{"operation":"document","citation":"PHMSA IA FED.2023.01","title":"IA Content FED.2023.01","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"2022-12-28","effective_on":"2022-12-28","summary":"IA Content FED.2023.01 Dec 28, 2022 Federal Content Question Content (GT) GRIT - Gas Rule Implementation Team - Made several edits to the Gas Rule Question Set, including question content edits, adders, deletions, and sequencing. (GT) GT IM Team - Revised certain questions in GT.AR and GT.IM to incorporate the Gas Rule requirements. (GT) Construction Team - Created a new DC.CONV group and 30 new questions to address ","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2023-01.json","markdown":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2023-01.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2023-01","source_url":"https://primis.phmsa.dot.gov/IA-Releases/ia-release-notes/notes/iac-fed.2023.01","body":"IA Content FED.2023.01\n\nDec 28, 2022\n\nFederal Content\n\nQuestion Content\n\n(GT) GRIT - Gas Rule Implementation Team - Made several edits to the Gas Rule Question Set, including question content edits, adders, deletions, and sequencing.\n\n(GT) GT IM Team - Revised certain questions in GT.AR and GT.IM to incorporate the Gas Rule requirements.\n\n(GT) Construction Team - Created a new DC.CONV group and 30 new questions to address “Conversion To Service” pipelines. Also created a “Conversion To Service” Directive.\n\n(GT) Construction Team - Edited several GT.DC questions to accommodate Gas Rule requirements that affected new construction.\n\n(GT & HL) Valve Rule Team - Implemented new questions and edited existing questions to address the 2022 Valve Rule.\n\n(GT & HL) CRM Team - General edits to Control Room Management questions.\n\n(HL) Breakout Tank Team - Created a new TDC Questions Set for new construction of API 620 tanks, which consists of seven new subgroups and 56 questions. Also created a new “New API 620 Tank Design & Construction” Directive with 34 questons.\n\n(GT & HL) Responded to various IA User Feedback requests.\n\nSee summary doc for more details.\n\n<<<PAGE 1>>>\n\nOverview Summary of IA Federal 2023.01 Changes (December, 2022)\nItem Description\n1 (GT) GRIT - Gas Rule Implementation Team - Made several edits to the Gas Rule Question Set, including\nquestion content edits, adders, deletions, and sequencing.\n2 (GT) GT IM Team - Revised certain questions in GT.AR and GT.IM to incorporate the Gas Rule\nrequirements.\n3 (GT) Construction Team - Created a new DC.CONV group and 30 new questions to address \"Conversion To\nService\" pipelines. Also created a \"Conversion To Service\" Directive.\n4 (GT) Construction Team - Edited several GT.DC questions to accommodate Gas Rule requirements that\naffected new construction.\n5 (GT & HL) Valve Rule Team - Implemented new questions and edited existing questions to address the\n2022 Valve Rule.\n6 (GT & HL) CRM Team - General edits to Control Room Management questions.\n7 (HL) Breakout Tank Team - Created a new TDC Questions Set for new construction of API 620 tanks, which\nconsists of seven new subgroups and 56 questions. Also created a new \"New API 620 Tank Design &\nConstruction\" Directive with 34 questons.\n8 (GT & HL) Responded to various IA User Feedback requests.\n\n<<<PAGE 2>>>\n\nFED.2023.01 - New Documents Uploaded into the IA LIBRARY via CERBERUS - FINAL (Rev. 22.12.12)\nFilename Q. Set GT and/or HL By By (Name)\nNTSB Report - Overview of SCADA Related Pipeline Accidents.pdf GT & HL CR.CRMGEN.CRMMGMT.P NTSB SS-0502 SCADA in Liquids Lines Safety Study 2005.pdf GT & HL CR.CRMGEN.CRMMGMT.P NTSB Report PAR-12/01 Enbridge HL Pipeline Rupture and Release at Marshall Michigan (2010).pdf GT & HL CR.CRMTRAIN.TEAMTRAINCOMPLETE.P PHMSA ADB PHMSA-2014-0020 Lessons Learned from the Release at Marshall Michigan.pdf GT & HL CR.CRMTRAIN.TEAMTRAINCOMPLETE.P CRM Maureen Williams\nCRM Maureen Williams\nCRM Maureen Williams\nCRM Maureen Williams\nPHMSA-2007-27954 PREAMBLE - Control Room Management - Human Factors.pdf GT & HL CR.CRMTRAIN.TEAMTRAINCOMPLETE.P CRM Maureen Williams\nValve Rule - 192.179 & 192.634 Construction Flow Chart.JPG GT DC.DPC.RMVINSTALLHCA.P Valve Rule Rod Seeley\nValve Rule - 192.610 & 192.634 Class Location Change.JPG GT MO.GO.CLASSCHNGVALVSPACE.P Valve Rule Rod Seeley\nValve Rule - 192.610 Flow Chart - Class Location Change.JPG GT MO.GO.CLASSCHNGVALVSPACE.P Valve Rule Rod