{"operation":"document","citation":"PHMSA IA FED.2022.02","title":"IA Content FED.2022.02","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"2022-02-22","effective_on":"2022-02-22","summary":"IA Content FED.2022.02 Feb 22, 2022 Federal Content Question Content Implemented new questions and groups for Congressionally mandated “Section 114.” In the “Integrated” Presentation: GD: 2 new subgroups, 40 total questions GT: 3 new subgroups, 58 total questions HL: 2 new subgroups, 24 total questions LNG: 1 new subgroup, 25 total questions (GD) Removed references to Master Meters (MM) from the MMLPGIM Group, as Mas","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2022-02.json","markdown":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2022-02.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2022-02","source_url":"https://primis.phmsa.dot.gov/IA-Releases/ia-release-notes/notes/iac-fed.2022.02","body":"IA Content FED.2022.02\n\nFeb 22, 2022\n\nFederal Content\n\nQuestion Content\n\nImplemented new questions and groups for Congressionally mandated “Section 114.” In the “Integrated” Presentation:\n\nGD: 2 new subgroups, 40 total questions\n\nGT: 3 new subgroups, 58 total questions\n\nHL: 2 new subgroups, 24 total questions\n\nLNG: 1 new subgroup, 25 total questions\n\n(GD) Removed references to Master Meters (MM) from the MMLPGIM Group, as Master Meters were exempted from IM regulations in 2021. Renamed the MMLPGIM Group and related Directive to LPGIM. Per the GD Team.\n\nResponded to several IA User Feedback requests.\n\nProvided numerous edits and updates requested by PHMSA Teams.\n\nSee summary document for more details.\n\n<<<PAGE 1>>>\n\nOverview Summary of FED. 2022.02 Changes (February, 2022)\nItem Description\n1 Implemented new questions and groups for Congressionally mandated \"Section 114.\" (See other\ntab, rows 150 - 232). In the \"Integrated\" Presentation:\nGD – 2 new subgroups, 40 total questions\nGT – 3 new subgroups, 58 total questions\nHL – 2 new subgroups, 24 total questions\nLNG – 1 new subgroup, 25 total questions\n2 (GD) Removed references to Master Meters (MM) from the MMLPGIM Group, as Master Meters\nwere exempted from IM regulations in 2021. Renamed the MMLPGIM Group and related\nDirective to LPGIM. Per the GD Team.\n3 Provided numerous edits and updates requested by PHMSA Teams.\n4 Responded to several IA User Feedback requests.\n\n<<<PAGE 2>>>\n\nNew FEDERAL PRS 2022.02 Content Edits (Completed. 22.02.21) - DK + TF\nGeneral Updates and Revisions sumbitted by PHMSA teams and IA Users.\nOwner Team Submitter/Owner/Lead PRS Question ID Edit Details IA Internal Notes Field (TF)\nCRM Byron Coy GD CR.CRMCOMP.SUBMITPROCEDURES.P/.R Revised consid #2 to 45 days to match FAQ I.03 Gas Distribution C. McLaren GD DC.CO.PLASTICSERVICE.O New Q to address plastic trenchless installation. Gas Distribution C. McLaren GD DC.CO.PLASTICSERVICE.P New Q to address plastic trenchless installation. Gas Distribution C. McLaren GD DC.CO.PLASTICTRENCHLESS.O New Q to address plastic trenchless installation. Gas Distribution C. McLaren GD DC.CO.PLASTICTRENCHLESS.P New Q to address plastic trenchless installation. Gas Distribution C. McLaren GD DC.CO.PLASTICWEAKLINK.O New Q to address plastic trenchless installation. Gas Distribution C. McLaren GD DC.CO.PLASTICWEAKLINK.P New Q to address plastic trenchless installation. Gas Distribution C. McLaren GD DC.METERREGSVC.CUSTMETERREGINSTALL.O Edited question text. Gas Distribution D. Lykken GD LPGIM.CA.EVALUATIONPERIOD.P Removed consid references to Master Meters. Gas Distribution D. Lykken GD LPGIM.CA.PERIODICEVALUATION.R Removed consid references to Master Meters. Gas Distribution D. Lykken GD LPGIM.QA.PLANIMPLEMENT.P Removed consid references to Master Meters. Gas Distribution D. Lykken GD LPGIM.QA.SYSTEMRECORDS.P Removed consid references to Master Meters. Gas Distribution D. Lykken GD LPGIM.RA.DEMOUNDERSTANDING.R Removed consid references to Master Meters. Gas Distribution