{"operation":"document","citation":"PHMSA IA FED.2023.02","title":"IA Content FED.2023.02","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"2023-06-29","effective_on":"2023-06-29","summary":"IA Content FED.2023.02 Jun 29, 2023 Federal Content Question Content GT - Created a new “Gas Gathering Type B & C (RIN-3)” Directive and applied 150 questions presented 156 times. Includes 3 new questions (AR.RCOM.GGREMEDIATION.P/.R/.O) GD - Added and edited GD questions to accommodate the 2022 Valve Rule GT - Added 19 questions to the “Conversion to Service” Directive, for the Construction Team GT - Added questions ","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2023-02.json","markdown":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2023-02.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2023-02","source_url":"https://primis.phmsa.dot.gov/IA-Releases/ia-release-notes/notes/iac-fed.2023.02","body":"IA Content FED.2023.02\n\nJun 29, 2023\n\nFederal Content\n\nQuestion Content\n\nGT - Created a new “Gas Gathering Type B & C (RIN-3)” Directive and applied 150 questions presented 156 times. Includes 3 new questions (AR.RCOM.GGREMEDIATION.P/.R/.O)\n\nGD - Added and edited GD questions to accommodate the 2022 Valve Rule\n\nGT - Added 19 questions to the “Conversion to Service” Directive, for the Construction Team\n\nGT - Added questions to the “Baseline Procedures (Form 1)” and “Baseline Records (Form 1) Directive\n\nHL - Added questions to the “Baseline Procedures (Form 3)” and “Baseline Records (Form 3) Directive\n\nGD and GT - Created a new DC.PLASTIC subgroup and moved numerous plastic-only questions from various other subgroups into DC.PLASTIC so that plastic pipe construction would be stand-alone. Added several new plastics questions\n\nGT - Applied new feature expandable/collapsible considerations to:\n\nNew header “Additional Considerations for Gathering Lines (Type B & C)” for 150 GT questions\n\nExisting header “For Pipeline Commissioning” considerations for 51 GT questions\n\nGD, GT, & HL - Standardized PHMSA ADB naming convention for consistency (“ADB-YYY-SS”)\n\nGD and GT - Added two documents to the IA Library in the Guidance folder\n\nGT and HL - Corrected various typos.\n\nSee summary document for more details.\n\n<<<PAGE 1>>>\n\nOverview Summary of IA Federal 2023.02 Changes (June, 2023)\nItem Description\n1 GT - Created a new \"Gas Gathering Type B & C (RIN-3)\" Directive and applied 150 questions presented\n156 times. Includes 3 new questions (AR.RCOM.GGREMEDIATION.P/.R/.O). (Chris McLaren).\n2 GD - Added and edited GD questions to accommodate the 2022 Valve Rule. (Chris McLaren).\n3 GT - Added 19 questions to the \"Conversion to Service\" Directive, for the Construction Team. (Diana\nFehling).\n4 GT - Added questions to the \"Baseline Procedures (Form 1)\" and \"Baseline Records (Form 1) Directive,\nand\nHL - Added questions to the \"Baseline Procedures (Form 3)\" and \"Baseline Records (Form 3) Directive,\nfor Dave Lykken / State Programs.\n5 GD and GT - Created a new DC.PLASTIC subgroup and moved numerous plastic-only questions from\nvarious other subgroups into DC.PLASTIC so that plastic pipe construction would be stand-alone. Added\nseveral new plastics questions. (Chris McLaren, Geralda Severe, Plastics Team, Diana F.).\n6 GT - Applied new feature expanbdable/collapsible considerations to:\n* New header “Additional Considerations for Gathering Lines (Type B & C)” for 150 GT questions.\n* Existing header \"For Pipeline Commissioning\" considerations for 51 GT questions.\n7 GD, GT, & HL - Standardized PHMSA ADB naming convention for consistency (\"ADB-YYY-SS\"), which were\nrequested by the IAT.