Seeley\nValve Rule - 192.634 & 195.418 Shut-off Definition.pdf GT DC.DPC.RMVINSTALLHCA.P Valve Rule Rod Seeley\nValve Rule - 192.634 & 195.418 Shut-off Definition.pdf HL DC.CO.RMVINSTALLHCA.P Valve Rule Rod Seeley\nValve Rule - 192.634 Crossovers.JPG GT DC.DPC.RMVINSTALLHCA.P Valve Rule Rod Seeley\nValve Rule - 192.634(b)(3) or 195.418(b)(3) Laterals.JPG GT DC.DPC.RMVINSTALLHCA.P Valve Rule Rod Seeley\nValve Rule - 192.634(b)(3) or 195.418(b)(3) Laterals.JPG HL DC.CO.RMVINSTALLHCA.P Valve Rule Rod Seeley\nValve Rule - 195.418 HCA Construction Flow Chart.JPG HL DC.CO.RMVINSTALLHCA.P Valve Rule Rod Seeley\nValve Rule – GT Valve Rule Flow Chart.PDF GT DC.DPC.RMVINSTALLHCA.P Valve Rule Rod Seeley\nValve Rule – HL Valve Rule Flow Chart.PDF HL DC.CO.RMVINSTALLHCA.P Valve Rule Rod Seeley\n\n<<<PAGE 3>>>\n\nNew PRS FED.2023.01 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 22.12.12\nTicket # Owner Team Submitter/Owner/Lead Date Rcvd PRS Question ID (or other) New? Edit Details\nGT GT GT GT GT GT\nn/a CRM Maureen Williams 11/14/2022 GT.2023.01 CR.CRMGEN.CRMMGMT.P Edited consideration #3 to include reference to the IA Library for the cited docum\nn/a CRM Maureen Williams 11/14/2022 GT.2023.01 CR.CRMGEN.CRMIMPLEMENT.R Edited question text and replaced considerations #1 - #4.\nn/a CRM Maureen Williams 11/14/2022 GT.2023.01 CR.CRMCMGT.FIELDCONTACT.P Edited question text and added consideration #5.\nn/a CRM Maureen Williams 11/14/2022 GT.2023.01 CR.CRMCMGT.FIELDCHANGES.R Edited question text and inserted new consideration #2.\nn/a CRM Maureen Williams 11/14/2022 GT.2023.01 CR.CRMTRAIN.TEAMTRAINCOMPLETE.P Moved consideration #3(l) into a new #4 and expanded to include\nhyperlinks and reference to the IA Library for the cited documents.\nn/a CRM Maureen Williams 11/14/2022 GT.2023.01 CR.CRMTRAIN.TEAMTRAINIDENTINDIVIDUAL.R Expanded consideration #1.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.CO.PLASTICJOINTQUAL.P Added consideration #5 and 192.285(e).\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.CO.PLASTICJOINTQUAL.R Added consideration #2 and 192.285(e).\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.CO.PLASTICJOINTQUAL.O Added consideration #2 and 192.285(e).\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.CO.INSPECTVISUAL.R Added consideration #3 and 192.205; edited #2c.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.CO.REPAIR.P Added consideration #3a and 192.493; edited #3.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.CO.REPAIR.R Added consideration #2a and 192.493.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.CO.INSTALL.R Expanded consideration #1e; added 192.493.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.WELDPROCEDURE.WELDERQUAL.P Added consideration #4h for 192.227(c).\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.WELDPROCEDURE.WELDERQUAL.R Added consideration #1h for 192.227(c).\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.WELDPROCEDURE.WELDERQUAL.O Added consideration #1g for 192.227(c).\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.METALCOMPONENT.R Added 192.205 to question text and code ref.; added consideration #3.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.VALVE.R Added 192.205 to question text and code ref.; added consideration #2.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.FLANGE.R Added 192.205 to question text and code ref.; added consideration #2.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.STANDARDFITTING.R Added 192.205 to question text and code ref.; added consideration #4.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.ILIPASS.P Edited consideration #1.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.ILIPASS.R Edited consideration #1; added code ref. 192.493.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.TAP.R Added 192.205 to question text and code ref.; added consideration #3.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.WELDFABRICATE.R Added 192.205 to question text and code ref.; added consideration #2.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.WELDEDBRANCH.R Added 192.205 to question text and code ref.; added consideration #3.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.SUPPORT.R Added 192.205 code ref.; inserted consideration #2.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.DPC.AMAOP.R Added 192.205 to code ref.; added consideration #2.