D. Lykken GD LPGIM.RA.IMPLEMENTTH.R Removed consid references to Master Meters. Gas Distribution D. Lykken GD LPGIM.RA.INFONEEDS.R Removed consid references to Master Meters. Gas Distribution C. McLaren GD PD.PA.EVALEFFECTIVENESS.R Edited question text. Gas Distribution C. McLaren GD PD.PA.LANGUAGE.P Added consid #4. Gas Distribution C. McLaren GD PD.PA.LANGUAGE.R Added consid #6. Gas Distribution D. Lykken GD Renamed MMLPGIM Directive to LPGIM In 2021, MMs exempted from IM regs. Gas Distribution D. Lykken GD Renamed MMLPGIM Group to LPGIM In 2021, MMs exempted from IM regs. Gas Distribution C. McLaren GD TD.ATM.ATMCORRODEINSP.O Edited question text. Corrosion & GD N.Solem / D.Lykken GD TD.COAT.COATAPPLY.R/.O New question from Corrosion Team. Corrosion & GD N.Solem / D.Lykken GD TD.CP.ELECISOLATETEST.P/.R/.O New question from Corrosion Team. GT IM Team J. Gilliam GT AR.RMP.FIELDREPAIRDEFECT.P Revised consids #1, #4 GT IM Team J. Gilliam GT AR.RMP.FIELDREPAIRLEAK.O Revised consid. #1(b)(v) GT IM Team J. Gilliam GT AR.RMP.FIELDREPAIRLEAK.P Revised consid. #2(b) GT IM Team J. Gilliam GT AR.RMP.FIELDREPAIRLEAK.R Revised consid. #2(e) GT IM Team J. Gilliam GT AR.RMP.FIELDREPAIRWELDS.P Added consids #2, #3, #4 GT IM Team J. Gilliam GT AR.RMP.HOTTAP.O Added consid. #2; Revised #3 GT IM Team J. Gilliam GT AR.RMP.HOTTAP.P Revised consid. #3 GT IM Team J. Gilliam GT AR.RMP.HOTTAP.R Added consids #2, #3 GT IM Team J. Gilliam GT AR.RMP.IGNITION.P Revised consid. #2(c), #2(d), and #5 GT IM Team J. Gilliam GT AR.RMP.METHOD.R Revised consid. #1(c); Added #1(d) GT IM Team J. Gilliam GT AR.RMP.PIPECONDITION.R Revised consid. #2 GT IM Team J. Gilliam GT AR.RMP.REPAIRQUAL.R Added consid. #1(d) GT IM Team J. Gilliam GT AR.RMP.REPAIRREQT.P Added consids #3, #4 GT IM Team J. Gilliam GT AR.RMP.SAFETY.O Added consids #1(a) - #1(e) GT IM Team J. Gilliam GT AR.RMP.SAFETY.P Added consids #1(a) - #1(e) GT IM Team J. Gilliam GT AR.RMP.WELDERQUAL.R Revised consids #1, #2 GT IM Team J. Gilliam GT AR.RMP.WELDQUAL.R Revised consids #1(a), #1(e) CRM Byron Coy GT CR.CRMCOMP.SUBMITPROCEDURES.P/.R Revised consid #2 to 45 days to match FAQ I.03 Construction Team Monte Flaherty GT DC.CO.FIELDBEND.P/.R/.O Revised consid. #1a GT IM Team J. Gilliam GT IM Sub-Group Re-sequenced sub-groups. IAT Rod S. GT SRN.AR-SCC.SCCDA.S New Question to address use of SCCDA. IAT Rod S. GT SRN.GENERAL.IDLEPIPE.S Moved from SRN.IM-HC and edited content. IAT Rod S. GT SRN.GENERAL.IDLERETURN.S Moved from SRN.IM-HC and edited content. IAT Rod S. GT SRN.GENERAL.INCIDENTREPORT.S Edited lead-in consideration. UNGS Team Cathy W. GT UNGS.CAVERNOPS.OMPROCED.P Edited question to include \"workovers\". UNGS Team Cathy W. GT UNGS.CAVERNOPS.OMTRAINING.P Added Secondary Reference \"192.12(c)\". UNGS Team Cathy W. GT UNGS.RESINTEG.CLOSEDSAFETYVALVE.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Revised consideration #2 to read \"45 days\" to match FAQ I.03, per CRM Team. (1\n2022.02 – Added new question, per the GD Team. (2/22; TF).\n2022.02 – Added new question, per the GD Team. (2/22; TF).\n2022.02 – Added new question, per the GD Team. (2/22; TF).\n2022.02 – Added new question, per the GD Team. (2/22; TF).\n2022.02 – Added new question, per the GD Team. (2/22; TF).\n2022.02 – Added new question, per the GD Team. (2/22; TF).\n2022.02 - Edited question text, per GD team. (1/22; TF).\n2022.02 - Removed references to Master Meters (MM), per the GD Team. (2/22; TF).\n2022.02 - Removed considerations reference to Master Meters (MM), per the GD Team. (2\n2022.02 - Removed considerations reference to Master Meters (MM), per the GD Team. (2\n2022.02 - Removed considerations reference to Master Meters (MM), per the GD Team. (2\n2022.02 - Removed considerations reference to Master Meters (MM), per the GD Team. (2\n2022.02 - Removed considerations reference to Master Meters (MM), per the GD Team. (2\n2022.02 - Removed considerations reference to Master Meters (MM), per the GD Team. (2\n2022.02 - Edited question text, per GD team. (1/22; TF).