\n8 GD and GT - Added two documents to the IA Library in the Guidance folder.\n9 GT and HL - Corrected various typos, which were provided by the IAT's QA/QC.\nPage 1 of 21\n\n<<<PAGE 2>>>\n\nNew PRS FED.2023.02 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 23.06.26 (Sent to RS and LC).\nSource Ticket # Owner Team Submitter / Owner /\nLead\nDate Rcvd Final PRS Question ID (or other) Issue(s)? Edit Details\nGD GD GD GD GD GD GD GD GD\nCM email\n4/5/23\nCM email\n4/5/23\nCM email\n3/30/23\nCM email\n3/30/23\nCM email\n3/30/23\nCM email\n4/6/23\nCM email\n4/6/23\nCM email\n4/6/23\nCM email\n4/6/23\nCM email\n3/30/23\nCM email\n3/30/23\nCM email\n3/30/23\nCM email\n3/30/23\nCM email\n3/30/23\nCM email\n3/30/23\nN/A Plastics Team Chris McLaren 4/5/2023 GD.2023.02 DC.CO.PLASTICJOINTQUAL.P Moved to new\nAdded consideration #5 and code reference to include new (2019) 192.285(e) code.\nN/A Plastics Team Chris McLaren 4/5/2023 GD.2023.02 DC.CO.PLASTICJOINTQUAL.R Moved to new\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.CO.PLASTICJOINT.R New Q in DC.PLASTIC\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.CO.PLASTICJOINTINSP.O New Q in DC.PLASTIC\nDC.PLASTIC subgroup.\nDC.PLASTIC subgroup.\nsubgroup.\nsubgroup.\nAdded consideration #5 and code reference to include new (2019) 192.285(e) code.\nNew question copied from GT; Applied to INSTRASTATE supgroup SUBEJOIN; Applied to\nNew question copied from GT; Applied to INSTRASTATE supgroup FIELDPIPE; Applied to\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.DP (Deleted Subgroup) Deleted DC.DP subgroup. After moving the questions into DC.PLASTIC, deleted the DC.DP \"Design of Pipe\"\nN/A Plastics Team Chris McLaren 4/6/2023 GD.2023.02 DC.DP.DESIGNPRESSPLASTIC.P New Q in DC.PLASTIC\nsubgroup.\nN/A Plastics Team Chris McLaren 4/6/2023 GD.2023.02 DC.DP.DESIGNPRESSPLASTIC.R New Q in DC.PLASTIC\nsubgroup.\nN/A Plastics Team Chris McLaren 4/6/2023 GD.2023.02 DC.DPC.PLASTICFITTING.P New Q in DC.PLASTIC\nsubgroup.\nN/A Plastics Team Chris McLaren 4/6/2023 GD.2023.02 DC.DPC.PLASTICFITTING.R New Q in DC.PLASTIC\nsubgroup.\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.MA.PLASTIC(SPECS).P New Q in DC.PLASTIC\nsubgroup.\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.MA.PLASTIC(SPECS).R New Q in DC.PLASTIC\nsubgroup.\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.MA.PLASTIC(SPECS).O New Q in DC.PLASTIC\nsubgroup.\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.MA.MARKING.P Re-Pres to DC.PLASTIC\nTQ.QUOMCONST\n\"Baseline PRO.\"\n\"Baseline PRO.\"\nSubgroup.\nNew question copied from GT and edited; Applied to INSTRASTATE presentation\nSUBLMAOP subgroup and \"Baseline Procedures (Form 2)\" directive.\nNew question copied from GT and edited; Applied to INSTRASTATE presentation\nSUBLMAOP subgroup and \"Baseline Records (Form 2)\" directive.\nNew question copied from GT and edited; Applied to INSTRASTATE presentation\nSUBLMAOP subgroup and \"Baseline Procedures (Form 2)\" directive.\nNew question copied from GT and edited; Applied to INSTRASTATE presentation\nPRESSURETEST subgroup and \"Baseline Records (Form 2)\" directive.\nNew question copied from GT; Applied to INSTRASTATE supgroup SUBLMAOP; Applied to\n\"Baseline PRO.\"\nNew question copied from GT; Applied to INSTRASTATE supgroup PRESSURETEST;\nApplied to \"Baseline PRO.\"\nNew question copied from GT; Applied to INSTRASTATE supgroup FIELDPIPE; Applied to\n\"Baseline PRO.\"\n\"Baseline PRO.\"\nNew question copied from GT; Applied to INSTRASTATE supgroup PRESSURETEST;\nApplied to \"Baseline PRO.