSA in accordance with 49 C.F.R. §190.11.\nThe Underground Natural Gas Storage Facility (UNGSF) regulations in § 192.12(a)-(d) state that each\nUNGSF that uses a solution-mined salt cavern reservoir, a depleted hydrocarbon reservoir, or an aquifer\nreservoir for natural gas storage must meet the design, construction, operations, maintenance, integrity\ndemonstration and verification, monitoring, threat and hazard identification, assessment, remediation,\nsite security, emergency response and preparedness, and recordkeeping provisions of the American\nPetroleum Institute (API) Recommended Practices (RP) 1170 and/or 1171. These frequently asked\nquestions (FAQs) are designed to assist operators and the public in understanding the application of the\nregulations to UNGSFs.\nThese FAQs reflect the Underground Natural Gas Storage Final Rule, published in the Federal Register on\nFebruary 12, 2020. These FAQs replace in their entirety the original FAQs, which were issued on\n4/03/2017 in response to the Interim Final Rule, which was published in the Federal Register on\nDecember 19, 2016. These FAQ’s are subject to change.\n1. Within the § 192.3 definition of an underground natural gas storage facility (UNGSF),\nwhat is meant by “any other equipment, facility, right-of-way, or building used in the\nunderground storage of natural gas?”\nThe principle components of an underground natural gas storage facility are the reservoir or cavern, the well,\nwellhead components, and wing valves. Elements located at, and used to specifically protect or facilitate\nthe operation of the wellhead, such as devices, fencing, barricades, or enclosures, are examples of “other\nequipment, facility, right-of-way, or building used in the underground storage of natural gas” and are subject\nto § 192.12.\nOriginal: 11/18/2021\n2. What does “incidental to transportation” mean?\nIf an UNGSF is used in any way to store gas that is received from a PHMSA regulated pipeline and\nreturns any of that stored gas to transportation by pipeline, then such a facility is incidental to\ntransportation and therefore covered by this final rule. Even if some of that gas is used to support\nproduction operations or is mingled with produced gas that has not yet entered transportation, the\n\n<<<PAGE 2>>>\n\nUNGSF FAQs – Published 12/14/2021 to Reflect the Final Rule\nstorage facility itself will be treated as a UNGSF under the final rule and will be subject to PHMSA’s full\njurisdiction. See 85 FR 8119, 8121.\nOriginal: 11/18/2021\n3. When did the reporting requirements for existing and new UNGSFs under §§ 191.15,\n191.17, 191.22, and 191.23 take effect?\nThe reporting requirements for incidents, National Registry of Operators, changes notifications, and\nsafety-related condition reporting became effective on January 18, 2017 (the effective date of the\nInterim Final Rule).\nUnder § 191.17, Annual Reports are due by March 15 for the preceding calendar year.\nOriginal: 11/18/2021\n4. What reporting is required for UNGSFs?\nThere are various reporting requirements for UNGSF operators related to incident reports (see §\n191.15(c); annual reports (see § 191.17(c)); new facilities [including new well construction and well\nabandonment], and certain changes made to existing facilities (see § 191.22(c); and safety related\ncondition reports (see § 191.23).\nOriginal: 11/18/2021\n5. Are individual notifications specified in § 191.22(c) required for every activity that\nmeets the reporting requirement?\nMultiple activities within the same storage field may be reported individually or combined into a single\nnotification. Separate notifications are required for each storage field.\nOriginal: 11/18/2021\n6. How is the start date of construction determined?\nThe start date of construction is when physical onsite construction activities commence, such as,\nconstruction equipment move-in activities. Section 192.12 states that UNGSFs “constructed after July 18,\n2017” must meet all requirements and recommendations of API RP 1170 or API RP 1171, as applicable,\nincluding design, construction, testing, and commissioning requirements.\nOriginal: 11/18/2021\n7. How are local or state licenses and permits for UNGSFs impacted by the Final Rule?\nNeither the PIPES Act nor the Final Rule alters the existing role of the States in the siting or permitting of\n\n<<<PAGE 3>>>\n\nUNGSF FAQs – Published 12/14/2021 to Reflect the Final Rule\nUNGSFs or their regulation of natural gas production. FERC and the States will continue to exercise their\nrespective authorities over the permitting of UNGSFs. PHMSA is not responsible for siting determinations\nor related provisions and does not prescribe the location of any facilities. Operators remain responsible\nfor obtaining and renewing any federal, state, or local licenses, permits, or certificates. See 85 FR 8104,\n8118 (Feb. 2, 2020).\nOriginal: 11/18/2021\n8. Does replacement, expansion, or addition of components or appurtenances on\nexisting storage wells require compliance with all provisions of API RPs 1170 or 1171,\nas applicable?\nYes. Such activities are considered maintenance activities under § 192.12, and must comply with API RP\n1170 or 1171, as applicable.\nOriginal: 11/18/2021\n9. What requirements apply to a well that is repurposed or a new well that is\nconstructed at an existing UNGSF?