{"operation":"document","citation":"PHMSA IA 2026.03","title":"IA Content 2026.03","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"2026-06-29","effective_on":"2026-06-29","summary":"IA Content 2026.03 Jun 29, 2026 Latest Federal Content Question Content GD, GT, HL, LNG: Implemented new Section 114 inspection coverage via addition of one question at the conclusion of the MO.XX Operations Subgroup in each PRS. GD: LPG question LPG.NFPA59-TRANSFER.TRANSFEROPS.R deleted to complete 03/26 MNOPS/PHMSA updates. GT: Minor updates for improved reg reference consistency and nomenclature improvements per O","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-ia-release-2026-03.json","markdown":"https://regulus.evalyn.ai/document/phmsa-ia-release-2026-03.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-ia-release-2026-03","source_url":"https://primis.phmsa.dot.gov/IA-Releases/ia-release-notes/notes/iac-2026.03","body":"IA Content 2026.03\n\nJun 29, 2026 Latest\n\nFederal Content\n\nQuestion Content\n\nGD, GT, HL, LNG: Implemented new Section 114 inspection coverage via addition of one question at the conclusion of the MO.XX Operations Subgroup in each PRS.\n\nGD: LPG question LPG.NFPA59-TRANSFER.TRANSFEROPS.R deleted to complete 03/26 MNOPS/PHMSA updates.\n\nGT: Minor updates for improved reg reference consistency and nomenclature improvements per O&M Team scrub of EP and MO Groups.\n\nGT: New SP.CL-D question set (12 new Subgroups) added for Special Permit Group D (Special Permit PHMSA-2019-0207). 37 new questions added in addition to many re- presented questions.\n\nGT: MO.GOCLASS.ELIGIBLECL3INITIAL.P updated to reflect publication of technical corrections associated with Eligible Class 3 segments (Class Location Change Requirements Rule (rule effective date: March 16, 2026)).\n\nHL: Construction Team - Updated various Considerations in the DC.CO and DC.MO Subgroups.\n\nHL: Construction Team - Deleted DC.BIO and SRN.DC.BIO Subgroups and associated Biofuels directive and updated related content in the DC.DN Subgroup, including renaming DC.DN.DESIGN.X to DC.DN.FLANGES.X.\n\nIAT - Applied BOT/RT exclusion to SRN.FS-TSAPIINSPECT.TANKINSP.S, and Biofuels exclusion to SRN.MO-BIO.BIOOMPROC.S and SRN.EP-ERB.BIOFUELS.S.\n\nSee summary document for more details.\n\n<<<PAGE 1>>>\n\nOverview Summary of IA Federal 2026.03 Changes – June 30, 2026\nSystem Type(s)* Update Description\n1 GD, GT, HL, LNG Implemented new Section 114 inspection coverage via addition of one question at the\nconclusion of the MO.XX Operations Subgroup in each PRS.\n2 GD LPG question LPG.NFPA59-TRANSFER.TRANSFEROPS.R deleted to complete 03/26\nMNOPS/PHMSA updates.\n3 GT Minor updates for improved reg reference consistency and nomenclature improvements per\nO&M Team scrub of EP and MO Groups.\n4 GT New SP.CL-D question set (12 new Subgroups) added for Special Permit Group D\n(Special Permit PHMSA-2019-0207). 37 new questions added in addition to many re-\npresented questions.\n5 GT MO.GOCLASS.ELIGIBLECL3INITIAL.P updated to reflect publication of technical\ncorrections associated with Eligible Class 3 segments (Class Location Change\nRequirements Rule (rule effective date: March 16, 2026)).