\"\nNew question copied from GT; Re-Pres to DC.PLASTIC; Applied to INSTRASTATE supgroup\nSUBLPRESSTEST; Applied to \"Baseline PRO.\"\nNew question copied from GT; Re-Pres to DC.PLASTIC; Applied to INSTRASTATE supgroup\nSUBLNORMOPS; Applied to \"Baseline PRO\" and \"OQ Field Inspection (Form 15).\"\nNew question copied from GT; Applied to INSTRASTATE supgroup SUBLMAOP; Applied to\nsubgroup.\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.MA.MARKING.R Re-Pres to DC.PLASTIC\nsubgroup.\nN/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 DC.PT.PRESSTESTPLASTIC.P New Q in DC.PLASTIC\nsubgroup.\nCM email3/30/23 N/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 TQ.QUOMCONST.PLASTIC.P New Q in\nsubgroup.\nCM email3/30/23 N/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 TQ.QUOMCONST.PLASTIC.R New Q in\nTQ.QUOMCONST\nNew question copied from GT; Re-Pres to DC.PLASTIC; Applied to INSTRASTATE supgroup\nSUBLNORMOPS; Applied to \"Baseline PRO\" and \"OQ Field Inspection (Form 15).\"\nsubgroup.\nCM email3/30/23 N/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 TQ.QUOMCONST.PLASTIC.O New Q in\nTQ.QUOMCONST\nNew question copied from GT; Re-Pres to DC.PLASTIC; Applied to INSTRASTATE supgroup\nFIELDPIPE; Applied to \"Baseline PRO\" and \"OQ Field Inspection (Form 15).\"\nsubgroup.\nCM email3/30/23 N/A Plastics Team Chris McLaren 3/30/2023 GD.2023.02 TQ.QUOMCONST.PLASTICINSPECT.P New Q in\nTQ.QUOMCONST\nNew question copied from GT; Re-Pres to DC.PLASTIC; Applied to INSTRASTATE supgroup\nSUBEJOIN; Applied to \"Baseline PRO\" and \"OQ Field Inspection (Form 15).\"\nsubgroup.\nCM email3/6/23 N/A GD Team Chris McLaren 3/6/2023 GD.2023.02 GDIM.RA.INFORMATION.P N/A Added consideration #3(b) for mechanical leak repair clamps.\nCM email3/6/23 N/A GD Team Chris McLaren 3/6/2023 GD.2023.02 GDIM.RA.INFOCONSIDERED.P N/A Added consideration #5(b) for mechanical leak repair clamps.\nCM email3/6/23 N/A GD Team Chris McLaren 3/6/2023 GD.2023.02 GDIM.RA.INFOCONSIDERED.R N/A Added consideration #2(b) for mechanical leak repair clamps.\nCM email3/6/23 N/A GD Team Chris McLaren 3/6/2023 GD.2023.02 GDIM.RA.OUTSIDESOURCES.P N/A Added consideration #2(b) for mechanical leak repair clamps.\nCM email3/6/23 N/A GD Team Chris McLaren 3/6/2023 GD.2023.02 GDIM.RA.OUTSIDESOURCESIMPL.R N/A Added consideration #5(b) for mechanical leak repair clamps.\nDL email;\nN/A O&M Team D. Lykken / Rod S. 3/30/2023 GD.2023.02 EP.ERG.LIAISON.P Electric / Other Util not\n1) Edited question text and considerations #2 and #3 regarding \"911 call centers.\"\nLC email\nEnforceable - DL/ZB.\n2) Edited ADB naming (ADB-2005-03) in Consideration #2 and reference.\nADB Format - Code Refs\nDL email;\nLC email\nN/A O&M Team D. Lykken / Rod S. 3/30/2023 GD.2023.02 EP.ERG.LIAISON.R Electric / Other Util not\nEnforceable - DL/ZB.\nCorrect ADB Format.\n1) Edited question text regarding \"911 emergency call centers\" and consideration #8;\n2) Edited code to 192.603(b);\n3) Edited ADB naming (ADB-2005-03) in Consideration #8 and reference.\n2 of 21\n\n<<<PAGE 3>>>\n\nNew PRS FED.2023.02 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 23.06.26 (Sent to RS and LC).\nSource Ticket # Owner Team Submitter / Owner /\nLead\nDate Rcvd Final PRS Question ID (or other) Issue(s)? Edit Details\nLC N/A O&M Team IAT (LC & RS) 3/8/2023 GD.2023.02 EP.ERG.LIAISON.P ADB Format Corrected ADB naming to ADB-2005-03. (6/23; TF).\nLC N/A O&M Team IAT (LC & RS) 3/8/2023 GD.2023.02 EP.ERG.LIAISON.R ADB Format Corrected ADB naming to ADB-2005-03. (6/23; TF).