{"operation":"document","citation":"PHMSA IA FED.2026.01","title":"IA Content FED.2026.01","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"2025-12-23","effective_on":"2025-12-23","summary":"IA Content FED.2026.01 Dec 23, 2025 Federal Content Question Content This update includes changes to GD, GT, and HL questions. GD: IA feedback informed edits and corrections. GT & HL: Construction Team made numerous content edits and updates. GT & HL: Inspection Development & Support (IDS) Team revised referenced standards, editions, and sections for Standards II IBR update. GT & HL: Inspection Development & Support ","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2026-01.json","markdown":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2026-01.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-ia-release-fed-2026-01","source_url":"https://primis.phmsa.dot.gov/IA-Releases/ia-release-notes/notes/iac-fed.2026.01","body":"IA Content FED.2026.01\n\nDec 23, 2025\n\nFederal Content\n\nQuestion Content\n\nThis update includes changes to GD, GT, and HL questions.\n\nGD: IA feedback informed edits and corrections.\n\nGT & HL: Construction Team made numerous content edits and updates.\n\nGT & HL: Inspection Development & Support (IDS) Team revised referenced standards, editions, and sections for Standards II IBR update.\n\nGT & HL: Inspection Development & Support (IDS) Team revised referenced standards, editions, and sections for SPRINT Rule IBR update.\n\nGT: GTIM Team made referenced standards updates related to IBR.\n\nSee summary document for more details.\n\n<<<PAGE 1>>>\n\nOverview Summary of IA Federal 2026.01 Changes - December 2025\nItem System\nType(s)\n1 GD\n2 GT & HL\n3 GT & HL\n4 GT & HL\n5 GT\nTeam & Update Description\nIA Feedback - Made edits and corrected typos.\nConstruction Team - Made numerous content edits and updates.\nInspection Development & Support (IDS) Team - Revised referenced standards, editions, and\nsections for Standards II IBR update.\nInspection Development & Support (IDS) Team - Revised referenced standards, editions, and\nsections for SPRINT Rule IBR update.\nGTIM Team - Made referenced standards updates related to IBR.\n6\nListing of Federal 2026.01 Protocol Revision Sets (PRSs):\nFederal PRS Edited for 2026.01\nDescription\nDA No\nDrug & Alcohol\nGas Distribution\nGD Yes\nGas Transmission\nGT Yes\nHL Yes\nHazardous Liquid\nLNG No\nLiquefied Natural Gas\nPage 1 of 1\n\n<<<PAGE 2>>>\n\nFEDERAL.2026.01 - DECEMBER 2025 PRS Summary Update. FINAL SUBMITTED 25.12.23 (Excludes UNGS Citations). (TF)\nSource Owner Team Submitter / Owner Date Rcvd PRS Question ID (or other) New? Question Edit Details\nGD.2026.01 GD.2026.01 GD.2026.01\nIA fdbk GD IA feedback 10/2/2025 GD.2026.01 LPG (NFPA58 + NFPA59) group Corrected typo in title.\nIA fdbk GD IA feedback (DK) 6/25/2025 GD.2026.01 RPT.RR.OPID.R 2026.01 - Added to Intrastate presentation, per IA feedback. (12/25; TF)\nD. Kuhtenia GD IA feedback (DK) 8/15/2025 GD.2026.01 MO.RW.ROWMARKER.P 2026.01 - Moved CGA Best Practices from Code Ref to Guidance field, per DK. (12/25; TF)\nD. Kuhtenia GD IA feedback (DK) 8/15/2025 GD.2026.01 MO.RW.ROWMARKER.O 2026.01 - Moved CGA Best Practices from Code Ref to Guidance field, per DK. (12/25; TF)\nD. Kuhtenia GD IA feedback (DK) 8/15/2025 GD.2026.01 MO.RW.ROWMARKERABOVE.O 2026.01 - Moved CGA Best Practices from Code Ref to Guidance field, per DK. (12/25; TF)\nGT.2026.01 GT.2026.01 GT.2026.01\nEmail Construction Team Wayne C. / Diana F. 11/13/2025 GT.2026.01 MO.RW.ROWMARKER.P 2026.01 - Added to the CTS Directive, per Constr Team. (12/25; TF)\nEmail Construction Team Wayne C. / Diana F. 11/13/2025 GT.2026.01 MO.RW.ROWMARKER.O 2026.01 - Added to the CTS Directive, per Constr Team. (12/25; TF)\nEmail Construction Team Wayne C. / Diana F. 11/13/2025 GT.2026.01 SRN.DC-CONV.CONVERSION.S 2026.01 - Added to the CTS Directive, per Constr. Team. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.EC.ECDAREGION.R 2026.01 - Replaced considerations, per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.IL.ILIREVIEWQUAL.P 2026.01 - Edited consideration #4 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.IL.ILISPECS.P 2026.01 - Edited standard issue item (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.IL.ILIACCEPCRITERIA.P 2026.01 - Edited consideration #1 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCHCA.SCHEDULE.P 2026.01 - Edited consideration #1 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCHCA.SCHEDULE.R 2026.01 - Edited consideration #1 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCHCA.IMMEDIATE.P 2026.01 - Edited consideration #1 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCHCA.IMMEDIATE.R 2026.01 - Edited consideration #1 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCHCA.ONEYEAR.P 2026.01 - Edited consideration #1d (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCHCA.ONEYEAR.R 2026.01 - Edited consideration #1d (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCNONHCA.IMMEDIATE.P 2026.01 - Edited consideration #1 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCNONHCA.IMMEDIATE.R 2026.01 - Edited consideration #1 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCNONHCA.TWOYEAR.P 2026.01 - Edited consideration #1d (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCNONHCA.TWOYEAR.R 2026.01 - Edited consideration #1d (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RCNONHCA.REMEDIATION.O 2026.01 - Edited consideration #6 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.RMP.CRACKNDT.P 2026.01 - Edited secondary reference (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.PA.ASSESSMETHODS.P 2026.01 - Edited consideration #6 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 AR.PA.THREATID.R 2026.01 - Edited consideration #3 (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 IM.BA.BASCHEDULE.P 2026.01 - Edited consideration #3a (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail GTIM Jeff Gilliam 11/5/2025 GT.2026.01 IM.QA.IMNONMANDT.P 2026.01 - Edited question text (IBR), per GTIM Team / Jeff G. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.CO.REPAIR.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.CO.REPAIR.R 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.CO.INSTALL.R 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.DPC.VALVE.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.DPC.VALVE.R 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.DPC.VALVE.O 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.DPC.ILIPASS.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.DPC.ILIPASS.R 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.DPC.HOLDERS.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.DPC.HOLDERS.R 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.DPC.HOLDERS.O 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.PLASTIC.PLASTICHANDLING.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.PLASTIC.PLASTICHANDLING.R 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.PLASTIC.PLASTICHANDLING.O 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.MA.MARKING.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.MA.MARKING.O 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.TQ.OQCONSTMAINT.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.PLASTIC.PLASTICSPECS.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\nEmail Insp Devel & Suppt (IDS) David Y. / Rod S. 11/17/2025 GT.2026.01 DC.PLASTIC.PLASTICSPECS.R 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n1 of 5\n\n<<<PAGE 3>>>\n\nFEDERAL.2026.01 - DECEMBER 2025 PRS Summary Update. FINAL SUBMITTED 25.12.23 (Excludes UNGS Citations). (TF)\nSource Owner Team Submitter / Owner Date Rcvd PRS Question ID (or other) New? Question Edit Details\nEmail Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 GT.2026.01 DC.PLASTIC.PLASTICSPECS.O FS.CS.HOLDERLOC.O FS.CS.CMPCOMBUSTIBLE.P FS.CS.CMPCOMBUSTIBLE.R FS.CS.CMPCOMBUSTIBLE.O MO.RECONFMATV.OPPORTUNISTIC.O MO.RECONFM3.ECAREMAINDEFECTSILI.P MO.RECONFM3.ECAREMAINDEFECTSILI.R MO.AMAOP.ADDITIONALOM.P MO.AMAOP.ADDITIONALOM.R DC.DPC.VALVE.P DC.DPC.VALVE.R DC.DPC.VALVE.O DC.DPCCMP.CMPBLDGLOCATE.P DC.DPCCMP.CMPBLDGLOCATE.R DC.DPCCMP.CMPBLDGLOCATE.O DC.DPCCMP.CMPVENTILATE.R DC.PLASTIC.DESIGNPRESSPLASTIC.P DC.PLASTIC.PLASTICSPECS.P DC.PLASTIC.PLASTICSPECS.R DC.PLASTIC.PLASTICSPECS.O DC.VAULTS.VAULTWATER.P DC.VAULTS.VAULTWATER.R DC.VAULTS.VAULTWATER.O FS.CS.CMPNFPA70.O MO.GO.MOC.P RPT.NR.IMPERFRPT.P RPT.NR.IMPERFRPT.R TQ.QUIM.IMQC.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF).\nHL.2026.01 HL.2026.01 HL.2026.01\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.SPECS.P 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.SPECS.R Y 2026.01 - New R question, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.SPECS.O Y 2026.01 - New O question, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Diana F. 11/12/2025 HL.2026.01 DC.CO.INSPECTION.P (DF) Reviewed 10/28/25, no edits needed. (12/25; TF)\nEmail Construction Team Diana F. 11/12/2025 HL.2026.01 DC.CO.INSPECTION.O (DF) Reviewed 10/28/25, no edits needed. (12/25; TF)\nEmail Construction Team Diana F. 11/12/2025 HL.2026.01 DC.CO.LOCATION.P 2026.01 - Edited consideration #1, added #2 and #3, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Diana F. 11/12/2025 HL.2026.01 DC.CO.LOCATION.R 2026.01 - Replaced consideration #1, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Diana F. 11/12/2025 HL.2026.01 DC.CO.LOCATION.O 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.INSTALL.P 2026.01 - Edited question text; replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.INSTALL.R Y 2026.01 - New R question, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.INSTALL.O 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.INSTALLOFFSHORE.O / .R CONV 2026.01 - Converted question from O to R, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.COVER.P 2026.01 - Deleted considerations #1d - #1q; edited #2, added #3, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.COVER.R 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.COVER.O 2026.01 - Edited question text; replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.INSTALLABOVEGRND.P 2026.01 - Edited consideration #1, added #2, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.INSTALLABOVEGRND.R 2026.01 - Replaced consideration #1, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.INSTALLABOVEGRND.O 2026.01 - Replaced consideration #1, added #2, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.CLEAR.P 2026.01 - Replaced consideration #1, per Constr. Team / Diana F. (12/25; TF)\n2 of 5\n\n<<<PAGE 4>>>\n\nFEDERAL.2026.01 - DECEMBER 2025 PRS Summary Update. FINAL SUBMITTED 25.12.23 (Excludes UNGS Citations). (TF)\nSource Owner Team Submitter / Owner Date Rcvd PRS Question ID (or other) New? Question Edit Details\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.CLEAR.R Y 2026.01 - New R question, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.CLEAR.O 2026.01 - Replaced consideration #1, added #2, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.BACKFILL.P 2026.01 - Replaced consideration #1, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.BACKFILL.R Y 2026.01 - New R question, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.CO.BACKFILL.O 2026.01 - Edited question text, replaced consideration #1, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.INSTALL.P 2026.01 - Edited question text, replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.INSTALL.O 2026.01 - Edited question text, replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.COVER.P 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.COVER.R 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.COVER.O 2026.01 - Edited question text, replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.INSTALLABOVEGRND.P 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.INSTALLABOVEGRND.R 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.INSTALLABOVEGRND.O 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.CLEAR.P 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.CLEAR.O 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.BACKFILL.P 2026.01 - Edited question text, replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.PS.BACKFILL.O 2026.01 - Edited question text, replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.TQ.INSPECTORQUAL.P 2026.01 - Edited question text, replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.TQ.INSPECTORQUAL.R 2026.01 - Edited question text, replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Joe K. / Diana F. 11/12/2025 HL.2026.01 DC.TQ.INSPECTORQUAL.O 2026.01 - Edited question text, replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Gery B. / Diana F. 11/12/2025 HL.2026.01 DC.DN.VALVE.P 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Gery B. / Diana F. 11/12/2025 HL.2026.01 DC.DN.VALVE.R 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Gery B. / Diana F. 11/12/2025 HL.2026.01 DC.DN.VALVE.O 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Gery B. / Diana