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.MA.GEN.R Added 192.205 to question text and code ref.; added consideration #3.\nn/a Construction (CIC) Joe K. / Diana Fehling 11/9/2022 GT.2023.01 DC.TQ.OQCONSTMAINT.P Added consideration #3 for ILI standards; added 192.493.\nemail Construction (CIC) Hans S. / Diana Fehling 11/10/2022 GT.2023.01 DC.COCMP.CMPGASDETECT.P/.R Added \"Design/Construction\" to title; deleted 192.736(b).\nemail Construction (CIC) Hans S. / Diana Fehling 11/10/2022 GT.2023.01 FS.CSSYSPROT.CMPGASDETOM.P/.R. Removed \"Design/Construction\" from title; added 192.736(b).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV (New \"Conversion-to-Service\" subgroup) x New DC.CONV subgroup for Conversion to Service (192.14)\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 CONVERSION (New \"Conversion-to-Service\" Directive) x New CONVERSION Directive for Conversion to Service (192.14)\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 SRN.DC-CONV.CONVERSION.S x New SRN.DC-CONV question for Conversion to Service. (192.14) DC.CONV.\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.NOTIFICATION.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.PROCEDURE.P x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.INTEGRITYMGMT.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.PHYSICALDEFECTS.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.UNSAFEDEFECTS.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.HCAPIR.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.HCAID.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.DP.CLASSLOCATION.P/.R Applied existing DC.DP.CLASSLOCATION.P/.R to new CONV Directive for Conversio\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.RISKASSESSMENT.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.DESIGN.R x New DC.CONV question for Conversion to Service. (192.14).\n1 of 5\n\n<<<PAGE 4>>>\n\nNew PRS FED.2023.01 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 22.12.12\nTicket # Owner Team Submitter/Owner/Lead Date Rcvd PRS Question ID (or other) New? Edit Details\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.CONSTRUCTION.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.OPSMAINTENANCE.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.OPSMAINTMODIF.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.HISTORICALRECORDS.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.MISSINGRECORDS.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.STRENGTHTESTING.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.IMPROGRAM.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.PMMEASURES.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.RECORDS.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a Construction (CIC) Diana Fehling 11/10/2022 GT.2023.01 DC.CONV.COMMISSIONING.P/.R x New DC.CONV question for Conversion to Service. (192.14).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 AR.CDA.CDACORR.R Added consideration #5.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 AR.LSR.LSREXTCORR.R Edited consideration #1 (added “calendar” year).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 AR.LSR.LSRINTCORR.R Edited consideration #2c (added “calendar” year).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.RA.RADATA.P Corrected typo consideration #6.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.BA.BAMETHODS.P Inserted new consideration #6 for Gas Rule.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.BA.BAMETHODS.R Inserted new consideration #3 for Gas Rule.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.BA.BASCHEDULE.P Edited consideration #3(a) and (b) for Gas Rule.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.LOWSTRESSREASSESS.P Added consideration #3(d).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.REASSESSINTERVAL.P Added consideration #5(e).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.LOWSTRESSREASSESS.R Added consideration #6.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.PERIODICEVAL.P Added consideration #2(e).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.PERIODICEVAL.R Added consideration #5.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.REASSESSINTERVAL.R Added considerations #1(b)(v) and #1(c)(v).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.REASSESSMETHOD.P Minor edit to consideration #1(d).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.REASSESSMETHOD.R Minor edit to consideration #1(d).