\nLC N/A CRM Team IAT (LC & RS) 3/8/2023 GD.2023.02 CR.SCADA.BACKUPSCADADEV.P (X2) ADB Format Corrected ADB naming to ADB-2003-09; ADB-1999-03. (6/23; TF).\nLC N/A CRM Team IAT (LC & RS) 3/8/2023 GD.2023.02 CR.CRMFM.FATIGUERISKS.P ADB Format Corrected ADB naming to ADB-2005-06. (6/23; TF).\nLC N/A Corrosion Team IAT (LC & RS) 3/8/2023 GD.2023.02 TD.CPEXPOSED.EXPOSEINSPECT.P ADB Format Corrected ADB naming to ADB-2003-05. (6/23; TF).\nLC N/A Corrosion Team IAT (LC & RS) 3/8/2023 GD.2023.02 TD.CP.POST1971.P ADB Format Corrected ADB naming to ADB-2006-03. (6/23; TF).\nLC N/A Corrosion Team IAT (LC & RS) 3/8/2023 GD.2023.02 TD.CP.POST1971.R ADB Format Corrected ADB naming to ADB-2006-03. (6/23; TF).\nLC N/A Corrosion Team IAT (LC & RS) 3/8/2023 GD.2023.02 TD.CPEXPOSED.EXPOSEINSPECT.R ADB Format Corrected ADB naming to ADB-2003-05. (6/23; TF).\nLC N/A Corrosion Team IAT (LC & RS) 3/8/2023 GD.2023.02 TD.CPEXPOSED.EXPOSEINSPECT.O ADB Format Corrected ADB naming to ADB-2003-05. (6/23; TF).\nLC N/A OQ Team IAT (LC & RS) 3/8/2023 GD.2023.02 TQ.OQ.CHANGENOTIFY.P ADB Format Corrected ADB naming to ADB-2009-03. (6/23; TF).\nGT GT GT GT GT GT GT GT GT\nCM email\n4/5/23\nDL email;\nLC email\nDL email;\nLC email\nN/A Plastics Team Chris McLaren 4/5/2023 GT.2023.02 DC.CO.PLASTICJOINTQUAL.P Moved to new\nN/A O&M Team D. Lykken / Rod S. 3/30/2023 GT.2023.02 EP.ERG.LIAISON.P N/A O&M Team D. Lykken / Rod S. 3/30/2023 GT.2023.02 EP.ERG.LIAISON.R DC.PLASTIC subgroup.\nElectric / Other Util not\nEnforceable - DL/ZB.\nADB Format - Code Refs\nElectric / Other Util not\nEnforceable - DL/ZB.\nADB Format - Code Refs\nRevised consideration #2 to reflect updated 192.285(c) code.\n1) Edited question text and consideration #4 regarding \"911 call centers.\"\n2) Edited ADB naming (ADB-2005-03) in Consideration #3 and reference.\n3) Added question to the \"GG - Type B & C. (RIN-3)\" Directive and 2 related considerations, per the\nRule Implementation Team.\n1) Edited question text to add \"911 emergency call centers\";\n2) Edited text in consideration #8;\n3) Edited code to 192.603(b);\n4) Edited ADB naming (ADB-2005-03) in Consideration #8 and reference;\n5) Added question to the new \"GG - Type B & C. (RIN-3)\" Directive.\n6) Added new considerations under new \"Additional Considerations for Gathering Lines\" header.\nEdited considerations; Changed primary from 192.103 to 192.121.\nCM email\n4/6/23\nCM email\n4/6/23\nD.Fehling\n3/23\nD.Fehling\n3/23\nCM email\n4/6/23\nCM email\n4/6/23\nD.Fehling\n3/23\nD.Fehling\n3/23\nD.Fehling\n3/23\nLykken 2/23\nemail\nLykken 2/23\nemail\nLykken 2/23\nemail\nR.Seeley\nemail 4/17\nN/A Plastics Team Chris McLaren 4/6/2023 GT.2023.02 DC.DP.DESIGNPRESSPLASTIC.P Moved to new\nDC.PLASTIC subgroup.\nN/A Plastics Team Chris McLaren 4/6/2023 GT.2023.02 DC.DP.DESIGNPRESSPLASTIC.R Moved to new\nEdited consideration #1; Added #2 and #3.\nDC.PLASTIC subgroup.\nN/A Construction Team /\nPlastics Team\nN/A Construction Team /\nPlastics Team\nC. McLaren /\nD. Fehling\nC. McLaren /\nD. Fehling\n3/30/2023 GT.2023.02 DC.DP.DESIGNLIMITPLASTIC.P Cited code 192.123 no\nDeleted question, per the Construction Team and Plastics Team. Cited code 192.123 no\nlonger exists\n3/30/2023 GT.2023.02 DC.DP.DESIGNLIMITPLASTIC.R Cited code 192.123 no\nDeleted question, per the Construction Team and Plastics Team. Cited code 192.123 no\nlonger exists\nN/A Plastics Team Chris McLaren 4/6/2023 GT.2023.02 DC.DPC.PLASTICFITTING.P Moved to new\nDC.PLASTIC subgroup.\nN/A Plastics Team Chris McLaren 4/6/2023 GT.2023.02 DC.DPC.PLASTICFITTING.R Moved to new\nDC.PLASTIC subgroup.\nlonger exists.\nlonger exists.\nEdited question text and considerations; Changed primary from 192.191 to 192.143(c)\nb/c 192.191 no longer exists.