# ENLINK LBU-GAS&LIQUIDS — Gas transmission and gathering — incident on 2019-03-04

- **operation:** document
- **citation:** PHMSA Report 20190036
- **title:** ENLINK LBU-GAS&LIQUIDS — Gas transmission and gathering — incident on 2019-03-04
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-03-29
- **effective on:** 2019-03-04
- **summary:** Gas transmission and gathering incident in Not Within a Municipality, DESOTO County, LA. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 1 NATURAL GAS released, $131,536 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-1a1784c60b36df969450f996.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-1a1784c60b36df969450f996.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-1a1784c60b36df969450f996
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident in Not Within a Municipality, DESOTO County, LA. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 1 NATURAL GAS released, $131,536 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20190036.

Operator ID: 32005.

Reported incident date: 3/4/2019 15:20.

Location detail: MP16.43

Cause detail: EXTERNAL CORROSION

Cause detail: DURING THE ANNUAL CP SURVEY, OPERATIONS PERSONNEL FOUND AN APPARENT SMALL LEAK INSIDE A CASING AT A RAILROAD CROSSING. THE LEL ON THE VENT PIPE WAS FOUND TO BE 15%. IF THE REPAIR COST DID NOT EXCEED THE $50,000 THRESHOLD, THIS INCIDENT WOULD NOT HAVE BEEN REPORTABLE. THE ACTUAL LEAK WAS A MINOR PIN HOLE INSIDE THE CASING. IT APPEARS THE COATING WAS DAMAGED DURING THE INITIAL INSTALLATION OF THE CROSSING. THE CASING WAS NOT SHORTED. THE ESTIMATED GAS LOSS IS <1MCF.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: CORROSION — EXTERNAL.

PHMSA indexed costs: $131,964 reported total cost, $62,075.264 in 1984 dollars, $152,324.338 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false