\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.REASSESSWAIVER.P Added consideration #4.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.REASSESSWAIVER.R Added consideration #2.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.CA.REASSESSEXCPERF.P Minor edit to consideration #5.\nn/a GT IM Jeff Gilliam 7/21/2022 GT.2023.01 IM.QA.RECORDS.P Minor edits to considerations.\n6940 Gas Rule (GRIT) Rod Seeley 10/18/2022 GT.2023.01 MO.RECONFMATV.TESTMETHODS.R Added consideration #3; Corrected typo in question text.\nn/a Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 AR.PA.THREATID.P Inserted new consideration #3 for \"seismicity.\"\nn/a Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 DC.PT.PRESSTESTRECORD.P/.R Inserted new consideration #3 for linking test records to specific pipe.\nn/a Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 DC.SPT.SPIKEPRESSTEST.P Added consideration #2g.\nn/a Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 DC.SPT.SPIKEPRESSTEST.R Inserted new consideration #3.\nn/a Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 RPT.RR.ANNUALREPORT.R Removed question from the \"2019 Gas Rule\" Directive.\nn/a Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 MO.GOMAOP.MAOPLIMIT.P Removed question from the \"2019 Gas Rule\" Directive.\nn/a Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 MO.GM. TRAPSAFETY.P Inserted new consideration #3.\nn/a Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 MO.GM. TRAPSAFETY.R Revised question text for clarity; inserted new consideration #4.\n7052 Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 MO.GOCLASS.CLASSLOCATESTUDY.P/.R Moved to the top of the order to precede CLASSLOCATEREV.P/.R/.O.\n7062 Gas Rule (GRIT) Rod Seeley 11/17/2022 GT.2023.01 MO.RECONFMATV.TESTMETHODS.R Added consideration #3.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 DC.DPC.RMVINSTALLHCA.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 DC.DPC.RMVINSTALLHCA.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 DC.DPC.ASVFLOWMODEL.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 DC.DPC.ASVFLOWMODEL.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 DC.DPC.VALVESPACE.P Added consideration #3 and 192.179(e)-(h).\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.COMMSYS.P Inserted new considerations #1 and #2; deleted old #1 and #3.\n2 of 5\n\n<<<PAGE 5>>>\n\nNew PRS FED.2023.01 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 22.12.12\nTicket # Owner Team Submitter/Owner/Lead Date Rcvd PRS Question ID (or other) New? Edit Details\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.NOTIFPOTRUPTURE.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.VALVESHUTOFF.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.VALVESHUTOFF.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.NOTIFPOTRUPTURE.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.RUPTUREIDENTIF.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.PRESSREDUCESD.P Edited question text to address the Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.AUTHORITIES.P Edited question text and expanded consideration #1.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.INCIDENTACTIONS.P Deleted question, per Valve Rule team.\nn/a Valve Rule Team Rod Seeley GT.2023.01 GT.2023.01 EP.ERG.INCIDENTANALYSIS.P Deleted question after splitting into two separate questions.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.INCIDENTANALYSIS.R Deleted question after splitting into two separate questions.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.ERG.LIAISON.P Expanded consideration #1(a) & inserted #2; changed primary from 192.615(c) to\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII. Created new \"FII\" Failure & Incident Investigation Subgroup. x Created new \"FII\" Failure & Incident Investigation Subgroup.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII.INCIDENTANALYSIS.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII.INCIDENTRMVANALYSIS.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII.INCIDENTSUMMARY.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII.INCIDENTANALYSIS.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII.FAILUREANALYSIS.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII.FAILURERMVANALYSIS.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII.FAILURESUMMARY.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 EP.FII.FAILUREANALYSIS.