\n6 HL Construction Team - Updated various Considerations in the DC.CO and DC.MO\nSubgroups.\n7 HL Construction Team - Deleted DC.BIO and SRN.DC.BIO Subgroups and associated\nBiofuels directive and updated related content in the DC.DN Subgroup, including\nrenaming DC.DN.DESIGN.X to DC.DN.FLANGES.X.\n8 HL IAT - Applied BOT/RT exclusion to SRN.FS-TSAPIINSPECT.TANKINSP.S, and\nBiofuels exclusion to SRN.MO-BIO.BIOOMPROC.S and SRN.EP-ERB.BIOFUELS.S.\n* No changes were made to Drug & Alcohol inspection content.\n\n<<<PAGE 2>>>\n\nFEDERAL.2026.03 - PRS Summary Update 43 83\nSource Owner Team Submitter / Owner Date Rcvd PRS Question ID (or other) New?\nQuestion Edit Details\nGD.2026.03 GD.2026.03 GD.2026.03\nEmail GD MNOPS/OPS 3/19/2026 GD.2026.03 LPG.NFPA59-TRANSFER.TRANSFEROPSRVW.R 2026.03 - Question deleted per completion of 03/26 MNOPS comments (most MNOPS changes implemented in a GT.2026.02 patch, but\nquestion deletion was deferred to the GT.2026.03 update).\nEmail IAT Matthew Davids 6/15/2026 GD.2026.03 MO.GO.SEC114OMEFFECTREVIEW.P Y 2026.03 - Section 114 Question added for mandate (06/26; MJD(IDS)).\nGT.2026.03 GT.2026.03 GT.2026.03\nEmail Email Email O&M Team Tiffany Baker 5/6/2026 GT.2026.03 EP.FII.FAILURESUMMARY.P O&M Team Tiffany Baker 5/6/2026 GT.2026.03 EP.ERG.AUTHORITIES.P O&M Team Tiffany Baker 5/6/2026 GT.2026.03 EP.ERG.INCIDENTDATA.P Email O&M Team Tiffany Baker 5/6/2026 GT.2026.03 EP.ERG.VALVESHUTOFF.R Email O&M Team Tiffany Baker 5/6/2026 GT.2026.03 TQ.TR.TRAINING.P Email O&M Team Tiffany Baker 5/6/2026 GT.2026.03 TQ.TR.TRAINING.R Email O&M Team Tiffany Baker 5/6/2026 GT.2026.03 TQ.TR.TRAINING.O 2026.03 - Moved 192.617(d) to Secondary Reg. reference and made 192.617(a) Primary Reg reference per O&M Team (06/26; DGK).\n2026.03 - Updated Consideration #1a to replace \"hazardous liquid\" with \"gas pipeline\" and delete reference to HVLs, consistent with\n192.615(a)(8).\n2026.03 - Revised primary reg reference to 192.605(a) and moved 192.605(b)(4) to secondary reg reference per O&M Team (T. Baker)\n(06/26; DGK).\n2026.03 - Revised primary reg reference from 192.605(b) to 192.603(b) (06/26; DGK).\n2026.03 - Question re-presented to EP.ERG per O&M Team (T. Baker) (06/26; DGK).\n2026.03 - Question re-presented to EP.ERG per O&M Team (T. Baker) (06/26; DGK).\n2026.03 - Question re-presented to EP.ERG per O&M Team (T. Baker) (06/26; DGK).\nEmail Email Email Email Email Email Email Email Email O&M Team O&M Team Tiffany Baker Tiffany Baker 5/6/2026 5/6/2026 GT.2026.03 GT.2026.03 O&M Team Tiffany Baker 5/6/2026 GT.2026.03 MO.GOABNORMAL.ABNORMALCHECK.P MO.GOCLASS.CLASSLOCATEREV.O MO.GOMAOP.MAOPDETERMINE.R O&M Team Tiffany Baker 5/6/2026 GT.2026.03 MO.GM.VALVEINSPECT.O O&M Team Tiffany Baker 5/6/2026 GT.2026.03 O&M Team Tiffany Baker 5/6/2026 GT.2026.03 O&M Team Tiffany Baker 5/6/2026 GT.2026.03 MO.GM.ASVSHUTINPRESS.R O&M Team Tiffany Baker 5/6/2026 GT.2026.03 Insp Devel & Suppt (IDS) Zack Wynkoop 5/22/2026 GT.2026.03 2026.03 - Edit Consideration 1b from \"root cause plan\" to \"root cause analysis\" per O&M Team (T. Baker) (06/26; DGK)\n2026.03 - Switched 192.609 to be primary reg reference and 192.611(a) to be secondary per O&M Team (T. Baker) (06/26; DGK).