# TEXAS EASTERN TRANSMISSION LP (SPECTRA ENERGY CORP) — Gas transmission and gathering — incident on 2014-11-17

- **operation:** document
- **citation:** PHMSA Report 20140135
- **title:** TEXAS EASTERN TRANSMISSION LP (SPECTRA ENERGY CORP) — Gas transmission and gathering — incident on 2014-11-17
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2014-12-12
- **effective on:** 2014-11-17
- **summary:** Gas transmission and gathering incident. Reported cause: OTHER OUTSIDE FORCE DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 223 NATURAL GAS released, $2,000,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-0be5f017c0ddf937cdb21210.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-0be5f017c0ddf937cdb21210.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-0be5f017c0ddf937cdb21210
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident. Reported cause: OTHER OUTSIDE FORCE DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 223 NATURAL GAS released, $2,000,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20140135.

Operator ID: 19235.

Reported incident date: 11/17/2014 7:30.

Cause detail: ROUTINE OR NORMAL FISHING OR OTHER MARITIME ACTIVITY NOT ENGAGED IN EXCAVATION

Cause detail: ON THE MORNING OF NOVEMBER 17, 2014, A LARGE BARGE WAS BEING PUSHED BY A TUG IN 15 FOOT SEAS WHEN THE TUG LOST POWER. THE TUG COULD NOT REGAIN POWER IN A TIMELY MANNER. AN ANCHOR WAS DROPPED WHICH SNAGGED TEXAS EASTERN TRANSMISSION LP'S 16-INCH LINE 41-A-5 NATURAL GAS TRANSMISSION PIPELINE IN EAST CAMERON BLOCK 321. THE ANCHOR COMPLETELY SEVERED THE PIPELINE CAUSING A SUBSTANTIAL RELEASE OF NATURAL GAS.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: OTHER OUTSIDE FORCE DAMAGE — FISHING OR MARITIME ACTIVITY.

PHMSA indexed costs: $2,093,296 reported total cost, $1,079,375.488 in 1984 dollars, $2,578,473.7 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false
- **body characters:** 1420