F. 11/12/2025 HL.2026.01 DC.DN.CO2FRACPROP.P 2026.01 - Replaced considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Gery B. / Diana F. 11/12/2025 HL.2026.01 DC.DN.CO2FRACPROP.R 2026.01 - Edited all considerations, per Constr. Team / Diana F. (12/25; TF)\nEmail Construction Team Gery B. / Diana F. 11/12/2025 HL.2026.01 DC.DN.CO2FRACPROP.O Y 2026.01 - New O question, per Constr. Team / Diana F. (12/25; TF)\nEmail Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 SRN.AR-IL.ILIUSE.S AR.SCC.SCCDAPLAN.P AR.SCC.SCCDAPREASSESS.R AR.IL.ILIIMPLPERQUAL.P AR.IL.ILIIMPLPERQUAL.R AR.PA.METHOD.P AR.PA.METHOD.R AR.PA.REVIEWQUAL.P AR.PA.STANDARDS.P AR.RMP.WELDINSPECT.R AR.RMP.CRACKNDE.P AR.RMP.CRACKNDE.R DC.DN.EXTERNALPRESS.R DC.DN.EXTERNALPRESS.O DC.DN.EXTLOAD.P DC.DN.EXTLOAD.R DC.DN.FITTING.P DC.DN.ILIPASS.P DC.DN.ILIPASS.R DC.DN.ILIPASS.O FS.TANKS.NONSTDINSP.P FS.TANKS.NONSTDINSP.R FS.TANKS.EXTINSP2510.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Fixed typo API 1104 edition during the Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised MSS Standard Practice SP-75 during the Stds II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n3 of 5\n\n<<<PAGE 5>>>\n\nFEDERAL.2026.01 - DECEMBER 2025 PRS Summary Update. FINAL SUBMITTED 25.12.23 (Excludes UNGS Citations). (TF)\nSource Owner Team Submitter / Owner Date Rcvd PRS Question ID (or other) New? Question Edit Details\nEmail Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Email Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 FS.TANKS.EXTINSP2510.R FS.TANKS.INTINSP2510.P FS.TANKS.INTINSP2510.R TDC.SHOP.BOSPEC.O FS.TS.INSPECTIONS.O FS.TS.IGNITION.P FS.TS.IGNITION.O FS.TS.IMPOUND.R FS.TS.IMPOUND.O FS.TS.REPAIRLEAKTEST.P FS.TS.REPAIRLEAKTEST.R MO.LOMOP.MOPDETERMINE.R TD.ICP.BOLINING.P TD.ICP.BOLINING.R TDC.650REGS.OVERFILLPROT.P TDC.650REGS.OVERFILLPROT.R TDC.650REGS.OVERFILLPROT.O TDC.650REGS.IGNITIONPROT.P TDC.650REGS.IGNITIONPROT.R TDC.650REGS.IGNITIONPROT.O TDC.650REGS.IMPOUNDMENT.P TDC.650REGS.IMPOUNDMENT.R TDC.650REGS.IMPOUNDMENT.O TDC.650FDN.SLIDING.R TDC.2510REGS.TANKSPEC.P TDC.2510REGS.OVERFILLPROT.P TDC.2510REGS.OVERFILLPROT.R TDC.2510REGS.OVERFILLPROT.O TDC.2510REGS.PRESSURERELIEFS.P TDC.2510REGS.PRESSURERELIEFS.R TDC.2510REGS.PRESSURERELIEFS.O TDC.2510REGS.UNAUTHENTRY.O TDC.2510DESIGN.TANKDESIGN.P TDC.2510DESIGN.TANKDESIGN.R TDC.2510DESIGN.DESIGNLIMITS.P TDC.2510DESIGN.FDNSUPPORTS.P TDC.2510DESIGN.FDNSUPPORTS.O TDC.2510DESIGN.SHUTOFFVALVES.P TDC.2510DESIGN.SHUTOFFVALVES.O TDC.2510DESIGN.FIREPROT.P TDC.2510DESIGN.FIREPROT.O TDC.2510DESIGN.DESIGNOBS.O TDC.2510SITING.SITINGSAFETY.P TDC.2510SITING.SITINGSAFETY.O TDC.2510SITING.IMPOUNDMENT .R TDC.2510SITING.IMPOUNDMENT.O TDC.SHOP.BOSPEC.O AR.RMP.REPLACESTD.R DC.DN.VALVE.P 2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Fixed minor typo during the Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Edited consid #1b; Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/2\n2026.01 - Edited consid #1b; Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/2\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for Standards II IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Edited API 6d to include (25th Edition),for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF)\n4 of 5\n\n<<<PAGE 6>>>\n\nFEDERAL.2026.01 - DECEMBER 2025 PRS Summary Update. FINAL SUBMITTED 25.12.23 (Excludes UNGS Citations). (TF)\nSource Owner Team Submitter / Owner Date Rcvd PRS Question ID (or other) New? Question Edit Details\nEmail Email Email Email Email Email Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) Insp Devel & Suppt (IDS) David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. David Y. / Rod S. 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 11/17/2025 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 HL.2026.01 DC.DN.VALVE.R DC.DN.FITTING.P FS.TS.FLOATINGROOF.P FS.TS.FLOATINGROOF.R TDC.650REGS.ROOFEGRESS.P TDC.650REGS.ROOFEGRESS.R 2026.01 - Edited API 6d to include (25th Edition),for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised MSS SP-75 to 2019 during the SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF)\n2026.01 - Revised referenced standard for SPRINT Rule IBR update, per David Y./IDS Team. (12/25; TF)\nLNG.2026.01 LNG.2026.01 LNG.2026.01\nThere were no content updates to the LNG Question Set.\n5 of 5","truncated":false,"body_characters":38782}