\n2026.03 - Revised primary reg reference from 192.709(c) to 192.603(b) per O&M Team (T. Baker) (06/26; DGK).\n2026.03 - Added secondary reg references 192.745(c), 192.745(d), 192.745(e), and 192.745(f) to cover ASV,RCV, and RMVs, per O&M\nTeam (T. Baker) (06/26; DGK).\nMO.GOABNORMAL.ABNORMALREVIEW.R 2026.03 - Primary reg reference revised from 192.605(a) to 192.603(b) per O&M Team (T. Baker) (06/26; DGK).\n2026.03 - Revised primary reg reference to be 192.709(c) and moved 192.750 to secondary reg reference list per O&M Team (T. Baker;\nMO.GM.TRAPSAFETY.R\n6/26).\n2026.03 - Revised primary reg reference from 192.709(b) to 192.603(b) per O&M Team (T. Baker) (06/26; DGK).\n2026.03 - Revised primary reg reference from 192.709(c) to 192.603(b) per O&M Team (T. Baker) (06/26; DGK).\n2026.03 - New subgroups SP.CL-D-GENERAL, SP.CL-D-MAOP, SP.CL-D-CIS, SP.CL-D-CP, SP.CL-D-INTCURR, SP.CL-D-IM, SP.CL-D-CA, SP.CL-D-\nREPAIR, SP.CL-D-DP, SP.CL-D-ANNUALRPT, SP.CL-D-SPECIAL, SP.CL-D-VALVE created for Special Permit Group D (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 Email IDS Zack Wynkoop 5/22/2026 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 GT.2026.03 MO.GOODOR.ODORIZE.R New SP.CL-D question set (12 new Subgroups)\nfor Special Permit Group D (Special Permit\nPHMSA-2019-0207).\nNote: Most questions in the new Subgroups\nare re-presentations; only the new questions\nare included in this listing.\nSP.CL-D-GENERAL.D0-DEFINITIONS.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-GENERAL.C13-DOCUMENTATION.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-GENERAL.C13-DOCUMENTATION.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-MAOP.C2-MAOPSPLIMIT.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-MAOP.C2-MAOPSPLIMIT.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-CIS.C4-CIS.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-CIS.C4-CIS.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-CP.C5-TESTSTATION.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-CP.C5-TESTSTATION.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-CP.C5-TESTSTATION.O Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-CP.C6-CPREMEDIATION.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-CP.C6-CPREMEDIATION.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-INTCURR.C7-SPIC.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-INTCURR.C7-SPIC.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-IM.D-IMPROG.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-CA.C8-REASSESSMENT.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-REPAIR.C8-SPREPAIRS.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-REPAIR.C8-SPREPAIRS.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-DP.C9-DAMAGEPREV.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-DP.C9-DAMAGEPREV.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-DP.C9-DAMAGEPREV.O Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-ANNUALRPT.C10-PROGRESSRPT.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-ANNUALRPT.C10-PROGRESSRPT.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-SPECIAL.C11-LNMRKR.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-SPECIAL.C11-LNMRKR.O Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nSP.CL-D-SPECIAL.C11-DATAINTEGRATION.