\nNew storage wells or repurposed non-storage wells (e.g., production or abandoned wells), for which\nphysical onsite construction began after July 18, 2017 at an existing UNGSF, under § 192.12 must follow\nthe requirements of API RP 1170 or 1171, as applicable.\nFor any existing, in-service storage well that is repurposed as a different type of storage well, any casing,\ntubing, packers, or wellhead that is replaced must meet the requirements in § 192.12(a) or (b).\nOriginal: 11/18/2021\n10. Can an operator use a prior integrity assessment to avoid duplicating work previously\nperformed?\nYes. The Final Rule makes clear in § 192.12(d)(2) that UNGSF operators may use one or more integrity\nassessments, which may include prior downhole integrity inspections, completed before the effective\ndate (3/13/2020) of the rule to establish a baseline assessment, so long as they meet the requirements\nof Section 8 of RP 1171, and continue to be relevant and valid for the current operating conditions\nand environment. When evaluating prior integrity assessment results, operators must account for\nthe growth and effects of indicated defects since the time the integrity assessment was performed.\nOperators may also conduct new or additional assessments to supplement prior assessments as\nnecessary to establish a more thorough understanding of a UNGSF’s risks.\nOriginal: 11/18/2021\n11. Must UNGSFs have a Drug and Alcohol Testing Program?\nYes. UNGSF operators must comply with 49 CFR Part 199. Any operator of a pipeline facility that is\n\n<<<PAGE 4>>>\n\nUNGSF FAQs – Published 12/14/2021 to Reflect the Final Rule\nsubject to any Part 192 regulations is required to test covered employees for the presence of\nprohibited drugs and alcohol. A covered employee is a person who performs a covered function,\nincluding persons employed by operators, contractors engaged by operators, and persons employed\nby such contractors. Covered functions include operations, maintenance, or emergency-response\nfunctions that are performed on the pipeline facility.\nOriginal: 11/18/2021\n12. Must operators of UNGSFs comply with Part 192, Subpart N, Qualification of Pipeline\nPersonnel?\nNo. UNGSF operators must comply with the training requirements in API RP 1170 (Section 9.7.5) or\nAPI RP 1171 (Section 11.12), dependent on the type of storage field. Both describe general training\nparameters and specifically identify the need to train personnel for normal, abnormal, and emergency\nconditions.\nIn addition, § 192.12(d)(1)(iv) specifically requires a training program for staff involved in the Integrity\nManagement Program.\nOriginal: 11/18/2021\n13. Does the Final Rule require any new Reporting of Safety-Related Conditions (SRCs)?\nYes. Section 191.23(a)(11) requires UNGSF operators to report \"Any malfunction or operating error that\ncauses the pressure of a UNGSF using a salt cavern for natural gas storage to fall below its minimum\nallowable operating pressure, as defined by the facility's State or Federal operating permit or certificate,\nwhichever pressure is higher.\" This is distinguishable from SRC reporting requirements applicable to other\nfacilities subject to § 191.23, as this UNGSF-specific requirement applies to malfunctions or operating\nerrors below the minimum allowable operating pressure.\nIn addition, § 191.23(b)(5) states that an SRC report is not required for any safety-related condition that\n“exists on an UNGSF, where a well or wellhead is isolated [see FAQ #14], allowing the reservoir or cavern\nand all other components of the facility to continue to operate normally and without pressure\nrestriction.”\nOriginal: 11/18/2021\n14. What is meant by “well or wellhead is isolated” as used in § 191.23(b)(5)?\nA well or wellhead is “isolated” by plugging (e.g., by one or more bridge plugs), shut in at the surface,\nand pressure removed.\nOriginal: 11/18/2021\n15. Do the other requirements of Part 192 apply to UNGSF?\nNo. Only § 192.12 applies to UNGSFs. However, UNGSF operators must recognize that there are Part\n\n<<<PAGE 5>>>\n\nUNGSF FAQs – Published 12/14/2021 to Reflect the Final Rule\n191 reporting requirements applicable to UNGSFs, and Part 199 requirements for drug and alcohol\ntesting, which are described in a separate FAQ. See 85 FR at 8112-13.\nOriginal: 11/18/2021\n16. What are the Integrity Management Program requirements established in the Final\nRule?\nThe Final Rule requires each operator of a UNGSF to establish and follow a comprehensive written\nIntegrity Management Program in accordance with § 192.12(d).\nOriginal: 11/18/2021\n17. What are the key dates associated with the publishing of the Final Rule?\nThe Final Rule was published in the Federal Register on February 12, 2020, in Volume 85, commencing on\nFR Page 8104.\nThe Effective Date of the Rule is March 13, 2020. The Effective Date is the date the overall Rule goes into\neffect and UNGSF operators are expected to comply with the general provisions.\nThe Compliance Dates are those dates by which covered entities are required to comply with the new or\nrevised individual provisions of the Final Rule where a compliance date or period is provided. Section\n192.12 describes a number of compliance dates that Reservoir and Cavern UNGSF operators must meet.