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 IM.PM.PMMRMV.P (formerly PMMASORCV) Edited ID, title, question text, considerations #1, #3; added considerations #7, #8.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 IM.PM.PMMRMV.R (formerly PMMASORCV) Edited ID, title, question text, considerations #1, #8, #10; added considerations #1\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 MO.GM.AETREQUIREMENT.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 MO.GM.AETREQUIREMENT.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 MO.GM.RMVREMEDIAL.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 MO.GM.RMVREMEDIAL.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 MO.GM.ASVSHUTINPRESS.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 MO.GM.ASVSHUTINPRESS.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/24/2022 GT.2023.02 MO.GO.CLASSCHNGVALVSPACE.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/24/2022 GT.2023.02 MO.GO.CLASSCHNGVALVSPACE.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/24/2022 GT.2023.02 MO.GO.CLASSCHNGVALVSPACE.O x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 GT.2023.01 SRN.EP-FII. Created new SRN - \"FII\" Failure & Incident Investigation Screening Subgroup. x Created new SRN - \"FII\" Failure & Incident Investigation Screening Subgroup.\nn/a Valve Rule Team Rod Seeley 11/24/2022 GT.2023.02 SRN.EP-FII.FAILUREINVEST.S x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/24/2022 GT.2023.02 SRN.IM-PM.PMIMPGENERAL.S Added \"Note\" consideration for the Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/24/2022 GT.2023.02 SRN.IM-RA.RAMOD.S Added \"Note\" consideration for the Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/24/2022 GT.2023.02 SRN.MO-GO.OMPLANMOD.S Added \"Note\" consideration for the Valve Rule.\n6875 IA Team (IAT) Rod Seeley 11/17/2022 GT.2023.01 SRN.GENERAL.IDLEPIPE.S Inserted content from IDLERETURN.S, then deleted IDLERETURN.S.\n6875 IA Team (IAT) Rod Seeley 11/17/2022 GT.2023.01 SRN.GENERAL.IDLERETURN.S Moved content from IDLERETURN.S into IDLEPIPE.S, then deleted IDLERETURN.S.\n6927 UNGS Cathy W. 9/13/2022 GT.2023.01 UNGS.RPT.ANNUALREPORT.P Moved question to the bottom of the subgroup (#17).\n6927 UNGS Cathy W. 9/13/2022 GT.2023.01 UNGS.RPT.ANNUALREPORT.R Moved question to the bottom of the subgroup (#18).\nn/a UNGS Cathy W. 9/13/2022 GT.2023.01 UNGS.RPT.REGISTRYCHGSNOTIF.R Added consideration #3.\nn/a UNGS Cathy W. 11/1/2022 GT.2023.01 UNGS.RULE.FAQ27DRUGTEST.P/.R Edited question text and consideration #2, per UNGS team.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.DATASOURCES.P Edited considerations #4(b)(iii) and #4(c).\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.DATASOURCES.R Edited considerations #4(b)(iii) and #4(c).\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.THREATEVAL.P Deleted consideration #2; edited #3 and #6.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.THREATEVAL.R Deleted consideration #2; edited #5.\n3 of 5\n\n<<<PAGE 6>>>\n\nNew PRS FED.2023.01 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 22.12.12\nTicket # Owner Team Submitter/Owner/Lead Date Rcvd PRS Question ID (or other) New? Edit Details\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.THREATINTERACT.P Inserted new consideration #1.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.THREATINTERACT.R Inserted new consideration #1.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.RISKASSESSMETHOD.R Added new consideration #3.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.PREVMITIGMETHOD.R Edited consideration #1; inserted new #2.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.RISKMGMTEFFECTIVE.P Added new consideration #3.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.RESRISK.RISKMGMTEFFECTIVE.R Added new consideration #2.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.CAVERNRISK.THREATEVAL.P Deleted consideration #2; edited #4.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.CAVERNRISK.THREATEVAL.R Deleted consideration #2; edited #4 and #5.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.CAVERNRISK.THREATINTERACT.P Inserted new consideration #1.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.CAVERNRISK.THREATINTERACT.R Inserted new consideration #1.\nn/a UNGS Cathy W. 11/11/2022 GT.2023.01 UNGS.CAVERNRISK.RISKREASSESSINTRVL.R Minor edits to consideration #7.