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\n1 of 3\n\n<<<PAGE 3>>>\n\nFEDERAL.2026.03 - PRS Summary Update 43 83\nSource Owner Team Submitter / Owner Date Rcvd PRS Question ID (or other) New? Question Edit Details\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-SPECIAL.C11-DATAINTEGRATION.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-SPECIAL.C11-PATROL.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-SPECIAL.C11-PATROL.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-SPECIAL.C11-ENVIROASSESS.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-SPECIAL.C11-ENVIROASSESS.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-VALVE.C12-MAINLINEVALVE.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-VALVE.C12-MAINLINEVALVE.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-VALVE.C12-MAINLINEVALVE.O Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-VALVE.C12-MAINLINECLOSURE.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-VALVE.C12-MAINLINECLOSURE.R Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail IDS Zack Wynkoop 5/22/2026 GT.2026.03 SP.CL-D-VALVE.C12-EMERGENCYCOMMS.P Y 2026.03 - New question for SP Set D, per Z. Wynkoop (06/26; DGK).\nEmail Gas Rule Impl. Team Matthew Bottini 5/27/2026 GT.2026.03 MO.GOCLASS.ELIGIBLECL3INITIAL.P 2026.03 - Updated Consideration #5 to reflect publication of technical corrections associated with Eligible Class 3 segments (06/26;\nDGK).\nEmail IAT Matthew Davids 6/15/2026 GT.2026.03 MO.GO.SEC114OMEFFECTREVIEW.P Y 2026.03 - Section 114 Question added for mandate (06/26; MJD(IDS)).\nHL.2026.03 HL.2026.03 HL.2026.03\nEmail Construction Team Scott Hamilton/\nDiana Fehling 4/20/2026 HL.2026.03 DC.CO.LOCATION.R 2026.03 - Replaced Considerations, per Construction Team (06/26; DGK).\nEmail Construction Team Scott Hamilton/\nDiana Fehling 4/20/2026 HL.2026.03 DC.CO.LOCATION.O 2026.03 - Replaced Considerations, per Construction Team (06/26; DGK).\nEmail Construction Team Scott Hamilton/\nDiana Fehling 4/20/2026 HL.2026.03 DC.CO.FIELDBEND.P 2026.03 - Replaced Considerations, per Construction Team (06/26; DGK).\nEmail Construction Team Scott Hamilton/\nDiana Fehling 4/20/2026 HL.2026.03 DC.CO.FIELDBEND.O 2026.03 - Replaced Considerations, per Construction Team (06/26; DGK).\nEmail Construction Team Diana Fehling 4/20/2026 HL.2026.03 DC.CO.RECORDS.P 2026.03 - Considerations updated per Construction Team (06/26; DGK).\nEmail Construction Team Diana Fehling 4/20/2026 HL.2026.03 DC.CO.RECORDS.R 2026.03 - Considerations updated per Construction Team (06/26; DGK).\nEmail Construction Team Diana Fehling 4/20/2026 HL.2026.03 DC.MO.MOVE.P 2026.03 - Replaced Considerations, per Construction Team (06/26; DGK).\nEmail Construction Team Diana Fehling 4/20/2026 HL.2026.03 DC.MO.MOVE.R Y 2026.03 - New question, per Construction Team (06/26; DGK).\nEmail Construction Team Diana Fehling 4/20/2026 HL.2026.03 DC.MO.MOVE.O 2026.03 - Replaced Considerations, per Construction Team (06/26; DGK).\nEmail Construction Team Diana Fehling 4/20/2026 HL.2026.03 DC.CO.FIELDBEND.O 2026.03 - Replaced Considerations, per Construction Team (06/26; DGK).