{"operation":"document","citation":"PHMSA Report 20130083","title":"MARSHALL COUNTY GAS DISTRICT — Gas transmission and gathering — incident on 2013-08-09","source_type":"incident","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2013-09-10","effective_on":"2013-08-09","summary":"Gas transmission and gathering incident in SCOTTSBORO, JACKSON County, AL. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 1110 NATURAL GAS released, $12,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-incident-22e8ae5f5aa6a03c7f704576.json","markdown":"https://regulus.evalyn.ai/document/phmsa-incident-22e8ae5f5aa6a03c7f704576.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-incident-22e8ae5f5aa6a03c7f704576","source_url":"https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip","body":"Gas transmission and gathering incident in SCOTTSBORO, JACKSON County, AL. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 1110 NATURAL GAS released, $12,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.\n\nReport number: 20130083.\n\nOperator ID: 12180.\n\nReported incident date: 8/9/2013 10:45.\n\nLocation detail: MM 83.8\n\nCause detail: EXCAVATION DAMAGE BY THIRD PARTY\n\nCause detail: EXCAVATION ISSUE\n\nCause detail: EXCAVATOR FAILED TO MAINTAIN CLEARANCE AFTER VERIFYING MARKS\n\nPHMSA trend classification: significant incident, not serious.\n\nPHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.\n\nPHMSA indexed costs: $170,902 reported total cost, $90,413.135 in 1984 dollars, $215,761.072 in current-year dollars.\n\nPHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.","truncated":false,"body_characters":1095}