\nEdited question text and considerations; Changed primary from 192.191 to 192.143(c)\nb/c 192.191 no longer exists.\nN/A Construction Team D. Fehling 3/23/2023 GT.2023.02 \"Conversion to Service\" Directive. N/A Applied 19 additional GT questions to the \"Conversion to service\" (per 192.14) Directive.\nN/A Construction Team D. Fehling 3/23/2023 GT.2023.02 DC.MA.MARKING.P Re-Pres to new\nRevised consideration #1(a) to reflect updated IBR D2513-18a; Deleted consideration #5.\nN/A Construction Team D. Fehling 3/23/2023 GT.2023.02 DC.MA.MARKING.R Re-Pres to new\nDC.PLASTIC subgroup.\nDC.PLASTIC subgroup.\nEdited consideration #1(a) code from 192.63(a)(2) to 192.63(a); Edited #1(b) to D2513-\n18a and 193.63(a).\nN/A Added question to the GT \"Baseline Procedures (Form 1)\" Directive.\nN/A O&M Team D.Lykken /\n2/23/2023 GT.2023.02 MO.GM.TRAPSAFETY.P State Programs\nN/A O&M Team D.Lykken /\n2/23/2023 GT.2023.02 MO.GM.TRAPSAFETY.R State Programs\nN/A O&M Team D.Lykken /\n2/23/2023 GT.2023.02 MO.GM.TRAPSAFETY.O State Programs\nN/A PA & DP Team R.Seeley / IAT 4/17/2023 GT.2023.02 PD.PA.EDUCATE.R N/A Added question to the GT \"Baseline Records (Form 1)\" Directive.\nN/A Added question to the GT \"Baseline Field Inspection (Form 1)\" Directive.\nN/A Edited question text to a single question; Expanded consideration #1.\nIAT / RS / LC N/A Construction Team D. Fehling 3/23/2023 GT.2023.02 DC.DPCCMP.CMPSAFETYEQUIP.R Code Errata Shortened code reference in considerations from 192.171(a)(b)(c)(d)(e) to 192.171, per\nthe Construction Team (6/23; TF)\nN/A N/A Construction Team IAT (LC & RS) 2/22/2023 GT.2023.02 DC.DPC.RMVINSTALLHCA.R Code Errata Corrected code typo in consid #4 from 195.636(c) to 192.636(c), per IAT QA/QC.\nLC N/A Gas Rule Team (GRIT) IAT (LC & RS) 2/22/2023 GT.2023.02 MO.MCA.MAOPRECONFIRM.P Code Errata Corrected code typo in consid #2 from 192.632(a)(iv) to 192.632(a)(2)(iv), per IAT\nQA/QC.\n3 of 21\n\n<<<PAGE 4>>>\n\nNew PRS FED.2023.02 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 23.06.26 (Sent to RS and LC).\nSource Ticket # Owner Team Submitter / Owner /\nLead\nDate Rcvd Final PRS Question ID (or other) Issue(s)? Edit Details\nLC N/A Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.CO.HAZARD.P ADB Format Edited ADB naming to \"ADB-2022-01\" and added link in Consideration #1.\nLC N/A CRM Team IAT (LC & RS) 3/8/2023 GT.2023.02 CR.CRMTRAIN.TEAMTRAINCOMPLETE.P ADB Format Edited ADB naming to \"ADB-2014-02\" in Consideration #4 and reference.\nLC N/A Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.DPC.CCCATHPROTDES.P ADB Format Edited ADB naming to \"ADB-2003-06\" in Consideration #1(d).\nLC N/A O&M Team IAT (LC & RS) 3/8/2023 GT.2023.02 AR.PTI.PRESSTESTRESULT.R ADB Format Corrected ADB naming to ADB-2004-01. (6/23; TF).\nLC N/A Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.MA.GEN.P ADB Format Corrected ADB naming to ADB-2009-01. (6/23; TF).\nLC N/A Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.MA.GEN.R ADB Format Corrected ADB naming to ADB-2009-01. (6/23; TF).\nLC N/A Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.MA.STEELPIPE.P ADB Format Corrected ADB naming to ADB-2009-01. (6/23; TF).\nLC N/A Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.DPC.CCEXTRNLPROT.P ADB Format Corrected ADB naming to ADB-2003-06. (6/23; TF).\nLC N/A Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.CO.REPAIR.P ADB Format Corrected ADB naming to ADB-2010-03. (6/23; TF).\nLC LC O&M Team IAT (LC & RS) 3/8/2023 GT.2023.02 EP.ERG.LIAISON.P ADB Format Corrected ADB naming to ADB-2005-03. (6/23; TF).