\n2022.02 - Added consideration #4, per GD team. (1/22; TF).\n2022.02 - Added consideration #6, per GD team. (1/22; TF).\n2022.02 - Renamed MMLPGIM Directive to LPGIM, per the GD Team. (2/22; TF)\n2022.02 - Renamed MMLPGIM Group to LPGIM, per the GD Team. (2/22; TF)\n2022.02 - Edited question text, per GD team. (1/22; TF).\n2022.02 – New question, per the Distribution Team & Corrosion Team. (1/22; TF.)\n2022.02 – New question, per the Distribution Team & Corrosion Team. (1/22; TF.)\n2022.02 – Edited considerations #1, #4, per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #1(b)(v), per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #2(b), per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #2(e), per the IM Team. (1/22; TF).\n2022.02 – Added considerations #2 – #4, per the IM Team. (1/22; TF).\n2022.02 – Added consideration #2; Edited #3, per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #3, per the IM Team. (1/22; TF).\n2022.02 – Added considerations #2 and #3, per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #2(c), #2(d), #5, per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #1(c); Added #1(d), per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #2, per the IM Team. (1/22; TF).\n2022.02 – Added consideration #1(d), per the IM Team. (1/22; TF).\n2022.02 – Added considerations #3, #4, per the IM Team. (1/22; TF).\n2022.02 – Added considerations #1(a) - #1(e), per the IM Team. (1/22; TF).\n2022.02 – Added considerations #1(a) - #1(e), per the IM Team. (1/22; TF).\n2022.02 – Edited considerations #1, #2, per the IM Team. (1/22; TF).\n2022.02 – Edited considerations #1(a), #1(e), per the IM Team. (1/22; TF).\n2022.02 - Revised consideration #2 to read \"45 days\" to match FAQ I.03, per CRM Team. (1\n2022.02 - Edited consideration #1(a) and added code ref 192.315(a), per the Construction I\n2022.02 - Re-sequenced sub-groups (moved IM.HC and IM.RA to precede IM.BA), per GT IM\n2022.02 - New question to address use of SCCDA, per the IAT. (1/22; TF).\n2022.02 – Moved question to SRN.GENERAL and re-presented back to SRN.IM-HC; Edited q\n2022.02 – Moved question to SRN.GENERAL and re-presented back to SRN.IM-HC; Edited q\n2022.02 - Minor edit to the lead-in consideration, per IAT. (1/22; TF).\n2022.02 - Edited question to include \"workovers\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"192.12(c)\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n\n<<<PAGE 3>>>\n\nNew FEDERAL PRS 2022.02 Content Edits (Completed. 22.02.21) - DK + TF\nGeneral Updates and Revisions sumbitted by PHMSA teams and IA Users.\nOwner Team Submitter/Owner/Lead PRS Question ID Edit Details IA Internal Notes Field (TF)\nUNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team UNGS Team Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. Cathy W. GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT GT UNGS.RESINTEG.CLOSEDSAFETYVALVE.P/.R Revised question text for \"automatically closeable\" safety valves. 2022.02 - Revised question text, per UNGS Team. (1/22; TF).\nUNGS.RESINTEG.WELLANNULAR.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESINTEG.WELLANNULAREXCEEDED.PAdded secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESINTEG.WELLANNULARLIMIT.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESINTEG.WELLHEADVALVEMAINT.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESINTEG.WELLHEADVALVETEST.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESINTEG.WELLSSSVTEST.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESINTEG.WELLVISUALINSPECT.P Expanded consid. #1 to require \"eyes on\" visual inspection. 2022.02 - Expanded consid. #1 to require \"eyes on\" visual inspection. (1/22; TF).\nUNGS.RESINTEG.WELLVISUALINSPECT.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESPROCED.CONTROLROOM.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESPROCED.MOC.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESPROCED.SFTYENVPROGENV.