{"operation":"document","citation":"PHMSA Hazmat Incident X-2010100107","title":"PHMSA Hazmat Incident X-2010100107 — POLYCHORINATED BIPHENYLS, LIQUID — RED BUTTES, WY","source_type":"incident","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":null,"effective_on":"2010-09-17","summary":"Serious reporter-submitted hazardous materials transportation incident on 2010-09-17 in RED BUTTES, WY.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-hazmat-incident-x-2010100107.json","markdown":"https://regulus.evalyn.ai/document/phmsa-hazmat-incident-x-2010100107.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-hazmat-incident-x-2010100107","source_url":"https://portal.phmsa.dot.gov/PDFGenerator/getPublicReport/OHMIR_5800-1-PUBLIC?INCIDENTID=G%2B7ODu8kaBCOz6c6JaqeVA%3D%3D","body":"PHMSA hazardous materials incident report X-2010100107.\nIncident date: 2010-09-17.\nLocation: RED BUTTES, WY.\nMode: Rail.\nCarrier/reporter: Union Pacific Railroad.\nShipper: Clean Harbors / CLEAN HARBORS ENVIRONMENTAL SERVICES.\nMaterials: UN2315; POLYCHORINATED BIPHENYLS, LIQUID; hazard class 9; 0.0625 LGA released | UN3432; POLYCHLORINATED BIPHENYLS, SOLID; hazard class 9; 84576 SLB released.\nWhat failed: Pressure Relief Valve or Device - Reclosing; Pressure Relief Valve or Device - Reclosing.\nHow failed: Leaked; Leaked.\nReported failure causes: Derailment; Rollover Accident.\nReported result: Spillage.\nReporter-submitted DOT Form 5800.1 data may be incomplete, corrected, supplemented, or misreported. A record, serious-incident classification, failure description, or relationship to a reporting rule is not a PHMSA causal finding, compliance determination, or finding of a violation.","truncated":false,"body_characters":892}