\nLC LC O&M Team IAT (LC & RS) 3/8/2023 GT.2023.02 EP.ERG.LIAISON.R ADB Format Corrected ADB naming to ADB-2005-03. (6/23; TF).\nLC LC Corrosion Team IAT (LC & RS) 3/8/2023 GT.2023.02 TD.CP.POST1971.P ADB Format Corrected ADB naming to ADB-2006-03. (6/23; TF).\nLC LC Corrosion Team IAT (LC & RS) 3/8/2023 GT.2023.02 TD.CP.POST1971.R ADB Format Corrected ADB naming to ADB-2006-03. (6/23; TF).\nLC LC Corrosion Team IAT (LC & RS) 3/8/2023 GT.2023.02 TD.CPEXPOSED.EXPOSEINSPECT.P ADB Format Corrected ADB naming to ADB-2003-05. (6/23; TF).\nLC LC Corrosion Team IAT (LC & RS) 3/8/2023 GT.2023.02 TD.CPEXPOSED.EXPOSEINSPECT.R ADB Format Corrected ADB naming to ADB-2003-05. (6/23; TF).\nLC LC Corrosion Team IAT (LC & RS) 3/8/2023 GT.2023.02 TD.CPEXPOSED.EXPOSEINSPECT.O ADB Format Corrected ADB naming to ADB-2003-05. (6/23; TF).\nLC LC CRM Team IAT (LC & RS) 3/8/2023 GT.2023.02 CR.SCADA.BACKUPSCADADEV.P (X2) ADB Format Corrected ADB naming to ADB-2003-09; ADB-1999-03. (6/23; TF).\nLC LC CRM Team IAT (LC & RS) 3/8/2023 GT.2023.02 CR.CRMFM.FATIGUERISKS.P ADB Format Corrected ADB naming to ADB-2005-06. (6/23; TF).\nLC LC Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.TQ.EXCAVATE.R ADB Format Corrected ADB naming to ADB-2006-01. (6/23; TF).\nLC LC Construction Team IAT (LC & RS) 3/8/2023 GT.2023.02 DC.TQ.EXCAVATE.O ADB Format Corrected ADB naming to ADB-2006-01. (6/23; TF).\nLC LC O&M Team IAT (LC & RS) 3/8/2023 GT.2023.02 SRN.MO-GOMAOP.MAOPVALID.S ADB Format Corrected ADB naming to ADB-2012-06. (6/23; TF).\nLC LC OQ Team IAT (LC & RS) 3/8/2023 GT.2023.02 TQ.OQ.CHANGENOTIFY.P ADB Format Corrected ADB naming to ADB-2009-03. (6/23; TF).\nLC LC OQ Team IAT (LC & RS) 3/8/2023 GT.2023.02 TQ.QU.EXCAVATE.P ADB Format Corrected ADB naming to ADB-2006-01. (6/23; TF).\nLC LC OQ Team IAT (LC & RS) 3/8/2023 GT.2023.02 TQ.QU.EXCAVATE.R ADB Format Corrected ADB naming to ADB-2006-01. (6/23; TF).\nLC LC OQ Team IAT (LC & RS) 3/8/2023 GT.2023.02 TQ.QU.EXCAVATE.O (also in refs) ADB Format Corrected ADB naming to ADB-2006-01. (6/23; TF).\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 AR.RCOM.GGREMEDIATION.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 AR.RCOM.GGREMEDIATION.R N/A New Question. Added to new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 AR.RCOM.GGREMEDIATION.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.REVIEW.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.REVIEW.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.LOCATION.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.INCIDENTDATA.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.NOTICES.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.NOTICES.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.COMMSYS.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.RESPONSE.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.READINESS.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.READINESS.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.PUBLICPRIORITY.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.PRESSREDUCESD.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.PUBLICHAZ.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.AUTHORITIES.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.NOTIFY911.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.NOTIFY911.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.OUTAGERESTORE.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.POSTEVNTREVIEW.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.POSTEVNTREVIEW.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.LIAISON.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 EP.ERG.LIAISON.