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESPROCED.SFTYENVPROGSECUR.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESPROCED.TRAINOM.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESPROCED.TRAINOMCHGS.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESSITE.ERTRAINING.P Added citation 192.12(c) and \"Section 11.2.1\". 2022.02 - Added citation §192.12(c) and \"Section 11.2.1\", per the UNGS Team. (1/22; TF).\nUNGS.RESSITE.SECURITY.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CAPIDENTIF.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CASINGCEMENT.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CASINGCONN1.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CASINGCONN2.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CASINGCONN3.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CASINGCONN4.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CASINGCONN5.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CASINGHANDLING.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CEMENTBOND.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CEMENTEVAL.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CEMENTPLUGDEPTH.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CEMENTPUMPING.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CEMENTSLURRY.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CLOSURE.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CLOSUREREC.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.COMPLETION.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.CONSTRMONITOR.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.DEVIATIONS.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.EHSPEOPLEENV.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.EHSWATER.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.EHSWORKSITE.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.GENRECORDSRET.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.ISOLATION.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.MAINTINTEGRITY.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.PLUGREPAIR.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.PLUGS.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.PRODCASINGDES1.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.PRODCASINGDES2.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.PRODCASINGDES3.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.PRODCASINGDES4.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.REMEDIATION.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.STIMULATION.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\nUNGS.RESWELLDES.SURFACEPLUG.P Added secondary ref. \"Section 11.2.1.\" 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n\n<<<PAGE 4>>>\n\nNew FEDERAL PRS 2022.02 Content Edits (Completed. 22.02.21) - DK + TF\nGeneral Updates and Revisions sumbitted by PHMSA teams and IA Users.\nOwner Team Submitter/Owner/Lead PRS Question ID Edit Details IA Internal Notes Field (TF)\nUNGS Team Cathy W. GT UNGS.RESWELLDES.SURFCASINGDES.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLCASINGDES.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLCOMPLETION.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLHEADENTRY.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLHEADEQUIP.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLHEADESD.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLHEADISOLVLV.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLHEADRATING.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLREPAIR.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLTESTDES.P Added secondary ref. \"Section 11.2.1.\" UNGS Team Cathy W. GT UNGS.RESWELLDES.WELLTESTING.P Added secondary ref. \"Section 11.2.1.