# MID LOUISIANA GAS CO — Gas transmission and gathering — incident on 1999-08-15

- **operation:** document
- **citation:** PHMSA Report 19990153
- **title:** MID LOUISIANA GAS CO — Gas transmission and gathering — incident on 1999-08-15
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 1999-09-21
- **effective on:** 1999-08-15
- **summary:** Gas transmission and gathering incident in VENICE, PLAQUEMINES County, LA. Reported cause: DAMAGE BY OUTSIDE FORCE. Reported consequences: 0 fatalities, 0 injuries, $100,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-0d6816456afd2c1980c18ee0.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-0d6816456afd2c1980c18ee0.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-0d6816456afd2c1980c18ee0
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/bea0164f-672a-475e-986b-8e45e9634dbf?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20mid%201984%20to%202001.zip
**body:**

Gas transmission and gathering incident in VENICE, PLAQUEMINES County, LA. Reported cause: DAMAGE BY OUTSIDE FORCE. Reported consequences: 0 fatalities, 0 injuries, $100,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 19990153.

Operator ID: 12462.

Reported incident date: 19990815.

Cause detail: DRAGLINE CAUGHT PIPE WITH ONE TOOTH OF BUCKET.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.

PHMSA indexed costs: $100,000 reported total cost, $68,984.938 in 1984 dollars, $169,888.671 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false
- **body characters:** 949