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 MO.GOMAOP.MAOPDETERMINE.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 MO.GOMAOP.MAOPLIMIT.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\n4 of 21\n\n<<<PAGE 5>>>\n\nNew PRS FED.2023.02 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 23.06.26 (Sent to RS and LC).\nSource Ticket # Owner Team Submitter / Owner /\nLead\nDate Rcvd Final PRS Question ID (or other) Issue(s)? Edit Details\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 MO.GOMAOP.MAOPDETERMINE.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 MO.GOMAOP.MAOPLIMIT.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 MO.RW.ROWMARKER.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 MO.RW.LEAKAGE.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 MO.RW.LEAKAGE.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.DP.PDPROGRAM.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.DP.ONECALL.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.DP.EXCAVATEMARK.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.DP.TPD.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.DP.TPDONECALL.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.DP.ONECALL.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.DP.PDPROGRAM.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.ASSETS.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.AUDIENCEID.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.MGMTSUPPORT.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.PROGRAM.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.AUDIENCEID.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.MESSAGES.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.SUPPLEMENTAL.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.EDUCATE.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.LOCATIONMESSAGE.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.MESSAGEFREQUENCY.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.LIAISON.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.LANGUAGE.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.LANGUAGE.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.EVALPLAN.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.EVALIMPL.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.AUDITMETHODS.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.PROGRAMIMPROVE.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.EVALEFFECTIVENESS.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.MEASUREOUTREACH.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.MEASUREUNDERSTANDABILITY.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.MEASUREBEHAVIOR.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.MEASUREBOTTOM.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.PA.CHANGES.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 PD.RW.ROWMARKER.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.NR.19218NOTIF.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.NR.19218NOTIF.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.ANNUALREPORT.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.IMMEDREPORT.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.IMMEDREPORT.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.INCIDENTREPORT.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.INCIDENTREPORTSUPP.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.INCIDENTREPORT.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.INCIDENTREPORTSUPP.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.SRCR.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.SRCR.