\" GT IM Team J. Gilliam HL AR.RMP.CRACKNDE.P Revised consids #1, #3 GT IM Team J. Gilliam HL AR.RMP.CRACKNDE.R Revised consid. #3 GT IM Team J. Gilliam HL AR.RMP.METHOD.P Revised consids #1, #2 GT IM Team J. Gilliam HL AR.RMP.METHOD.R Added consid. #1(c) GT IM Team J. Gilliam HL AR.RMP.SAFETY.O Revised consid. #1 GT IM Team J. Gilliam HL AR.RMP.SAFETY.P Revised consid. #1 GT IM Team J. Gilliam HL AR.RMP.WELDERQUAL.R Revised consid. #2 GT IM Team J. Gilliam HL AR.RMP.WELDINSPECT.R Revised consid. #1(b) GT IM Team J. Gilliam HL AR.RMP.WELDQUAL.R Revised consid. #1(f), #1(j) CRM Byron Coy HL CR.CRMCOMP.SUBMITPROCEDURES.P/.R Revised consid #2 to \"45 days\" to match FAQ I.03 2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 - Added Secondary Reference \"Section 11.2.1\", per the UNGS Team. (2/22; TF).\n2022.02 – Edited considerations #1, #3, per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #3, per the IM Team. (1/22; TF).\n2022.02 – Edited considerations #1, #2, per the IM Team. (1/22; TF).\n2022.02 – Added consideration #1(c), per the IM Team. (1/22; TF).\n2022.02 – Added considerations #1(a) - #1(g), per the IM Team. (1/22; TF).\n2022.02 – Added considerations #1(a) - #1(h), per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #2, per the IM Team. (1/22; TF).\n2022.02 – Edited consideration #1(b), per the IM Team. (1/22; TF).\n2022.02 – Edited considerations #1(f), #1(j), per the IM Team. (1/22; TF).\n2022.02 - Revised consideration #2 to read \"45 days\" to match FAQ I.03, per CRM Team. (1\nIAT Rod S. HL CR.LD.LDEVAL.P Resolved. No Action Required. N/A\nIAT Rod S. HL SRN.GENERAL.ACCIDENTREPORT.S Edited lead-in consideration. 2022.02 - Minor edit to the lead-in consideration, per IAT. (1/22; TF).\nIAT Rod S. HL SRN.GENERAL.IDLEPIPE.S Moved from SRN.MO-LO and edited content. 2022.02 – Moved question to SRN.GENERAL and re-presented back to SRN.MO-LO; Edited\nIAT Rod S. HL SRN.GENERAL.IDLERETURN.S Moved from SRN.MO-LO and edited content. 2022.02 – Moved question to SRN.GENERAL and re-presented back to SRN.MO-LO; Edited\nBOT G. Puth HL SRN.TDC.TK620.S Edited SRN considerations for API 620 tanks. 2022.02 - Edited considerations for API 620 tanks, per the Breakout Tank Team. (2/22; TF).\nBOT G. Puth HL TDC.650REGS.OVERFILLPROT.O Merged consids #3 - #5 into #2 and added content. 2022.02 - Merged considerations #3 - #5 into #2 and added content. (1/22; TF).\nBOT G. Puth HL TDC.650REGS.OVERFILLPROT.P Merged consids #4 - #6 into #3 and added content. 2022.02 - Merged considerations #4 - #6 into #3 and added content. (1/22; TF).\nBOT G. Puth HL TDC.650REGS.OVERFILLPROT.R Merged consids #5 - #7 into #4 and added content. 2022.02 - Merged considerations #5 - #7 into #4 and added content. (1/22; TF).\nBOT G. Puth HL TDC.650REGS.OVERFILLTESTING.O Edited question text; Changed primary code. 2022.02 - Edited question text; Changed primary code. (1/22; TF).\nBOT G. Puth HL TDC.650REGS.OVERFILLTESTING.P Edited question text; Changed primary code; Merged consids #4 - #7 into #4. 2022.02 - Edited question text; Changed primary code; Merged consids #4 - #7 into #4. (1/2\nBOT G. Puth HL TDC.650REGS.OVERFILLTESTING.R Edited question text; Changed primary code; Merged consids #3 - #4 into #3. 2022.02 - Edited question text; Changed primary code; Merged consids #3 - #4 into #3. (1/2\nCorrosion Team Nathan Solem LNG TD.ATM.ATMCORRMONITOR.O Revised consid. #3 2022.02 – Edited consideration #3, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.ATM.ATMCORRMONITOR.P Revised consid. #1; Added #2 - #5. 2022.02 – Edited consideration #1; Added #2 - #5, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.ATM.ATMCORRMONITOR.R Revised consid. #1; Added #2, #3, #4. 