\nn/a UNGS Cathy W. 11/14/2022 GT.2023.01 UNGS.RESSITE.FENCES.R Expanded considerations #1 and #2.\nn/a UNGS Cathy W. 11/14/2022 GT.2023.01 UNGS.RESSITE.FENCES.O Expanded consideration #1.\nn/a UNGS Cathy W. 11/14/2022 GT.2023.01 UNGS.RESSITE.SIGNAGE.P Edited consideration #1.\nn/a UNGS Cathy W. 11/14/2022 GT.2023.01 UNGS.RESSITE.SIGNAGE.R Added consideration #2.\nn/a UNGS Cathy W. 11/14/2022 GT.2023.01 UNGS.RESSITE.EMERGPLAN.R Deleted question.\nn/a UNGS Cathy W. 11/14/2022 GT.2023.01 UNGS.RESSITE.EMERGPLANDRILLS.R Inserted consideration #2.\nn/a UNGS Cathy W. 11/14/2022 GT.2023.01 UNGS.RESSITE.ERTRAINING.R Inserted new consideration #1; expanded #2.\nn/a UNGS Cathy W. 11/14/2022 GT.2023.01 UNGS.RESSITE.BLOWOUTPLAN.P Inserted new consideration #1; edited #3.\nHL HL HL HL HL HL\nn/a CRM Maureen Williams 11/14/2022 HL.2023.01 CR.CRMGEN.CRMMGMT.P Edited consideration #3 to include reference to the IA Library for the cited docum\nn/a CRM Maureen Williams 11/14/2022 HL.2023.01 CR.CRMGEN.CRMIMPLEMENT.R Edited question text and replaced considerations #1 - #4.\nn/a CRM Maureen Williams 11/14/2022 HL.2023.01 CR.CRMCMGT.CHANGECOORDINATION.P Edited question text.\nn/a CRM Maureen Williams 11/14/2022 HL.2023.01 CR.CRMCMGT.CHANGECOORDINATION.R Edited question text and added considerations #3 and #4.\nn/a CRM Maureen Williams 11/14/2022 HL.2023.01 CR.CRMCMGT.FIELDCONTACT.P Edited question text and added new consideration #5.\nn/a CRM Maureen Williams 11/14/2022 HL.2023.01 CR.CRMCMGT.FIELDCHANGES.R Edited question text and added new consideration #5.\nn/a CRM Maureen Williams 11/14/2022 HL.2023.01 CR.CRMTRAIN.TEAMTRAINCOMPLETE.P Moved consideration #3(l) into a new #4 and expanded to include\nhyperlinks and reference to the IA Library for the cited documents.\nn/a CRM Maureen Williams 11/14/2022 HL.2023.01 CR.CRMTRAIN.TEAMTRAINIDENTINDIVIDUAL.R Expanded consideration #1.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.VALVELOCATION.P Edited question text; edited consideration #1; added #1(g); added 195.260(g).\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.VALVELOCATION.R Replaced consideration #1c; expanded #1e; added #1g; added 195.260(g).\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.VALVELOCATION.O Replaced consideration #1c; expanded #1f; added #1h; added 195.260(g).\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.ASVFLOWMODEL.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.ASVFLOWMODEL.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.RMVINSTALLHCA.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.RMVINSTALLHCA.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.RMVINSTALL.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.RMVINSTALL.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 DC.CO.RMVINSTALL.O x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI. Created new \"FAI\" Failure & Accident Investigation Subgroup. x Created new \"FAI\" Failure & Accident Investigation Subgroup.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI.ACCIDENTANALYSIS.P (Moved from EP.ERL) Moved question from EP.ERL to new EP.FAI; replaced consideration #1; added #2\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI.ACCIDENTRMVANALYSIS.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI.ACCIDENTSUMMARY.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI.ACCIDENTANALYSIS.R (From EP.ERL) Moved question from EP.ERL to new EP.FAI and added consideration #2 for Valve\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI.FAILUREANALYSIS.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI.FAILURERMVANALYSIS.P x New question to address Valve Rule.\n4 of 5\n\n<<<PAGE 7>>>\n\nNew PRS FED.2023.01 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 22.12.12\nTicket # Owner Team Submitter/Owner/Lead Date Rcvd PRS Question ID (or other) New? Edit Details\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI.FAILURESUMMARY.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.FAI.FAILUREANALYSIS.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.ERL.LIAISON.P Edited consideration #1a and inserted new #2.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.ERL.NOTICES.P Inserted new consideration #2 and added #6.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.ERL.NOTIFPOTRUPTURE.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.ERL.VALVESHUTOFF.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.ERL.VALVESHUTOFF.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.ERL.NOTIFPOTRUPTURE.