\nEmail IDS David York 5/15/2026 HL.2026.03 TD.CP.DEFICIENCY.R 2026.03 - Typo \"indentified\" corrected to \"identified\" in the Standard Issues table (3x) (DGK; 06/26)\nEmail IAT David York 6/1/2026 HL.2026.03 SRN.FS-TSAPIINSPECT.TANKINSP.S 2026.03 - Applied BOT/RT exclusion tag per IA Feedback resolution (05/26; DY).\nEmail IAT David York 6/1/2026 HL.2026.03 SRN.MO-BIO.BIOOMPROC.S 2026.03 - Applied Biofuels exclusion tag (05/26; DY).\nEmail IAT David York 6/1/2026 HL.2026.03 SRN.EP-ERB.BIOFUELS.S 2026.03 - Applied Biofuels exclusion tag (05/26; DY).\nEmail Construction Team Wes Carmack/\nDiana Fehling 6/5/2026 HL.2026.03 DC.DN.NEWPIPE.P 2026.03 - Question text and Considerations updated per CIC Team (06/26; DGK).\nEmail Construction Team Wes Carmack/\nDiana Fehling 6/5/2026 HL.2026.03 DC.DN.NEWPIPE.R 2026.03 - Question text and Considerations updated per CIC Team (06/26; DGK).\nEmail Construction Team Wes Carmack/\nDiana Fehling 6/5/2026 HL.2026.03 DC.DN.NEWPIPE.O 2026.03 - Question text and Considerations updated per CIC Team (06/26; DGK).\nEmail Construction Team Wes Carmack/\nDiana Fehling 6/11/2026 HL.2026.03 DC.BIO Subgroup / Biofuels Directive Email Construction Team Wes Carmack/\nDiana Fehling 6/11/2026 HL.2026.03 SRN.DC-BIO.BIO.S Email Construction Team Wes Carmack/\nDiana Fehling 6/11/2026 HL.2026.03 DC.DN.DESIGN.P --> DC.DN.FLANGES.P Email Construction Team Wes Carmack/\nDiana Fehling 6/11/2026 HL.2026.03 DC.DN.DESIGN.R --> DC.DN.FLANGES.R Email Construction Team Wes Carmack/\nDiana Fehling 6/11/2026 HL.2026.03 DC.DN.FLANGES.O DC.DN.CHEMCOMPATIBLE.R 2026.03 - Subgroup and Biofuels directive deleted per CIC Team (was previously entirely re-presented questions).\n2026.03 - Question (and associated Subgroup) deleted per CIC Team (06/26; DGK).\n2026.23 - Question updated to be flange-specific and generalized for all commodities transported per CIC Team. Also removed DC.BIO\nsubgroup and Biofuels directive from PRS (06/26; DGK).\n2026.23 - Question updated to be flange-specific and generalized for all commodities transported per CIC Team. Also removed DC.BIO\nsubgroup and Biofuels directive from PRS (06/26; DGK).\nY 2026.23 - New question to add .O version of question to the existing .P/.R question versions.\n2026.23 - Per CIC Team: Considerations revised to update and separate out Biofuels aspects; Biofuels subgroup and Biofuels directive\ndeleted; question added to Conversion to Service directive (06/26; DGK).\nEmail Construction Team Wes Carmack/\nDiana Fehling 6/11/2026 HL.2026.03 Email Construction Team Wes Carmack/\nDiana Fehling 6/11/2026 HL.2026.03 DC.DN.VALVEBIOFUELS.R 2026.03 - Question deleted per CIC Team as part of Biofuel-related updates (DGK; 06/26).\nEmail IAT Matthew Davids 6/15/2026 HL.2026.03 MO.LO.SEC114OMEFFECTREVIEW.P Y 2026.03 - Section 114 Question added for mandate (06/26; MJD(IDS)).\n2 of 3\n\n<<<PAGE 4>>>\n\nFEDERAL.2026.03 - PRS Summary Update 43 83\nSource Owner Team Submitter / Owner Date Rcvd PRS Question ID (or other) New? Question Edit Details\nLNG.2026.03 LNG.2026.03 LNG.2026.03\nIAT Matthew Davids 6/15/2026 6/15/2026 LNG.2026.03 MO.LO.SEC114OMEFFECTREVIEW.P Y 2026.03 - Section 114 Question added for mandate (06/26; MJD(IDS)).\n3 of 3","truncated":false,"body_characters":17244}