2022.02 – Edited consideration #4; Added #3, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.ATM.ATMCORROSION.P Added consideration #2 2022.02 – Added consideration #2, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.CP.BURIEDCOMP.P Revised consid. #2 2022.02 – Replaced consideration #2, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.CP.BURIEDCOMP.R Revised consid. #1 and #2 2022.02 – Replaced considerations #1 and #2, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.CP.EXTCORRMONITOR.O Revised consid. #1 2022.02 – Revised consideration #1, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.CP.EXTCORRMONITOR.P Revised consid. #1 and #2 2022.02 – Revised considerations #1 and #2, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.CP.EXTCORRMONITOR.R Revised consid. #1 and #2 2022.02 – Revised considerations #1 and #2, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.CP.INTFRCURRENT.P Revised consid. #1, #2; Added #3 - #6 2022.02 – Revised considerations #1 and #2; Added #3 - #6, per the Corrosion Team (1/22;\nCorrosion Team Nathan Solem LNG TD.CP.REMEDIATE.P Revised consid. #1, Added #2, #3 2022.02 – Revised consideration #1; Added #2 and #3, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.CP.REMEDIATE.R Revised consid. #1, Added #2 - #4 2022.02 – Revised consideration #1; Added #2 - #4, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.GEN.CORROSION.R Revised consid. #1, #2; Added #3 2022.02 – Revised considerations #1 and #2, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.ICP.INTCORR.P Added considerations #3 and #4 2022.02 – Added considerations #3 - #4, per the Corrosion Team (1/22; TF).\nCorrosion Team Nathan Solem LNG TD.ICP.INTCORRMONITOR.R Revised consid. #1, #2, Added #3 2022.02 – Revised considerations #1 and #2; Added #3, per the Corrosion Team (1/22; TF).\n\n<<<PAGE 5>>>\n\nNew FEDERAL PRS 2022.02 Content Edits (Completed. 22.02.21) - DK + TF\nSection 114 - New Group, Sub-Groups, and Questions to Accommodate the Congressionally Mandated \"Section 114\" (DK)\nOwner Team Submitter/Owner/Lead PRS Question ID Edit Details\nByron Coy Byron Coy GD SRN.114.INSPECTCVRG.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD SRN.114.GASTRANSPORT.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD SRN.114.DRIVERENGINE.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD SRN.114.NGUSE.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.LKRLSID.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.LKRLSVENT.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.LKRLSUNEXPCTVENT.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.LKRLSLKDATA.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.LKRLSDETECTLK.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.LKRLSIDMITRPR.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.LKMITRPRLAUF.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.REGSTATIONOM.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.REGSTATIONCONFIG.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.TESTRELIEFVLV.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.FLARE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.114.GNLDSGNCNFG.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.LEAKPRONE.LKRLS.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.LEAKPRONE.LKRLSLKDATA.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.LEAKPRONE.LKMITGRPREXAMPLE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GD 114.LEAKPRONE.LKMITGRPROTHER.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT SRN.114.INSPECTCVRG.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT SRN.114.GASTRANSPORT.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT SRN.114.DRIVERENGINE.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT SRN.114.NGUSE.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.COMPRESSOR.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.DRIVERENGINE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.LKRLSID.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.LKRLSVENT.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.LKRLSUNEXPCTVENT.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.LKRLSLKDATA.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.LKRLSDETECTLK.P New question to address \"Section 114\" implementation.\n\n<<<PAGE 6>>>\n\nNew FEDERAL PRS 2022.02 Content Edits (Completed. 22.02.21) - DK + TF\nSection 114 - New Group, Sub-Groups, and Questions to Accommodate the Congressionally Mandated \"Section 114\" (DK)\nOwner Team Submitter/Owner/Lead PRS Question ID Edit Details\nByron Coy Byron Coy GT 114.114.LKMITGRPRREPAIR.