\nExample Compliance Dates from the Final Rule include:\n• March 13, 2020 - Each UNGSF that uses a solution-mined salt cavern and was constructed after this\ndate may not commence operations until after it meets all the provisions of:\n• API RP 1170;\n• API RP1171, section 8, that are applicable to the physical characteristics and operations of the\nsalt cavern UNGSF; and\n• Section 192.12(c) and (d).\n• March 13, 2021 – By this date, each UNGSF that uses a solution-mined salt cavern and was constructed\nbetween July 18, 2017, and March 13, 2020, must meet all the provisions of:\n• API RP 1170 prior to commencing operations and Section 192.12(c) prior to commencing\noperations;\n• API RP 1171, section 8, that are applicable to the physical characteristics and operations of\nthe salt cavern UNGSF; and\n• Section 192.12(d).\n• March 13, 2021 – By this date, each UNGSF that uses a solution-mined salt cavern and was constructed\non or before July 18, 2017, must meet the provisions of:\n• API RP 1170, sections 9, 10, and 11, and § 192.12(c), [implemented by January 18, 2018];\n• API RP 1171, section 8, that are applicable to the physical characteristics and operations of\nthe salt cavern UNGSF; and\n• Section 192.12(d).\n\n<<<PAGE 6>>>\n\nUNGSF FAQs – Published 12/14/2021 to Reflect the Final Rule\n• March 13, 2021 – By this date, each UNGSF that uses a depleted hydrocarbon reservoir or an aquifer\nreservoir for natural gas storage and was constructed after July 18, 2017 must, prior to commencing\noperations, meet all the provisions of:\n• API RP 1171; and\n• Sections 192.12(c) and 192.12(d).\n• March 13, 2021 – By this date, each UNGSF that uses a depleted hydrocarbon reservoir or an aquifer\nreservoir for natural gas storage and was constructed on or before July 18, 2017 must, prior to\ncommencing operations, meet all provisions of:\n• API RP 1171, sections 8, 9, 10, and 11, and § 192.12(c), [implemented by January 18, 2018];\nand\n• Section 192.12(d).\n• March 13, 2024 – By this date, each UNGSF operator must complete the baseline risk assessments of\nall reservoirs, caverns, and 40% of its wells (including wellhead assemblies), beginning with the highest\nrisk wells.\n• March 13, 2027 – By this date, each UNGSF operator must complete baseline risk assessments on all\nits wells (including wellhead assemblies).\nOriginal: 11/18/2021\n18. What is a risk analysis and how often should it be conducted?\nTo support a risk-based integrity management program, operators need to develop a systematic process\nfrom which threats/hazards from underground storage operations are identified, and the probability\n(likelihood) and consequences of potential adverse events are analyzed and estimated. The risk analysis\nis to be conducted at an operator-defined interval and repeated more frequently as a result of changes to\nthreats/hazards or consequences.\nAs required by § 192.12(d)(4), operators must document the decisions, justifications, and determinations\nmade to substantiate the risk analysis.\nOriginal: 11/18/2021\n19. What is included in a baseline assessment?\nA baseline assessment specifically includes one or more downhole integrity inspection method(s) as\nprovided for in API RP 1170 and 1171 for each well, reservoir, and cavern based on the potential\nthreats/hazards identified by the risk analysis. In addition, operators may choose to supplement downhole\nintegrity inspections with other inspections based on the potential threats/hazards identified by the risk\nanalysis in order to obtain adequate information to complete a thorough analysis. See § 192.12(d)(2).\nThe use of previous integrity assessments, including prior downhole integrity inspections, are addressed\nin the FAQ #10 on prior integrity assessments.\nOriginal: 11/18/2021\n\n<<<PAGE 7>>>\n\nUNGSF FAQs – Published 12/14/2021 to Reflect the Final Rule\n20. What is included in a re-assessment cycle?\nA re-assessment includes one or more methods to assess the integrity of the UNGSF, as identified in API\nRP 1171 or API RP 1170, as applicable, that account for the threats/hazards identified through the risk\nanalysis to determine the current condition of each well, reservoir, and cavern. A re-assessment interval\ncycle must not exceed seven (7) years from the date of the prior assessment.\nAs required by § 192.12(d)(4), the operator must document the decisions, justifications, and\ndeterminations made to support the integrity management program, including those made for the\nintegrity assessment intervals, and assessment methodology/technology used.\nOriginal: 11/18/2021\n21. How often are downhole integrity inspections performed?\nThere is no prescribed maximum interval for performing downhole integrity inspections. However, an\noperator must develop and implement a process that incorporates risk analysis and integrity assessment\nresults to schedule subsequent downhole integrity inspections.\nOriginal: 11/18/2021\n22. Are preventive & mitigative (P&M) measures part of the integrity management\nprogram?\nYes. In accordance with API RP 1171, Subsection 8.6, Preventative and Mitigative Measures, UNGSF\noperators must identify and implement preventive and mitigative (P&M) measures to manage and reduce\nrisks. P&M measures must be based on the specific threats/hazards and consequences identified for each\nreservoir or cavern, well, and wellhead.\nOriginal: 11/18/2021","truncated":false,"body_characters":16786}