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.OPID.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 RPT.RR.OPID.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.ATM.ATMCORRODE.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.ATM.ATMCORRODE.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.ATM.ATMCORRODEINSP.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.ATM.ATMCORRODEINSP.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.ATM.ATMCORRODEINSP.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\n5 of 21\n\n<<<PAGE 6>>>\n\nNew PRS FED.2023.02 PRS Summary Update (Contents Edits) Listing - FINAL - Rev. 23.06.26 (Sent to RS and LC).\nSource Ticket # Owner Team Submitter / Owner /\nLead\nDate Rcvd Final PRS Question ID (or other) Issue(s)? Edit Details\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.MONITORCRITERIA.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.MONITORCRITERIA.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.MONITORCRITERIA.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.TEST.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.TEST.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.CURRENTTEST.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.CURRENTTEST.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.CURRENTTEST.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.REVCURRENTTEST.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.REVCURRENTTEST.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.REVCURRENTTEST.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.DEFICIENCY.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.DEFICIENCY.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.TESTSTATION.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.TESTSTATION.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.TESTSTATION.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.TESTLEAD.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.TESTLEAD.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.TESTLEAD.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.INTFRCURRENT.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.INTFRCURRENT.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.INTFRCURRENT.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.RECORDS.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CPMONITOR.RECORDS.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.POST1971.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.POST1971.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.PRE1971.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.PRE1971.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.PRE1971.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.ALUMINUM.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.ALUMINUM.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.AMPHOTERIC.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.AMPHOTERIC.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.UNPROTECT.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.UNPROTECT.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.ELECISOLATE.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.ELECISOLATE.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.ELECISOLATE.O N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.ELECISOLATETEST.P N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.ELECISOLATETEST.R N/A Added considerations under new “Gathering Lines (Type B & C)” Header & Directive.\nChris M. N/A Rule Impl. Team Chris McLaren 4/13/2023 GT.2023.02 TD.CP.","truncated":true,"body_characters":122548}