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.TESTESD.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.TESTRELIEFVLV.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.FLARE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.GNLDSGNCNFG.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.GNLCMPSTATION.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.LKRLSWELLHD.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.LKRLSANN.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.114.LKRLSFIELD.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.LEAKPRONE.LKRLS.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.LEAKPRONE.LKRLSLKDATA.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.LEAKPRONE.LKMITGRPREXAMPLE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy GT 114.LEAKPRONE.LKMITGRPROTHER.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL SRN.114.INSPECTCVRG.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL SRN.114.GASTRANSPORT.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL SRN.114.DRIVERENGINE.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL SRN.114.NGUSE.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL 114.114.DRIVERENGINE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL 114.114.LKRLSID.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL 114.114.LKRLSDETECTLK.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL 114.114.GNLDSGNCNFG.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL 114.LEAKPRONE.LKRLS.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL 114.LEAKPRONE.LKRLSLKDATA.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL 114.LEAKPRONE.LKMITGRPREXAMPLE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy HL 114.LEAKPRONE.LKMITGRPROTHER.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG SRN.114.INSPECTCVRG.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG SRN.114.GASTRANSPORT.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG SRN.114.DRIVERENGINE.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG SRN.114.NGUSE.S New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.COMPRESSOR.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.DRIVERENGINE.P New question to address \"Section 114\" implementation.\n\n<<<PAGE 7>>>\n\nNew FEDERAL PRS 2022.02 Content Edits (Completed. 22.02.21) - DK + TF\nSection 114 - New Group, Sub-Groups, and Questions to Accommodate the Congressionally Mandated \"Section 114\" (DK)\nOwner Team Submitter/Owner/Lead PRS Question ID Edit Details\nByron Coy Byron Coy LNG 114.114.LKRLSID.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.LKRLSVENT.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.LKRLSUNEXPCTVENT.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.LKRLSLKDATA.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.LKRLSDETECTLK.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.LKRLSTNKSHELL.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.LKRLSTNKDISTURB.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.LKRLSTNKCOOLDOWN.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.LKRLSTNKBOIL.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.TESTESD.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.TESTRELIEFVLV.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.FLARE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.GNLDSGNCNFG.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.GNLCMPSTATION.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.114.GNLLNG.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.LEAKPRONE.LKRLS.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.LEAKPRONE.LKRLSLKDATA.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.LEAKPRONE.LKMITGRPREXAMPLE.P New question to address \"Section 114\" implementation.\nByron Coy Byron Coy LNG 114.LEAKPRONE.LKMITGRPROTHER.P New question to address \"Section 114\" implementation.","truncated":false,"body_characters":35352}