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.ERL.RELEASEREDUCE.P Edited question text; added considerations #2 and #3.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 EP.ERL.NOTIFY911.P Inserted considerations #1b, #1c, #1d.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 IM.PM.PMMEFRD.P/.R Changed question ID to IM.PM.PMMEFRDREQUIRED.P/.R.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 IM.PM.PMMEFRDREQUIRED.P (formerly PMMEFRD.P) Edited ID, title; inserted considerations #1b and #2.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 IM.PM.PMMEFRDREQUIRED.R (formerly PMMEFRD.R) Edited ID, title; inserted considerations #1b and #2.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 IM.PM.PMMEFRDOTHER.P x New - Split from PMMEFRDREQUIRED. New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 IM.PM.PMMEFRDOTHER.R x New - Split from PMMEFRDREQUIRED. New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.VALVEMAINT.P Moved question to #1 in the order.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.VALVEMAINTSEMIANN.P Moved question to #2 in the order; edited title, question text, and considerations\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.AETREQUIREMENT.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.AETREQUIREMENT.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.RMVREMEDIAL.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.RMVREMEDIAL.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.ASVSHUTINPRESS.P x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.ASVSHUTINPRESS.R x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.VALVEMAINT.O Moved question from #5 to #11; edited consideration #2.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 MO.LM.DYNAMICRISER.R Moved question to the bottom of the group (#12).\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 SRN.DC-CO.CONSTRUCTION.S Added \"Note\" consideration for the Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 SRN.EP-FAI. Created new SRN - \"FAI\" Failure & Accident Investigation Screening Subgroup. x Created new SRN - \"FAI\" Failure & Accident Investigation Screening Subgroup.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 SRN.EP-FAI.FAILUREINVEST.S x New question to address Valve Rule.\nn/a Valve Rule Team Rod Seeley 11/23/2022 HL.2023.01 SRN.IM-PM.PREVMITIGIMPL.S Added \"Note\" consideration for the Valve Rule.\n6875 IA Team (IAT) Rod Seeley 11/17/2022 HL.2023.01 SRN.GENERAL.IDLEPIPE.S Inserted content from IDLERETURN.S, then deleted IDLERETURN.S.\n6875 IA Team (IAT) Rod Seeley 11/17/2022 HL.2023.01 SRN.GENERAL.IDLERETURN.S Moved content from IDLERETURN.S into IDLEPIPE.S, then deleted IDLERETURN.S.\n6820 Typo only. Tony 7/12/2022 HL.2023.01 MO.EW.EXTWEATHERINSPIMPL.R Corrected question text typo. Replaced \"and\" with \"an.\"\n6426 CRM B. Coy 2/22/2022 HL.2023.01 SRN.CR-CRMCMGT.CHGMGMT.S Deleted reference to SRN.GENERAL.NEWFACILITIES.S, which had been deleted.\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 SRN.TDC-620REGS.TK620.S Revised and expanded question and considerations.\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 TDC.620 (New Directive with 33 Questions) x Created new \"New API 620 Tank Design & Construction\" Directive.\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 TDC.620REGS Subgroup (New. 16 questions) x Created new IA Subgroup for \"New API 620 Tank Construction.\"\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 TDC.620DESIGN Subgroup (New. 12 questions) x Created new IA Subgroup for \"New API 620 Tank Construction.\"\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 TDC.620FAB Subgroup (New. 6 questions) x Created new IA Subgroup for \"New API 620 Tank Construction.\"\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 TDC.620WELDING Subgroup (New. 8 questions) x Created new IA Subgroup for \"New API 620 Tank Construction.\"\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 TDC.620INSP Subgroup (New. 8 questions) x Created new IA Subgroup for \"New API 620 Tank Construction.\"\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 TDC.620HYDRO Subgroup (New. 4 questions) x Created new IA Subgroup for \"New API 620 Tank Construction.\"\nn/a BOT Greg Puth 10/17/2022 HL.2023.01 TDC.620MARKING Subgroup (New. 2 questions) x Created new IA Subgroup for \"New API 620 Tank Construction.\"\n5 of 5","truncated":false,"body_characters":33512}